Received New Laptop (ASUS ROG STRIX G15) Printed Revised POW (TASMORIS Service Road 2022)
Printed PCR (TASMORIS Service Road 2021) Completed General Layout (TASMORIS Service Road
Completed Plan and General Layout (TASMORIS - Lara Drainage Canal)
Printed General Layout of TASMORIS Service Road 20Submitted Plan of Lara Drainage Canal (Including Gen
Staff House)
MEUR - Camiling RIS
ry (Special Non-working Holiday)
alayang/Aguiic Creek)
Site Inspection - Rizal Creek and Paludpud/Balanoy C DEUR/MEUR (San Miguel Lateral A and Balayang/Aguiic Creek)
Patling IP 2022 Plan (Completed, Printed and Submitted to Regional Office)
Printed Construction Logbook of San Bartolome PIP 2Travel Order (Paludpud/Balanoy Creek, La Paz, Tarlac)
Modification of Plan (TASMORIS 20M 2022 - La Paz) Final Billing Duly Signed @ Regional Office (San Bartolome PIP 2021)
Site Inspection and Measurement of Accomplishmen Preparation of First Billing (TASMORIS 160M 2022)
Travel Order (Paludpud/Balanoy Creek, La Paz, Tarlac)
Preparation of Requirements for Material Testing ( Travel Order (Paludpud/Balanoy Creek, La Paz, Tarlac)
Birthday Greetings for Sir JAM Actual Accomplishments & First Billing (TASMORIS 160M 2022)
DEUR/MEUR Revision (San Miguel Lateral A and Balayang/Aguiic Creek)
A and Balayang/Aguiic Creek)
General Layouts of CY 2023 Proposed Projects Travel Order - Rizal Creek and Paludpud/Balanoy Creek
Travel Order - Rizal Creek and Paludpud/Balanoy Creek
Preparation of Variation Order No. 1 (TASMORIS 160M 2022)
er, Amungan, Iba, Zambales
er, Amungan, Iba, Zambales
l Non-working Holiday)
Variation Order (TASMORIS 160M 2022)
Variation Order (TASMORIS 160M 2022) Pictures of TASMORIS 160M 2022
Variation Order (TASMORIS 160M 2022)
Travel Order - Cataguing Creek (c/o JCD)
Daily Inspector's Report of TASMORIS 160M 2022 Received Copy of Indorsement Letter of PCR of San Bartolome PIP 20
RZAM IMO Building
Taken Pictures of Solar Lights around NIA Compound Preparation of Accomplishment Report (June 16-30, 2022)
10:19-10:22 - Call from IA President of Rizal, La Paz, 11:00-14:00 - Preparation of Powerpoint Presentation of CY 2022 Com
13:00-16:00 - Preparation of Pouring Permit of TASMORIS 60M 2022
14:00-16:00 - Preparation of Pouring Permit of TASMORIS 60M 2022
08:35-08:40 - Photocopy of Petronilo S. Bondoc Files
11:20-11:30 - Preparation and Printing of Personal Da13:30-14:30 - Bought Materials needed for Design Seminar
10:45-11:00 - Received DCP T720DW Printer form Fr 16:40-16:41 - Submitted DTR to Joyce Maninang
s Seminar @ Camayan Beach Resort, Subic Bay Freeport Zone
s Seminar @ Camayan Beach Resort, Subic Bay Freeport Zone
s Seminar @ Camayan Beach Resort, Subic Bay Freeport Zone
08:30-09:15 - Preparation and printing of Accomplish 09:24-09:25 - Received CY 2018 PCR Files from Jeline
08:20-08:21 - Received copy of Travel Order of Desig Forwarded PCR of Bueno CIS 2018, Castillo PIP 2018 a
10:30-10:31 - Printing of PCR of Camiling RIS 47.58M 13:27-13:28 - Printing of PCR of Balutu 1 CIS 2017 (fo
08:37-08:43 - Went to Ma'am Helen Payas to get the 08:45-09:35 - Reediting and reprinting of PCR of Ca
09:45-09:55 - Received PCRs of 2018 Project and 201610:05-10:06 - Returned POW of 2016 Calamity Fund to
09:00-09:30 - Engineering Section Weekly Meeting 09:41-09:42 - Forwarded PCRs of CY 2018 & CY 2019 Projects to AGG
09:00-09:05 - Received PCRs of CY 2018 and CY 2019 09:41-09:42 - Forwarded PCRs of CY 2018 & CY 2019 Pr
