CHINDA TANK PROJECT

MONTH-WISE WATER REQUIRMENT


PROPOSED Water Requirment in HA-mm
S.No NAME OF CROP IRRIGATION
IN Ha JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTAL
1 KHARIF
4 4 6 4 18
PADDY 0 0 0 0 0
1 4 1 6
SOYABEAN 0 0 0 0
2 RABI
6 6 6 6 24
HYV WHEAT 185 0 0 0 0 28194 28194 28194 28194 112776
0 0 0 0 3 3 2 2 2 12
Ord. WHEAT 180 0 0 0 0 13716 13716 9144 9144 9144 54864
0 0 0 0 3 3 6
GRAM 70 0 0 0 0 5334 5334 10668
TOTAL 435 0 0 0 0 47244 47244 37338 37338 9144 178308
Transmission Losses @ 1074.45
35% 0 0 0 0 16535.4 16535.4 13068.3 13068.3 3200.4 62407.8

G.TOTAL(HA-mm) 0 0 0 0 63779.4 63779.4 50406.3 50406.3 12344.4 240715.8


G.TOTAL(MCM) 0 0 0 0 0.6378 0.6378 0.5041 0.5041 0.1234 2.4072

Maximum water requirment in any month= 0.6378 MCM Units Mcum Mcft
Or 22.52 MCft Total kharif water requirment 0.0000 0.00
Total Rabi water requirment 2.4072 85.00
Assuming canal runs 25 days in a month & 16hour in a day i.e. Total water requirment 2.4072 85.00
99.89x100000 i.e.= 15.64 Cusecs
25x16x60x60 Or 0.44 Cumecs
Canal duty=Total irrigation in acres/Total discharge required in cusecs

Canal duty 1074.45/15.64 i.e.= 68.70 Acres /cusec


Or 1.02 cumecs /1000 Ha

(B.R.Paradkar) (V.A.Siddiqui) (A.N.Sharma)


Sub Engineer Sub Divisional Officer Executive Engineer
Water ResourceSub Division, Amarwada Water Resources Division
Chhindwara
CHINDA TANK PROJECT
Monthly water requirment(crop water requirment) in Mcft/Mcum
PROPOS Dalta in inches/cm
ED Total
NAME OF Delta in
S.No IRRIGAT Requirme
CROP ION IN inch/cm
JUNE JUL AUG SEP OCT NOV DEC JAN FEB MAR APRIL MAY nt
Acre/Ha

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
1 (A)KHARIF
PADDY 0 4 4 6 4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 18.0
0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
SOYABEAN 0 0 0 0 4 1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.0
0 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0
G.TOTAL(A) 0 0 0 0 0 0 0 0 0 0 0 0 0
2 (B)RABI
HYV WHEAT 24 6 6 6 6 0.0 0.0 0.0 24.0
617.5 60.00 0 0 0 0 0 15.00 15.00 15.00 15.00 0.0 0.0 0.0 60
250 1.5000 0 0 0 0 0 0.37500.3750 0.3750 0.3750 0.0 0.0 0.0 1.5
52.97 13.24 13.24 13.24 13.24 0.0 0.0 0.0 52.965
Ord. WHEAT 12 0 0 0 0 0 3 3 2 2 2 0.0 0.0 12.0
456.95 30 0 0 0 0 0 7.50 7.50 5.00 5.00 5.00 0.0 0.0 30.0
185 0.5550 0.13880.1388 0.0925 0.0925 0.0925 0.0 0.0 0.6
19.60 4.90 4.90 3.27 3.27 3.27 0.0 0.0 19.6
GRAM 6 0 0 0 0 0 0 3 3 0.0 0.0 0.0 0.0 6
298.87 15 0 0 0 0 0 0 7.50 7.50 0.0 0.0 0.0 0.0 15
121 0.1815 0.0908 0.0908 0.0 0.0 0.0 0.0 0.1815
6.41 3.20 3.20 0.0 0.0 0.0 0.0 6.408765
0.0 0.0 0.0 0.0 9 12 11 8 2 0 0 42
0.0 0.0 0.0 0.0 22.50 30.00 27.50 20.00 5.00 0.00 0.00 105
G.TOTAL(B) 1373.32 42.00 0.0 0.0 0.0 0.0 0.5138 0.6045 0.5583 0.4675 0.0925 0.00 0.00 2.2365
556 105.00 0.0 0.0 0.0 0.0 18.14 21.34 19.71 16.51 3.27 0.00 0.00 78.970815
Transmission 0.0 0.0 0.0 0.0 0.1798125 0.211575 0.1953875 0.163625 0.032375 0 0.00
Losses@ 35% 0.0 0.0 0.0 0.0 6.3491794 7.4707133 6.8991326 5.7775988 1.1431613 0 0.00 27.639785
G.TOTAL(HA-mm) 0.00 0.00 0.00 0.00 0.6936 0.8161 0.7536 0.6311 0.1249 0.00 0.00 3.019275
G.TOTAL(MCM) 0.00 0.00 0.00 0.00 24.4897 28.816 26.6109 22.2850 4.4093 0.00 0.00 106.6106

