Professional Documents
Culture Documents
Uc3 Asmep Design Development Drawing
Uc3 Asmep Design Development Drawing
ARCHITECTURAL
12.01.2023
DRAWING LIST DRAWING LIST
No. DRAWING No. DRAWING TITLE SCALE No. DRAWING No. DRAWING TITLE SCALE
32 UC3-DD-FAC-ARC-00032 CEILING FINISHING SHIPPING RECEIVING OFFICE KEY PLAN 1:100 (A1) REVISIONS
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
DRAWING LIST
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
PERSPECTIVE 1
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
PERSPECTIVE 2
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
PERSPECTIVE 3
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
PERSPECTIVE 4
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
PERSPECTIVE 5
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
SCOPE OF WORK
04 12/01/23
REV. DATE DESCRIPTION
REVISIONS
CLIENT:
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
WALL COLOUR COATED GALVALUME SHEET t=0.5mm, AAC+PLASTER WITH TEXTURED PAINT (JMBS 30/200 OR EQUIVALENT)
DOOR / SHUTTER POWDER COATED FRAME / SHUTTER
WINDOW POWDER COATED FRAME / GLAZING : TINTED GLASS t=6mm
CANOPY RC CANOPY WITH TEXTURED PAINT DESIGN & CONSTRUCTION:
GUEST CAR PARKING SHED / EMPLOYEE MOTORCYCLE PARKING SHED ITEMS SPECIFICATIONS REMARKS
ROOF -- RCC WHEEL STOPPER (150mm x 150mm) FOR GUEST CAR
PARKING
MEP CONSULTANT:
COLUMN -- PARKING LOT MARKING (FULL WHITE LINE)
PROJECT TILE:
DRAWING TITLE:
04 12/01/23
REV. DATE DESCRIPTION
REVISIONS
CLIENT:
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
MAIN ENTRANCE
GUARD HOUSE-1
HD
N
A WH
S
A A
E
R
117000
CAR PARKING WITH ROOF FOR
81000
EL+99.70(GFL-1.50)
ADMINISTRATION OFFICE GUEST PARKING
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-4
EL+99.70(GFL-1.50) GFL=+101.20
EL+99.593
YW12
19500
EL+99.90 YE12
12000
EL+99.70 EL+99.90 EL+99.90 EL+99.90
YW11 YE11
LINK PASSAGE-5
CHILLER YARD (GRAVEL)
W = 48m FLAG POLE-2 04 12/01/23
321000
REV. DATE DESCRIPTION
EL+99.575(GFL-1.625)
REVISIONS
FACTORY
300000
FACTORY
99000
99000
GFL=101.40 CLIENT:
GFL=+101.20
OFFICE
GFL=+101.20
SUBSTATION 3
OR
LINK PASSAGE-1
x 0
L O
D
3
3 0 0
T E
S E
EL+99.490
GFL = +100.40
RCC OPEN GUTTER W=1000 EL+99.370
EL+99.70 DESIGN & CONSTRUCTION:
YW6 EL+99.370 EL+99.368 YE6
12000
19500
81000
MATERIAL WAREHOUSE
81000
(08 NOS)
7
4
DE
1
DT- 1
2
P- 02
1.0%
YE1
YW1 EL+99.176
CAR PARKING (70 NOS)
EL+99.90(GFL-1.30)
2.9%
EL+99.30(GFL-1.90) EL+99.120
EL+99.120 EXISTING STP
GUARD HOUSE-2
EL+99.120(GFL-2.080) WATER TANK
SUB ENTRANCE PROJECT TILE:
DRAWING TITLE:
XW1 XW15 X1 X5 XE1 XE15
WEST FACTORY'S GROUND FLOOR LEVEL
GFL±0.000=101.20 MASTER PLAN
MAIN ENTRANCE
GUARD HOUSE-1
1.0%
RCC OPEN GUTTER W=1000
EL+99.45 EL+99.715(GFL-1.485) EL+99.80(GFL-1.40)
YE17
EL+99.45
EL+99.790
1.7%
STP-2 (10KL)
YW16 EL+99.753
RCC OPEN GUTTER W=1000
EL+99.90(GFL-1.30)
GFL +6.850 EL+99.70(GFL-1.50)
RCC OPEN GUTTER W=1200+400 SUBSTATION-1
GFL=101.40
1:30
(FOR FIRE MAIN PIPE)
117000
CAR PARKING WITH ROOF FOR
1:30
81000
EL+99.70(GFL-1.50)
GFL +9.585 GUEST PARKING
EL+99.70(GFL-1.50)
EL+99.593 ADMINISTRATION OFFICE
YW12 1:30
1:30 1:30
19500
12000
EL+99.70 EL+99.90 EL+99.90 EL+99.90
YW11 DRIVER ROOM
RC ROOF YE11
CHILLER YARD (GRAVEL) GFL +13.480 1:100 1:100
W = 48m FLAG POLE-2 04 12/01/23
321000
RC ROOF REV. DATE DESCRIPTION
EL+99.575(GFL-1.625)
WEST FACTORY EAST FACTORY REVISIONS
300000
99000
99000
CLIENT:
1:30
1:30
OFFICE
GFL =+100.40
EL+99.490
12000
1:30 1:30 1:30
19500
1:30
81000
1:30
81000
BUS PARKING
(08 NOS)
PUMP & WATER TANK
GFL =+99.65 EL+99.90(GFL-1.30)
WALK WAY STRUCTURAL CONSULTANT:
STP-1 (140KL)
GFL +6.850
YE1
YW1 EL+99.176
CAR PARKING (70 NOS)
2.9%
EL+99.30(GFL-1.90) EL+99.120
EL+99.120 EXISTING STP
GUARD HOUSE-2
EL+99.120(GFL-2.080) RCC OPEN GUTTER W=1200+400 WATER TANK
BIKE PARKING PROJECT TILE:
SUB ENTRANCE (FOR FIRE MAIN PIPE)
18000
54000
54000
25.89 m²
YW10 YW10
Y1 Y1 Y1 Y1 Y1 Y1
99000
1F_FACTORY
24000 24000
81000
4030.30 m²
X1 X5 X1 X5 X1 X5
YW6 YW6
490000
04 12/01/23
207000 26000 24000 26000 207000 REV. DATE DESCRIPTION
REVISIONS
117000
PRODUCT WAREHOUSE 138.41 m²
81000
17058.20 m²
LINK PASSAGE-6
EXISTING GUEST PARKING-1 EXISTING GUEST PARKING-2
155.16 m²
276.53 m² 276.53 m²
YW12 YE12 PRINCIPAL CONSULTANT:
LINK PASSAGE-7
19500
12000
154.98 m²
YW11 YE11
EXISTING DRIVER ROOM
ADMINISTRATION OFFICE 13.21 m²
1493.16 m²
321000
SUBSTATION-3 STRUCTURAL CONSULTANT:
300000
FACTORY
99000
417.60 m²
99000
1FL AREA - 417.60 m2 20791.33 m² EAST FACTORY
EXISTING OFFICE
LINK BRIDGE 1020.15 m²
94.31 m² 1FL AREA - 845.00 m2
RFL AREA - 25.00 m2
MEP CONSULTANT:
YW6 YE6
12000
LINK PASSAGE-3 LINK PASSAGE-1
19500
155.30 m² 155.30 m²
YW5
YE5
LINK PASSAGE-2
155.30 m² EXISTING SUBSTATION-2
622.01 m²
81000
MATERIAL WAREHOUSE PROJECT TILE:
81000
W13: COLOUR COATED GALVALIUME SHEET t=0.5mm,PROFILE HIGHT t=6mm, UPTO GFL+3150
W10: TIMBER VENEER PANEL W/STAIN & VARNISHED FINISH W/8mm GROOVE LINE
WATER PROOF
W5: EXPOSED
C5: EXPOSED
W7: AEP
FACTORY
GFL
F-001 PRODUCT ROOM-1 GFL±0 5.5 ● - - - - - - - - - - - - - - - - - - - - ● - ● - - - - - - ● - ● - ● - - ● - - ● - - - - - -
F-002 PRODUCT ROOM-2 (FURTURE AREA) GFL±0 - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - - - ● - ● - ● - - ● - - - - ● - - - -
F-003 PRODUCT ROOM-3 (FURTURE AREA) GFL±0 - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - - - ● - ● - ● - - ● - - - - ● - - - -
F-004 PALLETIZING AREA-1 GFL±0 4.0 ● - - - - - - - - - - - - - - - - - - - - ● - ● - - - - - - ● - ● - ● - - ● - - ● - - - - - -
F-005 PALLETIZING AREA-2 GFL±0 - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - - - ● - ● - ● - - ● - - - - ● - - - -
F-006 PALLETIZING AREA-3 GFL±0 - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - - - ● - ● - ● - - ● - - - - ● - - - -
F-007 DUST COLLECTOR ROOM-1 GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● ● - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-008 DUST COLLECTOR ROOM-2 GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● ● - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-009 DUST COLLECTOR ROOM-3 GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● ● - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-010 DUST COLLECTOR ROOM-4 GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● ● - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-011 COMPRESSOR ROOM GFL±0 - - - - ● - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-012 ELECTRIC SUBSTATION GFL±0 - - - - ● - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-013 TRANSFORMER SPACE GFL±0 - - - - ● - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - - - ● - - - WALL PAINTING GFL+2300MM & ABOVE THAT NO PAINT
F-014 WORKSHOP GFL±0 - - ● - - - - - - - - - - - - - - - - - ● - - - ● - - - - - - ● - - - ● - - - - - - - ● - - - CRANE (1no), 4.1 TON CAPACITY
F-015 SPARE PARTS ROOM-1 GFL±0 - - ● - - - - - - - - - - - - - - - - - ● - - - ● - - - - - - ● - - - ● - - - - - - - ● - - - COUNTER
F-016 QC LAB ROOM GFL±0 3.0 - ● - - - - - - - - - - - - - - - - - ● - - - ● - - - - - - ● - ● - ● - - - - - ● - - - - - -
F-017 SAMPLE ROOM GFL±0 3.0 - ● - - - - - - - - - - - - - - - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
F-018 ANTE ROOM-1 GFL±0 - - - ● - - - - - - - - - - - - - - - - - - - - ● - - - - - - ● - - - ● - - ● - - - - ● - - - -
F-019 ANTE ROOM-2 GFL±0 5.5 ● - - - - - - - - - - - - - - - - - - - - ● - ● - - - - - - ● - - - ● - - ● - - ● - - - - - -
F-020 ANTE ROOM-3 GFL±0 - - - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - ● - - - ● - - ● - - - - - - - - -
F-021 ANTE ROOM-4 GFL±0 - - - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - ● - - - ● - - ● - - - - - - - - -
F-022 ANTE ROOM-5 GFL±0 4.0 - ● - - - - - - - - - - - - - - - - - - - ● - ● - - - - - - ● - - - ● - - ● - - ● - - - - - -
F-023 ANTE ROOM-6 GFL±0 - - - - - - - - - - - - - - - - - - - - - - - - ● - - - - - - ● - - - ● - - ● - - - - - - - - - 04 12/01/23
DRAWING TITLE:
WEST FACTORY
INTERIOR FINISHING SCHEDULE (1/2)
W13: COLOUR COATED GALVALIUME SHEET t=0.5mm, PROFILE HIGHT t=6mm, UPTO GFL+3150
W10: TIMBER VENEER PANEL W/STAIN & VARNISHED FINISH W/8mm GROOVE LINE
WATER PROOF
W5: EXPOSED
C5: EXPOSED
W7: AEP
PRODUCT WAREHOUSE
P-001 PRODUCT WAREHOUSE GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - ● - - - - - - ● - ● - - - ● ● - - - - ● - - - -
P-002 SHIPPING OFFICE GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - - - - - - - ● - - - - - INCLUDE MEETING AREA
P-003 PANTRY-1 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - KITCHEN SINK CABINET, HANDWASH
P-004 CANTEEN-1 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
P-005 KITCHEN-1 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
P-006 LOGISTIC OFFICE-1 GFL±0 2.4 - ● - - - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
P-007 MALE LOCKER ROOM-1 GFL±0 2.4 - ● - - - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
P-008 DRIVER REST ROOM-1 GFL±0 2.4 - - - - - - - ● - - - - - - - - - - - ● - - - - - - - - - - ● - - - - - - - - - ● - - - - - -
P-009 DRIVER TOILET-1 GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - ● - ● - - - - ● - - - - - - WALL WATERPROOFING 1M RISE
P-010 WORKER MALE TOILET-1 GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - ● - ● - - - - ● - - - - - - WALL WATERPROOFING 1M RISE
P-011 WORKER STAFF FEMALE LOCKER & TOILET-1 GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - ● - ● - - - - ● - - - - - - WALL WATERPROOFING 1M RISE
P-012 CORRIDOR-1 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - - - - - - - ● - - - - - -
MATERIAL WAREHOUSE
M-001 MATERIAL WAREHOUSE GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - ● - - - ● ● - - - - ● - - -
SECONDARY DUST COLLECTION TRIM & POLY LOSS STOCK
M-002 GFL±0 - - - ● - - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - ● - - - ● ● - - - - ● - - - -
ROOM
M-003 RECEIVING OFFICE GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - ● - ● - - - - - ● - - - - - INCLUDE MEETING AREA
M-004 CANTEEN-2 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
M-005 PANTRY-3 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
M-006 KITCHEN-2 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - ● - - - - - ● - - - - - KITCHEN SINK CABINET, HANDWASH
M-007 LOGISTIC OFFICE-2 GFL±0 2.4 - ● - - - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
M-008 MALE LOCKER ROOM-2 GFL±0 2.4 - ● - - - - - - - - - - - - - - - - - ● - - - - - - - - - - ● - - - ● - - - - - ● - - - - - -
M-009 WORKER STAFF FEMALE LOCKER & TOILET-2 GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - - - - - ● - - - ● - - - - - ● - - - - - WALL WATERPROOFING 1M RISE
M-010 WORKER MALE TOILET-2 GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - ● - ● - - - - ● - - - - - - WALL WATERPROOFING 1M RISE 04 12/01/23
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
WEST FACTORY
INTERIOR FINISHING SCHEDULE (2/2)
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
Y4 Y3
CORRIDOR-1 KITCHEN-1
WORKER STAFF FEMALE
HANDRAIL
LOCKER & TOILET-1
Y4 Y3
DRIVER TOILET-1
YW16 LOADING AREA YW16
(SHIPPING) WORKER MALE TOILET-1
DRIVER REST ROOM-1
18000
18000
GFL-1.300 SHIPPING OFFICE
DN LOGISTIC OFFICE-1
YW15 YW15
MALE LOCKER ROOM-1
18000
18000
CANTEEN-1 MEETING AREA
YW14 YW14
81000
81000
PRODUCT WAREHOUSE
27000
27000
X5 GFL +0.000 X5 X5 X5
YW13 YW13
18000
18000
YW12 YW12
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-5 LINK PASSAGE-4 EXTERIOR EXTERIOR
EXTERIOR EXTERIOR
19500
19500
STAIRCASE-1 STAIRCASE-2 STAIRCASE-1 STAIRCASE-2
LINK BRIDGE LINK BRIDGE
YW11 ABOVE YW11
ANTE ROOM-6 ANTE ROOM-5 QC LAB ROOM ANTE ROOM-4 ANTE ROOM-3 RC ROOF
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1 AC ROOM-2
SAMPLE ROOM PALLETIZING AREA-3 ASSEMBLY ROOM CORRIDOR-4 AC ROOM-1
GFL +0.000 GFL +0.000 GFL +0.000 1FL +0.000 1FL +0.000 MULTIPURPOSE ROOM 1FL +0.000
ANTE ROOM-9
YW10 UP YW10
STAIR-3 STAIR-3
NO FALSE CEILING AREA FALSE CEILING AREA NO FALSE CEILING AREA FALSE CEILING AREA
18000
18000
COMPRESSOR ROOM FEMALE TOILET-2
FEMALE TOILET-1 MALE TOILET-1 GFL +0.000 PANTRY-2
MALE TOILET-2
YW9 YW9
ELECTRIC SUBSTATION CATWALK
GFL +0.000 PRODUCT ROOM-3 GFL+6500
PRODUCT ROOM-2 PRODUCT ROOM-1
(FUTURE AREA) (FUTURE AREA) PRODUCTION OFFICE
GFL +0.000
300000
1FL +0.000
99000
27000
27000
99000
SPARE PARTS ROOM-1 (FUTURE AREA) (FUTURE AREA)
GFL +0.000 GFL +0.000
COUNTER W=1200
UNFINISHED AREA UNFINISHED AREA MEETING ROOM-1
TRANSFORMER SPACE
No ceiling ANTE ROOM-8 No ceiling
YW8 No floor coating No floor coating YW8
STAIR-1 STAIR-1 ANTE ROOM-10
04 12/01/23
SL ROOM-1
18000
18000
REV. DATE DESCRIPTION
TRAINING ROOM
TOOL STORE-1 WORKSHOP TOOL STORE-2 SL ROOM-2 1FL +0.000 REVISIONS
YW7 X6 GFL +0.000 X6 X6 X6 YW7 CLIENT:
CORRIDOR-3
CORRIDOR-2 STORAGE-1
18000
18000
DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-2 DUST COLLECTOR ROOM-1
19500
YW5 YW5
LINK PASSAGE - 3 LINK PASSAGE - 2 LINK PASSAGE - 1 GFL-1500
18000
18000
PRINCIPAL CONSULTANT:
HANDRAIL
YW4 YW4
27000
27000
STRUCTURAL CONSULTANT:
MATERIAL WAREHOUSE SECONDARY DUST
GFL +0.000 COLLECTION TRIM & POLY
LOSS STOCK ROOM
81000
81000
YW3 YW3
CANTEEN-2 MALE LOCKER ROOM-2
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
X7 X7 X7 X7
YW2 YW2
RECEIVING OFFICE
DN
GFL -1.300
18000
18000
PANTRY-3 CORRIDOR-5
FLATFORM PLATFORM PROJECT TILE:
KITCHEN-2 HANDRAIL LOADING AREA (RECEIVING)
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
DRIVER REST ROOM-2
RE-CONSTRUCTION PROJECT
PLATFORM LOCKER & TOILET-2 Y4 Y3
STATUS:
WORKER MALE TOILET-2
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000 207000
DRAWING TITLE:
Y4 Y3 WEST FACTORY
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 FLOOR PLAN (GFL,1FL)
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
GROUND FLOOR PLAN FIRST FLOOR PLAN DRAWN BY: CHECK BY: APPROVED BY:
1 : 750 1 : 750
SCALE: 1:750 (A1) DATE:
LEGEND: 1:1500 (A3) 12/01/23
GFL±0.00=+101.20 DRAWING NUMBER: REV.
