INTEGRATED PROJECT (ARC60904)

Assignment 1: DOCUMENTATION OF BUILDING PLAN SUBMISSION (Group Task)


Weightage: 40%
Submission date: Week 6

WATCHPOINT - Building Plans Submission Set

ITEM TO SHOW DO NOT SHOW


 Title of project  Do not include images
Cover Sheet  Full names and student number. Do not use initials / nickname of the building on the
 Tutor’s name coversheet
 Name of Firm
 Drawing list / content with reference no.
Table For Drawing Titles And Drawing Reference No.
No Drawing Title Drawing Ref. No.
1
2
3
SITE PLAN
Site Plan  Roads, driveways & traffic directions (to indicate width of road)
(1:200)  Lot boundary & building set-back lines
 Landscape buffer/setback (if applicable)
Key Plan  Portions of immediate surrounding lot including entrance roads
(nts) connecting
 Existing or proposed parking space/slots
Location Plan  Turfed areas, landscape, soft scape and other external features
(nts)  North Arrow to match Floor Plans orientation
Note:
 Site Plan to use the Roof Plan view for building, not Ground Floor
Plan

KEY PLAN
 Neighborhood landmarks
 Main road and street
 Arrow pointing to ‘The Site’
 North arrow facing up on the drawing sheet

LOCATION PLAN
 Main access roads leading to site
 Neighborhood landmark /housing/commercial areas
 Arrow pointing to ‘The Site’
 North arrow facing up on the drawing sheet

Integrated Project (ARC60904): August 2022 – Assignment 1 1|P a g e


 Room info/Finishes box in every room/spaces  Don’t show travel
Floor Plans  Finished floor level (FFL) at strategic locations distance lines
(Building Plans  Door & window indications  Don’t show plants,
Submission)  Rainwater downpipe system, discharging down to nearest manholes trees, loose furniture
(1:100) or drains or people
 Complete dimensioning (4 layers)  Don’t show tile
 Built-in furniture, if any patterns for toilets and
 Fixtures (toilet, sink and others) other rooms
 Complete and organized Grid Lines.  Don’t show sanitary
 Additional Specifications (other than mentioned in finishing box) piping discharge
 Staircase names layout
 Directional arrows for ramps and stairs  Don’t include
dimensions on
 Ramp gradient or pitch indicator
Note: windows, doors and
 Legends at every page: Finishes Code, Vent, Doors, Windows fenestration
 Table for Natural Lighting and Natural Ventilation Calculations for  Don’t show site details
each floor plans (and roof plan, if provided) and features on upper
 Site boundary to be shown on upper floor plans floor plans
 Show part of site on Ground Floor Plan only  Don’t indicate
 Upper level to show roof or canopy on the immediate floor below individual tread
numbering

 Allocation of water tanks, if any  Don’t show


Roof Plan  Lift motor room, if any diagrammatic
(1:100)  Skylight. If any rainwater outlets and
 Rainwater outlets, gutters distribution system
 Roof pitch degree
 Grid lines
 Dimensions
 Roof construction specification
 Show full roof tile hatching. Avoid cutting or showing just a portion
 Drop ceiling line  Don’t indicate door
2 x Sections  Wall hatching and window type
(1:100)  Footing/foundation  Don’t show plants,
 Earth/soil hatching trees, loose furniture
 Slab and beam hatching (if concrete) or people
 Room/spaces names  Dont show services
 Rainwater downpipe system, discharging down to nearest drains pipes, duct etc.
 Annotation and general specs.
 Vertical dimensions
 Column grids
 Finished Floor Level (FFL) and Road Level (RL)
 Room/space names
 Roof, canopy and others
 Roof construction specification
 Ground floor slab construction specification
Note:
 Do not cut section through columns
 Annotation and general specs.  Don’t indicate door
Elevations  Vertical dimensions and window type
Minimum 2  Column grids
(1:100)  Finish floor leveling (FFL)
 Complete roof hatching, do not cut portion
 Hatching of wall finishes, material and fixtures such as glass etc.
 External rainwater downpipe

