Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1 2 3 4 5 6 7 8

LEGEND:
A A

B B

D/S U/S
NOTES:-
'2'
C C
SECTIONAL ELEVATION

D D

TO MYSORE
A
HALF TOP

E E

TO MADIKERI
HALF BOTTOM

D/S U/S
A

F F

PLAN

G G

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500,
GENERAL ARRANGEMENT DRAWING OF
Fax: +91-80-41320989 Approved By: SK TITLE:
Member (Tech) BOX CULVERT FOR NEW CONSTRUCTION AT
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd.
NHAI HQ (Ministry of Road Transport & Highways)
DESIGN CH: 144+680
and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-CH-144+680-GA-001 R2 01 OF 02
1 2 3 4 5 6 7 8
Size: A2
1 2 3 4 5 6 7 8

A A

B B
'2'

DETAIL OF CURTAIN WALL TYPE-I DETAIL OF CURTAIN WALL TYPE-II


(DOWN STREAM SIDE) (UP STREAM SIDE)
C C

SECTION A-A

D D

E E

DETAIL-'2'
DETAIL-'1' DETAIL OF CONSTRUCTION JOINT

F F

G G

CLIENT: CONSULTANT: Feedback Infra Pvt. Ltd. STATUS: TENDER DRAWINGS


nd Drawn by: AKS
The Estate Building, 2 Floor, Construction of access controlled four laning with paved shoulder from Mysore
Next to Manipal Centre, to Kushalnagara section of NH‐275 from Design Ch. Km 122+200 (Existing Km 124.488)
Dickenson Road, Designed by: VVL near Guddehosur at start of Kushalnagara Bypass to Design Ch. Km 144+900 at
H F DBAC INFRA Bangalore - 560042
PROJECT:
Near Hemming Village/ SH‐21 Hassan ‐Periyapatna Road Junction on Hybrid Annuity H
Member (Tech) Making Infrastructure Happen Mode under Bharatmala Pariyojana in the state of Karnataka (Package‐II)
R2 Oct Package-II & III has been divided into Package-II,III,IV & V
Karnataka, INDIA Checked by: KAL
NHAI HQ Tel:- 91-80-42840500,
GENERAL ARRANGEMENT DRAWING OF
Fax: +91-80-41320989 Approved By: SK TITLE:
Member (Tech) BOX CULVERT FOR NEW CONSTRUCTION AT
R1 July Package-II & III has been divided into Package-II,III & IV National Highways Authority of India The information contained herein is Confidential & Property of Feedback Infra Pvt. Ltd.
NHAI HQ (Ministry of Road Transport & Highways)
DESIGN CH: 144+680
and not for Publication. The Information is Issued on the Understanding that no part Scale: Date:
Government of India thereof shall be Copied or Communicated to a Third Party without Authorisation in REV. SHEET:
REV DATE DESCRIPTION OF REVISIONS BY G-5 & 6, Sector-10, Dwarka, New Delhi-110075 Writing from Feedback Infra Pvt.Ltd. AS SHOWN OCT-2022 DRG NO.: FIPL-M-M-NH-275-TAED-723-BC-NEW-CH-144+680-GA-001 R2 02 OF 02
1 2 3 4 5 6 7 8
Size: A2

You might also like