1FL=GFL+6800 UC3-DD-FAC-ARC-00016 04
N
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
Y4 Y3
YW16 YW16
GFL +6.850
18000
YW15 YW15
18000
PRODUCT WAREHOUSE
YW14 YW14
81000
1:30
1:30
1:30
X5 GLASSWOOL INSULATION X5
50mm THK (24kg/m3)
YW13 YW13
GFL +9.590
18000
LINK PASSAGE-4
YW12 YW12
STAIRCASE-1 STAIRCASE-2
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-5
LINK BRIDGE
YW11 YW11
18000
1:30
1:30
300000
1:30
99000
27000
YW8 YW8
04 12/01/23
18000
GFL +10.291
YW6 YW6
1:30 DESIGN & CONSTRUCTION:
1:30 1:30
19500
YW5 YW5
18000
PRINCIPAL CONSULTANT:
GFL +9.590
SOLAR PANEL BY OTHERS
1:30
YW4 YW4
MATERIAL WAREHOUSE
ROOF: STANDING SEAM ROOF
1:30
27000
GLASSWOOL INSULATION
81000
MEP CONSULTANT:
X7 X7
YW2 YW2
GFL +6.850
18000
PROJECT TILE:
DRAWING TITLE:
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 WEST FACTORY
ROOF PLAN
2700
1:30
2700
50mm THK (24kg/m3)
50mm THK (24kg/m3) 1:30 TOS=GFL+6500 TOS=GFL+6500
6500 6500
650 9200
650 9200
9850
9850
GFL=+101.20 GFL=+101.20
6500
6500
0 0
GL GL
18000 18000 27000 18000 -650 -650
15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 12000
81000
207000
YW1 YW2 YW3 YW4 YW5
XW15 XW14 XW13 XW12 XW11 XW10 XW9 XW8 XW7 XW6 XW5 XW4 XW3 XW2 XW1
2700
0.5mm TCT, W/ GLASSWOOL INSULATION 50mm METAL SHEET 0.6mm TCT TOS=GFL+9200 THK (24kg/m3) 50mm THK (24kg/m3) TOS=GFL+6500
THK (24kg/m3) H=76mm, BARE GALVALUME W/ 9200 6500
GLASSWOOL INSULATION
650 9200
1:30
9850
GFL=+101.20
6500
1:30 50mm THK (24kg/m3) TOS=GFL+6500
6500 2700
0
6500
GL
650 9200
9850
GFL=+101.20 -650
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
0
GL 207000
18000 27000 18000 18000 -650
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
81000
YW5 YW4 YW3 YW2 YW1
MATERIAL WAREHOUSE SOUTH ELEVATION
1 : 600
MATERIAL WAREHOUSE WEST ELEVATION
1 : 600
ROOF: STANDING SEAM ROOF ROOF: STANDING SEAM ROOF
TOS=GFL+13100 WALL: COLOUR COATED GALVALUME SHEET
METAL SHEET 0.6mm TCT WALL: COLOUR COATED GALVALUME SHEET METAL SHEET 0.6mm TCT
13100 0.5mm TCT, W/ GLASSWOOL INSULATION 50mm
H=76mm, BARE GALVALUME W/ 0.5mm TCT, W/ GLASSWOOL INSULATION 50mm H=76mm, BARE GALVALUME W/
TOS=GFL+10000 THK (24kg/m3)
GLASSWOOL INSULATION THK (24kg/m3) GLASSWOOL INSULATION TOS=GFL+13100
50mm THK (24kg/m3) 3100 10000 50mm THK (24kg/m3)
1:30 13100
6675
GFL+6800
6800 3200
6800
650 13100
650 13100
13750
13750
GFL=+101.20 GFL=+101.20
6800
0 0
GL GL
18000 18000 27000 18000 18000 -650 -650
15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 12000
99000
207000
YW6 YW7 YW8 YW9 YW10 YW11
XW15 XW14 XW13 XW12 XW11 XW10 XW9 XW8 XW7 XW6 XW5 XW4 XW3 XW2 XW1
ROOF: STANDING SEAM ROOF ROOF: STANDING SEAM ROOF REV. DATE DESCRIPTION
TOS=GFL+13100 METAL SHEET 0.6mm TCT WALL: COLOUR COATED GALVALUME SHEET REVISIONS
WALL: COLOUR COATED GALVALUME SHEET METAL SHEET 0.6mm TCT
0.5mm TCT, W/ GLASSWOOL INSULATION 50mm
0.5mm TCT, W/ GLASSWOOL INSULATION 50mm H=76mm, BARE GALVALUME W/ 13100 H=76mm, BARE GALVALUME W/
THK (24kg/m3) CLIENT:
THK (24kg/m3) GLASSWOOL INSULATION TOS=GFL+10000 GLASSWOOL INSULATION
50mm THK (24kg/m3) TOS=GFL+13100
1:30 50mm THK (24kg/m3) 10000
13100
650 10000 3100
6800
13100
10000
13750
13750
GFL=+101.20 GFL=+101.20
0 0 DESIGN & CONSTRUCTION:
GL GL
18000 18000 27000 18000 18000 -650 12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 -650
99000
207000
YW11 YW10 YW9 YW8 YW7 YW6
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
PRINCIPAL CONSULTANT:
9850
GFL=+101.20 GFL=+101.20
0 0
GL MEP CONSULTANT:
18000 27000 18000 18000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 12000 GL
-650
207000 -650
81000
YW12 YW13 YW14 YW15 YW16 XW15 XW14 XW13 XW12 XW11 XW10 XW9 XW8 XW7 XW6 XW5 XW4 XW3 XW2 XW1
650 9200
9850
9850
Y4
Y3
H=76mm, BARE GALVALUME W/
GLASSWOOL INSULATION YW16 YW16
50mm THK (24kg/m3) TOS=GFL+6500
6500
1
X5 X5
6500
GFL=+101.20
7150
PRODUCT WAREHOUSE 0
GL
650
-650
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 YW12 YW12
207000
YW11 YW11
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
X5 SECTION
ROOF: STANDING SEAM ROOF
1 : 500
METAL SHEET 0.6mm TCT
H=76mm, BARE GALVALUME W/ X6 X6
ELECTRIC SUBSTATION TRANSFORMER SPACE
GLASSWOOL INSULATION
50mm THK (24kg/m3) TRAINING ROOM CORRIDOR-4 TOS=GFL+9200 YW6 YW6
9200
GFL+6800 YW5 YW5
6800 2400
FUTURE AREA FUTURE AREA 6800
650 9200
9850
GFL=+101.20
X7 X7
PRODUCT ROOM-2 PRODUCT ROOM-1 WORKSHOP PRODUCT ROOM-3 0
GL
-650
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
YW1 YW1
207000
Y4
Y3
XW1 XW15
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 SECTION KEYPLAN
1 : 2000 ROOF: STANDING SEAM ROOF
ROOF: STANDING SEAM ROOF
METAL SHEET 0.6mm TCT X6 SECTION METAL SHEET 0.6mm TCT
1 : 500 H=76mm, BARE GALVALUME W/
H=76mm, BARE GALVALUME W/ GLASSWOOL INSULATION
TOS=GFL+9200 1:30
GLASSWOOL INSULATION 50mm THK (24kg/m3) TOS=GFL+6500
50mm THK (24kg/m3) 9200
6500
TOS=GFL+6500
6500 2700
6500
650 9200
9850
6500
GFL=+101.20
MATERIAL WAREHOUSE 0
LOADING AREA
GL
DOCK LEVELER EL+99.90 (SHIPPING) GFL=+101.20
-650 0 GL=GFL-1485
1300
1%
1485
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000
18000
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
YW15 YW16
HC SLAB W/SLOPE 04 12/01/23
X7 SECTION + RC WATER PROOF DOCK LEVELER TYPICAL SECTION 1-1 REV. DATE DESCRIPTION
6800 6300
TOS=GFL+6500 DESIGN & CONSTRUCTION:
6800 3200
6500 2700
6500 2700
6500
13100
TOS=GFL+6500
7150 300
9200
650 9200
9850
6500
650 6500
10000
GFL=+101.20
MATERIAL WAREHOUSE PRODUCT ROOM-3 PRODUCT WAREHOUSE 0
GFL=+101.20
0 GL
GL -650 PRINCIPAL CONSULTANT:
CANTEEN-2 DUST COLLECTOR ROOM-2 PALLETIZING AREA-3
-650
18000 18000 27000 18000 19500 18000 18000 27000 18000 18000 19500 18000 27000 18000 18000
300000
YW1 YW2 YW3 YW4 YW5 YW6 YW7 YW8 YW9 YW10 YW11 YW12 YW13 YW14 YW15 YW16
STRUCTURAL CONSULTANT:
Y3 SECTION
1 : 500
ROOF: STANDING SEAM ROOF HC SLAB W/SLOPE
METAL SHEET 0.6mm TCT + RC WATER PROOF
MEP CONSULTANT:
H=76mm, BARE GALVALUME W/ WALL: COLOUR COATED
ROOF: STANDING SEAM ROOF GLASSWOOL INSULATION GALVALUME SHEET 0.5mm TCT ROOF: STANDING SEAM ROOF
METAL SHEET 0.6mm TCT TOS=GFL+10000 50mm THK (24kg/m3) METAL SHEET 0.6mm TCT
TOS=GFL+13100 H=76mm, BARE GALVALUME W/
H=76mm, BARE GALVALUME W/ 10000 STORAGE-1 TRAINING ROOM MEETING ROOM-1 PRODUCTION OFFICE CORRIDOR-4 13100 GLASSWOOL INSULATION
TOS=GFL+9200 GLASSWOOL INSULATION TOS=GFL+9200
50mm THK (24kg/m3) MALE TOILET-2 FEMALE TOILET-2 GFL+6800 50mm THK (24kg/m3) 9200
9200 1:30 PROJECT TILE:
6800
TOS=GFL+6500 1:30
6800 6300 1:30 TOS=GFL+6500 UNICHARM INDIA 3RD FACTORY
6500 2700
6500 2700
6500 2700
6500 2700
6500 13100 6500 RE-CONSTRUCTION PROJECT
650 9200
9200
9200
650 9200
GFL=+101.20 GFL=+101.20
STATUS:
0 PRODUCT WAREHOUSE 0
DESIGN DEVELOPMENT
GL GL
-650 MALE TOILET-1 STAIR-3 -650
STAIR-2 SAMPLE ROOM QC LAB ROOM
RECEIVING OFFICE MATERIAL WAREHOUSE DRAWING TITLE:
ANTE ROOM-7 WORKSHOP STAIR-1 SPARE PARTS ROOM-1 ANTE ROOM-9
18000 18000 27000 18000 19500 18000 18000 27000 18000 18000 19500 18000 27000 18000 18000 WEST FACTORY
300000 SECTION
YW1 YW2 YW3 YW4 YW5 YW6 YW7 YW8 YW9 YW10 YW11 YW12 YW13 YW14 YW15 YW16 DRAWN BY: CHECK BY: APPROVED BY:
18000
SHIPPING OFFICE
LOGISTIC OFFICE-1
YW15 YW15
MALE LOCKER ROOM-1
CANTEEN-1
18000
18000
MEETING AREA
YW14 YW14
81000
81000
PRODUCT WAREHOUSE
27000
27000
YW13 YW13
18000
18000
YW12 YW12
EXTERIOR
LINK PASSAGE-7 LINK PASSAGE-6 EXTERIOR
EXTERIOR LINK PASSAGE-5 LINK PASSAGE-4 STAIRCASE-1
19500
19500
STAIRCASE-1 STAIRCASE-2
EXTERIOR
STAIRCASE-2
YW11 YW11
ANTE ROOM-6 ANTE ROOM-5 QC LAB ROOM ANTE ROOM-4 ANTE ROOM-3
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1
SAMPLE ROOM PALLETIZING AREA-3 CORRIDOR-4
AC ROOM-2 ASSEMBLY ROOM MULTIPURPOSE ROOM AC ROOM-1
ANTE ROOM-9
YW10 YW10
NO FALSE CEILING AREA FALSE CEILING AREA NO FALSE CEILING AREA FALSE CEILING AREA
STAIR-3
18000
18000
FEMALE TOILET-1 COMPRESSOR ROOM FEMALE TOILET-2
MALE TOILET-1
PANTRY-2
MALE TOILET-2
YW9 YW9
ELECTRIC SUBSTATION
PRODUCT ROOM-2 PRODUCT ROOM-1 PRODUCT ROOM-3
(FUTURE AREA) (FUTURE AREA) PRODUCTION OFFICE
300000
27000
99000
SPARE PARTS ROOM-1
18000
ANTE ROOM-10 REV. DATE DESCRIPTION
SL ROOM-2
TRAINING ROOM REVISIONS
SL ROOM-1 WORKSHOP TOOL STORE-2
YW7 YW7 CLIENT:
TOOL STORE-1 CORRIDOR-3
CORRIDOR-2 STORAGE-1
18000
18000
DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-1
DUST COLLECTOR ROOM-2
STAIR-2 STAIR-2
YW6 YW6
ANTE ROOM-2 ANTE ROOM-7 ANTE ROOM-1
DESIGN & CONSTRUCTION:
19500
19500
YW5 YW5
LINK PASSAGE - 3 LINK PASSAGE - 2 LINK PASSAGE - 1 GFL-1500
18000
18000
PRINCIPAL CONSULTANT:
YW4 YW4
HANDRAIL
27000
27000
STRUCTURAL CONSULTANT:
81000
81000
MATERIAL WAREHOUSE SECONDARY DUST
COLLECTION TRIM & POLY
YW3 LOSS STOCK ROOM
YW3
CANTEEN-2 MALE LOCKER ROOM-2
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
YW2 YW2
RECEIVING OFFICE
18000
18000
PANTRY-3 CORRIDOR-5 PROJECT TILE:
DRIVER REST ROOM-2
KITCHEN-2 LOADING AREA (RECEIVING)
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
WORKER MALE TOILET-2
RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2
STATUS:
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000
207000
DRAWING TITLE:
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 WEST FACTORY
FIRE SAFETY PLAN
GF - FIRE SAFETY PLAN 1F - FIRE SAFETY PLAN DRAWN BY: CHECK BY: APPROVED BY:
1 : 750 1 : 750
SCALE: 1:750 (A1) DATE:
1:1500 (A3) 12/01/23
DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00020 04
AW AW AW
N
LEGEND:
7 7 6
AW SD AD
DRIVER TOILET-1 6 1A DOOR TAG
WORKER MALE TOILET-1 1
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 AW WORKER STAFF FEMALE AW AW AW AW WINDOW TAG
DRIVER TOILET-1 7 LOCKER & TOILET-1 6 6 6 1
SS SS SS SS WORKER MALE TOILET-1
1 1 1 1
SS DRIVER REST ROOM-1 WORKER STAFF FEMALE YW16
4
SD SS SS SS SS LOGISTIC OFFICE-1 LOCKER & TOILET-1 SD SD
1A 1A AW KITCHEN-1
1A 1 1 1 1 SS KITCHEN-1 8
1
DRIVER REST ROOM-1 SD
LOADING AREA 1B
YW16 (SHIPPING) SD
SS 1A FAW
1 6
CORRIDOR-1 SD
18000
CORRIDOR-1 SD SD SD
SHIPPING OFFICE 1B 1B 1TA 1TA
18000
SD SHIPPING OFFICE
YW15 1A
MEETING AREA SD SD
AW 1B 1B
18000
CANTEEN-1 8 FAW
SH SH SH SH SH SH CANTEEN-1 6
3 6 6 6 6 6 MALE LOCKER ROOM-1 MALE LOCKER ROOM-1
YW14 SD SS LOGISTIC OFFICE-1 MEETING AREA
1A
81000
SH SH SH SH SH 4
6 6 6 6 6
SH PRODUCT WAREHOUSE
27000
3 SD YW15
SS 1A
4 FAW FAW
SD SH SD FD 6 6
1 3 1A 1
15000 15000
YW13 SD
SD SH 1A 30000
SD SD SH SD SD
1A 5 SH SD SD
18000
1A 1 5 1A
5 1 SH 1
1A
5
XW6 XW7 XW8
YW12
EXTERIOR GF-SHIPPING OFFICE - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN
FD LINK PASSAGE-7 LINK PASSAGE-6 FD FSS LINK PASSAGE-4
SD SD SD LINK PASSAGE-5 1A 5A FD STAIRCASE-2 SD EXTERIOR 1 : 200 SD EXTERIOR
19500
1A
EXTERIOR FD FSS 1A 10 5 1A
1A
SD 1A
STAIRCASE-2
FSS 1A 5A FSS SD STAIRCASE-1 FD WD FD SD
1A
STAIRCASE-1 5A 5A 1A 2 3
2 1A
YW11 WD YW11
ANTE ROOM-6 ANTE ROOM-5 SH FD QC LAB ROOM ANTE ROOM-4
SH ANTE ROOM-3 3
3 3
FD 3 SS
18000
18000
SD SH 2 SH SD
3 SH
PALLETIZING AREA-1 2A SD CORRIDOR-4
1A
PALLETIZING AREA-2 3 SD SH 1 1A AC ROOM-2 ASSEMBLY ROOM AC ROOM-1 FD
3 FD ANTE ROOM-9 SAMPLE ROOM 1 3 SD MULTIPURPOSE ROOM 2
YW10 SH 1 YW10
3 FD 1A
WD SS
SD 1 SH SD 2 SD 2A
1 NO FALSE CEILING AREA FALSE CEILING AREA SD 3 PALLETIZING AREA-3 1A NO FALSE CEILING AREA FALSE CEILING AREA SD 10
18000
18000
10
SD FD COMPRESSOR ROOM
1A
FD
1 3 1
SD SS FEMALE TOILET-2
FEMALE TOILET-1 SD
YW9 MALE TOILET-1 5 2A PANTRY-2 10 YW9
PRODUCT ROOM-1 SD SS PRODUCT ROOM-3 MALE TOILET-2
PRODUCT ROOM-2
(FUTURE AREA) SD WD WD
10
SD
ELECTRIC SUBSTATION
(FUTURE AREA) 2
14 3 WD
SPARE PARTS ROOM-1 5 2 3
300000
27000
99000
AW SH UNFINISHED AREA FSS PRODUCTION OFFICE
FSS
TRANSFORMER SPACE
1A 9 2 No ceiling 4 1 WD
1 No floor coating WD 3
FD FSS 3
UNFINISHED AREA 1 4 SH FSS SH FD
No ceiling 2 ANTE ROOM-8 1 5 1 SL MEETING ROOM-1 WD
YW8 No floor coating
SS FD 1 1A YW8
FD 2
1
FD ANTE ROOM-10 WD
1 FD SD STAIR-1 04 12/01/23
18000
18000
1 SL ROOM-2 1 1 3
SS FD REV. DATE DESCRIPTION
SH SD 1 WD REVISIONS
3
5 SL ROOM-1 WORKSHOP 5 TOOL STORE-2 SD TRAINING ROOM 3
YW7 CORRIDOR-2
1A YW7 CLIENT:
TOOL STORE-1 FSS SD WD
SD 3 5
DUST COLLECTOR ROOM-2 DUST COLLECTOR ROOM-1 SS STORAGE-1 3
18000
18000
1 1A
SS DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 FSS FD CORRIDOR-3 FD
SD
1A 1
WD
1
ANTE ROOM-2 STAIR-2
3
ANTE ROOM-1 1 SD STAIR-2 3
YW6 1A YW6
SD FD FD ANTE ROOM-7 FD SD FD
FD FD 1A 1
DESIGN & CONSTRUCTION:
1A 1 1
19500
FD 1 1
1A
1A
SH FD FSS FSS SH FD 12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
1A 1A 4A 5 1
5
SD 207000
YW5
FSS SD LINK PASSAGE - 1 SH 1A
SD SD SD 4A 1A 1 GFL-1500
18000
SD XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 PRINCIPAL CONSULTANT:
1A 1A 1A LINK PASSAGE - 2
SD 1A FSS
SD LINK PASSAGE - 3 SD
SH 1 2
1
5 SH 1
HANDRAIL 1F - DOOR. WINDOW KEY PLAN
YW4 1 SH
SH
5 SH FSS FAW 1 : 750 3
1 2 6
SD YW2
SH SH
27000
STRUCTURAL CONSULTANT:
1A 6 3
SECONDARY DUST
COLLECTION TRIM & POLY FAW FD
SH LOSS STOCK ROOM 6 1 SD SS
SH SH SH
81000
MATERIAL WAREHOUSE 3 1A 4
6 6 6 FD
YW3 SD 1 SD
MEETING AREA LOGISTIC OFFICE-2
1A SH 1A FAW
CANTEEN-2 MALE LOCKER ROOM-2 SH 6
6
CANTEEN-2 MALE LOCKER ROOM-2 AW
6 SH SD
18000
1A 1TA 1TA
SD PANTRY-3 1 1 SS
SD FAW
1A SS SS SS 4 SD PROJECT TILE:
1A
KITCHEN-2 4 1 1 LOADING AREA (RECEIVING)
6 PANTRY-3 SD SD 1A
YW1 SD 1B 1B UNICHARM INDIA 3RD FACTORY
AW
WORKER STAFF FEMALE
CORRIDOR-5 SS SS SS
1B
8 RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2 SS
KITCHEN-2 AW
1 4 1
1
SD 6
WORKER MALE TOILET-2 1A STATUS:
SS
1 YW1 DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000
AW AW AW AW
WORKER STAFF FEMALE
AW AW DRAWING TITLE:
LOCKER & TOILET-2 7
6 6 6 6 7
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 AW WEST FACTORY
WORKER MALE TOILET-2 7
DOOR, WINDOW, SHUTTER, LOUVER KEY
15000 15000
PLAN
30000
DRAWN BY: CHECK BY: APPROVED BY:
XW8 XW9 XW10
SCALE: 1:750 (A1) DATE:
1:1500 (A3) 12/01/23
GF - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN GF-RECEIVING OFFICE - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN
DRAWING NUMBER: REV.
1 : 750 1 : 200
UC3-DD-FAC-ARC-00021 04
STEEL DOOR SCHEDULE
FRAME DOOR GLASS LOUVER LOCKS SET HANDLE HINGES MISCELLANEOUS LEGEND:
ST: STEEL FL: FLOAT
CYCLIDER
AL: ALUMINUM T: TEMPERED
PANIC HARDWARE
ELECTRICAL LOCK
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
CREMON HANDLE
PASSAGE LATCH
MEETING STYLE
CASED HANDLE
LEVER HANDLE
AIR TIGHTNESS
SPRING HINGE
TT: TINTED GLASS LF: LAMINATED
DOOR CLOSER
PULL HANDLE
FLOOR HINGE
THUMB TURN
JAMB DEPTH
PIVOT HINGE
FIRE RATING
PUSH PLATE
THRESHOLD
BUTT HINGE
FLUSH BOLT
CHAIN BOLT
KICK PLATE
DEAD LOCK
DOOR STOP
THICKNESS
HOOK LOCK
CASE LOCK
THCKNESS
MATERIAL
MATERIAL
MATERIAL
MATERIAL
QUANTITY
HEIGHT
HEIGHT
HEIGHT
WIDTH
WIDTH
WIDTH
FINISH
FINISH
FINISH
COLOR
KNOB
TYPE
PRODUCT WAREHOUSE, ELECTRICAL SUBSTATION, 1100 2150 22 ● ST ST TBC 550 700
PRODUCT ROOM-3, CORRIDOR-3, DUST COLLECTOR ROOM-1,
FD
2150
SINGLE
2HR FIRE RATED
1A FL SWING
1100
DOUBLE
2HR FIRE RATED
2 FL SWING
1800
ANTE ROOM-9, PRODUCT ROOM-3, PALLETIZING AREA-1 1000 3000 2 ● ST ST
FD
SINGLE
3000
SD
2150
SINGLE 04 12/01/23
SD DOUBLE
1TA FL SWING
1500
DESIGN & CONSTRUCTION:
ANTE ROOM-8, ANTE ROOM-9, WORKSHOP, 1100 2150 5 ST ST
TRANSFORMER SPACE
2150
SD SINGLE
SWING
5
1100 PRINCIPAL CONSULTANT:
QC LAB ROOM, ANTE ROOM-9, CORRIDOR-4 850 2150 5 ST ST 150 700 150 750
2150
SINGLE
SD
FL SWING
10 STRUCTURAL CONSULTANT:
850
SD DOUBLE
14 FL SWING
MEP CONSULTANT:
1800
WD
2150
SINGLE
1A FL SWING PROJECT TILE:
WD SINGLE
DESIGN DEVELOPMENT
2 FL SWING
1100 DRAWING TITLE:
ASSEMBLY ROOM, CORRIDOR-4, PRODUCTION OFFICE, 1800 2150 10 WD WD 150 1800 WEST FACTORY
MEETING ROOM-1, TRANING ROOM, STORAGE-1
DOOR, WINDOW, SHUTTER, LOUVER
2150
WD DOUBLE
SCHEDULE (1/5)
3 FL SWING
1800 DRAWN BY: CHECK BY: APPROVED BY:
AIR TIGHTNESS
ST: STEEL FL: FLOAT
FIRE RATING
AL: ALUMINUM T: TEMPERED
QUANTITY
HEIGHT
WD: WOODEN TG: THIN GLASS
WIDTH
MARK SHAPE LOCATION TYPE OPERATION SWITCH SLAT BOTTOM BAR GUIDE RAIL TOP RAIL SHUTTER CASE CONTROL BOX GUARD POST REMARKS HM: HOLLOW METAL WR: WIRE GLASS
SUS: STAINLESS STEEL AN: ANODIZED
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
PRODUCT ROOM 1,3 STEEL SHUTTER 4000 4000 2 ● 2HR FIRE RATED
TT: TINTED GLASS LF: LAMINATED
MATERIAL WAREHOUSE
ANTE ROOM-8
FSS
4000
1
FL
4000
FSS
4000
1A
FL
4000
FL
4000
DUST COLLECTION ROOM 2,3, STEEL SHUTTER 3000 4000 2 ● 2HR FIRE RATED
ANTE ROOM-7
FSS
4000
FL
3000 04 12/01/23
REV. DATE DESCRIPTION
LINK PASSAGE-1,3 STEEL SHUTTER 5000 5000 2 ● 2HR FIRE RATED REVISIONS
PRODUCT ROOM 1,3 CLIENT:
FSS
5000
4 5000
DESIGN & CONSTRUCTION:
FL
FSS
5000
4A 5000
STRUCTURAL CONSULTANT:
FL
ANTE ROOM 3,4,5,6 STEEL SHUTTER 5000 5000 4 ● 2HR FIRE RATED MEP CONSULTANT:
FSS
5A
5000
DRAWING TITLE:
WEST FACTORY
DOOR, WINDOW, SHUTTER, LOUVER
SCHEDULE (2/5)
AIR TIGHTNESS
ST: STEEL FL: FLOAT
FIRE RATING
AL: ALUMINUM T: TEMPERED
QUANTITY
HEIGHT
WD: WOODEN TG: THIN GLASS
WIDTH
MARK SHAPE LOCATION TYPE OPERATION SWITCH SLAT BOTTOM BAR GUIDE RAIL TOP RAIL SHUTTER CASE CONTROL BOX GUARD POST REMARKS HM: HOLLOW METAL WR: WIRE GLASS
SUS: STAINLESS STEEL AN: ANODIZED
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
MATERIAL WAREHOUSE, STEEL SHUTTER
SHEET SHUTTER 4000 4000 3
TT: TINTED GLASS LF: LAMINATED
SECONDARY DUST
COLLECTION
TRIM & POLY LOSS
SH STOCK ROOM
4000
1
FL
4000
SH
4000
FL
4000
5000
FL
SH
5000
5000
FL 04 12/01/23
REV. DATE DESCRIPTION
SH
STOCK ROOM
6
FL
DESIGN & CONSTRUCTION:
2500
PRODUCT WAREHOUSE, STEEL SHUTTER 2500 3000 18 DOCK SHELTER (3400x3500xD960) AT DOCK LEVELER
PRINCIPAL CONSULTANT:
MAERIAL WAREHOUSE, (SS-1) 12 NOS / EXTERIOR FINISHING FRAME:
SECONDARY DUST POWDER COATED
COLLECTION
TRIM & POLY LOSS
3000
SS
STOCK ROOM
1
FL STRUCTURAL CONSULTANT:
2500
DUST COLLECTOR ROOM 1,4 STEEL SHUTTER 4000 4000 2 MANUAL SHUTTER/ MEP CONSULTANT:
EXTERIOR FINISHING FRAME: POWDER COATED
SS
4000
1A
PROJECT TILE:
DRAWING TITLE:
WEST FACTORY
DOOR, WINDOW, SHUTTER, LOUVER
SCHEDULE (3/5)
AIR TIGHTNESS
ST: STEEL FL: FLOAT
FIRE RATING
AL: ALUMINUM T: TEMPERED
QUANTITY
HEIGHT
WD: WOODEN TG: THIN GLASS
WIDTH
MARK SHAPE LOCATION TYPE OPERATION SWITCH SLAT BOTTOM BAR GUIDE RAIL TOP RAIL SHUTTER CASE CONTROL BOX GUARD POST REMARKS HM: HOLLOW METAL WR: WIRE GLASS
SUS: STAINLESS STEEL AN: ANODIZED
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
ANTE ROOM-8, WORKSHOP, STEEL SHUTTER 3000 3000 2
TT: TINTED GLASS LF: LAMINATED
SPARE PARTS ROOM-1
SS
3000
2
FL
3000
SS
4000
2A
FL
4000
WORKSHOP, ANTE ROOM-7 STEEL SHUTTER 3000 4000 1 EXTERIOR FINISHING FRAME: POWDER COATED
SS
4000
FL
3000
MATERIAL WAREHOUSE, STEEL SHUTTER 5000 5000 5 EXTERIOR FINISHING FRAME: POWDER COATED
PRODUCT WAREHOUSE
SS
4
5000
5000
FL 04 12/01/23
REV. DATE DESCRIPTION
SS
6
5000
FL
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
WEST FACTORY
DOOR, WINDOW, SHUTTER, LOUVER
SCHEDULE (4/5)
PANIC HARDWARE
ELECTRICAL LOCK
CREMON HANDLE
AIR TIGHTNESST
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
PASSAGE LATCH
MEETING STYLE
CASED HANDLE
LEVER HANDLE
SPRING HINGE
HEAD & JAMB
DOOR CLOSER
PULL HANDLE
TT: TINTED GLASS LF: LAMINATED
FLOOR HINGE
THUMB TURN
JAMB WIDTH
PIVOT HINGE
FIRE RATING
PUSH PLATE
THRESHOLD
BUTT HINGE
FLUSH BOLT
CHAIN BOLT
KICK PLATE
DEAD LOCK
DOOR STOP
THICKNESS
THICKNESS
HOOK LOCK
CASE LOCK
MATERIAL
MATERIAL
MATERIAL
MATERIAL
QUANTITY
HEIGHT
HEIGHT
HEIGHT
WIDTH
WIDTH
WIDTH
FINISH
FINISH
FINISH
COLOR
KNOB
TYPE
MARK SHAPE LOCATION TYPE REMARKS
SHIPPING OFFICE, CANTEEN-1, CANTEEN-2, RECEIVING OFFICE FIXED WINDOW 2000 1100 10 t=6.0 TT
2000
AW
800 1100
6
FL
WORKER STAFF FAMALE LOCKER & TOILET-1, FIXED WINDOW 450 1100 6 t=6.0 TT
WORKER STAFF FAMALE LOCKER & TOILET-2,
WOKER MALE TOILET-1, DRIVER TOILET-1,
WOKER MALE TOILET-2
800 1100
AW
7 FL
450
LOGISTIC OFFICE-1, DRIVER REST ROOM-1, FIXED WINDOW 1300 1300 4 t=6.0 TT
LOGISTIC OFFICE-2, DRIVER REST ROOM-2
1300
AW
8
FL
1000
1300
AW
9 FL
900
1300
DESIGN & CONSTRUCTION:
SHIPPING OFFICE, MATERIAL WAREHOUSE, RECEIVING OFFICE FIXED WINDOW 3000 1300 8 ● TBC 2HR FIRE RATED
PRINCIPAL CONSULTANT:
1300
FAW
6 FL
850
STRUCTURAL CONSULTANT:
3000
MEP CONSULTANT:
TRANSFORMER SPACE STEEL LOUVER 28500 4600 1
SL FL
4600
920
PROJECT TILE:
1
UNICHARM INDIA 3RD FACTORY
28500
5700 RE-CONSTRUCTION PROJECT
STATUS:
DESIGN DEVELOPMENT
DRAWING TITLE:
WEST FACTORY
DOOR, WINDOW, SHUTTER, LOUVER
SCHEDULE (5/5)
18000
SHIPPING OFFICE STUD @ 610 C/C GYPSUM BOARD
LOGISTIC OFFICE-1 (ACOUSTIC) 15mm SINGLE SIDE
TOTAL 86mm
YW15 YW15
MALE LOCKER ROOM-1 RC WALL H = 1000mm + DRYWALL
CANTEEN-1 UP TO CEILING + 500mm ACOUSTIC
18000
18000
MEETING AREA PARTITION WITH ROCKWOOL
24kg/m3
90mm STUD @610 C/C GYPSUM
YW14 YW14 BOARD 15mm / MOISTURE
RESISTANT GYPSUM BOARD 15mm
81000
81000
+ HARD GYPSUM BOARD 12.5mm
TOTAL 145mm
PRODUCT WAREHOUSE
27000
27000
INTERNAL WALL CLADDING SHEET
B5 UP TO GFL+3150 LEVEL
18000
STUD + GYPSUM BOARD 15mm
SINGLE SIDE
TOTAL 86mm
YW12 YW12 DRYWALL UP TO ROOF 70mm C-
LINK PASSAGE-7 LINK PASSAGE-6 EXTERIOR STUD + GYPSUM BOARD 15mm
EXTERIOR LINK PASSAGE-5 LINK PASSAGE-4 STAIRCASE-1 EXTERIOR BOTH SIDE
19500
19500
STAIRCASE-1 B5 B5 B5 B5 STAIRCASE-2 TOTAL 102mm
EXTERIOR
STAIRCASE-2 GLASSWOOL WITH BOTH SIDE WIRE
MESH UP TO ROOF
YW11 YW11
ANTE ROOM-6 ANTE ROOM-5 QC LAB ROOM ANTE ROOM-4
B7 B1 B1: PVC BASE H = 100
B5
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1 CORRIDOR-4
PALLETIZING AREA-3 ANTE ROOM-3 AC ROOM-2
B7
ASSEMBLY ROOM B1 MULTIPURPOSE ROOM AC ROOM-1 B2 B2: ALUMINUM H = 100
B7 SAMPLE ROOM B5
ANTE ROOM-9 B1 B1 B5
YW10 YW10 B3 B3: SAME AS FLOOR (H = 100)
STAIR-3 B7 STAIR-3
NO FALSE CEILING AREA FALSE CEILING AREA B7 NO FALSE CEILING AREA FALSE CEILING AREA B4 B4: TIMBER SKIRTING H = 60
B7
18000
18000
COMPRESSOR ROOM FEMALE TOILET-2 B6
FEMALE TOILET-1 MALE TOILET-1 B5 B5: AEP PAINT FIN.
