Figure 3-9 Consultant's Organization Chart

Consultant Client
ITECO Nepal (P) Ltd. Department of Roads
PMHHP, Babarmahal, KTM

Team Leader
Sanat Prasad Upadhyay

Pavement / Material Traffic & Road Safety Geologist / Geotech Hydrologist Bridge/ Structural Environmental Civil Engineer Senior Surveyor
Engineer Engineer Engineers Engineer Engineer 1. Shyam Pd.
Utshav Subedi Upadhya Dhakal
Prakash Kumar Subhash Dhungel Tuk Lal Adhikari Gobinda Pd. Dr. Rajan Suwal Shiv Shankar 2. Satya Lal Pd.
Dhungana Poudel Karki Yadav

Support Staff

Office Manager
CAD Operators
Office Assistant
ITECO Nepal (P) Ltd Page 34
Detailed Survey, Engineering Design, Preparation of Contract
Documents DPR of Khurkot-Ghurmi Sector of Mid Hill Highway

Form 3G. Time Schedule for Professional Personnel


Months Number
Name Position Reports Due /Activities
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 of Months
Sanat Prasad Upadhyay Team Leader/Sr. Highway engineer As per Form 3E 6

Utshav Subedi Civil Engineer As per Form 3E 6

Tuk Lal Adhikari Geologist/Geotechnical engineer As per Form 3E 3


Key Professional staff

Prakash Kumar Dhungana Pavement engineer/Material Engineer As per Form 3E 2

Dr. Rajan Suwal Bridge/Structural Engineer As per Form 3E 2

Shiv Shankar Karki Environmentalist/Environmental Engineer As per Form 3E 3

Subash Dhungel Traffic and Road Safety Engineer As per Form 3E 2

Govinda Prasad Poudel Hydrologist As per Form 3E 3

Shyam Prasad Upadhya


Senior Surveyor As per Form 3E 3
Satya Lal Prasad Yadav

Total Man Months: 30

Supporting Staff

Madhu Sudan Aryal CAD Operator 3

Anil Tamrakar Office Assistant 2

Uddav Khanal Office Manager 2


Total Man Months: 7