Integrated Project (ARC60904): August 2022 – Assignment 1 2|P a g e


 Dimensions of doors and windows  Don’t have to include
Door & Window  Only for external windows (facing immediate outdoors). internal glass wall
Schedules  Curtain wall to be included under window schedule paneling
(1:50)  Specifications  Don’t show plan view
 Door Swing direction (dash line in elevation), hinge, knob and others for doors or windows
Note:
 Window and door schedule should be on separate sheet. Unless
the sheets have so much empty space, then can combine both in
one sheet
 ALL rooms, spaces including stores, staircases and corridors to be
Natural Lighting calculated. Ducts and risers to be excluded
&  Calculation for natural ventilation shall use only the area of the
Natural operable window panels
Ventilation  Calculations for natural lighting shall include both the area of the fixed
Schedules panels and the operable window panels
 One table for each individual floor plans
 Refer and follow sample table provided at the end of this document

Table For Natural Lighting And Natural Ventilation Calculations


Natural Lighting Natural Ventilation
Floor Required: Required:
Room/ Provided Provided
No Area 10% of 10% of
Space Action Action
(sq.m.) Floor Area Floor Area
sq.m. % sq.m. %
(sq.m.) (sq.m.)
1
2
3
Note:
 Under the ‘Action’ column, indicate the remedy in order to comply (if doesn’t comply) as below:
AL – using Artificial Lighting MV- using Mechanical Ventilation

WATCHPOINT - Bomba Plans Submission Set

SITE PLAN
Bomba Plans  Same as Site Plan for Building Plans Submission above but with
(1:100, submission additional yellow colour for Bomba appliances access roads
excluding Sections  Indicate Fire Hydrant location
and Elevations)  Additional Bomba Notes

FLOOR PLANS
 Same as Floor Plans for Building Plans Submission above but with
additional fire-fighting elements and fixtures including Fire-rated
doors, in red ink
 Legends to be included on every page: Finishes, Vent, Doors,
Windows with additional Bomba elements/fixtures code
 Table for Natural Lighting and Natural Ventilation Calculations for
each floor plan (and roof plan, if provided)
 Light Red colour on the fire compartment walls and party walls (over
the brick hatching)
 Boundary line to be indicated on every floor plan
 To indicate travel distance lines from the furthermost point to the
nearest exit in every floorplans.

CALCULATION
 Show purpose group, with calculation of occupancy load, and
staircase exit width
 Calculate of building floor area, and building volume, to check
compliance for UBBL 5th schedule on limits of compartmentation

Integrated Project (ARC60904): August 2022 – Assignment 1 3|P a g e


SEQUENCE OF DRAWINGS

1. Cover sheet
2. Building Plans Submission Set
i. Site Plan/Key Plan/Location Plan
ii. Floor Plans
iii. Roof Plan
iv. Sections
v. Elevations
vi. Door Schedule
vii. Window Schedule

3. Bomba Plans Submission Set


i. Site Plan/Key Plan/Location Plan
ii. Floor Plans
iii. Roof Plan

GENERAL REMINDER

1. To show brick hatching


2. To apply color coding for building plan submission drawings according to the relevant authority guidelines
3. To indicate fire path and travel distance from the furthermost point to the nearest fire exit on Bomba plans
4. Concrete elements (column, lift core, concrete wall etc.) on Plans and Sections to be similarly hatched
5. Line weights at least 3 different types
6. Each room to have Finishes Box indicating wall, floor, ceiling, skirting, a/c & ventilation, ceiling height (in mm) and room/area
size (in sq.m.). Make sure the size is appropriate according to drawing scale
7. Fire-fighting indication on Bomba plans to be in red colour (including party walls, fire compartment walls and fire staircase
wall)
8. Finished Floor Level (FFL) to be indicated at strategic locations, do not attached to Finishes Box. Make sure the size is
appropriate according to the drawing scale
9. Doors and windows indication to be shown on floor plans view.
10. All plans, sections and elevations to have the same scale
11. If possible, always try to draw plans with north arrow facing up or upward on the drawing sheet.