PRE-COMMISSIONING/PRE-DISMANTLING TEST FOR TRANSFORMER

Test Date:

Company / Site:

Location:

Client / Contractor:

Make:

Serial Number:

MVA:

Rated Voltage (KV):

Nos. of Phase:

Rated Current (A):

Manufacturing Year:

Vector Group:

Cooling Method:

Total Weight:

%Impedance:
*Visual Image or Soft copy of full name plate of Transformer also required.

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 2 of 10

 Tanδ and Capacitance Measurement of Winding


OTI:____________ (Only Wdg/Earth - GST Mode in case of YNa0)
Applied
Winding Test Capacitance Tanδ Current
Voltage
Combination Mode ( ) (%) ( )
(KV)

HV/LV UST
(CHL)

HV/Ground
GST-g
with LV Guard
(CH)

HV/LV+Ground GST
(CH+CHL)

LV/HV UST
(CLH)

LV/Ground
GST-g
with HV Guard
(CL)

LV/HV+Ground GST
(CL+CLH)

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 3 of 10

 Tanδ and Capacitance Measurement of Bushings


Test Capacitance Tanδ Current
Bushing Details Mode Voltage
(kV) ( ) (%) ( )
SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g

SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g

SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g

SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g

SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g

SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g

SR.NO:
MAKE: UST
KV:
M.Year:
Identification: GST-g
Phase identification to be written in identification.

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 4 of 10

 Magnetization Current Measurement

__________SIDE
Tap Voltage Applied (Volts) Current Measured In mAmps
No.

__________SIDE
Tap Voltage Applied (Volts) Current Measured In mAmps
No.

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 5 of 10

 Magnetic Balance Measurement

________SIDE:
Option-1, If connection in Star (U-N, V-N, W-N)
Option-2, If connection in Delta (U-V, V-W, W-U)
Voltage Measured (Volts)
TAP POSITION

________SIDE:
Option-1, If connection in Star (U-N, V-N, W-N)
Option-2, If connection in Delta (U-V, V-W, W-U)
Voltage Measured (Volts)
TAP POSITION

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 6 of 10

 Short Circuit Current Measurement


Combination: HV/LV
Applied 3 phase Voltage on HV Side and Measured Current in HV & LV Side. While LV kept
shorted.
HV Side HV Side LV Side
Tap
(Applied Volts) (Current in Amp) (Current in Amp)
Pos.
1U – 1V 1V – 1W 1W – 1U 1U 1V 1W 2U 2V 2W
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 7 of 10

 Vector Group Check: (By 3-Phase Supply)

Terminals Shorted:_______________ Vector Group:______________


Voltage Applied 1U-1V= 1V-1W= 1W-1U=
Voltage Measured
Measured Voltage Vector Diagram
Between

Conditions / Remarks:

Vector Group Confirmed: ⃝ YES ⃝ NO

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 8 of 10

 Turns Ratio Test / Voltage Ratio Test


Applied Volts at HV Side and Measured volts at LV Side (Ratio measured by TTR set)
Option-1, If YNd11 (1U-1N / 2U-2W, 1V-1N / 2V-2U, 1W-1N / 2W-2V)
Option-2, If YNd1 (1U-1N / 2U-2V, 1V-1N / 2V-2W, 1W-1N / 2W-2U)
Option-3, If YNyn0 (1U-1N / 2U-2N, 1V-1N / 2V-2N, 1W-1N / 2W-2N)
Option-4, If YNa0 (1U-N / 2U-N, 1V-N / 2V-N, 1W-N / 2W-N)
Option-5, If Dyn11 (1U-1V / 2U-2N, 1V-1W / 2V-2N, 1W-1U / 2W-2N)
Option-6, If Dyn1 (1U-1W / 2U-2N, 1V-1U / 2V-2N, 1W-1V / 2W-2N)
Option-7, If 1-ɸ Transformer, HV-N / LV1-LV2
TAP PRIMARY VOLTAGE (V) SECONDARY VOLTAGE (V) MEASURED RATIO
NO.

*Omicron CPC-100 users must save measurement .xml files.

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 9 of 10

 Winding Resistance Test:


OTI:____________ WTI:____________
________SIDE: All below Results in ___________(Unit)
Option-1, If connection in Star (U-N, V-N, W-N)
Option-2, If connection in Delta (U-V, V-W, W-U)
WINDING RESISTANCE
TAP POS.

*Omicron CPC-100 users must save measurement .xml files.

________SIDE: All below Results in ___________(Unit)


Option-1, If connection in Star (U-N, V-N, W-N)
Option-2, If connection in Delta (U-V, V-W, W-U)
WINDING RESISTANCE
TAP POS.

LA Engg Sign_____________ Client Sign______________ Witness Sign________________


Page 10 of 10

 Insulation Resistance Test of Winding:


OTI: __________ Results in _________ (Unit)

Applied IR Value DAI PI


Connection 15 Sec 60 Sec 600 Sec (60 Sec/ (600 Sec/
Voltage 15 Sec) 60 Sec)
HV / E

LV / E

HV / LV

 Core Insulation Resistance Test:


(If Terminals available for Test)
Applied Volts:____________ Results in _________ (Unit)
Combination IR Value
Core to Frame
Core to Earth
Frame to Earth