B5 PANTRY-2
B6 B6 MALE TOILET-2 B6 B6
YW9 B1 YW9 B6: CERAMIC TILE H = 100
PRODUCT ROOM-2 B7 PRODUCT ROOM-3 B7 ELECTRIC SUBSTATION
(FUTURE AREA) (FUTURE AREA) B7 B7: R = 50mm MORTAR BASE H = 100
PRODUCT ROOM-1 B5
B7
PRODUCTION OFFICE WITH EPOXY COATING t = 0.5mm
300000
27000
99000
SPARE PARTS ROOM-1 B1
B5
UNFINISHED AREA UNFINISHED AREA MEETING ROOM-1
ANTE ROOM-8 TRANSFORMER SPACE
No ceiling No ceiling
YW8 No floor coating No floor coating B5 B1 YW8
B7
STAIR-1 STAIR-1
04 12/01/23
B7 B7
18000
18000
ANTE ROOM-10 REV. DATE DESCRIPTION
SL ROOM-2 TRAINING ROOM
SL ROOM-1 B1 REVISIONS
WORKSHOP TOOL STORE-2 B1
YW7 B5 YW7 CLIENT:
CORRIDOR-2 STORAGE-1
TOOL STORE-1 CORRIDOR-3
B7
18000
18000
DUST COLLECTOR ROOM-4 B1
ANTE ROOM-2 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-1
B5 STAIR-2
DUST COLLECTOR ROOM-2
B7 B5 B5 B5
YW6 B7 YW6
ANTE ROOM-7 ANTE ROOM-1 STAIR-2
DESIGN & CONSTRUCTION:
B7 B7
19500
19500
YW5 YW5
LINK PASSAGE - 3 LINK PASSAGE - 2 LINK PASSAGE - 1 GFL-1500
18000
18000
PRINCIPAL CONSULTANT:
B5 B5 B5
YW4 YW4
HANDRAIL
27000
27000
STRUCTURAL CONSULTANT:
MATERIAL WAREHOUSE
B5
81000
81000
SECONDARY DUST
COLLECTION TRIM & POLY
YW3 LOSS STOCK ROOM
YW3
CANTEEN-2 MALE LOCKER ROOM-2 B5
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
YW2 YW2
RECEIVING OFFICE
18000
18000
PANTRY-3 CORRIDOR-5 PROJECT TILE:
DRIVER REST ROOM-2
KITCHEN-2 LOADING AREA (RECEIVING)
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
WORKER MALE TOILET-2
RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2
STATUS:
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000
207000
DRAWING TITLE:
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 WEST FACTORY
WALL TYPE & BASE KEY PLAN
GF - WALL TYPE KEY PLAN 1F - WALL TYPE KEY PLAN DRAWN BY: CHECK BY: APPROVED BY:
1 : 750 1 : 750
SCALE: 1:750 (A1) DATE:
1:1500 (A3) 12/01/23
DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00027 04
N LEGEND:
70mm C-STUD @ 610c/c
GYPSUM BOARD 15mm + 15mm BOTH SIDES
UP TO ROOF / ABOVE FLOOR (NBC INDIA)
TOTAL: 132mm
(2HFR WALL SYSTEM)
70mm C-STUD @ 610c/c
GYPSUM BOARD 15mm + 15mm BOTH SIDES UP TO
ROOF / ABOVE FLOOR ( VOLUNTARY INSTALLATION)
YW16 TOTAL: 132mm
(2HFR WALL SYSTEM)
DRIVER TOILET-1
KITCHEN-1 DRYWALL UP TO CEILING 70mm C-
B6 STUD @ 610 C/C GYPSUM BOARD
B1 15mm BOTH SIDE
TOTAL 102mm
DRYWALL UP TO CEILING 70mm C-
WORKER STAFF FEMALE STUD @ 610 C/C GYPSUM BOARD
DRIVER REST ROOM-1 (ACOUSTIC) 15mm SINGLE SIDE
LOCKER & TOILET-1
B5 WORKER MALE TOILET-1 TOTAL 86mm
B6
PANTRY-1
B6 RC WALL H = 1000mm + DRYWALL
B1 UP TO CEILING + 500mm ACOUSTIC
PARTITION WITH ROCKWOOL
24kg/m3
90mm STUD @610 C/C GYPSUM
CORRIDOR-1 CANTEEN-1 BOARD 15mm / MOISTURE
RESISTANT GYPSUM BOARD 15mm
B1 B1 + HARD GYPSUM BOARD 12.5mm
SHIPPING OFFICE TOTAL 145mm
INTERNAL WALL CLADDING SHEET
B1
18000
UP TO GFL+3150 LEVEL
04 12/01/23
REV. DATE DESCRIPTION
REVISIONS
CLIENT:
YW2
PRINCIPAL CONSULTANT:
MEETING AREA
18000
STRUCTURAL CONSULTANT:
RECEIVING OFFICE
B1
CANTEEN-2 CORRIDOR-5
B1 B1
MEP CONSULTANT:
PANTRY-3
B1
DRIVER REST ROOM-2
WORKER MALE TOILET-2
WORKER STAFF FEMALE B5
LOCKER & TOILET-2 B6 PROJECT TILE:
KITCHEN-2 B6 UNICHARM INDIA 3RD FACTORY
B1
RE-CONSTRUCTION PROJECT
DRIVER TOILET-2
B6 STATUS:
DESIGN DEVELOPMENT
YW1
DRAWING TITLE:
WEST FACTORY
15000 15000
WALL TYPE & BASE SHIPPING RECEIVING
30000 OFFICE KEY PLAN
18000
SHIPPING OFFICE
LOGISTIC OFFICE-1
YW15 YW15
MALE LOCKER ROOM-1
CANTEEN-1 MEETING AREA
18000
18000
YW14 YW14
81000
81000
PRODUCT WAREHOUSE
27000
27000
YW13 YW13
18000
18000
YW12 YW12
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-5 LINK PASSAGE-4
19500
19500
EXTERIOR EXTERIOR
STAIRCASE-1 STAIRCASE-2
ASSEMBLY ROOM MULTIPURPOSE ROOM
YW11 YW11
ANTE ROOM-6 ANTE ROOM-5 QC LAB ROOM ANTE ROOM-4 ANTE ROOM-3
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1
SAMPLE ROOM PALLETIZING AREA-3 CORRIDOR-4
AC ROOM-2 AC ROOM-1
ANTE ROOM-9
YW10 YW10
NO FALSE CEILING AREA FALSE CEILING AREA STAIR-3 NO FALSE CEILING AREA FALSE CEILING AREA STAIR-3
18000
18000
COMPRESSOR ROOM
FEMALE TOILET-1 MALE TOILET-1 FEMALE TOILET-2
PANTRY-2
MALE TOILET-2
YW9 YW9
ELECTRIC SUBSTATION
PRODUCT ROOM-2 PRODUCT ROOM-1 PRODUCT ROOM-3
(FUTURE AREA) (FUTURE AREA) PRODUCTION OFFICE
300000
FUTURE FUTURE
99000
27000
27000
99000
SPARE PARTS ROOM-1
AREA AREA
18000
REV. DATE DESCRIPTION
TRAINING ROOM REVISIONS
SL ROOM-1 WORKSHOP TOOL STORE-2 SL ROOM-2
YW7 YW7 CLIENT:
CORRIDOR-3
CORRIDOR-2 TOOL STORE-1 STORAGE-1
18000
18000
DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-2 DUST COLLECTOR ROOM-1
19500
YW5 YW5
LINK PASSAGE - 3 LINK PASSAGE - 2 LINK PASSAGE - 1 GFL-1500
18000
18000
PRINCIPAL CONSULTANT:
HANDRAIL
YW4 YW4
27000
27000
STRUCTURAL CONSULTANT:
SECONDARY DUST
COLLECTION TRIM & POLY
LOSS STOCK ROOM
81000
81000
MATERIAL WAREHOUSE
YW3 YW3
CANTEEN-2 MALE LOCKER ROOM-2
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
YW2 YW2
RECEIVING OFFICE
18000
18000
PANTRY-3 CORRIDOR-5 PROJECT TILE:
DRIVER REST ROOM-2
KITCHEN-2 LOADING AREA (RECEIVING)
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
WORKER MALE TOILET-2
RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2
STATUS:
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000
207000
DRAWING TITLE:
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 WEST FACTORY
FLOOR FINISHING KEY PLAN
GF - FLOOR FINISHING PLAN 1F - FLOOR FINISHING PLAN DRAWN BY: CHECK BY: APPROVED BY:
1 : 750 1 : 750
SCALE: 1:750 (A1) DATE:
1:1500 (A3) 12/01/23
DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00029 04
N
LEGEND
YW16
DRIVER TOILET-1 KITCHEN-1
GFL +0.000
CANTEEN-1
CORRIDOR-1 GFL +0.000
GFL +0.000
SHIPPING OFFICE
GFL +0.000
18000
MEETING AREA
YW15
15000 15000
30000
04 12/01/23
REV. DATE DESCRIPTION
REVISIONS
CLIENT:
YW2
MEETING AREA
MALE LOCKER ROOM-2 LOGISTIC OFFICE-2
GFL +0.000 GFL +0.000
PRINCIPAL CONSULTANT:
18000
STRUCTURAL CONSULTANT:
RECEIVING OFFICE
GFL +0.000
CANTEEN-2 CORRIDOR-5
GFL +0.000
GFL +0.000
MEP CONSULTANT:
PANTRY-3
GFL +0.000
WORKER MALE TOILET-2
GFL -0.030 DRIVER REST ROOM-2
WORKER STAFF FEMALE GFL +0.000
LOCKER & TOILET-2 PROJECT TILE:
GFL -0.030
KITCHEN-2
UNICHARM INDIA 3RD FACTORY
GFL +0.000
RE-CONSTRUCTION PROJECT
STATUS:
DESIGN DEVELOPMENT
YW1
DRAWING TITLE:
WEST FACTORY
15000 15000
FLOOR FINISHING SHIPPING RECEIVING
30000 OFFICE KEY PLAN
18000
SHIPPING OFFICE
LOGISTIC OFFICE-1
CH=2400
YW15 YW15
MALE LOCKER ROOM-1
MEETING AREA
18000
18000
WORKER STAFF FEMALE
CANTEEN-1
LOCKER & TOILET-1
YW14 YW14
81000
81000
PRODUCT WAREHOUSE
27000
27000
YW13 YW13
18000
18000
YW12 YW12
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-5 LINK PASSAGE-4
19500
19500
ASSEMBLY ROOM MULTIPURPOSE ROOM
YW11 YW11
ANTE ROOM-6 ANTE ROOM-5 CH=3000 CH=3000 QC LAB ROOM ANTE ROOM-4 ANTE ROOM-3
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1 CORRIDOR-4
SAMPLE ROOM PALLETIZING AREA-3
CH=4000 AC ROOM-2 CH=3000 CH=3000 CH=3000 AC ROOM-1
ANTE ROOM-9
YW10 YW10
STAIR-3
CH=3000 STAIR-3
18000
18000
COMPRESSOR ROOM
FEMALE TOILET-1 MALE TOILET-1 FEMALE TOILET-2
PANTRY-2
CH=2400 MALE TOILET-2
YW9 YW9
CH=2400 ELECTRIC SUBSTATION CH=2400 CH=2400
PRODUCT ROOM-2 PRODUCT ROOM-1 PRODUCT ROOM-3 PRODUCTION OFFICE
(FUTURE AREA) (FUTURE AREA)
300000
27000
99000
CH=3000
CH=3000
CH=3000
TRANSFORMER SPACE MEETING ROOM-1
ANTE ROOM-8
YW8 STAIR-1 YW8
STAIR-1 CH=3000 ANTE ROOM-10
04 12/01/23
CH=3000
18000
18000
CH=3000 CH=3000 REV. DATE DESCRIPTION
SL ROOM-1 TRAINING ROOM REVISIONS
WORKSHOP TOOL STORE-2 SL ROOM-2
YW7 STORAGE-1
YW7 CLIENT:
CH=5500 TOOL STORE-1 CH=3000
18000
18000
DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-2 DUST COLLECTOR ROOM-1
19500
CH=5000
YW5 YW5
LINK PASSAGE-3 LINK PASSAGE-2 LINK PASSAGE-1
18000
18000
PRINCIPAL CONSULTANT:
YW4 YW4
27000
27000
STRUCTURAL CONSULTANT:
81000
81000
MATERIAL WAREHOUSE CH=2400 SECONDARY DUST
COLLECTION TRIM & POLY
YW3 LOSS STOCK ROOM
YW3
CANTEEN-2 MALE LOCKER ROOM-2
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
CH=2400
YW2 YW2
RECEIVING OFFICE
CH=2400
18000
18000
PANTRY-3
PROJECT TILE:
KITCHEN-2 DRIVER REST ROOM-2
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
WORKER MALE TOILET-2
RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 STATUS:
DESIGN DEVELOPMENT
207000 207000
DRAWING TITLE:
WEST FACTORY
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
CEILING FINISHING KEY PLAN
KITCHEN-1
CH=2400
CH=2400
18000
MEETING AREA
CH=2400 CH=2400
YW15
15000 15000
30000
YW2
PRINCIPAL CONSULTANT:
MALE LOCKER ROOM-2 LOGISTIC OFFICE-2
MEETING AREA
CH=2400 CH=2400
CH=2400
18000
CANTEEN-2 CORRIDOR-5
MEP CONSULTANT:
CH=2400 CH=2400
PANTRY-3
18000
SHIPPING OFFICE
LOGISTIC OFFICE-1
YW15 YW15
MALE LOCKER ROOM-1
CANTEEN-1 MEETING AREA
18000
18000
YW14 YW14
81000
81000
PRODUCT WAREHOUSE
27000
27000
YW13 YW13
18000
18000
YW12 YW12
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-5 LINK PASSAGE-4
19500
19500
EXTERIOR EXTERIOR EXTERIOR EXTERIOR
STAIRCASE-1 STAIRCASE-2 STAIRCASE-1 STAIRCASE-2
ASSEMBLY ROOM MULTIPURPOSE ROOM
YW11 YW11
ANTE ROOM-6 ANTE ROOM-5 QC LAB ROOM ANTE ROOM-4 ANTE ROOM-3
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1
SAMPLE ROOM PALLETIZING AREA-3 CORRIDOR-4
AC ROOM-2 AC ROOM-1
ANTE ROOM-9
YW10 YW10
NO FALSE CEILING AREA FALSE CEILING AREA STAIR-3 NO FALSE CEILING AREA FALSE CEILING AREA STAIR-3
18000
18000
COMPRESSOR ROOM
FEMALE TOILET-1 MALE TOILET-1 FEMALE TOILET-2
PANTRY-2
MALE TOILET-2
YW9 YW9
ELECTRIC SUBSTATION
PRODUCT ROOM-2 PRODUCT ROOM-1 PRODUCT ROOM-3
(FUTURE AREA) (FUTURE AREA) PRODUCTION OFFICE
300000
FUTURE FUTURE
99000
27000
27000
99000
SPARE PARTS ROOM-1
AREA AREA
18000
REV. DATE DESCRIPTION
TRAINING ROOM REVISIONS
SL ROOM-1 WORKSHOP TOOL STORE-2 SL ROOM-2
YW7 YW7 CLIENT:
CORRIDOR-3
CORRIDOR-2 TOOL STORE-1 STORAGE-1
18000
18000
DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-2 DUST COLLECTOR ROOM-1
19500
YW5 YW5
LINK PASSAGE - 3 LINK PASSAGE - 2 LINK PASSAGE - 1 GFL-1500
18000
18000
PRINCIPAL CONSULTANT:
HANDRAIL
YW4 YW4
27000
27000
STRUCTURAL CONSULTANT:
81000
81000
MATERIAL WAREHOUSE SECONDARY DUST
COLLECTION TRIM & POLY
YW3 LOSS STOCK ROOM
YW3
CANTEEN-2 MALE LOCKER ROOM-2
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
YW2 YW2
RECEIVING OFFICE
18000
18000
PANTRY-3 CORRIDOR-5 PROJECT TILE:
DRIVER REST ROOM-2
KITCHEN-2 LOADING AREA (RECEIVING)
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
WORKER MALE TOILET-2
RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2
STATUS:
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
207000
207000
DRAWING TITLE:
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 WEST FACTORY
WATERPROOFING KEY PLAN
GF -WATERPROOFING KEY PLAN 1F - WATERPROOFING KEY PLAN DRAWN BY: CHECK BY: APPROVED BY:
1 : 750 1 : 750
SCALE: 1:750 (A1) DATE:
1:1500 (A3) 12/01/23
DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00033 04
N LEGEND
8760
186 2530 11x 300=3300 2744 EW :EFFECTIVE WIDTH
(EW≥1500) (EW≥1500)
REGULATIONS (BASE ON CGDCR OF INDIA)
YW8 YW8
STAIRCASE WIDTH ≥ 1500mm
402
402
480
35 33 31 29 27 25 STAIRCASE TREAD ≥ 300mm
STAIRCASE STEP HEIGHT ≤ 160mm
FD XW1 XW15
1100
(EW≥1500) 1
(EW≥1500)
YW16 YW16
A A
2300
2300
( EW
≥1
500 PRODUCT WAREHOUSE
)
5302
5302
GFL +5.100 GFL +6.800
300
300
YW12 YW12
GRANITE STONE FLOOR: EPOXY PAINT
YW11 YW11
(EW≥1500)
(EW≥1500)
2300
2300
FACTORY
DN
STAIR-1
37 39 41 43 45 47
YW6 YW6
YW5 YW5
186 2830 11x 300=3300 2444
(EW≥1500) (EW≥1500)
8760
402
11 9 7 5 3 1
(EW≥1500)
(EW≥1500)
UP
A A
2300
2300
(EW 0) ROOF: STANDING SEAM ROOF
≥1 50 METAL SHEET 0.6mm TCT H=76mm,
50 ≥1
0 ) ( EW BARE GALVALUME W/ GLASSWOOL
GFL +1.700 INSULATION 50mm THK (24kg/m3)
5302
5302
GFL +3.400
300
300
GRANITE STONE
GRANITE STONE
12/01/23
(EW≥1500)
(EW≥1500)
04
2300
2300
REV. DATE DESCRIPTION
REVISIONS
CLIENT:
CH= 3000
186 2830 11x 300=3300 2444 132
(EW≥1500) (EW≥1500)
(EW≥1500) (EW≥1500) FD DESIGN & CONSTRUCTION:
8892 1
STEEL HANDRAIL
STAIRCASE - 1 PLAN (GFL+1.700 TO GFL+3.400)
1100
XW8 1FL=GFL+6800
1 : 50
6800
47
PRINCIPAL CONSULTANT:
45
12x 142=1700
43
8892
41
1100
186 2530 11x 300=3300 2744 132 39
GFL +5.10
(EW≥1500) (EW≥1500) 37
35 STRUCTURAL CONSULTANT:
2700
YW8 YW8 2744 11x 300=3300 33 2530
402
402
12x 142=1700
480
(EW≥1500) 31 (EW≥1500)
11 9 7 5 3 1
29
1100
FD 27
1100
1 GFL +3.40
6800
25 MEP CONSULTANT:
(EW≥1500)
(EW≥1500)
UP
A A
2300
2300
23
21
0)
12x 142=1700
50 2444 11x 300=3300 2830
(EW≥ W≥1 19
1500 (E (EW≥1500) 17 (EW≥1500)
)
GFL +0.000
1100
5302
5302
15 PROJECT TILE:
GFL +1.70
300
300
13
FLOOR: EPOXY PAINT
11
UNICHARM INDIA 3RD FACTORY
9
RE-CONSTRUCTION PROJECT
12x 142=1700
SD FD 7
(EW≥1500)
5 1
(EW≥1500)
STATUS:
5
2300
2300
1100
DESIGN DEVELOPMENT
3
GFL
1
0 DRAWING TITLE:
SD
13 15 17 19 21 23
5 WEST FACTORY
STAIRCASE - 1 DETAIL
2744 11x 300=3300 2530
186 2830 11x 300=3300 2444 132 (EW≥1500) (EW≥1500)
8574 186
(EW≥1500) (EW≥1500) DRAWN BY: CHECK BY: APPROVED BY:
8892
XW8
STAIRCASE - 1 PLAN (GFL+0.000 TO GFL+1.700) 1 : 50 1:100(A3) 12/01/23
1 : 50 DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00034 04
N LEGEND
XW8
9066
EW :EFFECTIVE WIDTH
186 2775 11x 300=3300 2673 132
(EW≥1500) (EW≥1500)
REGULATIONS (BASE ON CGDCR OF INDIA)
132
132
35 33 31 29 27 25 STAIRCASE WIDTH ≥ 1500mm
STAIRCASE TREAD ≥ 300mm
STAIRCASE STEP HEIGHT ≤ 160mm
XW1 XW15
(EW≥1500)
(EW≥1500)
2200 C C
2200
YW16 YW16
(EW
≥ 15
00 )
PRODUCT WAREHOUSE
GFL +5.100 GFL +6.800
300
300
5147
5147
GRANITE STONE FLOOR: EPOXY PAINT
YW12 YW12
YW11 YW11
(EW≥1500)
(EW≥1500)
DN
2200
2200
FD
1100
1 FACTORY
37 39 41 43 45 47
500
315
315
YW6 YW6 STAIR-2
YW6 YW6
YW5 YW5
186 3075 11x 300=3300 2373 132
(EW≥1500) (EW≥1500)
9066
MATERIAL WAREHOUSE
XW8
STAIRCASE - 2 PLAN (GFL+5.100 TO GFL+6.800) YW1 YW1
1 : 50
XW1 XW15
XW8 KEYPLAN
9112
186 2775 11x 300=3300 2719 132
(EW≥1500) (EW≥1500)
132
132
35 33 31 29 27 25
(EW≥1500)
(EW≥1500)
C UP C
2200
2200
ROOF: STANDING SEAM ROOF
(E W 0) METAL SHEET 0.6mm TCT H=76mm,
≥1 50
500 ≥1 BARE GALVALUME W/ GLASSWOOL
) (E W INSULATION 50mm THK (24kg/m3)
GFL +1.700
300
300
5147
5147
GRANITE STONE
GFL +3.400
04 12/01/23
REV. DATE DESCRIPTION
GRANITE STONE
REVISIONS
(EW≥1500)
(EW≥1500)
2200
CH= 3000
13 15 17 19 21 23 (EW≥1500) (EW≥1500)
315
315
YW6 YW6 FD
1 STEEL HANDRAIL DESIGN & CONSTRUCTION:
1100
1FL=GFL+6800
186 3075 11x 300=3300 2419 132 6800
(EW≥1500) (EW≥1500) 47
9112 45
12x 142=1700
43 PRINCIPAL CONSULTANT:
XW8
STAIRCASE - 2 PLAN (GFL+1.700 TO GFL+3.400) 41
1100
1 : 50 39 GFL +5.10
9112 37
186 2775 11x 300=3300 2719 132 35
9800
2700
(EW≥1500) (EW≥1500) 2719 11x 300=3300 33 2775 STRUCTURAL CONSULTANT:
12x 142=1700
(EW≥1500) 31 (EW≥1500)
132
132
29
11 9 7 5 3 1
1100
27
GFL +3.40
6800
25
(EW≥1500)
(EW≥1500)
23
C UP C MEP CONSULTANT:
2200
2200
12x 142=1700
0) (EW≥1500) 19 (EW≥1500)
(EW
≥ 15 ≥ 150 17
00 ) (E W
1100
15 GFL +1.70
13
300
300
5147
5147
PROJECT TILE:
GFL +0.000 11
FD 9 UNICHARM INDIA 3RD FACTORY
12x 142=1700
FLOOR: EPOXY PAINT 1A 7 RE-CONSTRUCTION PROJECT
(EW≥1500)
(EW≥1500)
5
1100
2200
2200
3 STATUS:
GFL DESIGN DEVELOPMENT
1
0
DRAWING TITLE:
13 15 17 19 21 23
315
315
WEST FACTORY
YW6 FD YW6 132 2719 11x 300=3300 2775 186
1A STAIRCASE - 2 DETAIL
(EW≥1500) (EW≥1500)
9112
1100
186 3075 11x 300=3300 2419 XW8 DRAWN BY: CHECK BY: APPROVED BY:
(EW≥1500) (EW≥1500)
8940 STAIRCASE - 2_SECTION C-C SCALE: 1:50(A1) DATE:
STAIRCASE - 2 PLAN (GFL+0.000 TO GFL+1.700) 1 : 50 1:100(A3) 12/01/23
XW8 DRAWING NUMBER: REV.
