2 Loose cable to be removed.

Lighting pole damaged by construction


3
work. Contractor to rectify the damage.
4 Damaged interlock to be replaced.

Whole board walk need deep cleaning


5
from concrete stamps and paint stamps.
Interlock need deep cleaning and proper
6
leveling around the lighting fixture.

Interlock around the lighting fixture need


7
proper leveling.
8 Damaged interlock to be replaced.

9 Construction works still in progress.


Interlock need deep cleaning on the whole
10
board walk.

11 Oil stamps to be deep cleaned.


Constrcution works still in progress.
12
Damaged interlock to be replaced.

Oil stamps to be deep cleaned. Damaged


13
curbstone to be maintained.
14 Whole interlock way need deep claning.

15 Damaged interlock to be replaced.


16 Interlock need deep cleaning.

17 Damaged curbstone to be replaced.


Road marking damaged to be painted
18
again.

19 Broken interlock to be replaced.


Road marking damaged to be painted
20
again.

Road marking damaged to be painted


21
again.
Road marking damaged to be painted
22
again.

Damaged curbstone to be maintained


23
properly.
24 Missing interlock to be installed.

25 Curbstone need deep cleaning.


26 Interlock need deep cleaning.

27 Interlock need deep cleaning.


28 Damaged curstone to be replaced.

Lighting pole damaged by construction


29
work. Contractor to rectify the damage.
30 Concrete pad to be finished properly.

Interlock need deep cleaning and proper


31
leveling around the lighting fixture.
Lighting pole damaged by construction
32
work. Contractor to rectify the damage.

Whole board walk need deep cleaning


33
from concrete stamps and paint stamps.
Proper finishing to be applied around the
34
manhole openings.

35 Area to be reinstated properly.


PUBLIC SERVICES - FACILITIES MAINTENANCE DEPARTMENT
FG 106 - Handover Snag List: CIVIL

Sn SNAG ITEM Photo/s Remarks

Detrioration of
interlock , Levelling
1
issues, aligning
issues

kerb stone to be
2
polished

3 leveling and grouting

to be cleaned and
4
polished

WO418_ GV Boundary Walls - Hnad-over Snags


Luis Cortez | Edwin Tomenio - CIVIL Page 1 of 3 UDC Public Services FM
PUBLIC SERVICES - FACILITIES MAINTENANCE DEPARTMENT
FG 106 - Handover Snag List: CIVIL

Sn SNAG ITEM Photo/s Remarks

Damaged interlocks (
5
Tens )

foundation not
6
levelled properly

Road Marking to be
7
re done

Manhole cover to be
8
finished

WO418_ GV Boundary Walls - Hnad-over Snags


Luis Cortez | Edwin Tomenio - CIVIL Page 2 of 3 UDC Public Services FM
PUBLIC SERVICES - FACILITIES MAINTENANCE DEPARTMENT
FG 106 - Handover Snag List: CIVIL

Sn SNAG ITEM Photo/s Remarks

Exposed Cables (
9
Dangerous )

10 Missing Tiles

Note:

WO418_ GV Boundary Walls - Hnad-over Snags


Luis Cortez | Edwin Tomenio - CIVIL Page 3 of 3 UDC Public Services FM