13:25-13:41 - Editing of PCR of Rizal CIP 2018 13:45-14:50 - Preparation of PCR of Tarlac PIP 2020
09:30-10:45 - Printing of DIR and Pouring Permit of St11:00-11:25 - Finding of documents needed for prepar
11:00-16:00 - Travel Order - Camiling RIS
09:24-09:42 - Editing and printing of attachments to 09:43-09:44 - Submitted DTR of August 1-15, 2022 to
10:00-10:30 - Helped in arranging files at BAC Office 13:30-15:20 - Preparation of PCR of Lucong CIS 2020
MO Canal Visitation 2022
10:15-13:46 - Preparation of Summary of Material Testing of TASMORIS Service Road 2021
09:00-10:00 - Editing and printing of Summary of Ma 10:00-11:00 - Weekly Engineering Section Meeting a
and Photocopied documents needed for preparation of PCRs of CY 2018-2021 Projects at Regional Office
13:40-14:00 - Signed PCR of CY 2020 Projects (Kate Di14:00-14:10 - Signed PCR of San Bartolome PIP 2021
08:28-08:29 - Forwarded PCR and Summary of Material 08:58-08:59 - Received PCR and Summary of Material
c CIS 2021 and PRIS Anao 2021
08:30-09:30 - Printing of PCR of WBIIS - Bulelatin an 09:45-09:46 - Received PCR of CY 2018 Projects and
08:08-08:09 - Sent Plan of Hacienda Luisita PIP 2021 08:30-08:31 - Received PCR of Castillo CIS 2020, WBIIS
16:00-16:01 - Received PCR of WBIIS - Mangilog 2019 from Arjay Valencia (for signature)
09:10-09:11 - Forwarded DTR of August 16-31, 2022 t09:11-09:12 - Received copy of Travel Order (Septem
13:20-13:21 - Retruned POW and Progress Billing of TGIS District I 2018 and TGIS Victoria 2018 to Filing Room
09:00-09:20 - Meeting with Sir Arvin Musni regarding 09:25-11:27 - Preparation of PCR of TGIS District III 2
09:00-09:10 - Sent Pictures of San Bartolome PIP 202111:15-11:18 - Received call from RIBASAN IA President
08:06-08:07 - Borrowed POW and Progress Billing of TGI 08:35-08:37 - Borrowed POW of TASMORIS 10M EEEIS
10:00-11:00 - Editing of PCR of TGIS District III 2019 11:03-11:05 - Returned POW and Progress Billing of TGIS Districts I, II
09:33-09:34 - Borrowed POW and Progress Billing of L10:25-10:30 - Sent PCR sample (Lucong CIS 2020) to
08:36-08:37 - Received PCR of TGIS District I 2020 fro 08:57-09:00 - Borrowed Progress Billing of Lilibangan
08:10-08:11 - Received PCR of TASMORIS Service Road 08:15-08:17 - Borrowed Files of Iba-Sula CIS 2019 fro
10:20-10:26 - PCR of Camiling RIS 56M 2019 and Bamb 11:46-13:02 - Preparation of Inspection Report of
09:05-09:06 - Received PCR of Castillo CIS Phase 3 fr 09:06-09:07 - Forwarded PCR of TASMORIS - SMORIS 16
14:25 - 20:00 - Inspection of San Bartolome PIP and Magao CIP with NIA IAT
08:15-08:20 - Sent Approved Plans of Magao CIP and 08:53-08:54 - Forwarded POW and Progress Billing of P
10:45-11:15 - Listing of IA and IA President to be inv
tillo CIS 2023 Typhoon Damage
f NIA IAT at Regional Office
lo CIS 2023 Typhoon Damage
19:30-20:17 - Editing of PCR of TASMORIS TARRIS 50 20:25-21:29 - Editing of PCR of TASMORIS SMORIS 6
10:17-10:24 - Printing of PCR of TASMORIS 60M 202210:32-11:15 - Printing of PCR of TASMORIS San Migue
05:30-18:10 - Attended Training on Preparation of POW 21:00-23:00 - First Revision of Program of Works of Camiling RIS Main
ration of POW of Lined Projects at NIA Central Office
ration of POW of Lined Projects at NIA Central Office
09:00-12:00 - Editing of General Layout 14:00-20:00 - Helped in preparation for Inauguration of Engineering B
