JOB No.
RU150/F-51/DRAIN UPTO 2.0m Ht.
TOTAL NO. OF PAGES
NAME SIGNATURE DATE
DESIGNED AP 22-12-2020
CHECKED GV
APPROVED
CODE REV.
IRC R0
RELEASED FOR
tW1 tW1
h=H+t
H
B U type drain
tW2 tW2
1 Self wt of Structure 1) 1 + 2 +4
Basic Parameters
Φ = 30 Deg
Coefficient of active earth pressure = 0.279
18 KN/m
3
Dry density of fill =
25 KN/m
3
Concrete Density =
3
water density = 10 KN/m
Live Load Surcharge = 1.20 m
5.00 KN/m
2
Foot path Live Load =
( as per IRC - 6 foot path Loading for crowd )
ka γ h /2
2
Earth pressure = 2.79 kN/m
ka γ h /2
2
Earth pressure = 2.79 kN/m
2
Modulus of Subgrade reation = 1500 KN/m
Summary of BM and SF
up to1 m Drain
SL.
DESCRIPTION Units
NO Top slab Bottom slab Side wall
Status of Section OK OK OK
Status of Section OK OK OK
Provision of Reinforcement
up to1 m Drain
Dia 8 8 8
Provided Spacing 0 0 0
Reinforcement
Dia 0 0 0
Spacing 0 0 0
Dia 0 0 0
=25% of
6 63 84 84
Ast
Distribution Reinforcement = Max(25% of 0.001Ac 31 56 56
Main Reinforcement or 0.001 Ac)
to be provided on both faces Max reqd 63 84 84
Check OK OK OK
OK OK OK
Comp. Stress due to Horizontal force, σcp Mpa 0.000 0.000 0.000
VRd.c = [0.12K(80 1.fck)0.33+0.15 cp]bw.d
VRd.c = KN 19 30 30
Govering VRdc= KN 19 30 30
αv mm 31 56 56
Vu kN 0 11 13
up to1 m Drain
SL.
DESCRIPTION Units
NO Bottom slab Side wall
0.0003 0.0001
εsm - εcm = (σsc - (kt*fct,eff/ρp,eff)*(1+αe*ρp,eff))/Es
W k = Sr,max*(εsm - εcm) mm 0.087 0.031
Allowable crack width mm 0.2 0.2
Status of sections OK OK
UPTO 1.5m HEIGHT
Design of single cell U Drain Structure ( 1.2 X 1.5 )
Drain width Drain height Thickness in m
S. No
Total (B)m clear (H) m Top (t) Bottom Slab(b) side wall Top side wall bottom
tW1 tW2
1 1.200 1.5 0.080 0.130 0.130 0.130
tW1 tW1
h=H+t
H
B U type drain
tW2 tW2
1 Self wt of Structure 1) 1 + 2 +4
Basic Parameters
Φ = 30 Deg
Coefficient of active earth pressure = 0.279
18 KN/m
3
Dry density of fill =
25 KN/m
3
Concrete Density =
3
water density = 10 KN/m
Live Load Surcharge = 1.20 m
5.00 KN/m
2
Foot path Live Load =
( as per IRC - 6 foot path Loading for crowd )
ka γ h /2
2
Earth pressure = 6.15 kN/m
ka γ h /2
2
Earth pressure = 6.15 kN/m
2
Modulus of Subgrade reation = 1500 KN/m
Summary of BM and SF
up to 1.5 m Drain
SL.
DESCRIPTION Units
NO Top slab Bottom slab Side wall
Status of Section OK OK OK
Status of Section OK OK OK
Provision of Reinforcement
up to 1.5 m Drain
Dia 8 10 10
Provided Spacing 0 0 0
Reinforcement
Dia 0 0 0
Spacing 0 0 0
Dia 0 0 0
=25% of
6 63 140 140
Ast
Distribution Reinforcement = Max(25% of 0.001Ac 31 75 75
Main Reinforcement or 0.001 Ac)
to be provided on both faces Max reqd 63 140 140
Check OK OK OK
OK OK OK
Comp. Stress due to Horizontal force, σcp Mpa 0.000 0.000 0.000
VRd.c = [0.12K(80 1.fck)0.33+0.15 cp]bw.d
VRd.c = KN 19 44 44
Govering VRdc= KN 19 44 44
αv mm 31 75 75
Vu kN 0 18 23
up to 1.5 m Drain
SL.
DESCRIPTION Units
NO Bottom slab Side wall
0.0002 0.0002
εsm - εcm = (σsc - (kt*fct,eff/ρp,eff)*(1+αe*ρp,eff))/Es
W k = Sr,max*(εsm - εcm) mm 0.060 0.054
Allowable crack width mm 0.2 0.2
Status of sections OK OK
UPTO 2.0m HEIGHT
Design of single cell U Drain Structure ( 1.1 X 2 )
Drain width Drain height Thickness in m
S. No
Total (B)m clear (H) m Top (t) Bottom Slab(b) side wall Top side wall bottom
tW1 tW2
1 1.100 2.0 0.080 0.170 0.170 0.170
tW1 tW1
h=H+t
H
B U type drain
tW2 tW2
1 Self wt of Structure 1) 1 + 2 +4
Basic Parameters
Φ = 30 Deg
Coefficient of active earth pressure = 0.279
18 KN/m
3
Dry density of fill =
25 KN/m
3
Concrete Density =
3
water density = 10 KN/m
Live Load Surcharge = 1.20 m
5.00 KN/m
2
Foot path Live Load =
( as per IRC - 6 foot path Loading for crowd )
ka γ h /2
2
Earth pressure = 10.92 kN/m
ka γ h /2
2
Earth pressure = 10.92 kN/m
2
Modulus of Subgrade reation = 1500 KN/m
Summary of BM and SF
up to 2 m Drain
SL.
DESCRIPTION Units
NO Top slab Bottom slab Side wall
Status of Section OK OK OK
Status of Section OK OK OK
Provision of Reinforcement
up to 2 m Drain
Dia 8 12 12
Provided Spacing 0 0 0
Reinforcement
Dia 0 0 0
Spacing 0 0 0
Dia 0 0 0
=25% of
6 63 217 217
Ast
Distribution Reinforcement = Max(25% of 0.001Ac 31 114 114
Main Reinforcement or 0.001 Ac)
to be provided on both faces Max reqd 63 217 217
Check OK OK OK
OK OK OK
Comp. Stress due to Horizontal force, σcp Mpa 0.000 0.000 0.000
VRd.c = [0.12K(80 1.fck)0.33+0.15 cp]bw.d
VRd.c = KN 19 67 67
Govering VRdc= KN 19 67 67
αv mm 31 114 114
Vu kN 0 33 35
up to 2 m Drain
SL.
DESCRIPTION Units
NO Bottom slab Side wall
0.0002 0.0002
εsm - εcm = (σsc - (kt*fct,eff/ρp,eff)*(1+αe*ρp,eff))/Es
W k = Sr,max*(εsm - εcm) mm 0.066 0.060
Allowable crack width mm 0.2 0.2
Status of sections OK OK