1 : 50
UC3-DD-FAC-ARC-00035 04
N LEGEND
6316
EW :EFFECTIVE WIDTH
186 2530 11x 300=3300 300
(EW≥1500)
STEEL HANDRAIL REGULATIONS (BASE ON CGDCR OF INDIA)
YW10 300 YW10 STAIRCASE WIDTH ≥ 1500mm
300
STAIRCASE TREAD ≥ 300mm
35 33 31 29 27 25
STAIRCASE STEP HEIGHT ≤ 160mm
STEEL HANDRAIL XW1 XW15
(EW≥1500)
(EW≥1500)
YW16 YW16
2300
2300
B B
(EW≥ PRODUCT WAREHOUSE
1500 )
GFL +6.800
5200
5200
300
300
FLOOR: EPOXY PAINT YW12 YW12
GFL +5.100
YW11 YW11
GRANITE STONE STAIR-3
(EW≥1500)
(EW≥1500)
2300
2300
DN FACTORY
37 39 41 43 45 47
YW6 YW6
3016 11x 300=3300 YW5 YW5
(EW≥1500) 6316
MATERIAL WAREHOUSE
STAIRCASE - 3 PLAN (GFL+5.100 TO GFL+6.800)
XW8
1 : 50 YW1 YW1
XW1 XW15
KEYPLAN
8760
186 2530 11x 300=3300 2744
(EW≥1500) (EW≥1500)
YW10 YW10
300
300
11 9 7 5 3 1
TOS=GFL+13100
13100
(EW≥1500)
(EW≥1500)
UP
2300
2300
B (EW
B
≥1 0 )
500 150
) (E W≥
GFL +1.700
5200
5200
GFL +3.400
300
300
GRANITE STONE GRANITE STONE 04 12/01/23
REV. DATE DESCRIPTION
REVISIONS
(EW≥1500)
(EW≥1500)
CLIENT:
2300
2300
CH= 3000
DESIGN & CONSTRUCTION:
(EW≥1500)
3016 11x 300=3300 2444
CORRIDOR-4 STEEL HANDRAIL
(EW≥1500) (EW≥1500)
8760
1100
XW8 STAIRCASE - 3 PLAN (GFL+1.700 TO GFL+3.400) 1FL=GFL+6800 PRINCIPAL CONSULTANT:
1 : 50 6800
47
45
12x 142=1700
43
6016
41
1100
186 2530 11x 300=3300 39 GFL +5.10 STRUCTURAL CONSULTANT:
(EW≥1500) 37
35
YW10 YW10 2700
300
300
12x 142=1700
11 9 7 5 3 1 (EW≥1500) 31 (EW≥1500)
29
MEP CONSULTANT:
1100
27
GFL +3.40
(EW≥1500)
(EW≥1500)
6800
UP 25
2300
2300
B B 23
2444 21 11x 300=3300 2830
12x 142=1700
(EW≥ 1 (EW≥1500) 19 (EW≥1500)
500 ) PROJECT TILE:
17
GFL +0.000
5200
5200
1100
300
300
15 GFL +1.70
FLOOR: EPOXY PAINT 13 RE-CONSTRUCTION PROJECT
11
9 STATUS:
12x 142=1700
DESIGN DEVELOPMENT
(EW≥1500)
(EW≥1500)
7
2300
2300
5
1100
3 DRAWING TITLE:
GFL
1
0 WEST FACTORY
13 15 17 19 21 23 STAIRCASE - 3 DETAIL
EW :EFFECTIVE WIDTH
(EW≥1500)
1700
1700
DN
(EW
D ≥ 15
00 )
D PRODUCT WAREHOUSE
3650
250
250
CHECKER PLATE YW12 YW12
CHECKER PLATE
YW11 YW11
(EW≥1500)
(EW≥1500)
1700
1700
EXTERIOR STAIRCASE-1
35 33 31 29 27 25
FACTORY
SD
525
525
1A
YW11
1100 350 YW6 YW6
XW1 XW15
KEYPLAN
7000
1700 11x 300=3300 2000
(EW≥1500) (EW≥1500)
13 15 17 19 21 23
(EW≥1500)
(EW≥1500)
(E
)
1700
1700
500
W≥
15
≥1
D 00 D
(EW
GFL +1.700 )
GFL +3.400
3650
3650
250
250
CHECKER PLATE
CHECKER PLATE
(EW≥1500)
(EW≥1500)
UP 12/01/23
1700
1700
04
REV. DATE DESCRIPTION
REVISIONS
11 9 7 5 3 1
7000 CLIENT:
525
525
SD
1A STEEL HANDRAIL
2000 11x 300=3300 1700 DESIGN & CONSTRUCTION:
(EW≥1500) (EW≥1500)
1100
7000
1FL=GFL+6800
6800
EXTERIOR STAIRCASE - 1 (GFL+1.700 TO GFL+3.400) 47
1 : 50 45
12x 142=1700
PRINCIPAL CONSULTANT:
43
41
1100
3200 39 GFL +5.10
37
4x 300=1200 2000
35
(EW≥1500)
33 STRUCTURAL CONSULTANT:
12x 142=1700
1700 11x300= 3300 31 2000
(EW≥1500) 29 (EW≥1500)
1 3 5
1100
2000 27 11x300= 3300 1700 GFL +3.40
6800
(EW≥1500)
(EW≥1500) 25 (EW≥1500)
1700
)
23
00
UP MEP CONSULTANT:
15
D D 21
≥
12x 142=1700
(EW
GFL +0.000 19
GFL-0.650
17
3650
250
1100
15
GFL +1.70
13
PROJECT TILE:
(EW≥1500)
11x300= 3300 9
UP
UNICHARM INDIA 3RD FACTORY
1700
8
SD
12x 142=1700
1A
7 RE-CONSTRUCTION PROJECT
5
1100
11 9 7 5 3 1
3 STATUS:
SD GFL DESIGN DEVELOPMENT
525
1A 1
YW11 0
5x 130=650
1100 350 GL DRAWING TITLE:
650
2000 11x 300=3300 1700 -650
WEST FACTORY
7000 2000 4x 300=1200 3800 EXTERIOR STAIRCASE - 1 DETAIL
(EW≥1500)
7000
DRAWN BY: CHECK BY: APPROVED BY:
(EW≥1500)
(EW≥1500)
1700
1700
DN CHECKER PLATE
E ( EW
≥ 15 E YW16 YW16
00 )
3650
250
250
GFL +5.100
CHECKER PLATE
CHECKER PLATE
(EW≥1500)
(EW≥1500)
YW12 YW12
1700
1700
YW11 YW11
35 33 31 29 27 EXTERIOR STAIRCASE-2
SD
FACTORY
525
525
1A
YW11 YW11
1100 300
2000 11x 300=3300 1700 YW6 YW6
(EW≥1500) (EW≥1500)
7000 YW5 YW5
YW1 YW1
13 15 17 19 21 23
(EW≥1500)
(EW≥1500)
1700
1700
(EW
)
00
E ≥1 E
15
500
W≥
)
(E
3650
250
250
(EW≥1500)
UP
1700
1700
7000
04 12/01/23
11 9 7
2000 11x300= 3300 1700 REV. DATE DESCRIPTION
REVISIONS
525
525
(EW≥1500) (EW≥1500)
YW11 YW11
CLIENT:
1100
DESIGN & CONSTRUCTION:
EXTERIOR STAIRCASE - 2 (GFL+1.700 TO GFL+3.400) 1FL=GFL+6800
1 : 50 6800
47
45
12x 142=1700
43
41 PRINCIPAL CONSULTANT:
1100
39
GFL +5.10
7000 37
35
3800 4x 300=1200 2000
1700 11x300= 3300 33 2000
(EW≥1500)
12x 142=1700
(EW≥1500) 31 (EW≥1500) STRUCTURAL CONSULTANT:
29
1100
1 3 5 27
GFL +3.40
25
(EW≥1500)
(EW≥1500)
6800
23
1700
1700
0)
7450
50
21
E E
12x 142=1700
≥1
MEP CONSULTANT:
(EW≥1500) 19 (EW≥1500)
(E W
17
GFL-0.650
1100
GFL +0.000
3650
3650
250
250
15
GFL +1.70
SD 13
1A
11
(EW≥1500)
(EW≥1500)
1700
12x 142=1700
(EW≥1500) (EW≥1500)
7 UNICHARM INDIA 3RD FACTORY
SD 5
RE-CONSTRUCTION PROJECT
1100
1A
11 9 7 5 3 1 3
1
GFL
STATUS:
525
525
0
DESIGN DEVELOPMENT
5x 130=650
YW11 YW11
GL
650
1100 160 -650
DRAWING TITLE:
2000 11x 300=3300 1700 2000 4x 300=1200 3800 WEST FACTORY
(EW≥1500) (EW≥1500) (EW≥1500) EXTERIOR STAIRCASE - 2 DETAIL
7000 7000
EXTERIOR STAIRCASE - 2 (GFL+0.650 TO GFL+0.000) EXTERIOR STAIRCASE - 2_SECTION E-E DRAWN BY: CHECK BY: APPROVED BY:
1 : 50 1 : 50
SCALE: 1:50(A1) DATE:
1:100(A3) 12/01/23
DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00038 04
N
STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
GALVALUME WITH GLASSWOOL INSULATION 50mm THK (24kg/m3)
ONE SIDED ALUMINUM FOIL GI WELDMESH 50x50x1.5mm THK STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
GALVALUME WITH GLASSWOOL INSULATION 50mm THK (24kg/m3)
ONE SIDED ALUMINUM FOIL GI WELDMESH 50x50x1.5mm THK
GUTTER
FLASHING COVER
XW1 XW15 DOWNSPOUT
1:30 PVC D150
YW16 YW16
PRODUCT WAREHOUSE
YW12 YW12
7930
7650
7650
YW11 YW11
8580
8300
8300
5000
5000
FACTORY
ANTE ROOM-1 LINK PASSAGE-1
2150
GFL GFL
0 0
YW6 YW6
650
650
650
GL GL
YW5 YW5 -650 -650
LINK PASSAGE-1 726 5000 40 1100 794
7660
MATERIAL WAREHOUSE
XW12
YW1 YW1 LINK PASSAGE 1,2,3 TYPICAL SECTION 2-2
YW6 1 : 100
XW1 XW15
LINK PASSAGE 1,2,3 TYPICAL SECTION 1-1
KEYPLAN 1 : 100 STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
GALVALUME WITH GLASSWOOL INSULATION 50mm THK (24kg/m3)
ONE SIDED ALUMINUM FOIL GI WELDMESH 50x50x1.5mm THK
WALL: COLOUR COATED GALVALUME SHEET 0.5mm TCT
W/GLASSWOOL INSULATION 50mm THK (24kg/m3)
XW12 DOWNSPOUT PVC D150 DOWNSPOUT PVC D150
ANTE ROOM-1
7650
GFL +0.000
8300
2 2
650
GL
1:30 -650
1 1 1 1
LINK PASSAGE 1,2,3_ELEVATION B
1 : 100 YW6
STANDING SEAM ROOF METAL PRINCIPAL CONSULTANT:
LINK PASSAGE-1 SHEET 0.6mm TCT H=76mm BARE
GFL +0.000 GALVALUME WITH GLASSWOOL
INSULATION 50mm THK (24kg/m3)
FLOOR: NATURAL CONCRETE HARDENER W/MAX ONE SIDED ALUMINUM FOIL GI
WELDMESH 50x50x1.5mm THK
WALL: COLOUR COATED GALVALUME SHEET 0.5mm TCT STRUCTURAL CONSULTANT:
W/GLASSWOOL INSULATION 50mm THK (24kg/m3)
FLASHING COVER GUTTER STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
GALVALUME WITH GLASSWOOL INSULATION 50mm THK (24kg/m3)
ONE SIDED ALUMINUM FOIL GI WELDMESH 50x50x1.5mm THK
MEP CONSULTANT:
1:30
PROJECT TILE:
7930
UNICHARM INDIA 3RD FACTORY
8580
RE-CONSTRUCTION PROJECT
STATUS:
DESIGN DEVELOPMENT
2 2
GFL
DRAWING TITLE:
7950 450 0
7950 450
650
GL WEST FACTORY
8400 8400
-650 TYPICAL LINK PASSAGE DETAIL 1,2,3
TYPICAL LINK PASSAGE DETAIL 1,2,3 GFL PLAN TYPICAL LINK PASSAGE DETAIL 1,2,3 ROOF PLAN LINK PASSAGE 1,2,3_ELEVATION A SCALE: DATE:
12/01/23
1 : 100 1 : 100 1 : 100
YW6 DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00039 04
N
XW1 XW15
STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
YW16 YW16 GALVALUME WITH GLASSWOOL INSULATION 50mm THK (24kg/m3)
ONE SIDED ALUMINUM FOIL GI WELDMESH 50x50x1.5mm THK
PRODUCT WAREHOUSE FLASHING COVER
GUTTER
1:30
LINK PASSAGE-4
YW12 YW12
YW11 YW11
5830
5550
FACTORY
6480
5000
6200
GFL GFL
YW6 YW6 0 0
650
650
YW5 YW5
GL GL
-650 -650
19500
MATERIAL WAREHOUSE
7660 160 YW12 YW11
YW1 YW1
2 6 2
5550
6200
04 12/01/23
REV. DATE DESCRIPTION
REVISIONS
7820 GFL CLIENT:
1:30 0
650
GL
-650
19500
DESIGN & CONSTRUCTION:
1 1 1 1
YW11 YW12
STRUCTURAL CONSULTANT:
STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
GALVALUME WITH GLASSWOOL INSULATION 50mm THK (24kg/m3)
ONE SIDED ALUMINUM FOIL GI WELDMESH 50x50x1.5mm THK
1:30 WALL: COLOUR COATED GALVALUME SHEET 0.5mm TCT MEP CONSULTANT:
7820 W/GLASSWOOL INSULATION 50mm THK (24kg/m3)
460 5000 401100
PROJECT TILE:
5830
RE-CONSTRUCTION PROJECT
6480
ANTE ROOM-3
2 2 STATUS:
GFL +0.000 6
DESIGN DEVELOPMENT
7950 450 GFL
0
8400 DRAWING TITLE:
650
GL
WEST FACTORY
-650
TYPICAL LINK PASSAGE DETAIL 4,5,6,7
19500
XW14
YW12 YW11 DRAWN BY: CHECK BY: APPROVED BY:
TYPICAL LINK PASSAGE DETAIL 4,5,6,7 GFL PLAN TYPICAL LINK PASSAGE DETAIL 4,5,6,7 ROOF PLAN LINK PASSAGE 4,5,6,7_ELEVATION A SCALE: DATE:
1 : 100 1 : 100 1 : 100 12/01/23
DRAWING NUMBER: REV.
UC3-DD-FAC-ARC-00040 04
N LEGEND:
50 SUNK
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 100 SUNK
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14
150 SUNK
560 SUNK
CORRIDOR-1 KITCHEN-1
WORKER STAFF FEMALE 1500 SUNK
LOCKER & TOILET-1
DRIVER TOILET-1
YW16 YW16
WORKER MALE TOILET-1
DRIVER REST ROOM-1
18000
18000
SHIPPING OFFICE
LOGISTIC OFFICE-1
YW15 YW15
MALE LOCKER ROOM-1
18000
18000
MEETING AREA
CANTEEN-1
YW14 YW14
81000
81000
PRODUCT WAREHOUSE
27000
27000
YW13 YW13
18000
18000
YW12 YW12
LINK PASSAGE-7 LINK PASSAGE-6 LINK PASSAGE-5 LINK PASSAGE-4 EXTERIOR EXTERIOR
EXTERIOR EXTERIOR
19500
19500
STAIRCASE-1 STAIRCASE-2 STAIRCASE-1 STAIRCASE-2
LINK BRIDGE LINK BRIDGE
YW11 ABOVE YW11
ANTE ROOM-6 ANTE ROOM-5 QC LAB ROOM ANTE ROOM-4 ANTE ROOM-3 RC ROOF
18000
18000
PALLETIZING AREA-2 PALLETIZING AREA-1
SAMPLE ROOM PALLETIZING AREA-3 AC ROOM-2 ASSEMBLY ROOM CORRIDOR-4
MULTIPURPOSE ROOM AC ROOM-1
ANTE ROOM-9
YW10 YW10
STAIR-3 STAIR-3
NO FALSE CEILING AREA FALSE CEILING AREA
18000
18000
COMPRESSOR ROOM FEMALE TOILET-2
FEMALE TOILET-1 MALE TOILET-1 PANTRY-2
MALE TOILET-2
YW9 YW9
ELECTRIC SUBSTATION CATWALK
PRODUCT ROOM-2 PRODUCT ROOM-1 PRODUCT ROOM-3 GFL+6500
(FUTURE AREA) (FUTURE AREA) PRODUCTION OFFICE
300000
99000
27000
27000
99000
SPARE PARTS ROOM-1 (FUTURE AREA) (FUTURE AREA)
18000
REV. DATE DESCRIPTION
TRAINING ROOM
TOOL STORE-1 WORKSHOP TOOL STORE-2 SL ROOM-2
REVISIONS
YW7 YW7 CLIENT:
CORRIDOR-3 STORAGE-1
CORRIDOR-2
18000
18000
DUST COLLECTOR ROOM-4 DUST COLLECTOR ROOM-3 DUST COLLECTOR ROOM-2 DUST COLLECTOR ROOM-1
19500
YW5 YW5
18000
18000
PRINCIPAL CONSULTANT:
YW4 YW4
27000
27000
STRUCTURAL CONSULTANT:
MATERIAL WAREHOUSE SECONDARY DUST
COLLECTION TRIM & POLY
LOSS STOCK ROOM
81000
81000
YW3 YW3
CANTEEN-2 MALE LOCKER ROOM-2
18000
18000
MEP CONSULTANT:
MEETING AREA LOGISTIC OFFICE-2
YW2 YW2
RECEIVING OFFICE
18000
18000
PANTRY-3 CORRIDOR-5 PROJECT TILE:
KITCHEN-2
YW1 YW1 UNICHARM INDIA 3RD FACTORY
WORKER STAFF FEMALE
DRIVER REST ROOM-2
RE-CONSTRUCTION PROJECT
LOCKER & TOILET-2
STATUS:
WORKER MALE TOILET-2
DESIGN DEVELOPMENT
12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 12000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000 15000
DRAWING TITLE:
207000 207000
WEST FACTORY
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15 SUNK SLAB KEY PLAN
XW1 XW2 XW3 XW4 XW5 XW6 XW7 XW8 XW9 XW10 XW11 XW12 XW13 XW14 XW15
W13: COLOUR COATED GALVALIUME SHEET t=0.5mm,PROFILE HIGHT t=6mm, UPTO GFL+3150
W10: TIMBER VENEER PANEL W/STAIN & VARNISHED FINISH W/8mm GROOVE LINE
WATER PROOF
W5: EXPOSED
C5: EXPOSED
W7: AEP
GFL=+101.20
GFL
A-001 MAIN ENTRANCE LOBBY GFL±0 3.0/3.3 - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - - ● - - ● - - - - ● - - - - - - ● DISPLAY, SIGNAGE "NOLA&DOLA"
A-002 VESTIBULE GFL-100 3.0 - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - - ● - - - - - - - ● - - - - - - - -
A-003 VIP OFFICE (6) GFL±0 3.0 - - - - - ● - - - - - - - - - - - - ● - - - - ● - - - - - - ● - - ● - - - - - - - - - ● - ● -
A-004 GUEST MEETING ROOM (8) GFL±0 3.0/3.3 - - - - - ● - - - - - - - - - - - - ● - - - - ● - - - - - - ● - - ● - - - - ● - - - - ● - ● -
A-005 MEETING ROOM-2 (8) GFL±0 3.0 - - - - - ● - - - - - - - - - - - - ● - - - - ● - - - - - - ● - - - - - - - - - - - - ● - ● -
A-006 OFFICE (50) GFL±0 3.0 - - - - - ● - - - - - - - - - - ● - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - ● -
A-007 TV MEETING ROOM (20) GFL±0 3.0 - - - - - ● - - - - - - - - - - ● - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - ● PROJECTOR SCREEN & PROJECTOR BOX
A-008 STORAGE-2 GFL±0 3.0 - - - - - ● - - - - - - - - - - ● - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - - -
A-009 SERVER ROOM GFL±0 3.0 - - - - - - ● - - - - - - - - ● - - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - - -
A-010 HR ROOM GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - - -
A-011 FIRE & SERCURITY CONTROL OFFICE GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - - -
A-012 STAFF ENTRANCE GFL±0/-100 3.0 - - - - - - ● - - - - - - - - - ● - - - - - - - - - - - - ● - - - - - - - ● - - - - - - - -
A-013 CORRIDOR-6 GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - - - - - - - ● - - - - - -
A-014 FIRST AID ROOM GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - ● - - - - - - - - - ● - - - - - -
A-015 MALE OFFICE STAFF LOCKER ROOM (8X6=48) GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - ● - - - - - - - ● - - - - - - - - - ● - - - - - -
A-016 FEMALE OFFICE STAFF LOCKER ROOM(4X6=24) GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - ● - - - - - - - ● - - - - - - - - - ● - - - - - -
A-017 PANTRY-4 GFL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - - - - - - - - - - ● - - - - - - KITCHEN CABINET
A-018 SK-1 GFL±0 2.4 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE
A-019 GUEST MALE TOILET GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE
A-020 GUEST FEMALE TOILET GFL-50 2.4 - - - - - - - ● - - - - - - - - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE
A-021 STAFF MALE TOILET-1 GFL-50 2.4 - - - - - - - - ● - - - - - - - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE
A-022 STAFF FEMALE TOILET-1 GFL-50 2.4 - - - - - - - - ● - - - - - - - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE
A-023 EMPLOYEE ENTRANCE PORCH GFL-100 3.1 - - - - - - - - - - ● - - - - - - ● - - - - ● - - - - - - - - - - - - - - - - - ● - - - - - SECURITY GATE (OUT OF SCOPE)
A-024 SHOE LOCKER GFL±0/-100 3.0 - ● - - - - - - - - - - - - - ● - ● - - - - ● - - - - - - - - - - - - - - - ● - - - - - - - - 04 01/12/23
A-025 MALE TOILET-3 GFL-50 2.4 - - - - - - - - ● - - - - - - - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE REV. DATE DESCRIPTION
A-119 PS-1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
A-120 PS-2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
A-121 PS-3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2FL
A-201 CONFRENCE ROOM (12) 2FL±0 3.0 - - - - - ● - - - - - - - - - - - - ● - - - - ● - - - - - - ● - - ● - - - - - - ● - - - - ● CABINET PROJECT TILE:
A-202 CANTEEN-3 (300) 2FL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - - - - - - - - - - - ● - - - - - - UNICHARM INDIA 3RD FACTORY
A-203 KITCHEN / SERVING ROOM 2FL-50 3.0 - - - - - - - - - ● - - - - ● - - - - - - - - - - - ● - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE RE-CONSTRUCTION PROJECT
A-204 KITCHEN OFFICE 2FL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - ● - - - - - - - - - - - - - - - - ● - - - - - -
A-205 SERVICE CORRIDOR 2FL±0 3.0 - - - - - - - - - ● - - - - - ● - - - - - - - ● - - - - - - - - - - - - - - - - ● - - - - - - STATUS:
A-206 MATERIAL STORAGE 2FL±0 3.0 - - - - - - - - - ● - - - - - ● - - - - - - - ● - - - - - - - - - - - - - - - - ● - - - - - - DESIGN DEVELOPMENT
A-207 MALE TOILET-5 2FL-50 2.4 - - - - - - - ● - - - - - - ● - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE
A-208 FEMALE TOILET-4 2FL-50 2.4 - - - - - - - ● - - - - - - ● - - - - - ● - - - - - ● - - - - - - - - - - - - ● - - - - - - WALL WATERPROOFING 1m RISE DRAWING TITLE:
A-209 HALL 2FL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - - - - - - - ● - - - - - -
A-210 CORRIDOR-10 2FL±0 3.0 - ● - - - - - - - - - - - - - ● - - - - - - - - - - - - - - ● - - - - - - - - - ● - - - - - - ADMINISTRATION OFFICE
A-211 PS-1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - INTERIOR FINISHING SCHEDULE (1/2)
A-212 PS-3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
DRAWN BY: CHECK BY: APPROVED BY:
COMMON
A-218 DW
LINK BRIDGE
A-216 STAIR - 9
A-216 STAIR - 8
A-215 STAIR - 7
A-214 STAIR - 6
A-213 STAIR - 5
A-212 STAIR - 4
A-217 STAIR - 10
-
FLOOR FINISH LEVEL(mm)
1FL±0
1FL±0
1FL±0
GFL±0
GFL±0
GFL±0
GFL±0
2FL-1400
-
3.0
7.1
7.1
7.1
7.1
CEILING HIGHT (m)
11.2
15.0
11.2
-
-
-
-
-
-
-
-
-
F1: EPOXY COATING (t=2mm)
-
-
-
●
●
●
●
●
●
F1A: EPOXY PAINT (t=0.5mm)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
F4: VITRIFIED TILE (800x800mm)
-
-
-
-
-
-
-
-
-
-
F6: RAISED FLOOR H=300
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
WATER PROOF
-
-
-
-
-
-
●
●
●
●
●
●
●
●
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
W5: EXPOSED
-
-
-
-
-
-
-
-
-
-
-
-
-
●
●
●
●
●
W7: AEP
-
-
-
-
-
-
-
-
-
-
GYPSUM BOARD t=12mm
W10: TIMBER VENEER PANEL W/STAIN & VARNISHED FINISH W/8mm GROOVE LINE
-
-
-
-
-
-
-
●
●
W13: COLOUR COATED GALVALIUME SHEET t=0.5mm, PROFILE HIGHT t=6mm, UPTO GFL+3150
-
-
-
-
-
-
-
-
-
●
●
●
●
●
●
●
●
-
-
-
-
-
-
-
-
C5: EXPOSED
-
-
-
-
-
-
-
-
-
CAPACITY: 500KG
04
REV.