Melissa Dalimeg (D'Brothers International Trading Corp.) regarding the concerns of the NIA Inspection and Assessment Team
uilt Plan of Sta. Lucia CIP 2021
09:18-10:30 - Preparation of Revised As-Built Plan of 10:30-15:05 - Helped in preparation of documents needed to comply
10:06-10:10 - forwarded PCR of Bamban CIS 2019, Lili10:17-10:20 - forwarded PCR of Sta. Lucia CIP 2021, TASMORIS San M
13:15-13:18 - Printed Application for Leave (October 15:15-16:55 - Revision of POW of Castillo CIS Typh
ASMORIS Service Road 2022
09:46-09:50 - Received PCR of Lilibangan CIS 2019, B 09:50-10:00 - Editing and printing of Transmittal of
13:50-16:24 - Computation of Survey Data of Camiling RIS Lateral I (Manual)
09:30-16:10 - Computation of Survey Data of Camiling RIS Lateral H (Excel)
10:35-11:22 - Coordinate to Ma'am Melissa Dalimeg an 13:20-14:30 - Computation of Survey Data of Camiling R
13:23-13:24 - Received PCR of TASMORIS Service R 13:35-13:36 - PCR of TASMORIS Service Road 2021, TASMORIS Conve
09:30-11:05 - Weekly Engineering Section Meeting 12:15-12:16 - Received PCR of TASMORIS Service Ro
08:46-08:47 - Received PCR of TASMORIS - Aduas/Bal09:30-10:21 - Discussion about the preparation of
a of Camiling RIS Lateral H & I (Excel)
13:31-13:33 - Coordination with Ma'am Melissa Dalimeg (D'Brothers International Trading Corp.) and Harrison Dancel abo
e PIP about the repair of damaged electrical wirings of San Bartolome PIP Solar Pump
18:00-23:00 - Preparation of POW of Rio Chico River 394M 2023 Scheme 1
Chico River 394M 2023 Scheme 1
08:30-16:00 - Preparation of POW of Rio Chico River 394M 2023 Scheme 1
09:00-11:00 - Meeting of Engineering Section regardi 14:00-16:00 - Discussion about the second scheme of Rio Chico River
Chico River 394M (Scheme 2) 2023
stillo CIS 2023 Typhoon Damage (Class "A" Concrete unit cost derivation)
09:18-09:20 - Forwarded Revised POW of Castillo CIS 13:00-13:02 - Received Revised POW of Castillo CIS 2023 Typhoon Da
08:45-09:45 - Cleaning of office table and arranging of10:00-13:13 - Preparation of DIR of TASMORIS Servic
09:00-16:00 - Practice for presentation for Year-end Thanksgiving Party at Regional Office
PDS to Ma'am Helen Payas
Regional Office (won Camel Rice Cooker)
Work Force)
09:00:10:20 - Weekly Engineering Section Meeting 10:20-11:00 - Updating of Completed PCR List
14:00-14:01 - Received PCR of TASMORIS - Balayang and Aguiic Creek 2021 and TASMORIS - Tarlac RIS 2022 from Jean Pau
16:50-16:52 - Received PCR of San Bartolome PIP 2021 from Arvin Kenneth Santos
RIS Lateral H+I 2023
Works of TASMORIS Lateral B-1a 2023
09:00-10:30- Weekly Engineering Section Meeting 11:30-15:00 - Meeting with NIA Central Office PPD T
13:00-16:00 - Courtesy Call to LGU Officers of San Clemente, Tarlac
sed San Clemente SRIP
15:00-17:00 - Exit Conference of NIA CO PPD Team
09:40-10:00 - Answered ISO 9001:2015 Awareness Su10:00-15:00 - Sixth Revision of POW of Castillo CIS
08:55-10:00 - Preparation of SALN 2022 10:20-10:25 - Submitted SALN 2022 to Mary Ann Ferr
Road 2022)
Photocopy of Signed Capital Outlay Plans Submitted Revised POW (TASMORIS Service Road 2022)
Submitted General Layout of TASMORIS Service RoadSubmitted PCR (TASMORIS Service Road 2021)
m Pau Tiglao)
General Layouts Submitted to Regional Office (TASMORIS
Submitted General Layouts to Regional Office (Pit-ao
alayang/Aguiic Creek)
a Paz, Tarlac)
a Paz, Tarlac)
