Professional Documents
Culture Documents
Typical Roadway Section - Normal Crown A: 3.05 3.05 1.5 1.5 Varies Varies (MIN) (MIN)
Typical Roadway Section - Normal Crown A: 3.05 3.05 1.5 1.5 Varies Varies (MIN) (MIN)
CL
VARIES 1.5 W 3.05 3.05 1.5 VARIES
(MIN) (VARIES) (MIN)
NOTE:
SLOPE VARIES e SLOPE -OUTER SHOULDER SLOPE SHALL NOT
e SLOPE SLOPE VARIES S=
2H EXCEED 7% OF CROSS OVER
:1V :1V
-e GREATER THAN 7.0% SHOULDER
2H
S=
SHALL BE PAVED
B TYPC
IALROADWAYSECTO
IN
F
-ULLSUPERELEVATO
IN
SCALE : 1:50 MTS.
PREPARED BY: PROJECT TITLE: SHEET CONTENTS: SUBMITTED TO: SHEET NO.
TYPICAL CROSS-SECTIONS
REPUBLIC OF THE PHILIPPINE
MARL JOHN F. PINEDA PROPOSED LOCAL ROAD AT BRGY. BASAK, LEBAK, SULTAN KUDARAT AND ROAD WAY SECTION W/ RCPC, CATCH ENGR. BERNADETH VENZON-DAPUN, M.
UNIVERSITY OF SOUTHERN MINDANAO
COLLEGE OF ENGINEERING AND COMPUTING
KABACAN, NORTH COTABATO
(STA. 0+000, STA. 1+220)
BASIN HEADWALL AT STATION 0+340 AND
STATION 0+800 16
LOCATION:
YEAR/COURSE/SECTION:
4/BSCE/B BRGY. BASAK, LEBAK, SULTAN KUDARAT DATE: DECEMBER 17, 2018