SCALE:
CLIENT:
STATUS:
DATE
DRAWN BY:
01/12/23
PROJECT TILE:
DRAWING TITLE:
MEP CONSULTANT:
DRAWING NUMBER:
NONE
PRINCIPAL CONSULTANT:
DESIGN & CONSTRUCTION:
STRUCTURAL CONSULTANT:
CHECK BY:
UC3-DD-ADM-ARC-00043
DESCRIPTION
REVISIONS
ADMINISTRATION OFFICE
DESIGN DEVELOPMENT
DATE:
APPROVED BY:
REV.
01/12/23
04
N
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
CANOPY
CANOPY ABOVE
Y2
DN Y2
Y7 Y7 Y7 Y7
VIP OFFICE (6) STAIR - 4 UP
VESTIBULE STAIR - 4
UP PJ ROOM-1 (8) DN
DISPLAY STAIR - 7
9000
9000
PS-1 PS-1 STORAGE-3
MAIN ENTRANCE LOBBY
GUEST MEETING ROOM (8) LINK BRIDGE-2 LINK BRIDGE-2
LINK BRIDGE-1 FUTURE WORK LINK BRIDGE-1 UP FUTURE WORK
ABOVE GFL ± 0.00 = +101.20 ABOVE ABOVE PJ ROOM-2 (8) 1FL= GFL+ 4100 ABOVE
Y6 Y6 Y6 Y6
FUTURE WORK
2500 CORRIDOR-7
MEETING ROOM-2 (8)
UP UP STAIR - 10
X3 CLEAR X3 X3 X3
WIDTH
9000
9000
TV MEETING ROOM (20) PS-2
GUEST MALE TOILET 3000
PJ ROOM-3 (8)
CLEAR
GUEST FEMALE TOILET OFFICE (50) WIDTH
Y5 Y5 Y5 Y5
FEMALE OFFICE STAFF PANTRY-4 PANTRY-5
LOCKER ROOM(4X6=24)
SK-1
STAFF FEMALE TOILET-1 STAFF FEMALE TOILET-2
9000
9000
X4 CORRIDOR-6
X4 X4 SK-2 X4
SERVER ROOM
STAFF MALE TOILET-2 MALE LOCKER ROOM
STAFF MALE TOILET-1 (134X12=1608)
54000
54000
Y4 Y4 Y4 Y4
FIRST AID ROOM CORRIDOR-8
UP DN
STAIR - 8
9000
9000
HR ROOM
CONTROL OFFICE
UP
CANOPY CANOPY
MALE OFFICE STAFF 04 01/12/23
STORAGE-4
LOCKER ROOM (8X6=48) STAFF ENTRANCE REV. DATE DESCRIPTION
Y3 Y3 Y3 Y3 REVISIONS
CLIENT:
DN GFL -0.100 EMPLOYEE ENTRANCE DN CANOPY ABOVE
PORCH FEMALE STAFF LOCKER
CANOPY ABOVE 9000 ROOM (4x5=20)
9000
SHOE LOCKER
FEMALE LOCKER ROOM
CORRIDOR-9 DESIGN & CONSTRUCTION:
(11X12=132)
Y2 Y2 Y2 Y2
MALE STAFF LOCKER ROOM
(25X6=150)
CLEAR
2500
GARBAGE ROOM WIDTH PRINCIPAL CONSULTANT:
9000
9000
PS-3 PS-3
MEP CONSULTANT:
X1 X2 X3 X4 X5
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
Y2 Y2 Y2
Y7 Y7 Y7
UP
STAIR - 4
9000
STAIR - 7 PS-1
DN LINK BRIDGE-2
LINK BRIDGE-2 LINK BRIDGE-2
(FUTURE WORK) LINK BRIDGE-1 LINK BRIDGE-1
FUTURE WORK FUTURE WORK
Y6 Y6 Y6
CLEAR UP UP
2FL -1.400 HALL
3000
LINK BRIDGE-1
WIDTH DN
X3 DN X3 X3 X3 X3 X3
9000
STAIR - 9
2FL =GFL+ 8200 STAIR - 10
TEMPORARY WALL
HAND WASH
Y5 Y5 Y5
9000
X4 X4 X4 1:100 1:100 X4 X4 1:100 1:100 X4
MALE TOILET-5 CANTEEN-3 (300)
54000
Y4 Y4 Y4
STAIR - 8
FEMALE TOILET-4
9000
DN
04 01/12/23
REV. DATE DESCRIPTION
REVISIONS
Y3 Y3 Y3
CLIENT:
9000
WATER DESIGN & CONSTRUCTION:
COOLER
Y2 Y2 Y2
KITCHEN OFFICE UP UP
9000
PS-3
UP DN STEEL LADDER STEEL LADDER
STAIR - 5
DN DW
Y1 Y1 Y1
STRUCTURAL CONSULTANT:
SERVICE CORRIDOR MATERIAL STORAGE
Y2 Y2 Y2
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
PROJECT TILE:
DRAWING TITLE:
ADMINISTRATION OFFICE
FLOOR PLAN (2FL, LRF, RF)
LINK BRIDGE - 2
3600
FUTURE WORK
PARAPET TOP
13500
1200
RC PARAPET W/PAINT
LRF
12300
4100
AAC BLOCK + PLASTER WITH
TEXTURED PAINT 2FL
8200
ALUMINUM COMPOSITE PANEL
t=4mm / ROOF: STANDING SEAM
14150
ROOF PANELS HEIGHT 76mm
4100
ALUMINUM COMPOSITE PANEL
t=4mm / ROOF: STANDING SEAM 1FL
ROOF PANELS HEIGHT 76mm
4100
4100
GFL=+101.20
0
650
GL
-650
9000 9000 9000 9000 9000 9000
54000
Y1 Y2 Y3 Y4 Y5 Y6 Y7
EAST ELEVATION
1 : 150
3600
LINK BRIDGE-1
3150
AAC BLOCK + PLASTER WITH
RC PARAPET W/PAINT
TEXTURED PAINT PARAPET TOP
13500
1200
LRF
12300
4100
2FL
8200
AAC BLOCK + PLASTER WITH
TEXTURED PAINT
14150
ALUMINUM COMPOSITE PANEL
4100
t=4mm / ROOF: STANDING SEAM ALUMINUM COMPOSITE PANEL
ROOF PANELS HEIGHT 76mm t=4mm / ROOF: STANDING SEAM 1FL
ROOF PANELS HEIGHT 76mm
4100
4100
GFL=+101.20 04 01/12/23
650
GL
-650 CLIENT:
STEEL LADDER
WEST ELEVATION
ALUMINUM COMPOSITE PANEL 1 : 150
t=4mm / ROOF: STANDING SEAM PRINCIPAL CONSULTANT:
ROOF PANELS HEIGHT 76mm
RC PARAPET W/PAINT
3600
ALUMINUM CURTAIN WALL EXPANSION JOINT ALUMINUM CURTAIN WALL PARAPET TOP
PARAPET TOP
13500 13500
1200
EXPANSION JOINT
1200
STRUCTURAL CONSULTANT:
LRF LRF
ALUMINUM CURTAIN WALL 12300 LINK BRIDGE-1 LINK BRIDGE-2 12300
(FUTURE WORK)
4100
4100
2FL 2FL
8200 8200 MEP CONSULTANT:
14150
14150
4100
4100
4100
4100
GFL=+101.20 GFL=+101.20
0 GL 0GL STATUS:
-650 DESIGN DEVELOPMENT
650
-650
650
DRAWING TITLE:
6000 6000 6000 6000
6000 6000 6000 6000
ADMINISTRATION OFFICE
24000
24000 ELEVATIONS
Y2
Y7
X1 X2 X3 X4 X5
X1 X2 X3 X4 X5
Y6
RCC SLAB + BITUMINIOUS MEMBRANE WATER PROOFING WITH X3 X3
STYLO FOAM INSULATION t=50mm + TOPPING CONCRETE RCC SLAB + BITUMINIOUS MEMBRANE WATER PROOFING
RC PARAPET W/PAINT
t=80mm, CEMENT TILE t=40mm WITH STYLO FOAM INSULATION t=50mm + TOPPING
RC PARAPET W/PAINT CONCRETE t=80mm, CEMENT TILE t=40mm RC PARAPET W/PAINT Y5
PARAPET TOP PARAPET TOP
RC PARAPET W/PAINT
13500 13500 X4 X4
LRF LRF
1200
1200
EXPANSION JOINT 1:100 1:100 1:100 1:100
12300 12300 Y4
4100
4100
3000
3000
3000
3000
HALL
CANTEEN-3 (300)
2FL 2FL
8200 8200
Y2
AAC BLOCK + PLASTER WITH AAC BLOCK + PLASTER WITH
TEXTURED PAINT TEXTURED PAINT
14150
14150
4100
4100
Y1
3000
3000
3000
3000
2400
EXPANSION JOINT STAIR - 9 STAIR - 10 TEMPORARY MALE LOCKER ROOM
PANEL 1FL STAFF FEMALE TOILET-2 CORRIDOR-8 (134X12=1608) 1FL
Y2
4100 4100
4100
4100
3000
3000
3000
3000
3000
3000
3000
2400
2400
MEETING ROOM-2 (8) OFFICE (50) OFFICE (50)
GFL=+101.20 CORRIDOR-6 SERVER ROOM GFL=+101.20 KEY PLAN
0 0
650
650
GL GL
MAIN ENTRANCE LOBBY TV MEETING ROOM (20) -650 -650
STAFF FEMALE TOILET-1
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
X3 SECTION X4 SECTION
1 : 120 1 : 120
04 01/12/23
REV. DATE DESCRIPTION
REVISIONS
CLIENT:
STEEL LADDER
PARAPET TOP
13500
LRF
1200
1200
RC PARAPET W/PAINT
12300
PRINCIPAL CONSULTANT:
4100
3000
3000
3000
3000
3000
3000
AAC BLOCK + PLASTER WITH
DW SERVICE CORRIDOR CANTEEN-3 (300) HALL STAIR - 7
TEXTURED PAINT 2FL
KITCHEN / SERVING ROOM 8200
STRUCTURAL CONSULTANT:
14150
4100
ALUMINUM COMPOSITE PANEL
3000
3000
3000
3000
AAC BLOCK + PLASTER WITH FEMALE LOCKER ROOM MALE LOCKER ROOM t=4mm / ROOF: STANDING SEAM
2400
350
4100
3000
3200
3000
3000
3000
3000
1FL -0.100
2400
GFL+ 0.260 SHOE LOCKER SERVER ROOM SK-1 TV MEETING ROOM (20) MAIN ENTRANCE LOBBY VESTIBULE
STAFF ENTRANCE STORAGE-2 GFL=+101.20 PROJECT TILE:
0 UNICHARM INDIA 3RD FACTORY
650
GL RE-CONSTRUCTION PROJECT
SERVICE ENTRANCE EMPLOYEE ENTRANCE -650
PORCH STATUS:
9000 9000 9000 9000 9000 9000 DESIGN DEVELOPMENT
54000
DRAWING TITLE:
ADMINISTRATION OFFICE
Y1 Y2 Y3 Y4 Y5 Y6 Y7
SECTIONS
1 : 120
SCALE: 1:120 (A1) DATE:
1:240 (A3) 01/12/23
DRAWING NUMBER: REV.
UC3-DD-ADM-ARC-00047 04
N LEGEND
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
X1 X2 X3 X4 X5
CANOPY
CANOPY ABOVE
DN
Y7 Y7 Y7
VIP OFFICE (6) STAIR - 4 UP DN
VESTIBULE STAIR - 4 STAIR - 4
UP PJ ROOM-1 (8) DN
CONFRENCE ROOM (12)
STAIR - 7
9000
9000
9000
FIRE COMPARTMENT AREA: PS-1 STAIR - 7 PS-1 STORAGE-3 PS-1
GUEST MEETING ROOM (8)
709.5m2 LINK BRIDGE-2
FUTURE WORK LINK BRIDGE-1 UP LINK BRIDGE-2 DN
LINK BRIDGE-1 MAIN ENTRANCE LOBBY GFL ± 0.00 ABOVE PJ ROOM-2 (8) FUTURE WORK LINK BRIDGE-2
ABOVE FIRE COMPARTMENT AREA: LINK BRIDGE-1
ABOVE ABOVE FUTURE WORK
325.9m2
Y6 Y6 Y6
1FL= GFL+ 4100 FUTURE WORK
2FL -1.400 UP FIRE COMPARTMENT AREA: UP
2500
MEETING ROOM-2 (8) PS-2 STAIR - 10 320.6m2
UP UP STAIR - 9 STAIR - 10
CLEAR
WIDTH 9000
9000
9000
2FL =GFL+ 8200
GUEST MALE TOILET
TV MEETING ROOM (20) PJ ROOM-3 (8) TEMPORARY WALL
HAND WASH
GUEST FEMALE TOILET OFFICE (50)
FEMALE OFFICE STAFF
Y5 Y5 Y5
PANTRY-4 PANTRY-5
LOCKER ROOM(4X6=24)
SK-1
STAFF FEMALE TOILET-1
STAFF FEMALE TOILET-2
9000
9000
9000
CORRIDOR-6 CLEAR
SK-2 WIDTH
SERVER ROOM MALE TOILET-5
STAFF MALE TOILET-2 MALE LOCKER ROOM
STAFF MALE TOILET-1 3000 (134X12=1608)
54000
54000
54000
Y4 Y4 Y4
FIRST AID ROOM CORRIDOR-8
UP DN FEMALE TOILET-4
04 01/12/23
STAIR - 8 FIRE COMPARTMENT AREA: CANTEEN-3 (300) REV. DATE DESCRIPTION
563.6m2 STAIR - 8
FIRE & SERCURITY REVISIONS
9000
9000
9000
HR ROOM STAIR - 8
CONTROL OFFICE
UP STORAGE-2 DN FIRE COMPARTMENT AREA: CLIENT:
FIRE COMPARTMENT AREA: CANOPY CANOPY 648.7m2
MALE OFFICE STAFF 108.0m2 STORAGE-4
LOCKER ROOM (8X6=48) STAFF ENTRANCE
Y3 Y3 Y3
9000
9000
FIRE COMPARTMENT AREA:
282.3m2 FEMALE LOCKER ROOM
(11X12=132) CORRIDOR-9
PRINCIPAL CONSULTANT:
Y2 Y2 Y2
MALE STAFF LOCKER ROOM KITCHEN OFFICE SERVICE CORRIDOR
SHOE LOCKER (25X6=150)
FIRE COMPARTMENT AREA:
PS-3 SERVICE ENTRANCE 335.0m2 CORRIDOR-10 KITCHEN / SERVING ROOM
9000
9000
9000
PS-3 PS-3 FIRE COMPARTMENT AREA: STRUCTURAL CONSULTANT:
UP DN DN UP 262.4m2
STAIR - 5
STAIR - 6 STAIR - 5 STAIR - 6
STAIR - 5
UP UP DW UP DW
Y1 Y1 Y1
MATERIAL STORAGE
GARBAGE ROOM MALE TOILET-3 FEMALE TOILET-3 MALE TOILET-4 MEP CONSULTANT:
SERVICE CORRIDOR
DRAWING TITLE:
GF - FIRE SAFETY PLAN 1F - FIRE SAFETY PLAN 2F - FIRE SAFETY PLAN ADMINISTRATION OFFICE
1 : 200 1 : 200 1 : 200 FIRE SAFETY PLAN
AW
WINDOW TAG
1
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
CANOPY ABOVE
CANOPY
AD ACW UP
WD 1a 1
1A
Y7 Y7 Y7 Y7
VIP OFFICE (6) AW AW UP
1
VESTIBULE 1
UP PJ ROOM-1 (8) FD
WD DN
1
FD 1A
AW AW
9000
9000
1
17 DISPLAY
AW AD PS-1 17 STAIR - 7 PS-1 STORAGE-3
GUEST MEETING ROOM (8) 2
1a GFL ± 0.00 WD
LINK BRIDGE-2 1A LINK BRIDGE-2
LINK BRIDGE-1 FUTURE WORK LINK BRIDGE-1 UP SD SD FUTURE WORK
ABOVE WD
MAIN ENTRANCE LOBBY SD ABOVE
PJ ROOM-2 (8)
1 1
1 ABOVE 1FL= GFL+ 4100 ABOVE
1A
Y6 Y6 Y6 Y6
WD FUTURE WORK
AW MEETING ROOM-2 (8) 2500 2A FD
17 3C
STAIR - 9 UP WD PS-2 UP STAIR - 10
WD CLEAR 1A
1A WIDTHTV MEETING ROOM (20)
AW
9000
9000
17 3000
GUEST MALE TOILET WD
1T AW PJ ROOM-3 (8) AW
WD WD WD CLEAR 12
2A
16
WIDTH FD
1T 1A 3C
GUEST FEMALE TOILET OFFICE (50)
Y5 FEMALE OFFICE STAFF
Y5 Y5 Y5
WD
LOCKER ROOM(4X6=24) WD PANTRY-4 1A
PANTRY-5
1
SK-1 WD
STAFF FEMALE TOILET-1 WD STAFF FEMALE TOILET-2
1T
1T WD AW AW
9000
9000
AW 1A 17 AW 13
13
WD 13 SK-2 WD
1T SERVER ROOM 1T
WD FD FD MALE LOCKER ROOM
STAFF MALE TOILET-1 1T 1A 1A STAFF MALE TOILET-2 (134X12=1608)
54000
54000
Y4 Y4 Y4 WD Y4
1T
FIRST AID ROOM
WD UP DN
WD 1A FD
1A 1A FD WD 04 01/12/23
1 3C
WD STORAGE-2 FIRE & SERCURITY AW AW AW
AW REV. DATE DESCRIPTION
9000
9000
FD HR ROOM
2A CONTROL OFFICE 18 13 13 REVISIONS
13 1 UP WD
CANOPY 3C
CLIENT:
MALE OFFICE STAFF AD SD STORAGE-4
LOCKER ROOM (8X6=48) WD STAFF ENTRANCE 2
1
1B FD CANOPY
3C
Y3 Y3 Y3 Y3
AD
DN 1 GFL -0.100 DN
FEMALE STAFF LOCKER
ROOM (4x5=20) DESIGN & CONSTRUCTION:
AW AW
9000
9000
13
AD AD
13 WD
2 FD
AW SHOE LOCKER 1 1 AW 3C
4100
Y2 Y2 Y2 Y2 PRINCIPAL CONSULTANT:
GARBAGE ROOM MALE STAFF LOCKER ROOM WD
2
(25X6=150)
FD WD WD WD WD
2500
1 1T 2 1T 1T
9000
9000
PS-3
UP DN FD DN STRUCTURAL CONSULTANT:
STAIR - 6 STAIR - 5 1 STAIR - 6
SERVICE ENTRANCE MALE TOILET-3
UP DW UP DW
Y1 Y1 Y1 Y1
MALE TOILET-4
SD AW SD AW AW FEMALE TOILET-3 AW
6 11 1A 11 11 11
MEP CONSULTANT:
GFL - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN 1F - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN DRAWING TITLE:
1 : 200 1 : 200
ADMINISTRATION OFFICE
DOOR, WINDOW PLAN (GFL,1FL)
AW
WINDOW TAG
1
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
Y7 Y7 Y7 Y7
DN
STAIR - 4
9000
9000
22 STAIR - 7 PS-1
DN
TEMPORARY WALL
Y6 SD FD Y6
1 1
Y6 Y6
2FL -1.400 UP WD UP
FD FD 1A HALL
2FL =GFL+ 8200 FUTURE WORK GFL+ 6.800 LINK BRIDGE
4 4 FUTURE WORK
DN DN
FAW FAW
9000
9000
5B 5B
FAW FAW
5A 5A
AW AW
19 FAD FAD 19
1 FAW HAND WASH FAW 1
5
Y5 5
Y5 Y5 Y5
9000
9000
AW AW
13 22
WD
1T
54000
54000
Y4 Y4 Y4 Y4
FEMALE TOILET-4
CANTEEN-3 (300) 1:100 1:100
04 01/12/23
WD
AW 1T
REV. DATE DESCRIPTION
13 AW REVISIONS
9000
9000
22
STAIR - 8
DN
CLIENT:
FD
1
Y3 Y3 Y3 Y3
AW
13
DESIGN & CONSTRUCTION:
AW
22
9000
9000
FSS FSS WATER
FD 6 6 COOLER
1A
PRINCIPAL CONSULTANT:
Y2 Y2 Y2 Y2
KITCHEN OFFICE SD
SD
1B FD
6 UP
1B
9000
1 1B
PS-3
SD STRUCTURAL CONSULTANT:
UP SERVICE CORRIDOR 1B DN STEEL LADDER
DN DW
Y1 Y1 Y1 Y1
AW MATERIAL STORAGE AW
11 11 MEP CONSULTANT:
6000 6000 6000 6000
6000 6000 6000 6000
24000
24000
PROJECT TILE:
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
UNICHARM INDIA 3RD FACTORY
RE-CONSTRUCTION PROJECT
STATUS:
2F - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN LRF - DOOR. WINDOW, SHUTTER LOUVER KEY PLAN
DESIGN DEVELOPMENT
1 : 200 1 : 200
DRAWING TITLE:
ADMINISTRATION OFFICE
DOOR, WINDOW PLAN (2FL,LRF)
ELECTRICAL LOCK
PANIC HARDWARE
CREMON HANDLE
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
PASSAGE LATCH
MEETING STYLE
CASED HANDLE
AIR TIGHTNESS
LEVER HANDLE
DOOR CLOSER
SPRING HINGE
TT: TINTED GLASS LF: LAMINATED
FLOOR HINGE
PULL HANDLE
HEAD & JAMB
THUMB TURN
PIVOT HINGE
FIRE RATING
JAMB DEPTH
PUSH PLATE
THRESHOLD
FLUSH BOLT
BUTT HINGE
CHAIN BOLT
DOOR STOP
HOOK LOCK
KICK PLATE
DEAD LOCK
THICKNESS
CASE LOCK
THCKNESS
QUANTITY
MATERIAL
MATERIAL
MATERIAL
MATERIAL
HEIGHT
HEIGHT
HEIGHT
COLOR
FINISH
FINISH
FINISH
WIDTH
WIDTH
WIDTH
KNOB
TYPE
SHOE LOCKER, STAFF DOUBLE 1700 2200 3 AL TT
ENTRANCE, SWING
EMPLOYEE ENTRANCE ALUMINUM
2200
AD COMPOSITE GLAZED
PORCH
1 FL DOOR
1700
EXTERIOR FINISHING
1A FL
FRAME: POWDER
1950 COATED
COMPOSITE GLAZED
2 FL DOOR
925
1 DOOR
FL
2HR FIRE RATED
1700
FD PRINCIPAL CONSULTANT:
2HR FIRE RATED
6 FL
1800
1 LOBBY
FL
1100
SD EXTERIOR FINISHING
2100
FRAME: POWDER
1A COATED
FL
260
1200
SERVICE ENTRANCE DOUBLE 1650 2150 1 ST 525 700 DRAWN BY: CHECK BY: APPROVED BY:
SWING
SD EXTERIOR FINISHING
2150
ELECTRICAL LOCK
PANIC HARDWARE
CREMON HANDLE
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
PASSAGE LATCH
MEETING STYLE
CASED HANDLE
AIR TIGHTNESS
LEVER HANDLE
DOOR CLOSER
SPRING HINGE
TT: TINTED GLASS LF: LAMINATED
FLOOR HINGE
PULL HANDLE
HEAD & JAMB
THUMB TURN
PIVOT HINGE
FIRE RATING
JAMB DEPTH
PUSH PLATE
THRESHOLD
FLUSH BOLT
BUTT HINGE
CHAIN BOLT
DOOR STOP
HOOK LOCK
KICK PLATE
DEAD LOCK
THICKNESS
CASE LOCK
THCKNESS
QUANTITY
MATERIAL
MATERIAL
MATERIAL
MATERIAL
HEIGHT
HEIGHT
HEIGHT
COLOR
FINISH
FINISH
FINISH
WIDTH
WIDTH
WIDTH
KNOB
TYPE
FEMALE OFFICE STAFF SINGLE 1100 2150 2 WD 150 700 150 750
LOCKER ROOM, MALE SWING
OFFICE STAFF LOCKER
2200
WD
ROOM, CORRIDOR-6
1 FL
1100
WD
FIRST AID ROOM, SERVER
1A FL
ROOM, PJ ROOM-1-2-3,
1100 CONFERENCE ROOM, OFFICE,
