Chinda Tank Water Planning (Final) 21!06!2020
Chinda Tank Water Planning (Final) 21!06!2020
Maximum water requirment in any month= 0.6378 MCM Units Mcum Mcft
Or 22.52 MCft Total kharif water requirment 0.0000 0.00
Total Rabi water requirment 2.4072 85.00
Assuming canal runs 25 days in a month & 16hour in a day i.e. Total water requirment 2.4072 85.00
99.89x100000 i.e.= 15.64 Cusecs
25x16x60x60 Or 0.44 Cumecs
Canal duty=Total irrigation in acres/Total discharge required in cusecs
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 (A)KHARIF
PADDY 0 4 4 6 4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.0
0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
SOYABEAN 0 0 0 0 4 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.0
0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
G.TOTAL(A) 0 0 0 0 0 0 0 0 0 0 0 0 0
2 (B)RABI
HYV WHEAT 24 6 6 6 6 0.0 0.0 0.0 24.0
617.5 60.00 0 0 0 0 0 15.00 15.00 15.00 15.00 0.0 0.0 0.0 60
250 1.5000 0 0 0 0 0 0.37500.3750 0.3750 0.3750 0.0 0.0 0.0 1.5
52.97 13.24 13.24 13.24 13.24 0.0 0.0 0.0 52.965
Ord. WHEAT 12 0 0 0 0 0 3 3 2 2 2 0.0 0.0 12.0
456.95 30 0 0 0 0 0 7.50 7.50 5.00 5.00 5.00 0.0 0.0 30.0
185 0.5550 0.13880.1388 0.0925 0.0925 0.0925 0.0 0.0 0.6
19.60 4.90 4.90 3.27 3.27 3.27 0.0 0.0 19.6
GRAM 6 0 0 0 0 0 0 3 3 0.0 0.0 0.0 0.0 6
298.87 15 0 0 0 0 0 0 7.50 7.50 0.0 0.0 0.0 0.0 15
121 0.1815 0.0908 0.0908 0.0 0.0 0.0 0.0 0.1815
6.41 3.20 3.20 0.0 0.0 0.0 0.0 6.408765
0.0 0.0 0.0 0.0 9 12 11 8 2 0 0 42
0.0 0.0 0.0 0.0 22.50 30.00 27.50 20.00 5.00 0.00 0.00 105
G.TOTAL(B) 1373.32 42.00 0.0 0.0 0.0 0.0 0.5138 0.6045 0.5583 0.4675 0.0925 0.00 0.00 2.2365
556 105.00 0.0 0.0 0.0 0.0 18.14 21.34 19.71 16.51 3.27 0.00 0.00 78.970815
Transmission 0.0 0.0 0.0 0.0 0.1798125 0.211575 0.1953875 0.163625 0.032375 0 0.00
Losses@ 35% 0.0 0.0 0.0 0.0 6.3491794 7.4707133 6.8991326 5.7775988 1.1431613 0 0.00 27.639785
G.TOTAL(HA-mm) 0.00 0.00 0.00 0.00 0.6936 0.8161 0.7536 0.6311 0.1249 0.00 0.00 3.019275
G.TOTAL(MCM) 0.00 0.00 0.00 0.00 24.4897 28.816 26.6109 22.2850 4.4093 0.00 0.00 106.6106
Kharif requirment of September Kharif requirment of October Kharif requirment of November Entire Rabi requirment
0.00 0.00 0.00 2.2365
35% Loss 0.00 35% Loss 0.00 35% Loss 0.00 35% Loss 0.7828
0.00 0.00 0.00 3.019
(B.R.Paradkar) (A.N.Sharma)
(V.A.Siddiqui) Executive Engineer
Sub Engineer Sub Divisional Officer Water Resources Division
Water ResourceSub Division, Amarwada Chhindwara
CHINDA TANK PROJECT
RAIN FALL DATA OF HARRAI RAINGAUGE STATION
FROM YEAR 1980 TO 2019
1 1980 633.4 1999 1944
2 1981 1027.6 1994 1795