11:00-11:15 - Free Foods @ Lobby 13:30-17:00 - Preparation of DIR of Sta. Lucia CIP 202
14:30-17:10 - Logbook of Sta. Lucia CIP 2021 17:10 - Completed Logbook of Sta. Lucia CIP 2021
a. Lucia CIP 2021
14:30-17:00 - Last Day Celebration of Sir Cedrik Carlos before going to Zambales Interim IMO
10:50-10:51 - PCR of San Bartolome (First Revision) signed by LBB
or Design Seminar
09:55-09:56 - Sent PCR sample format to Ray Sison 11:05-12:00 - Engineering Section Meeting
09:30-10:30 - Edited Title Block of As-Built Plan of St 11:43-11:44 - Received PCR of Lucong CIS (2018, 201
15:28-16:02 - Printed PCR of Balutu 1 CIS 2016 and Camiling RIS 47.58M 2016 (for signature)
09:35-09:36 - Forwarder new appointment papers to 09:36-09:37 - Forwarded edited PCRs to Joyce Maninan
12:05-12:10 - Received PCR of Balutu 1 CIS (Calamit 12:15-13:16 - Received PCR of San Bartolome 2021 and Laoang CIS 20
11:10-13:26 - Inventory of submitted and completed 13:26-13:42 - Editing and printing of Certificate of Te
14:10-14:50 - Photocopying of Pictures of TASMORIS 15:00-15:10 - Photocopying of Material Testing of T
09:15-09:16 - Forwarded PCR of San Bartolome PIP 2010:20-10:21 - Received PCR of San Bartolome PIP 2021
09:47-09:48 - Scanning of Summary of Material Test 13:30-13:31 - Forwarded PCR of San Bartolome PIP 2
09:04-09:05 - Forwarded PCR of Castillo CIS 2020, WBI10:05-10:15 - Sent 100M Solar Pump Project files to
10:15-10:17 - Received PCR of Camiling RIS 20M 201813:30-15:00 - Scanning and editing of attachments to P
IA President
08:39 - 08:58 - Edited PCR of TASMORIS 10M NIS Exten 10:00-11:00 - Editing of PCR of TGIS District I 2019
s Billing of TGIS Districts I, II & III to Filing Room
10:35-14:55 - Preparation of PCR of Lilibangan CIS 20115:16-15:17 - Returned POW and Progresss Billing of Lilibangan CIS 2
09:15-09:35 - PCR of Camiling RIS 20M 2018, Camiling09:35-10:47 - Weekly Meeting of Engineering Section
08:20-08:21 - Forwarded POW of TASMORIS San Miguel 08:35-08:36 - Borrowed Progress Billing of TASMORI
13:25-13:30 - Filed Special Privilege Leave to Ma'am 14:30-14:31 - Received PCR of TASMORIS 16M 2019 from
09:30-09:34 - Sent PCR file to Jean Pauline Bote and 10:00-11:44 - Editing of PCR Status of CY 2022 Project
10:42-10:43 - Returned Progress Billing of Lilibang 10:46-10:47 - Borrowed POW and Progress Billing of
13:20-13:30 - Assigned to prepare POW for Typhoon 13:30-15:10 - Editing of Program of Works details
Assessment Team
10:15-10:20 - Received Transmittal of PCR of Liliba 10:29-10:30 - Received Transmittal of PCR of WBIIS
12:16-13:13 - Printing of Second Revision of POW of 13:16-13:17 - Forwarded Revised POW of Castillo CIS
15:30-15:35 - Received PCR of TASMORIS 10M 2022 from Harrison Dancel (for revision of IA President Name)
p.) and Harrison Dancel about the damaged electrical wirings of San Bartolome PIP Solar Pump
astillo CIS 2023 Typhoon Damage from Sir Arvin Musni (for signature of Ma'am Placida Cordero)
19:00-23:59 - Printing of POW of Camiling RIS Lateral H and I 2023, Camiling RIS Service Road 2023 (from Nehemiah Santo
da Cordero (for submission to Regional Office)
2023 Typhoon Damage forwarded to Mekaella Joyce Maninang (signed by Sir Arvin Musni and Ma'am Placida Cordero)
12:00-13:00 - Fourth Revision of POW of Camiling RIS 13:00-14:00 - Printing of Revised POW of Camiling RIS
rlac RIS 2022 from Jean Pauline Bote