HALL, STORAGE-2
MAIN ENTRANCE LOBBY, SINGLE 850 2150 13 WD 150 700 150 750
GUEST FEMALE TOILET, SWING
WD GUEST MALE TOILET, STAFF
2150
FEMALE STAFF
2 FL LOCKER ROOM,
1100 CORRIDOR-9
CORRIDOR-6
2A FL
1350
3C
FL
1800
FIRE RATING
CLIENT:
QUANTITY
MARK SHAPE LOCATION TYPE OPERATION SWITCH SLAT BOTTOM BAR GUIDE RAIL TOP RAIL SHUTTER CASE CONTROL BOX GUARD POST REMARKS
HEIGHT
WIDTH
PRINCIPAL CONSULTANT:
STRUCTURAL CONSULTANT:
MEP CONSULTANT:
PROJECT TILE:
DRAWING TITLE:
ADMINISTRATION OFFICE
DOOR. WINDOW, SHUTTER, LOUVER
SCHEDULE (2/3)
PANIC HARDWARE
ELECTRICAL LOCK
CREMON HANDLE
PASSAGE LATCH
MEETING STYLE
CASED HANDLE
SUS: STAINLESS STEEL AN: ANODIZED
LEVER HANDLE
AIR TIGHTNESS
SPRING HINGE
HEAD & JAMB
DOOR CLOSER
PULL HANDLE
FLOOR HINGE
JAMB DEPTH
THUMB TURN
PIVOT HINGE
FIRE RATING
PUSH PLATE
SAT: SEMI AIR-TIGHT SOP: OIL PAINT
THRESHOLD
BUTT HINGE
FLUSH BOLT
CHAIN BOLT
KICK PLATE
DEAD LOCK
DOOR STOP
THICKNESS
THICKNESS
HOOK LOCK
CASE LOCK
MATERIAL
MATERIAL
MATERIAL
MATERIAL
QUANTITY
TT: TINTED GLASS LF: LAMINATED
HEIGHT
HEIGHT
HEIGHT
WIDTH
WIDTH
WIDTH
FINISH
FINISH
FINISH
COLOR
KNOB
TYPE
STAIR-4 CURTAIN 23950
950 13200
2150 1 t=6mm TT EXTERIOR FINISHING
WALL FRAME: POWDER
ACW1 COATED
13200
1 FL
23950
LOBBY,
1 FL VESTIBULE
2775
LOBBY,
2 FL VESTIBULE
6120
5400
11
FL
12 4100
2200
FL
13
FL
16 FL
4100
04 01/12/23
OFFICE FIXED 8400 1900 5 t=6mm TT EXTERIOR FINISHING REV. DATE DESCRIPTION
CLIENT:
17 FL
8400
FL
19 4100
FL
22
8400
HALL WALL
FAW
2200
5 FL
3500
STAIR-9, WALL
FAW
STAIR-10
UNICHARM INDIA 3RD FACTORY
3000
RE-CONSTRUCTION PROJECT
2200
5A FL
2900 STATUS:
DESIGN DEVELOPMENT
CANTEEN-3, CURTAIN 2800 3000
900 2175 2 ● TBC
800
HALL WALL
3000
FL
5B ADMINISTRATION OFFICE
2800 DOOR. WINDOW, SHUTTER, LOUVER
SCHEDULE (3/3)
DRYWALL UP TO CEILING
(70mm C-STUD @ 610 C/C GYPSUM BOARD 15mm
BOTH SIDE)
TOTAL 102mm
DRYWALL UP TO SLAB
(70mm C-STUD @ 610 C/C GYPSUM BOARD 15mm
BOTH SIDE)
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5 TOTAL 102mm
X1 X2 X3 X4 X5
RC WALL H = 1000mm + DRYWALL UP TO CEILING
(+ 500mm ACOUSTIC PARTITION WITH ROCK
WOOL 24kg/m3 90mm C-STUD @610 C/C GYPSUM
BOARD 15mm / MOISTURE RESISTANT GYPSUM
BOARD 15mm + HARD GYPSUM BOARD 12.5mm )
TILE FINISH (TOILET SIDE)
TOTAL 145mm
Y7 Y7 Y7 CHB.WALL t = 150
VIP OFFICE (6) VESTIBULE UP DN
PJ ROOM-1 (8) STAIR - 4 TIMBER VENEER PANEL W/STAIN VARNISH FINISH
B4 B3 DN
UP W/8mm GROOVE LINE
B1 CONFRENCE ROOM (12)
STORAGE-3 STAIR - 7
9000
9000
9000
DISPLAY MAIN ENTRANCE LOBBY PS-1 STAIR - 7 PS-1 PS-1 AAC BLOCK + PLASTER WITH TEXTURED PAINT
B1 B1 B4
B3 PJ ROOM-2 (8) UP
GUEST MEETING ROOM (8) LINK BRIDGE-1 DN LINK BRIDGE-2
1FL= GFL+ 4100 COLOUR COATED GALVALUME SHEET 0.5mm TCT
B4 TV MEETING ROOM (20) GFL ± 0.00 B1 (FUTURE WORK) W/GLASSWOOL INSULATION 50mm THK (24kg/m3)
Y6 Y6 Y6
LINK BRIDGE-1
LINK BRIDGE-2 CORRIDOR-7 STAIR - 10 LINK BRIDGE-2
2FL -1.400 UP HALL UP
2500 FUTURE WORK LINK BRIDGE-1 FUTURE WORK STAIR - 9 STAIR - 10
ABOVE MEETING ROOM-2 (8)
ABOVE ABOVE UP B1 UP ABOVE DN DN B1 B1: PVC BASE H = 100
CLEAR B1
B4 WIDTH
B2 B2: ALUMINUM H = 100
9000
9000
9000
PS-2 2FL =GFL+ 8200
GUEST MALE TOILET B6 B2 PJ ROOM-3 (8)
3000 TEMPORARY WALL B3 B3: SAME AS FLOOR (H = 100)
B1 CLEAR
B6 WIDTH HAND WASH B4 B4: TIMBER SKIRTING H = 60
GUEST FEMALE TOILET OFFICE (50)
FEMALE OFFICE STAFF
Y5 Y5 Y5
B1 PANTRY-4 PANTRY-5 B5 B5: AEP PAINT FIN.
LOCKER ROOM(4X6=24) B2 B1
SK-1 B1 STAFF FEMALE TOILET-2 B6 B6: CERAMIC TILE H = 100
STAFF FEMALE TOILET-1
B6 B6
B7 B7: R = 50mm MORTAR BASE H = 100 WITH EPOXY
9000
9000
9000
B6 COATING t = 0.5mm
CORRIDOR-6 SK-2 B1
B1 SERVER ROOM STAFF MALE TOILET-2 MALE TOILET-5
MALE LOCKER ROOM
STAFF MALE TOILET-1 B6 B1 B6 (134X12=1608)
54000
54000
54000
Y4 Y4 Y4
FIRST AID ROOM CORRIDOR-8 B1
UP DN B6 CANTEEN-3 (300) 04 01/12/23
B1 STORAGE-2 REV. DATE DESCRIPTION
STAIR - 8 B1
FIRE & SERCURITY REVISIONS
9000
9000
9000
B2 HR ROOM
CONTROL OFFICE
UP FEMALE TOILET-4 DN CLIENT:
CANOPY CANOPY
MALE OFFICE STAFF B1 B1
STAFF ENTRANCE STORAGE-4
LOCKER ROOM (8X6=48) B1 B3 B1
Y3 Y3 Y3
B1
GFL -0.100 DESIGN & CONSTRUCTION:
FEMALE STAFF LOCKER
ROOM (4x5=20) CANOPY CANOPY
9000
9000
9000
SHOE LOCKER
B3 FEMALE LOCKER ROOM WATER
MALE STAFF LOCKER ROOM CORRIDOR-9
(11X12=132) COOLER
B3 B3 (25X6=150) PRINCIPAL CONSULTANT:
Y2 B1 B1 Y2 Y2
B1 B1
B1 KITCHEN OFFICE
2500
9000
9000
PS-3 B1 STRUCTURAL CONSULTANT:
B1 UP DN B6 B6 DN PS-3 UP
B3 B6 STAIR - 6 STAIR - 5 STAIR - 6
UP UP DW DN DW B1
Y1 Y1 Y1
STAIR - 5 MATERIAL STORAGE
GARBAGE ROOM MALE TOILET-3 MALE TOILET-4 MEP CONSULTANT:
FEMALE TOILET-3
SERVICE CORRIDOR
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
24000 24000 24000
PROJECT TILE:
DRAWING TITLE:
GF - WALL TYPE KEY PLAN 1F - WALL TYPE KEY PLAN 2F - WALL TYPE KEY PLAN ADMINISTRATION OFFICE
1 : 200 1 : 200 1 : 200 WALL TYPE & BASE KEY PLAN
CANOPY
CANOPY ABOVE
DN STAIR - 4
Y7 Y7 Y7 Y7
VIP OFFICE (6) STAIR - 4 UP
GFL ± 0.000 VESTIBULE GFL -0.100
1FL +0.000 PJ ROOM-1 (8)
UP DN
GFL ± 0.000
9000
9000
PS-1 STAIR - 7 PS-1 STORAGE-3 1FL +0.000
GUEST MEETING ROOM (8) MAIN ENTRANCE LOBBY UP
GFL ± 0.000 GFL ± 0.000 PJ ROOM-2 (8) 1FL +0.000
1FL +0.000
1FL= GFL+ 4100
Y6 CLEAR
Y6 Y6 Y6
WIDTH LINK BRIDGE-2 FUTURE WORK LINK BRIDGE-2
LINK BRIDGE-1 MEETING ROOM-2 (8) LINK BRIDGE-1 CORRIDOR-7
FUTURE WORK FUTURE WORK
GFL ± 0.000 ABOVE 2500 ABOVE UP PS-2
ABOVE STAIR - 9 UP STAIR - 10 ABOVE
9000
9000
GFL ± 0.000
GFL -0.050 GUEST MALE TOILET
PJ ROOM-3 (8) 3000
1FL +0.000
GFL -0.050 GUEST FEMALE TOILET CLEAR
OFFICE (50) WIDTH
Y5 FEMALE OFFICE STAFF GFL ± 0.000 Y5 Y5 Y5
GFL ± 0.000 LOCKER ROOM(4X6=24) PANTRY-4 1FL +0.000 PANTRY-5
9000
9000
GFL ± 0.000
STAFF MALE TOILET-1 STAFF MALE TOILET-2 SK-2
SERVER ROOM
GFL ± 0.000 1FL -0.050 MALE LOCKER ROOM
GFL -0.050 (134X12=1608)
CORRIDOR-6
54000
54000
Y4 Y4 Y4 Y4 04 01/12/23
FIRST AID ROOM GFL ± 0.000 CORRIDOR-8 1FL +0.000
GFL ± 0.000 UP DN REV. DATE DESCRIPTION
STAIR - 8 REVISIONS
GFL ± 0.000
STAIR - 8
STORAGE-2 FIRE & SERCURITY CLIENT:
GFL ± 0.000 9000
9000
HR ROOM
CONTROL OFFICE
UP GFL ± 0.000
1FL +0.000
MALE OFFICE STAFF GFL ± 0.000
GFL ± 0.000 LOCKER ROOM (8X6=48) STAFF ENTRANCE STORAGE-4
Y3 Y3 Y3 Y3
GFL ± 0.000 1FL +0.000 DESIGN & CONSTRUCTION:
GFL -0.100 DN EMPLOYEE ENTRANCE DN GFL -0.100
PORCH FEMALE STAFF LOCKER
ROOM (4x5=20)
CANOPY CANOPY
9000
9000
GFL ± 0.000 SHOE LOCKER 1FL +0.000
FEMALE LOCKER ROOM PRINCIPAL CONSULTANT:
CORRIDOR-9
(11X12=132) 1FL +0.000
Y2 Y2 Y2 Y2
GFL +0.230 MALE STAFF LOCKER ROOM 1FL +0.000
(25X6=150)
SERVICE ENTRANCE
2500
GFL -0.050 STRUCTURAL CONSULTANT:
9000
9000
PS-3 PS-3
GFL +0.260 DN
UP STAIR - 6
FEMALE TOILET-3 MALE TOILET-4 DN
STAIR - 5 GFL ± 0.000
UP STAIR - 5 UP DW
STAIR - 6
Y1 Y1 Y1 Y1
MEP CONSULTANT:
1FL -0.050 1FL -0.050
GARBAGE ROOM MALE TOILET-3
X1 X2 X3 X4 X5 STATUS:
X1 X2 X3 X4 X5
DESIGN DEVELOPMENT
DRAWING TITLE:
ADMINISTRATION OFFICE
FLOOR FINISHING KEY PLAN (GFL,1FL)
GF - FLOOR FINISHING PLAN 1F - FLOOR FINISHING PLAN
1 : 200 1 : 200
DRAWN BY: CHECK BY: APPROVED BY:
24000
Y7 Y7
DN
STAIR - 4
9000
9000
STAIR - 7 PS-1
DN 2FL +0.000
FUTURE WORK
Y6 Y6
CLEAR UP UP GFL+ 6.800 LINK BRIDGE-2
2FL -1.400 HALL
3000
9000
9000
TEMPORARY WALL
HAND WASH
2FL +0.000 Y5 Y5
9000
9000
MALE TOILET-5
1:100 1:100
2FL -0.050
54000
54000
Y4 Y4 04 01/12/23
STAIR - 8 CANTEEN-3 (300) REV. DATE DESCRIPTION
FEMALE TOILET-4
REVISIONS
CLIENT:
9000
9000
DN
2FL -0.050
Y3 Y3
DESIGN & CONSTRUCTION:
2FL +0.000
9000
9000
WATER PRINCIPAL CONSULTANT:
COOLER
Y2 Y2
2FL +0.000 KITCHEN OFFICE SERVICE CORRIDOR
UP
2FL +0.000 KITCHEN / SERVING ROOM STRUCTURAL CONSULTANT:
CORRIDOR-10
9000
9000
PS-3
UP LRF +0.000 DN STEEL LADDER
STAIR - 5
2FL +0.000 2FL +0.000
DN
DW
Y1 Y1
MEP CONSULTANT:
STAIR - 5
MATERIAL STORAGE
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5 STATUS:
DESIGN DEVELOPMENT
DRAWING TITLE:
ADMINISTRATION OFFICE
LOWER ROOF FINISHING PLAN FLOOR FINISHING KEY PLAN (2FL,LRF)
2F - FLOOR FINISHING PLAN
1 : 200 1 : 200
DRAWN BY: CHECK BY: APPROVED BY:
CANOPY
Y7 Y7 Y7
VIP OFFICE (6) VESTIBULE STAIR - 4
CH=3000 PJ ROOM-1 (8) STAIR - 4
CH=3000
CH=3000
MAIN ENTRANCE LOBBY CH=3000 PS-1 STORAGE-3
9000
9000
PS-1
GUEST MEETING ROOM (8) CH=3000
CH=3300 PJ ROOM-2 (8)
CH=3300
CH=3000 CH=3000
CH=3000 TV MEETING ROOM (20) CH=3000
Y6 Y6 Y6 Y6
LINK BRIDGE-2
MEETING ROOM-2 (8) LINK BRIDGE-1
ABOVE STAIR - 9 CH=3000 CORRIDOR-7 FUTURE WORK
CH=3000 STAIR - 10 ABOVE
CH=3000
CH=3000
9000
9000
PS-2
CH=2400
GUEST MALE TOILET CH=3000 PJ ROOM-3 (8)
CH=2400
GUEST FEMALE TOILET OFFICE (50)
Y5 Y5 Y5 Y5
FEMALE OFFICE STAFF
LOCKER ROOM(4X6=24)
CH=3000 PANTRY-5 CH=3000
CH=3000 PANTRY-4
SK-1
STAFF FEMALE TOILET-1 CH=3000 CH=2400
CH=2400 STAFF FEMALE TOILET-2
MALE LOCKER ROOM
9000
9000
(134X12=1608)
CORRIDOR-6 CH=2400 CH=2400 SK-2
CH=2400 SERVER ROOM
54000
54000
Y4 Y4 Y4 Y4 04 01/12/23
FIRST AID ROOM CORRIDOR-8
CH=3000 CH=3000 REV. DATE DESCRIPTION
STORAGE-2 REVISIONS
STAIR - 8 FIRE & SERCURITY STAIR - 8 CH=3000
HR ROOM
CONTROL OFFICE CLIENT:
CH=3000
9000
9000
CH=3000
CH=3000 CH=3000
MALE OFFICE STAFF
LOCKER ROOM (8X6=48) STAFF ENTRANCE STORAGE-4
CH=3000
CH=3000
Y3 Y3 Y3 Y3
FEMALE STAFF LOCKER DESIGN & CONSTRUCTION:
ROOM (4x5=20)
CH=3100
CH=3000
9000
9000
CANOPY CANOPY
SHOE LOCKER
MALE STAFF LOCKER ROOM FEMALE LOCKER ROOM PRINCIPAL CONSULTANT:
(11X12=132) CORRIDOR-9
CH=3000 (25X6=150)
Y2 Y2 Y2 CH=3000 CH=3000 Y2
CH=3000
CH=3000
SERVICE ENTRANCE STRUCTURAL CONSULTANT:
9000
9000
PS-3 PS-3
DRAWING TITLE:
ADMINISTRATION OFFICE
GF - CEILING FINISHING KEYPLAN 1F - CEILING FINISHING KEYPLAN CEILING FINISHING KEY PLAN (GFL, 1FL)
1 : 200 1 : 200
Y7 Y7 Y7 Y7
STAIR - 4
CH=3000
CONFRENCE ROOM (12)
9000
9000
STAIR - 7 PS-1
CH=3000 CH=3000
LINK BRIDGE-2
LINK BRIDGE-1 (FUTURE WORK)
Y6 Y6 Y6 Y6
CLEAR
3000
WIDTH
HALL
9000
9000
CH=3000
Y5 Y5 Y5 Y5
9000
9000
MALE TOILET-5
CH=2400
54000
54000
Y4 Y4 Y4 Y4 04 01/12/23
FEMALE TOILET-4 REV. DATE DESCRIPTION
CANTEEN-3 (300)
STAIR - 8
REVISIONS
CH=3000 CH=3000 CLIENT:
9000
9000
CH=2400
Y3 Y3 Y3 Y3
DESIGN & CONSTRUCTION:
9000
9000
PRINCIPAL CONSULTANT:
Y2 Y2 Y2 Y2
KITCHEN OFFICE SERVICE CORRIDOR
CH=3000 RISER
KITCHEN / SERVING ROOM
STRUCTURAL CONSULTANT:
CH=3000 CORRIDOR-10
9000
9000
PS-3 CH=3000
CH=3000 STEEL LADDER
STAIR - 5 STAIR - 5
CH=3000
DW
Y1 Y1 Y1 Y1
MEP CONSULTANT:
MATERIAL STORAGE CH=3000
DRAWING TITLE:
ADMINISTRATION OFFICE
2F - CEILING FINISHING KEYPLAN LRF - CEILING FINISHING KEY PLAN CEILING FINISHING KEY PLAN (2FL, LRF)
1 : 200 1 : 200
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
CANOPY
DN
Y7 Y7 Y7
VIP OFFICE (6) STAIR - 4 UP
VESTIBULE
PJ ROOM-1 (8)
UP DN
9000
PS-1 STAIR - 7 PS-1 STORAGE-3
9000
GUEST MALE TOILET 3000
PJ ROOM-3 (8)
GUEST FEMALE TOILET CLEAR
OFFICE (50) WIDTH
Y5 FEMALE OFFICE STAFF
Y5 Y5
PANTRY-4
LOCKER ROOM(4X6=24) PANTRY-5
SK-1
STAFF FEMALE TOILET-1
STAFF FEMALE TOILET-2
9000
STAFF MALE TOILET-1 SK-2
SERVER ROOM
MALE LOCKER ROOM
STAFF MALE TOILET-2 (134X12=1608)
CORRIDOR-6
54000
Y4 Y4 Y4 04 01/12/23
FIRST AID ROOM CORRIDOR-8
UP DN REV. DATE DESCRIPTION
STAIR - 8 REVISIONS
STORAGE-2 FIRE & SERCURITY CLIENT:
9000
HR ROOM
CONTROL OFFICE
UP
CANOPY CANOPY
MALE OFFICE STAFF
STORAGE-4
LOCKER ROOM (8X6=48) STAFF ENTRANCE
Y3 Y3 Y3
DESIGN & CONSTRUCTION:
DN EMPLOYEE ENTRANCE DN
PORCH FEMALE STAFF LOCKER
ROOM (4x5=20)
9000
SHOE LOCKER
FEMALE LOCKER ROOM PRINCIPAL CONSULTANT:
CORRIDOR-9
(11X12=132)
Y2 Y2 Y2
MALE STAFF LOCKER ROOM
(25X6=150)
2500
STRUCTURAL CONSULTANT:
9000
PS-3
UP STAIR - 6 DN DN
STAIR - 5 STAIR - 6
STAIR - 5
UP UP DW
Y1 Y1 Y1
MEP CONSULTANT:
GARBAGE ROOM MALE TOILET-3 FEMALE TOILET-3 MALE TOILET-4
DRAWING TITLE:
ADMINISTRATION OFFICE
WATERPROOFING KEY PLAN (GFL, 1FL)
GF - WATERPROOFING KEYPLAN 1F - WATERPROOFING KEY PLAN
1 : 200 1 : 200
DRAWN BY: CHECK BY: APPROVED BY:
X1 X2 X3 X4 X5
X1 X2 X3 X4 X5
Y7 Y7
DN
STAIR - 4
9000
9000
PS-1
DN
Y6 Y6
UP UP LINK BRIDGE-2
LINK BRIDGE-1 2FL -1.400 STAIR - 9 2FL =GFL+ 8200 STAIR - 10
LINK BRIDGE-2
LINK BRIDGE-1
(FUTURE WORK) FUTURE WORK
DN DN
HALL
9000
9000
HAND WASH
Y5 Y5
9000
9000
1:100 1:100
MALE TOILET-5
54000
54000
Y4 Y4 04 01/12/23
FEMALE TOILET-4 CANTEEN-3 (300) REV. DATE DESCRIPTION
REVISIONS
STAIR - 8 CLIENT:
9000
9000
DN
Y3 Y3
DESIGN & CONSTRUCTION:
9000
9000
WATER PRINCIPAL CONSULTANT:
COOLER
Y2 Y2
KITCHEN OFFICE SERVICE CORRIDOR
UP
9000
PS-3
UP DN STEEL LADDER
DN DW
Y1 Y1
MEP CONSULTANT:
MATERIAL STORAGE
24000 24000
PROJECT TILE:
DRAWING TITLE:
ADMINISTRATION OFFICE
WATERPROOFING KEY PLAN (2FL, LRF)
2F - WATERPROOFING KEY PLAN LOWER ROOF WATERPROOFING KEY PLAN
1 : 200 1 : 200
DRAWN BY: CHECK BY: APPROVED BY:
X1 X1
3000
3800
3685
1:30
1:30
CLEAR WIDTH LINK BRIDGE-1
4 4 (24kg/m3) ONE SIDED ALUMINUM FOIL BACKING, GI WELDMESH
B X3 B X3 B 50x50x1.5mm THK
X3 B X3
1600
1600
2FL 2FL
2000
8200 8200
3750
1000
2150
2150
4100
4100
2335 500 19500 500 2500 1050 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1450
1950
1950
1FL 1FL
4100 4100
8850
8850
DOWNSPOUT PVC D200 DOWNSPOUT PVC D200
W/PAINT W/PAINT
4100
4100
4750
4750
GFL=+101.20 GFL=+101.20 04 01/12/23
0 0 REV. DATE DESCRIPTION
REVISIONS
650
650
GL GL
-650 -650 CLIENT:
2840 20000 3000 3000 20000
STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE STANDING SEAM ROOF METAL SHEET 0.6mm TCT H=76mm BARE
GALVALUME WITH GLASSWOOL INSULATION 50mm THK GALVALUME WITH GLASSWOOL INSULATION 50mm THK
(24kg/m3) ONE SIDED ALUMINUM FOIL BACKING, GI WELDMESH X1 (24kg/m3) ONE SIDED ALUMINUM FOIL BACKING, GI WELDMESH
50x50x1.5mm THK 50x50x1.5mm THK
EXPANSION JOINT PURLIN EXPANSION JOINT PRINCIPAL CONSULTANT:
PURLIN
945
MINERAL ACOUSTIC BOARD T-BAR (600x600mm) STRUCTURAL CONSULTANT:
1600
1600
2FL 2FL 2FL
FD FD 8200 8200 8200
3000
4 4
1400
1400
DOWNSPOUT PVC D200
W/PAINT MEP CONSULTANT:
4100
4100
2700
2700
1FL 1FL 1FL
4100 4100 4100
8850
8850
PROJECT TILE:
4100
4750
4750
STATUS:
GFL=+101.20 GFL=+101.20 GFL=+101.20 DESIGN DEVELOPMENT