3 1982 881 2019 1440.1
4 1983 1187.5 2013 1432.2
5 1984 895.5 2003 1218.2
6 1985 905.1 1993 1213.2
7 1986 943.4 1997 1204.4
8 1987 748.4 2005 1191
9 1988 1080.4 1983 1187.5 Mean Annual
10 1989 871.4 2009 1140.5 R.F. 39913.1/40= 997.83 mm
11 1990 810.6 2012 1132.2 39.28 Inch
12 1991 681.2 2001 1131.9
13 1992 974.8 1988 1080.4 75% Dependeble
14 1993 1213.2 2016 1059.7 R.F. 40X75/100
15 1994 1795 2007 1030.6 30
16 1995 852.6 1981 1027.6 852.6 mm
17 1996 530.3 2000 1007.5 33.57 Inch
18 1997 1204.4 2006 995
19 1998 907 1992 974.8 As per Binnie's table
20 1999 1944 2002 946.9 33 23 23
21 2000 1007.5 1986 943.4 34 0.139 0.7923
22 2001 1131.9 2011 917.9 23.7923
23 2002 946.9 1998 907
24 2003 1218.2 1985 905.1
25 2004 575 1984 895.5
26 2005 1191 2008 883.4
27 2006 995 1982 881
28 2007 1030.6 1989 871.4
29 2008 883.4 2015 857.6 (B.R.Paradkar) (V.A.Siddiqui)
30 2009 1140.5 1995 852.6 Sub Engineer Sub Divisional Officer
31 2010 778.3 1990 810.6 Water ResourceSub
Division, Amarwada
32 2011 917.9 2010 778.3
33 2012 1132.2 2017 767.3
34 2013 1432.2 1987 748.4
35 2014 746.4 2014 746.4
36 2015 857.6 1991 681.2
37 2016 1059.7 1980 633.4
38 2017 767.3 2004 575 (A.N.Sharma)
39 2018 574.6 2018 574.6 Executive Engineer
40 2019 1440.1 1996 530.3 Water Resources Division
Chhindwara
39913.1 39913.1
CHINDA TANK PROJECT
FIXATION OF PRINCIPAL LEVELS
(V.A.Siddiqui) (A.N.Sharma)
Sub Divisional Officer Executive Engineer
K.T.P. Canal Sub Dn. No. -2 Water Resources Dn.
Chhindwara (M.P) Chhindwara (M.P)
(Rahul Borkar)
Sub Divisional Officer (S.S.Mokasdar)
Water ResourceSub Division, Amarwada Executive Engineer
Water Resources Division
Chhindwara
CHINDA TANK PROJECT
DAM EARTH WORK
FLOOD LIFF-1.50M
L W H RATE UNIT AMOUNT
(A) 420 (5+25)/2 5.00 31500
(B) 420 (12.5+46.25)2 11.25 138796.9
(C) 420 (12.5+22.5)/2 4.00 29400
(D) 420 (22.5+31.5)/2 3.00 34020
(E) 420 (49.25+63.37)/2 3.55 83958.21
(F) 420 (34.5+65.7)/2 7.80 165765.6
483440.7 91 43993102
FLOOD LIFF-1.20M
(A) 420 (5+25)/2 5.00 31500
(B) 420 (12.5+45.35)2 10.95 133026.1
(C) 420 (12.5+22.5)/2 4.00 29400
(D) 420 (22.5+31.5)/2 3.00 34020
(E) 420 (48.35+62.55)/2 3.55 82675.95
(F) 420 (34.5+64.50)/2 7.50 155925
466547 91 42455779
FLOOD LIFF-0.90M
(A) 420 (5+25)/2 5.00 31500
(B) 420 (12.5+44.45)2 10.65 127368.7
(C) 420 (12.5+22.5)/2 4.00 29400
(D) 420 (22.5+31.5)/2 3.00 34020
(E) 420 (47.45+61.65)/2 3.55 81334.05
(F) 420 (34.5+63.30)/2 7.20 149385.6
453008.3 91 41223758
SPILL CHANNEL
FLOOD LIFF-1.50M
400 (70.87+50)/2 5 120870 81 9790470
FLOOD LIFF-1.20M
400 (110.87+90)/2 5 200870 81 16270470
FLOOD LIFF-0.90M
402 (140.87+120)/2 5 262174.4 81 21236122