15:00-16:00 - Preparation of PDS HRMIS Form 19:00-19:30 - Printing of Unit Cost Derivations of
10:25-10:30 - Received Brother Ink from Janelle Manalo
ce Road 2022)
10:20-11:00 - Reedited and Forwarded PCRs of Calam12:08-12:20 - Received PCRs of 2016 Calamity Fund from Sir Armen G
ome 2021 and Laoang CIS 2019 from Harrison Dancel
13:30-15:40 - Editing and Printing of PCR of Camiling 16:00-16:10 - Forwarded PCR of WBIIS - Bulelatin and Mangilog Area
10:15-11:40 - Edited and printed PCR of Camiling RIS 14:10-14:11 - Received PCR of WBIIS Pangasan 2021 an
09:30-10:20 - Printing of PCR of TGIS District I 2018 11:20-11:28 - Scanning of Parcellary Map of North Lawi
11:00-11:25 - Helped in printing Powerpoint Presentat13:00-15:27 - Editing and Printing of PCR of TGIS Distr
10:48-10:49 - Received PCR of WBIIS Bulelatin and Ma11:32-11:35 - Forwarded PCR of WBIIS Bulelatin and M
08:36-08:37 - Received POW of Iba-Sula CIS 2020 from09:55-09:56 - Borrowed Files of Iba-Sula CIS from Pe
16:00-16:46 - Preparation of attachments to DTR of 16:46-16:47 - Forwarded DTR of September 1-15, 2022 to Mikaella Jo
13:30-13:32 - Received PCR of TASMORIS - San Miguel13:32 - 22:30 - Preparation of documents needed for the inspection o
11:00-15:50 - Preparation and printing of Revised PCR of TASMORIS Service Road 2021
15:15-16:05 - Printing of Approved Plan of Sta. Lucia 16:05-17:00 - Editing of PCR of TASMORIS San Miguel Side 2022
10:31-10:32 - Forwarded PCR of Lilibangan CIS 2019, 10:35-15:50 - Preparation of Pouring Permit of TASM
14:55-14:56 - Received PCR of Balayang-Aguiic Creek 15:00-15:25 - PCR of TASMORIS - Tarlac RIS 10M 2018, TGIS District I
esident Name)
023 (from Nehemiah Santos), Balutu 1 CIS 2023 Typhoon Damage (from Arjay Valencia), Camiling RIS Magsaysay Dam 2023 (from Rede
ida Cordero)
14:00-14:10 - Revised POW of Camiling RIS Lateral H+I 2023 forwarded to Sir Arvin Musni (for signature)
ulelatin and Mangilog Area 2018, Calamay CIS 2018, TGIS District I 2020, Camiling RIS 20M 2018, Lucong CIS 2020 and WBIIS - Balnges
14:20-14:25 - Printing of Folder Cover of Parcellary M15:00-16:00 - Editing of PCR of TGIS Victoria 2018
15:50-15:51 - Received PCR of Castillo CIS Phase 3 2 16:00-17:50 - Helped in printing Powerpoint Presentation of Staff Me
11:35-12:15 - Editing and printing of PCR of Lilibangan13:30-15:30 - Site Inspection of TDC Projects 2022
10:23-10:31 - Scanning and editing of POW and Final Bi 11:40-12:02 - Preparation of PCR of Iba-Sula CIS 2020
er 1-15, 2022 to Mikaella Joyce Maninang (for signature)
needed for the inspection of San Bartolome PIP, Magao CIP and Sta. Lucia PIP with NIA IAT
IS 10M 2018, TGIS District I 2018, TGIS District I 2019, TASMORIS Service Road 5.5M 2019, TASMORIS 16M 2019, TASMORIS - SMORIS
aysay Dam 2023 (from Redentor Campanilla) and Sto. Rosario Caagusan Creek CIS 2023 (from Arjay Valencia) with help from Mikaella
of Calamay CIS 2018 (for signature)
S 2020 and WBIIS - Balnges Dam 2020 to Harrison Dancel (for signature of IA President)
16:45-16:48 - Received PCR of WBIIS Bulelatin and Mangilog 2018, Camiling RIS 20M 2018, Camiling RIS CCAW 2018, Cami
14:15-14:16 - Received PCR of WBIIS Bulelatin and Ma14:30-15:40 - Preparation of submission of 11 PCRs to
eek 2022 & Camiling RIS (15M) 2022 to Harrison Dancel (for signature of IA President)
2019, TASMORIS - SMORIS 60M 2022, Camiling RIS 15M and Camiling RIS Baybayaoas 100M 2022 signed by Kate Dianne Estrada (for s
a
Fair