0 0 0
650
650
GL GL GL DRAWING TITLE:
-650 -650 -650
2550 20000 3000 243 3420 ADMINISTRATION OFFICE
X1 LINK BRIDGE-1 DETAIL
Y7 100 Y7 Y7 Y7
100
100
150
11 13 15 17 19 1 3 5 7 9 STAIRCASE-1
(E W
(EW
0)
)
1500
1500
00
≥1
50
≥1
15
50
≥1
0)
50
W≥
(EW
0)
(E
GFL+ 1.367 GFL+ 0.000 GFL+ 4.100 GFL+ 5.467
3300
3300
300
300
GRANITE STONE EPOXY PAINT EPOXY PAINT GRANITE STONE LRF
12300
(E
( EW
0)
0)
W≥
50
50
≥1
≥1
15
≥1
1500
1500
50
00
(EW
A A A A
( EW
FD
0)
1100
)
1
9 7 5 3 1 29 27 25 13 11
1525 300x10=3000 1540 1525 300x10=3000 1540 MINERAL ACOUSTIC BOARD T-BAR
(EW≥1500) (EW≥1500) (600x600mm)
4100
100 6000 (EW≥1500) (EW≥1500)
100 5965 35 1525 3000 1540
CH= 3000
Y1 Y1
1100
1 : 50 X1 X5
2FL
29
8200 KEYPLAN
137x10=1367
27
1367
25
X4 X5 X4 X5
1100
23 GFL +6.833
100 5965 35 6065 35 21
137x10=1367
1525 17 3000 1540
15 EW :EFFECTIVE WIDTH
1367
4100
1100
Y7 Y7 STEEL HANDRAIL 13
100
100
GFL +5.467
11 REGULATIONS (BASE ON CGDCR of INDIA)
11 13 15 17 19 21 23 25 27 29 9
(E FD
W≥ 0) STAIRCASE WIDTH ≥ 1500mm
(E
0)
1500
1500
137x10=1367
50 7
W≥
1
15 STAIRCASE TREAD ≥ 300mm
50
0 ≥1
≥1
15
0) 5
1367
W STAIRCASE STEP HEIGHT ≤ 160mm
(E
W
00
1100
(E
GFL+ 1.367 GFL+ 2.733 GFL+ 5.467 3
)
GFL+ 6.833 1FL
3400
3300
4100
300
300
GRANITE STONE GRANITE STONE GRANITE STONE GRANITE STONE 29
137x10=1367
0)
27
(EW
(EW
)
500
0
15
25
≥1
1367
≥1
UP
≥1
W≥
1500
1500
1100
500
A A A A
500
DN STEEL HANDRAIL
(E
(EW
23 GFL +2.733
)
)
9 7 23 21 19 17 15 13 11 21
19
04 01/12/23
137x10=1367
1525 2700 17 1840 REV. DATE DESCRIPTION
15 REVISIONS
1367
4100
1525 300x10=3000 1540
1100
1525 300x10=3000 1540 13 GFL +1.367
(EW≥1500) (EW≥1500) (EW≥1500) (EW≥1500) CLIENT:
100 5965 35 11
6065 35
9
137x10=1367
7
5
1100
3
GFL=+101.20
STAIRCASE - 4 PLAN (GFL+1.367 TO GFL+2.733) STAIRCASE - 4 PLAN (GFL+5.467 TO GFL+6.833) 1
0 DESIGN & CONSTRUCTION:
1 : 50 1 : 50
X4 X5 X4 X5
X4 X5
100 5965 35 100 5965 35
1525 300x10=3000 1540 1525 300x10=3000 1540 STRUCTURAL CONSULTANT:
STAIRCASE - 4 SECTION A
1 : 50
Y7 Y7
100
100
1 3 17 19 21 23 25 27 29
(E
(EW 0) W DN
0)
1500
1500
UP ≥1 MEP CONSULTANT:
≥1 50
50
50 ≥1 50
≥1
0) W 0)
W
(E
(E
3300
300
300
(EW
(EW
PROJECT TILE:
50
50
≥1
≥1
≥1
≥ 15
1500
DN
(EW
(EW
A A A A
500
FD
00 )
1 RE-CONSTRUCTION PROJECT
)
29 27 25 23 21 19 17 15 13 11
STATUS:
DESIGN DEVELOPMENT
1525 300x10=3000 1540 1525 300x10=3000 1540
100 (EW≥1500) 5965 (EW≥1500) 35 (EW≥1500) (EW≥1500)
6065 DRAWING TITLE:
ADMINISTRATION OFFICE
STAIRCASE - 4 DETAIL
STAIRCASE - 4 PLAN (GFL+2.733 TO GFL+4.100) STAIRCASE - 4 PLAN (GFL+6.833 TO GFL+8.200)
1 : 50 1 : 50 DRAWN BY: CHECK BY: APPROVED BY:
13 15 17 19 21 23 1 3 5 15 17 19
(E W
(EW 0)
1500
1500
UP 50 Y7 Y7
≥1
≥1
500 ≥1
5 00
) ( E W
)
GFL+ 2.180 GFL+ 0.260 GFL+ 8.200 GFL+ 6.882
3465
3465
465
465
GRANITE STONE EPOXY PAINT GRANITE STONE GRANITE STONE
(EW
)
)
5 00
500
≥1
≥1
≥1
1500
1500
A UP A A UP A
5 00
(E W
(EW
)
11 9 7 5 3 1 27 25 23 21
Y1 Y1
35
35
35 1515 300x11=3300 1150 1815 300x9=2700 1400
(EW≥1500) (EW≥1500) 6000 (EW≥1500)
6000
CH= 3000
35 5965 85 5915 100 SD
1C
PARAPET TOP
1515 3300 1150 1515 300x10=3000 1550 13500
1100
(EW≥1500) (EW≥1500)
GFL +12.650 X1 X5
850
FD 27 LRF KEYPLAN
13 15 17 19 21 23 1 3 5 7 9
350
1 12300
(EW
(EW 25
159x9=1430
1500
1500
≥ 1 UP 500
)
≥1
DN 50 ≥1 23
500
0)
1100
(EW
1080
21 GFL +11.220
)
3465
465
465
GRANITE STONE GRANITE STONE 17
GRANITE STONE GRANITE STONE
159x9=1430
15 EW :EFFECTIVE WIDTH
0)
( EW
00 )
1430
50
1100
≥1
13
≥1
≥ 15
4100
1515 2700 1850
1500
1500
A UP A A A
( EW
REGULATIONS (BASE ON CGDCR of INDIA)
5 00
(EW
11
)
9 7 5 3 1 27 25 23
13 11 9 STAIRCASE WIDTH ≥ 1500mm
Y1 Y1 FD 7 STAIRCASE TREAD ≥ 300mm
35
35
159x10=1589
1 STAIRCASE STEP HEIGHT ≤ 160mm
5
1589
1515 300x10=3000 1450 1815 300x8=2400 1850
1100
(EW≥1500) (EW≥1500) 3
35 5965
35 5965 100 1 2FL
8200
STAIRCASE - 5 PLAN (GFL+2.180 TO GFL+4.100) STAIRCASE - 5 PLAN (GFL+8.200 TO GFL+9.664) 27
1 : 50
146x9= 1318
1 : 50 25
X1 X2
X1 X2
1318
23
1100
6000 35 5965 100 21
35 1815 300x10=3000 1150 1515 300x10=3000 1550 19 04 01/12/23
REV. DATE DESCRIPTION
17
146x9= 1318
REVISIONS
15
1318
4100
1100
1515 13 3000 1450 CLIENT:
11 17 19 21 23 21 3 5 7 9 GFL +5.564
11
(EW 0)
(E
1500
1500
≥ 1 UP 50
W≥
DN 50 1 9
W≥
15
0) (E
00
146x10= 1464
7
)
1464
1100
GFL+ 11.220
3465
3465
465
465
15 23
500
00
≥ 15
)
≥1
1500
1500
21
A UP A A A
(EW
(EW
160x12= 1920
19
9 7 5 3 1 19 17 15 13 11
1920
17 PRINCIPAL CONSULTANT:
Y1 Y1 1515 3000 1450
35
35
1100
15
GFL +2.180
1515 300x10=3000 1450 1515 300x9=2700 1850 13
(EW≥1500) (EW≥1500) 11
4100
35 5965 35 (EW≥1500) 5965 (EW≥1500)
9
STRUCTURAL CONSULTANT:
160x12=1920
7
STAIRCASE - 5 PLAN (GFL+4.100 TO GFL+5.418) STAIRCASE - 5 PLAN (GFL+9.644 TO GFL+10.982) 5
2180
1100
1 : 50 1 : 50
3
X1 X2 GFL +0.260
X1 X2 1
35 5965 50 GFL=+101.20
50 5915 35 MEP CONSULTANT:
260
0
1815 300x9=2700 1500 1500 300x8=2400 1900 115
(EW≥1500) (EW≥1500) 1515 300x11=3300 1150
6000
11 13 15 17 19 21 23 25 27
(E X1 X2 PROJECT TILE:
W≥ (E W
0)
)
1515
1500
15
≥1 50
≥1
00 0) GFL+ 12.650
) (EW RE-CONSTRUCTION PROJECT
( EW
465
1 : 50
GRANITE STONE GRANITE STONE DESIGN DEVELOPMENT
GRANITE STONE
0)
50
(E
(E W
≥1
500
W≥
W
≥1
DRAWING TITLE:
15
≥1
(E
1500
1500
A UP A A A
0
500
(EW
0)
ADMINISTRATION OFFICE
)
9 7 5 3 21 19 17 15 13 11
STAIRCASE - 5 DETAIL
Y1 Y1
35
35
765
765
1500 300x10=3000 1565 Y7 Y7
LAMINATED GLASS T=10mm STAIRCASE-4
(Tempered glass 5mm thick + clear film
1100
GFL+ 6.833 19 17 15 13 11 GFL+ 5.467 +tempered glass 5mm thick)
21 23 7 9
800
(EW GRANITE STONE GRANITE STONE
0)
2000
2000
1500
≥1 TEMPER GLASS
50
50 ≥1
GFL+ 2.733 )
0
(E W 1 ( EW
≥ 15 00 ) 1
00 ) ≥ 15
GFL+ 1.367 (EW STAIR FLOOR
3445
445
GRANITE STONE
30
21
GRANITE STONE
9
0)
(E
W≥
50
UP 23
≥1
1
STRINGER
1500
50
(EW
0)
A A
300x10=3000
300x10=3000
PL22X450
19 17 15 13 11 25
5 STAIR CH
Y1
35
35
27
1500 300x10=3000 1565 3 TYPICAL HANDRAIL SECTION STAIR-3
(EW≥1500) (EW≥1500) 29 1 : 15 Y2
100 6000 Y1 Y1
1
GFL+ 4.100 UP
X3
STAIRCASE - 6 PLAN (GFL+1.367 TO +2.733) GRANITE STONE
X1 X5
1 : 50
2 KEYPLAN
2000 300x12=3600 2000
1100
1100
3800 3800
2FL
8200
29
4100
STAIRCASE TREAD ≥ 300mm
1100
1 3 5 7 9 13 SUPPORT GFL +5.467 STAIRCASE STEP HEIGHT ≤ 160mm
(EW 11 COLUMN
1500
≥ 1 UP 0)
150
9
50 ≥ STRINGER
0)
GFL+ 0.000 (E W 7
GFL+ 1.367 5
SUPPORT
3445
3
445
W≥
50
≥1
15
04 01/12/23
1500
(EW
1100
STAIRCASE - 6 PLAN (GFL+0.000 TO GFL+1.367)
1100
1 : 50
PRINCIPAL CONSULTANT:
MINERAL ACOUSTIC BOARD T-BAR
4100
4100
(600x600mm) MINERAL ACOUSTIC BOARD T-BAR
1500 3000 1550 (600x600mm)
CH= 3000
4100
3000 2000 765
CH= 3000
STRUCTURAL CONSULTANT:
X4 X5 STEEL HANDRAIL
1100
1FL
4100 GLASS RAILING
1100
29 2FL
137x10=1367
25
1100
137x10=1367
21 23 25 27 29 23 GFL +2.733 27
25
(EW
1367
1500
21
DN
1100
≥1
23 GFL +6.833
19
50
GFL+ 2.733 21
137x10=1367
0)
17 STRINGER
19 PROJECT TILE:
1367
4100
15
GFL+ 4.100
1100
3445
137x10=1367
UNICHARM INDIA 3RD FACTORY
445
17
GRANITE STONE 13 GFL +1.367
15
1367
4100
GRANITE STONE 11 RE-CONSTRUCTION PROJECT
13
)
9 GFL +5.467
00
≥ 15
137x10=1367
11
137x5=683137x2=273
7 STATUS:
1500
( EW
A A 9 DESIGN DEVELOPMENT
1100
1367
5
19 17 15 13 11 7
273
3
GFL=+101.20
SUPPORT
1367
1 5
Y1 0
35
250
250
Y7 Y7
(EW≥1500)
GFL+ 1.419 GFL+ 4.100 FD
(EW≥1500)
1875 1
1625
1625
(EW (EW GRANITE STONE
≥ 1 GRANITE STONE ≥ 15 00 )
500 1500
) 00 ) ≥ 15
) (EW≥ (EW
UP DN
9 1 25
11
7 3 23
300x8=2400
300x8=2400
300x9=2700
13 13
5825
5825
5 5
15 11
3 7 STAIRCASE-5
17 9
) (EW
1 50 0 ≥1
≥1 500
UP (EW ) LRF
(EW≥1500)
(EW≥1500)
GFL+ 5.362 12300
1800
1800
GFL+ 0.000
1500
GRANITE STONE
1100
EPOXY PAINT Y1 Y1
X1 X5
MINERAL ACOUSTIC BOARD T-BAR
A A
STAIRCASE - 8 PLAN (GFL+0.000 TO +1.419)
(600x600mm) KEYPLAN
4100
1 : 50
STAIRCASE - 8 PLAN (GFL+4.100 TO GFL+5.362) 1500 2700 1625
CH= 3000
1 : 50
X1 X1
35 3370 A
35 3370 A
1500 370 1500 LEGEND
1500 370 1500
2FL
Y4 Y4 8200 EW :EFFECTIVE WIDTH
250
250
25
GFL+ 1.419 GFL+ 6.623 23 REGULATIONS (BASE ON CGDCR of INDIA)
158x10=1577
(EW≥1500)
(EW≥1500)
(E (E 21
W≥ GRANITE STONE 0 )
1577
W≥ GRANITE STONE 0 )
1625
1625
1625
STAIRCASE WIDTH ≥ 1500mm
50 50
1100
15 15 2400 19
00 ≥1 00 ≥1 1800 1625 GFL +6.623 STAIRCASE TREAD ≥ 300mm
) (EW ) (EW 17 STAIRCASE STEP HEIGHT ≤ 160mm
UP 15
9 17
158x8=1262
13
4100
11 15
1262
1100
11
7 19 GFL +5.362
300x8=2400
300x8=2400
300x8=2400
9
13 13
6075
5825
7
21 5
158x8=1262
15 11 5
1262
7 3 04 01/12/23
19 STEEL HANDRAIL
1
1FL REV. DATE DESCRIPTION
17 9
4100 REVISIONS
(E UP
0)
25
W
50
(E
≥1
)
CLIENT:
00
≥1
W
(EW≥1500)
158x9=1419
23
GFL+ 2.681 00 )
≥1
15
(EW≥1500)
50
(E
W≥
1419
21
0)
GFL+ 5.362
1800
1800
1800
(E
1100
GRANITE STONE 19 GFL +2.681
GRANITE STONE 17
15
1800 2400 1625
158x8=1262
DESIGN & CONSTRUCTION:
13
1262
4100
1100
11 GFL +1.419
A A 9
STAIRCASE - 8 PLAN (GFL+1.419 TO GFL+2.681) STAIRCASE - 8 PLAN (GFL+5.362 TO GFL+6.623) 7
158x9=1419
1 : 50 1 : 50
5 PRINCIPAL CONSULTANT:
1419
3
X1 X1
A 1
GFL=+101.20
35 3370 0
A
1500 370 1500
Y4 Y4
250
250
1625
0
(E
50 ≥1 00 Y4
W
≥1 50 15
≥1
0) ≥
(E W (EW
50
0)
MEP CONSULTANT:
DN
STAIRCASE - 8 - SECTION A
1 25 17
1 : 50
15
3 23 19
300x8=2400
300x9=2700
13
PROJECT TILE:
5825
5825
5 21 21
11 UNICHARM INDIA 3RD FACTORY
7 19 23 RE-CONSTRUCTION PROJECT
9
) ( EW STATUS:
0 25
50 ≥1 DESIGN DEVELOPMENT
≥1 50
0) DN
(EW
(EW≥1500)
(EW≥1500)
DRAWING TITLE:
1500
X1 X5
LRF
12300
Y7 Y7
1100
1100
EXPANSION JOINT
4100
CH= 3000
CH= 3000
X1
X1 X2
1100
2FL
Y6 Y6 8200
9
140x10=1400
7
1 3 5 7 9 5
1400
GFL+ 8.200
1100
STEEL HANDRAIL
1500
1500
UP 3 GFL +6.800
1 Y1 Y1
GFL+ 6.800 GRANITE STONE 17
FD GFL+ 6.800 FD 15
4 4
EPOXY PAINT 13
GFL+ 4.100
4100
X3 EPOXY PAINT GFL+ 5.053 X3 X3 X3 X1 X5
1747
11
UP GRANITE STONE
159x17=2700
1500
1500
DN KEYPLAN
1100
9
GFL +5.053
17 15 13 11 9 7 5 3 1 17 15 13 11 9 7
A A A A
5
3
953
1 1FL
4100 LEGEND
300x11=3300 1650 300x5=1500 300x10=3000
EW :EFFECTIVE WIDTH
300x9=2700 1650 300x5=1500
REGULATIONS (BASE ON CGDCR of INDIA)
04 01/12/23
REV. DATE DESCRIPTION
REVISIONS
LRF
12300 CLIENT:
1100
DESIGN & CONSTRUCTION:
4100
(600x600mm)
CH= 3000
X4 X5 X5 PRINCIPAL CONSULTANT:
TEMPORARY WALL
1100
102 148
2FL
Y6 Y6 8200
9
STRUCTURAL CONSULTANT:
140x10=1400
7
9 7 5 3 1
5
1400
1500
1500
1100
GFL+ 8.200 UP FUTURE WORK
FUTURE WORK 3 GFL +6.800
1
GRANITE STONE 17
GFL+ 4.100 GFL+ 6.800 GFL+ 6.800 15
STEEL HANDRAIL MEP CONSULTANT:
EPOXY PAINT 13
X3 GRANITE STONE GFL+ 5.053 X3X3 X3
4100
EPOXY PAINT
1747
11
1500
1500
1500
1500
UP DN
159x17=2700
1100
9
1 3 5 7 9 11 13 15 17 9 11 13 15 17 GFL +5.053
7
B B B B
5 PROJECT TILE:
3
UNICHARM INDIA 3RD FACTORY
953
300x5=1500 1650 300x10=3000 300x10=3000 1FL
1
4100 RE-CONSTRUCTION PROJECT
STATUS:
DESIGN DEVELOPMENT
300x5=1500 1650 300x9=2700
DRAWING TITLE:
ADMINISTRATION OFFICE
X4 X5
STAIRCASE - 9 & 10 DETAIL
STAIRCASE - 10 PLAN (GFL+4.100 TO GFL+6.800) STAIRCASE - 10 PLAN (GFL+6.800 TO +8.200) STAIRCASE - 10 SECTION B
1 : 50 1 : 50 1 : 50 DRAWN BY: CHECK BY: APPROVED BY:
50 SUNK
X1 X2 X3 X4 X5 100 SUNK
X1 X2 X3 X4 X5
150 SUNK
1600 SUNK
CANOPY
CANOPY ABOVE
DN
Y7 Y7 Y7 Y7
VIP OFFICE (6) STAIR - 4 STAIR - 4
VESTIBULE
PJ ROOM-1 (8) DN
UP
9000
9000
PS-1 STAIR - 7 PS-1 STORAGE-3
MAIN ENTRANCE LOBBY
GUEST MEETING ROOM (8) LINK BRIDGE-2 LINK BRIDGE-2
LINK BRIDGE-1 FUTURE WORK LINK BRIDGE-1 UP FUTURE WORK
ABOVE ABOVE ABOVE PJ ROOM-2 (8)
ABOVE
Y6 Y6 Y6 Y6
2500 CORRIDOR-7
MEETING ROOM-2 (8) UP STAIR - 10
UP
9000
9000
TV MEETING ROOM (20) PS-2
GUEST MALE TOILET 3000
PJ ROOM-3 (8)
9000
9000
CORRIDOR-6 SK-2
SERVER ROOM
STAFF MALE TOILET-2 MALE LOCKER ROOM
STAFF MALE TOILET-1 (134X12=1608)
54000
54000
Y4 Y4 Y4 Y4
FIRST AID ROOM CORRIDOR-8
DN
STAIR - 8
9000
9000
HR ROOM
CONTROL OFFICE
UP
MALE OFFICE STAFF 04 01/12/23
STORAGE-4
LOCKER ROOM (8X6=48) STAFF ENTRANCE REV. DATE DESCRIPTION
Y3 Y3 Y3 Y3 REVISIONS
CLIENT:
EMPLOYEE ENTRANCE
DN PORCH DN
FEMALE STAFF LOCKER
9000 ROOM (4x5=20)
9000
SHOE LOCKER
FEMALE LOCKER ROOM
CORRIDOR-9 DESIGN & CONSTRUCTION:
(11X12=132)
Y2 Y2 Y2 Y2
MALE STAFF LOCKER ROOM
(25X6=150)
2500
GARBAGE ROOM PRINCIPAL CONSULTANT:
9000
9000
PS-3 PS-3
UP DN FEMALE TOILET-3
MALE TOILET-4 DN
STAIR - 5 STAIR - 5 STAIR - 6
STAIR - 6
UP DW
Y1 Y1 Y1 Y1
STRUCTURAL CONSULTANT:
MALE TOILET-3
SERVICE ENTRANCE
MEP CONSULTANT:
ADMINISTRATION OFFICE
SUNK SLAB KEY PLAN (GFL,1FL)
50 SUNK
150 SUNK
400 SUNK
X1 X2 X3 X4 X5
X1 X2 X3 X4 X5
Y7 Y7 Y7
DN
STAIR - 4
9000
9000
PS-1
DN LINK BRIDGE-2
(FUTURE WORK)
Y6 Y6 Y6
DN HALL DN
2FL -1.400
3000
LINK BRIDGE-1
2FL =GFL+ 8200
9000
9000
STAIR - 9 STAIR - 10
Y5 Y5 Y5
1:100 1:100
9000
9000
MALE TOILET-5 CANTEEN-3 (300)
54000
54000
Y4 Y4 Y4
STAIR - 8
FEMALE TOILET-4
9000
9000
DN
04 01/12/23
REV. DATE DESCRIPTION
Y3 Y3 Y3 REVISIONS
CLIENT:
9000
9000
DESIGN & CONSTRUCTION:
Y2 Y2 Y2
KITCHEN OFFICE GFL +0.300
9000
PS-3
DN STEEL LADDER
STAIR - 5
DN DW
Y1 Y1 Y1
STRUCTURAL CONSULTANT:
SERVICE CORRIDOR MATERIAL STORAGE
24000 24000
MEP CONSULTANT:
X1 X2 X3 X4 X5 X1 X2 X3 X4 X5
PROJECT TILE:
2ND FLOOR SUNK SLAB KEY PLAN RFL FLOOR SUNK SLAB KEY PLAN
1 : 200 1 : 200 UNICHARM INDIA 3RD FACTORY
RE-CONSTRUCTION PROJECT
STATUS:
DESIGN DEVELOPMENT
DRAWING TITLE:
ADMINISTRATION OFFICE
SUNK SLAB KEY PLAN (2FL)
STRUCTURAL
ARCHITECTURAL
12.01.2023
LL Map
0.3
ton/m²
1.0 ton/m²
1.45 1.45
ton/m² ton/m²
0.3
1.0 ton/m²
1.0 1.0 1.0
ton/m² ton/m² ton/m² ton/m²
1.0
ton/m²
2.0 ton/m²
0.3
ton/m²
LL Map
0.075ton/m²
0.075ton/m²
LL Map
0.3
0.2
ton/m²
ton/m²
0.3
0.2 ton/m² 0.2
ton/m² ton/m²
0.5
ton/m²
0.4
ton/m²
0.5
ton/m²
0.5
ton/m²
0.4
ton/m²
LL Map
0.4
ton/m²
0.2
ton/m²
0.25
ton/m²
0.3
ton/m²
0.4
ton/m²
UNICHARM INDIA PRIVATE LIMITED
UNICHARM INDIA 3RD FACTORY RE-CONSTRUCTION PROJECT
MEPF
ARCHITECTURAL
12.01.2023
項目/ I t ems 内容/ Descr i pt i on 項目/ I t ems 内容/ Descr i pt i on
B. Mechani cal /機械設備
1 HVAC Syst em * Desi gn condi t i on 6 Dr ai nage & Vent * Sewage wat er and wast e wat er shal l be separ at ed i nsi de bui l di ng. They shal l be mi xed i n t he 1st manhol e.
