Professional Documents
Culture Documents
Monitoring Harian Closing Defect
Monitoring Harian Closing Defect
Gedung Lantai
9 10 11 12 13 14 15
RA RI RA RI RA RI RA RI RA RI RA RI RA
Lt.1
Masjid (78 item) Lt.2
Façade
Lt.1
Auditorium (234 item) Lt.2
Lt.3
Gerbang (30 item)
Power House (34 item)
Petilasan (10 item)
Lt.1
Lt.2
Lt.3
Direktorat Lt.4
Lt.5
Lt.6
Façade
Lt.1
Lt.2
Lt.3
UKM Lt.4
Lt.5
Lt.6
Façade
Site Dev A
JPO
Lt.1
Lt.2
Lt.3
Lt.4
Kelas & Lab
Lt.5
Lt.6
Lt.7
Façade
Site Dev B
Schedule Ceklist BAST 1 Proyek Politeknik PUPR Semarang
November
15 16 17 18 19 20 21 22 23 24
RI RA RI RA RI RA RI RA RI RA RI RA RI RA RI RA RI RA RI
25 26 27 28 29 30
RA RI RA RI RA RI RA RI RA RI RA RI
Progress Harian Closing Defect Proyek Poilteknik PUPR Semarang
Tanggal Item 11/9/2022 Progress per Progress per
Gedung Lantai
Ceklist Defect close open Lantai Gedung
Gerbang Lt.1 40 5 35 13% 13%
Lt.1 78 53 25 68%
Masjid 68%
Lt.Dak - - - -
Lt.1 125 39 86 31%
Auditorium Lt.2 84 23 61 27% 26%
Lt. Dak 25 0 25 0%
Petilasan Lt.1 10 0 10 0% 0%
Power House Lt.1 34 0 34 0% 0%
Direktorat Lt.1 86 0 86 0% 0%