For Pr ocess & War ehouse Ai r condi t i oni ng syst em shal l be i nst al l ed i n Pr ocess ar ea f or BC pr ocess( 3 l i nes) i n t hi s scope. Syst em * Pr ovi de sump pi t and pumpi ng syst em at ext er nal l ocat i on.
Desi gn t emper at ur e; 28℃±2℃ RH ; no cont r ol ※Cool i ng onl y * Sewage pi pe shal l be i nst al l ed ar ound new bui l di ng and connect ed t o STP. Sewage pi pe f r om exi st i ng
Out door t emper at ur e; Guadhouse & Day Car e Cent er shal l be al so i nst al l ed up t o STP l ocat ed on Nor t h-si de of new f act or y.
Summer D. B. 43. 3degC W. B. 25. 6degC * Ki t chen dr ai nage shal l be connect ed t o STP vi a gr ease t r ap.
Monsoon D. B. 32. 2degC W. B. 28. 3degC * Tr eat ed wat er t hr ough STP shal l be used f or i r r i gat i on wat er . Tappi ng f r om i r r i gat i on mai n l oop pi pe
Wi nt er D. B. 15. 6degC W. B. 10. 6degC shal l be pr ovi ded wi t h val ve at 30mt r spaci ng i n ext er i or t ur f ar ea.
* Ai r cool ed chi l l er ( 256RT) x 3nos shal l be pr ovi ded f or OHUs. * Dr ai n f r om sump pi t i n Pump Rooms shal l be pumped-up and connect ed t o STP.
* 3 nos OHUs ( 50000CMH, 600kw) f or BC pr ocess l i nes shal l be pr ovi ded wi t h washabl e f i l t er . * Vent pi pe shal l be i nst al l ed f or each dr ai nage l i ne, STP and wat er t anks pr oper l y.
* Var i abl e ai r f l ow suppl y f an shal l be pr ovi ded f or OHU t o cope wi t h dust col l ect or exhaust ai r change.
* Dust col l ect or exhaust ai r vol ume; 45, 000m3/h per 1 BC l i ne. 7 Fi r e Pr ot ect i on * Fi r e hose r eel s, yar d hyadr ant s, spr i nkl er and f i r e ext i ngui sher s shal l be pr ovi ded i n accor dance wi t h
* Dedi cat ed exhaust i n 3, 000m3/h f or bl ower i n each pr ocess l i ne shal l be r equi r ed. Syst em I ndi an code/r egul at i on and NFPA ( Ref er Neemur ana Pl ant ) .
* OA suppl y f ans shal l be pr ovi ded i n Mat er i al / Pr oduct War ehouse t o keep posi t i ve pr essur e. * Fi r e pumps shal l consi st as bel ow ;
* Pr ocess exhaust f or QC ar ea and bat t er y char gi ng ar ea shal l be r equi r ed. Engi ne-dr i ven t ype( 2, 000GPM) x1, For spr i nkl er ( 2, 000GPM) x1, For hydr ant ( 2, 000GPM) x1, Jockey pump x2
* SP pi pe( 80Φ) shal l be connect ed t o each dust col l ect or .
2 HVAC Syst em * Desi gn condi t i on * Make-up wat er t ank w/ st eel f r ame shal l be i nst al l ed on t he r oof of Of f i ce Bui l di ng
For Of f i ce Ar ea Desi gn t emper at ur e; 26℃±2℃ RH ; no cont r ol ※Cool i ng onl y * SP pi pi ng & heads shal l be i nst al l ed bel ow t he r oof i n f ut ur e i mpl ement at i on ar ea ( Or di nar y Hazar d) .
* Ai r -cool ed package ai r -condi t i oner ( VRV t ype) shal l be pr ovi ded i n of f i ce ar ea wi t h pr oper
vent i l at i on f or of f i ce, meet i ng r oom, cant een, r est r oom, LT panel r oom and so on. 8 Compr essed ai r * Pr ocess demand;
* I nsect scr een shal l be pr ovi ded i n OA & EA l ouver and hood. suppl y syst em 12m3/mi n per each Pr ocess l i ne f or BC pr ocess machi ne i n t hi s scope.
* Exhaust ai r t aken f r om shoe box shal l be pr ovi ded. * Ot her demand;
* 1 nos Ai r shower uni t shal l be pr ovi ded i n f r ont of St ai r -2 on f i r st f l oor . Dust col l ect or , Par t s st or age ( 25Ax1) , Wor k shop( 25Ax3) , QC r oom ( 25Ax3) , Tr ai ni ng r oom( 15Ax8) ,
2 nos Ai r shower uni t ( t unnel t ype w/ai r cur t ai n & SUS bar i nsi de t unnel ) shal l be pr ovi ded i n Ant e Room-9. RC r oof on Of f i ce Bui l di ng ( 25Ax2) , Chi l l er Yar d ( 25Ax1) , Ant e Room-1, 2, 3, 4 ( 15A x2 f or each)
* Suppl y pur essur e; 7. 0kg/cm2
3 Aut omat i c Cont r ol * BMS shal l be pr ovi ded t o moni t or and cont r ol as bel ow ; * 3 nos of 75kw, Oi l -i nj ect i on, scr ew, ai r cool ed t ype of compr essor shal l be pr ovi ded.
& BMS Syst em Cont r ol ; chi l l er , OHU, f an, dust col l ect or et c. * 1 nos of Mul t i -uni t cont r ol panel ( max. number of connect i on ; 4 uni t s) shal l be i nst al l ed.
Moni t or i ng/al ar m; val ve, f i l t er pr essur e di f f er ent i al , wat er l evel i n t ank, compr essor , * Ref r i ger ant t ype dr yer ( DP 10oC) shal l be r equi r ed.
dr yer , pump, panel , power suppl y l i ne, wat er l eak det ect i on et c. * Pr e f i l t er ; 1μm Af t er f i l t er ; 0. 01μm
Measur ement ; t emper at ur e, wat er f l ow r at e, ai r f l ow r at e, el ect r i cal consumpt i on et c. * 1 nos of Ai r r eci ever t ank ( cap. 5m3) shal l be pr ovi ded.
* BMS t er mi nal uni t shal l be i nst al l ed i n Fi r e & Secur i t y Conr t ol Room@Of f i ce Bl dg. * Capaci t y of each compr essor shal l cat er t o each pr ocess machi ne r espect i vel y. No st and-by r equi r ed.
* OHU /chi l l er /vent i l at i on syst em f or pr ocess shal l be st ar t ed/st opped by BMS oper at i on * 100A mai n l oop pi pe f or each pr ocess l i nes shal l be i nst al l ed wi t h val ve f or f ut ur e pr ovi si on.
* OHU /vent i l at i on syst em f or pr ocess shal l be i nt er l ocked by f i r e al ar m syst em. * Fl ow met er f or each pr ocess l i ne shal l be pr ovi ded and aut o dr ai n uni t at pr oper l ocat i on
* Al ar m Moni t or panel shal l be pr ovi ded i n Pr oduct i on Of f i ce and Fi r e & Secur i t y Conr t ol Room@Of f i ce Bl dg. Ai r f l ow r at e measur ed by t he f l ow met er shal l be moni t or ed by BMS.
* Emer gency cal l syst em f r om pr oduct i ona ar ea shal l be pr ovi ded. * Dr op pi pi ng t aken f r om l oop br anch pi pe shal l be i nst al l ed up t o FL+1, 000mm w/ val ve & PG ( f or 3 BC l i nes) .
* Dr ai n wat er shal l be connect ed t o STP vi a oi l t r ap.
4 Wat er Suppl y Syst em 1. Sani t ar y f i xt ur es
* Pr ovi de i ndi an st andar d t ype of sani t ay f i xt ur e f or t oi l et and pant r y i n of f i ce/f act or y bui l di ng. 9 Dust Col l ect or 1. Scope of wor k
Guest t oi l et ; west er n t ype wi t h washl et Stuff t o i l e t ; I n d i a n ty p e wi t h ha n d s h o w e r Syst em * Pr i mar y dust col l ect or & Secondar y dust col l ect or wi t h exhaust f an ; Out of scope
Producti on toi l et; I ndi an type wi th hand shower * NG Loss shr edder wi t h compact or ; Out of scope
* Hand dr yer s shal l be pr ovi ded i n each t oi l et & Ant e Room-9. * Cont r ol syst em f or dust col l ect or syst em ; Out of scope
* Manual f l ush val ve f or ur i nal shal l be pr ovi ded. * Dust col l ect or duct ; Scope of wor k
* Si nk & bi b cock shal l be pr ovi ded i n each St or age ( j ani t or r oom) . * Pr essur e r el i ef ; Out of scope
* Faucet s shal l be pr ovi ded i n each t oi l et handwash, pant r y, si nk i n Ant e Room-9 and cant een. * Spar k sensor , Met al det ect or ; Out of scope
* 2 nos wat er cool er s shal l be pr ovi ded i n Cant een. 1 nos wat er cool er shal l be pr ovi ded i n Ant e Room-9. * Fi r e damper ; Suppl i ed by DC cont r act or . / I nst al l at i on shal l be scope of wor k.
* FA si gnal t r ansf er f r om FACP t o l ocal cont r ol panel of dust col l ect or ; Scope of wor k
2. Wat er suppl y syst em
* New ci t y wat er i ncomi ng shal l be t aken f r om Sout h si de and i nst al l pi pi ng t o r aw wat er t ank. 2. Dust col l ect or syst em f or BC pr ocess l i ne
* Fi l t er ed wat er shal l be suppl i ed t o t oi l et f l ushi ng, hand wash. * 3 nos of Pr i mar y dust col l ect or wi t h bag f i l t er shal l be i nst al l ed r espect i vel y f or each BC l i ne.
* RO wat er uni t shal l be pr ovi ded i n QC Room and Ki t chen. * Secondar y dust col l ect or shal l consi st as bel ow ;
* Fi l t er ed wat er shal l be suppl i ed t o t he exi st i ng Guar dhouse & Day Car e Cent er vi a Buf f er Tank & - 1 nos f or 7 pr ocess l i nes ( To be i nst al l ed i n t hi s phase by ot her s)
Boost er pump. ( r ef er t o Si t e Ut i l i t y Pl an) - 1 nos f or 5 pr ocess l i nes ( To be i nst al l ed i n f ut ur e phase)
* Ai r f l ow r at e ; 750m3/mi n ( 45, 000CMH) per each BC pr ocess l i ne
3. Hot wat er syst em * Dust col l ect or f an shal l be VFD t ype. ( To be i nst al l ed by ot her s)
* N/A * Ai r f l ow measur ement por t shal l be pr ovi ded on pr i mar y si de of dust col l ect or exhaust bl ower .
* Oper at i on st at us and al ar m shal l be moni t or ed by l ocal panel ( by ot her s) and BMS.
5 Gas Suppl y Syst em * N/A * Dust col l ect or duct ( f or 3 BC l i nes) shal l be i nst al l ed i ncl udi ng hook-up.
* Fl exi bl e j oi nt shal l be pr ovi ded f or dust col l ect or duct i nst al l ed i nsi de cei l i ng of Li nk Passage-3.
21 Nov 2022
1 66KV i ncomi ng wor k * N/A ( To ut i l i ze exi st i ng i ncomi ng, 66kV/11kV swi t chi ng yar d and HT Panel ) 6 Fi r e Al ar m Syst em * Addr essabl e F/A syst em ( combi nat i on panel , det ect or ) shal l be pr ovi ded i n accor dance
wi t h I ndi an r egul at i on/codes & st andar ds and NFPA.
2 Subst at i on Syst em * Two( 2) mai n f eeder s shal l be di st r i but ed f r om exi st i ng HT Panel Room t o Subst at i on-3 and * FACP( Fi r e Al ar m Cont r ol Panel ) shal l be i nst al l ed i n Fi r e & Secur i t y Cont r ol Of f i ce@Of f i ce Bl dg.
El ect r i c Subst at i on vi a under gr ound HDPE pi pi ng and manhol es. * Annunci at or s shal l be i nst al l ed i n Pr oduct i on Of f i ce@new f act or y and exi st i ng Guar dhouse.
* To i nst al l 11kV HT VCB panel s i n Subst at i on-3 and El ect r i c Subst at i on. ( Exi st i ng FACP l ocat ed i n exi st i ng Guar dhouse shal l be r emoved. )
11kV mai n f eeder s shal l be di st r i but ed t o 11kV/433V and 11kV/210V t r ansf or mer s. * Beam det ect or shal l be i nst al l ed i nsi de cei l i ng of Pr oduct i on ar ea, Dust Col l ect or Room and War ehouse.
* I n Subst at i on-3, t he f ol l owi ng t r ansf or mer s ( oi l t ype w/aut o t ap changer ) shal l be i nst al l ed; * Response i ndi cat or shal l be i nst al l ed i n al l t he ar ea wher e det ect or s i nst al l ed i nsi de cei l i ng
( 1) 11kV/433V * Ear l y smoke det ect i on syst em( VESDA) and f l ame det ect i on camer a shal l be out of scope.
TRF-1 - 4,000kVA x1set for production (BC x3lines) 7 Li ght ni ng Pr ot ect i on * Li ght ni ng pr ot ect i on shal l be pr ovi ded as convent i onal t ype.
TRF-2 - 4, 000kVA x1set f or gener al ser vi ces such as chi l l er s, AHUs, f i r e pumps, ai r compr essor s, Syst em
pr i mar y dust col l ect or s and l ef t hal f of Mat er i al / Pr oduct War ehouse.
( 2) 11kV/210V 8 Publ i c Addr ess Syst em * PA syst em shal l consi st of ampl i f i er , chai m, t i mer , DVD pl ayer , sel ect or swi t ch,
TRF-3- 1, 500kVA x1set f or pr oduct i on ( BC x3l i nes) r emot e mi cr ophone, el ect r i cal power uni t and r ack.
* I n El ect r i c Subst at i on, t he f ol l owi ng t r ansf or mer s ( mol d t ype w/aut o t ap changer ) shal l be i nst al l ed; These mai n equi pment shal l be l ocat ed i n Fi r e & Secur i t y Cont r ol Of f i ce@Of f i ce Bl dg.
( 1) 11kV/433V * Speaker Hor n t ype i n war ehouse / pr oduct i on ar ea, Recessed t ype i n of f i ce ar ea
TRF-6 - 3, 000kVA x1set f or gener al ser vi ces such as secondar y dust col l ect or , bui l di ng l oad f or * At t enuat or Of f i ce ar ea et c.
r i ght hal f of Mat er i al / Pr oduct War ehouse, Of f i ce Bui l di ng, Car /Bi ke Par ki ng, * Br oadcast i ng si mul t aneousl y t hr ough t he t el ephone set shal l be r equi r ed.
exi st i ng Guar dhouse and exi st i ng Day Car e Cent er . * Br oadcast i ng t hr ough Emer gency cal l syst em i n scope of BMS f r om pr oduct i on ar ea shal l be r equi r ed
* Mai n LT-di st r i but i on panel s shal l be pr ovi ded at subst at i on.
9 Tel ephone Syst em * To ut i l i ze t he exi st i ng TEL i ncomi ng t o t he exsi t i ng Guar d House.
3 DR-UPS r el at ed wor k * N/A * Mai n wi r i ng shal l be dest r i but ed f r om t he exi st i ng Guar d House t o MDF l ocat ed i n Of f i ce Bui l di ng.
* Wi r i ng & condui t f r om MDF t o each TEL out l et vi a t er mi nal boar d shal l be pr ovi ded.
4 Power Di st r i but i on Syst em * Gener al l oad 3φ4W 415V - 1φ240V * TEL codui t s, out l et s, wi r i ng & MDF shal l be pr ovi ded wi t hi n scope of wor k.
( gener al , pr ocess) * Pr ocess l oad 3φ4W 415V and 3φ3W 240V ( no neut r al wi r e) * 20 set s Mul t i pl e f unct i on di gi t al Handset s, 30 set s st andar d handset s, 2 set s hand phone
※Det ai l f or BC pr ocess l oad shal l be r ef er r ed t o t he exi st i ng f act or y i n Neemr ana. * PABX( 10 i ncomi ng, 20 ext ensi ons) wi t h 2 hour s bat t er y
* Gener al Load Li ght i ng, Recept acl e, HVAC, Pumps, El ect r i cal shut t er s, For kl i f t char ger s et c.
* Spar e ci r cui t br eaker ( 10%) and f ut ur e space( 20%) shal l be pr ovi ded i n each di st r i but i on panel 10 LAN syst em * LAN cabl e t ype : cat 6
* LAN condui t s f r om ser ver t o LAN out l et t hr ough HUB uni t shal l be pr ovi ded wi t hi n scope of wor k.
5 Li ght i ng and Recept acl e * Li ght i ng - Li ght i ng f i xt ur e shal l be LED t ype. * LAN Equi pment ( Ser ver , HUB, swi t chi ng panel ) t o be out of scope
- Pr oduct i on ar ea; 250Lx War ehouse; 150Lx Tr uck yar d; 150Lx * Ser ver shal l be i nst al l ed i n Ser ver r oom, and HUB i n pr oduct i on of f i ce.
Of f i ce ar ea; 500Lx Ut i l i t y; 200Lx * LAN shal l be pr ovi ded t o each dust col l ect or r espect i vel y by opt i cal f i ber cabl e.
* Out door - St r eet l i ght LED wi t h 7 mt r pol e, phot o cel l sensor and t i mer shal l be
i nst al l ed at 30mt r spaci ng ar ound new f act or y & of f i ce bui l di ng. 11 CCTV syst em & * Car d r eader syst em, CCTV syst em and Bor der Secur i t y syst em shal l be out of scope.
- I n exi st i ng ar ea ar ound 1st f act or y, pol e & f i xt ur es shal l be r eused and Secur i t y syst em
power shal l be suppl i ed f r om El ect r i c Subst at i on i n new f act or y.
- Gar den l i ght shal l be i nst al l ed under t he canopy of Of i i ce Bui l di ng. 12 MATV syst em * N/A
- Fl oodl i ght shal l be i nst al l ed f or Chi l l er Yar d.
- Addi t i onal st r eet l i ght shal l be i nst al l ed ar ound l oadi ng ar ea and Of f i ce Bui l di ng. 13 AV syst em * Cei l i ng-mount ed pr oj ect or , mot or i zed scr een and wi r i ng / condui t i n Mul t i -Pur pose Room
- Mot i on sensor l i ght shal l be i nst al l ed above al l t he evacuat i on door l eadi ng t o t he out si de. shal l be i ncl uded.
- No gener al l i ght shal l be i nst al l ed i n t he f ut ur e i mpl ement at i on ar ea. * Ot her t han t he above-ment i oned shal l be out of scope.
* Swi t ch zoni ng War ehouse; 2 way swi t ch f r om bot h si de of Logi st i c of f i ce and pr oduct i on ar ea
Pr oduct i on; i ndi vi dual swi t ch f or each l i ght i ng l i ne 14 Super Sensi t i ve Smoke * N/A
Toi l et / Locker Room; Mot i on sensor t ype f or aut omat i c On/Of f Det ect or & Fl ame Sensor
* Emer gency l i ght Cent r al UPS shal l be i nst al l ed. Power f or each emer gency l i ght shal l be
pr ovi ded f r om UPS. 15 Gr oundi ng * Gr oundi ng shal l be i nst al l ed i n accor dance wi t h I ndi an code & st andar d.
Onl y emer gency l i ght shal l be i nst al l ed i n t he f ut ur e i mpl ement at i on ar ea. * Pr ovi de Bui l di ng Gr oundi ng Loop and GI Ear t h St r i p al l over t he bui l di ng.
* Exi t l i ght Bat t er y t ype shal l be pr ovi ded i n accor dance wi t h I ndi a r egul at i on/codes & st andar ds. * Pr ovi de gr oundi ng bet ween MLTP and each di st r i but i on/MCC panel wi t h cabl e si ze i n 50%
* I nsect cat cher l i ght /Yel l ow l amp Out of scope ( Power Recept acl e pr ovi ded f ol l owi ng Neemr ana) of r espect i ve f eeder .
* For kl i f t Char ger3φ4W 415V-Recept acl e f or f or kl i f t s. ( 32A x 10set s i n t ot al ) * Pr ovi de gr oundi ng f or cont r ol ci r cui t of pr oduct i on machi ne wi t h t est i ng el ect r ode.
21 NOV 2022