Kharif requirment of September Kharif requirment of October Kharif requirment of November Entire Rabi requirment
0.00 0.00 0.00 2.2365
35% Loss 0.00 35% Loss 0.00 35% Loss 0.00 35% Loss 0.7828
0.00 0.00 0.00 3.019

(B.R.Paradkar) (A.N.Sharma)
(V.A.Siddiqui) Executive Engineer
Sub Engineer Sub Divisional Officer Water Resources Division
Water ResourceSub Division, Amarwada Chhindwara
CHINDA TANK PROJECT
RAIN FALL DATA OF HARRAI RAINGAUGE STATION
FROM YEAR 1980 TO 2019
1 1980 633.4 1999 1944
2 1981 1027.6 1994 1795
3 1982 881 2019 1440.1
4 1983 1187.5 2013 1432.2
5 1984 895.5 2003 1218.2
6 1985 905.1 1993 1213.2
7 1986 943.4 1997 1204.4
8 1987 748.4 2005 1191
9 1988 1080.4 1983 1187.5 Mean Annual
10 1989 871.4 2009 1140.5 R.F. 39913.1/40= 997.83 mm
11 1990 810.6 2012 1132.2 39.28 Inch
12 1991 681.2 2001 1131.9
13 1992 974.8 1988 1080.4 75% Dependeble
14 1993 1213.2 2016 1059.7 R.F. 40X75/100
15 1994 1795 2007 1030.6 30
16 1995 852.6 1981 1027.6 852.6 mm
17 1996 530.3 2000 1007.5 33.57 Inch
18 1997 1204.4 2006 995
19 1998 907 1992 974.8 As per Binnie's table
20 1999 1944 2002 946.9 33 23 23
21 2000 1007.5 1986 943.4 34 0.139 0.7923
22 2001 1131.9 2011 917.9 23.7923
23 2002 946.9 1998 907
24 2003 1218.2 1985 905.1
25 2004 575 1984 895.5
26 2005 1191 2008 883.4
27 2006 995 1982 881
28 2007 1030.6 1989 871.4
29 2008 883.4 2015 857.6 (B.R.Paradkar) (V.A.Siddiqui)
30 2009 1140.5 1995 852.6 Sub Engineer Sub Divisional Officer
31 2010 778.3 1990 810.6 Water ResourceSub
Division, Amarwada
32 2011 917.9 2010 778.3
33 2012 1132.2 2017 767.3
34 2013 1432.2 1987 748.4
35 2014 746.4 2014 746.4
36 2015 857.6 1991 681.2
37 2016 1059.7 1980 633.4
38 2017 767.3 2004 575 (A.N.Sharma)
39 2018 574.6 2018 574.6 Executive Engineer
40 2019 1440.1 1996 530.3 Water Resources Division
Chhindwara
39913.1 39913.1
CHINDA TANK PROJECT
FIXATION OF PRINCIPAL LEVELS

(A) Yield Calculation :


1 Topo Sheet No. 55-N/4
Latitude 22°03'48"
Longitudnal 79°03'35"
2 Total Catchment Area 13.17 Sq. Km
Catchment Area 5.08 Sq. Mile
3 Mean Annual Rainfall 997.83 mm
39.28 Inches
4 75% Dependable Annual Rainfall 852.6 mm
(36 Years 1981 to 2016) BICHHUA Raingauge Station 33.57 Inches
5 75% Dependable Yield (Binnie's Yield / sqm) 23.7923 Mcft
From Binnie's Table
6 75% Dependable Yield from Catchment Area 120.98 Mcft
3.43 Mcum
7 Catchment Area Hilly Catchment with Rapid slope
Binnies diminishing factor 0.90
Binnies yield with diminishing factor 108.88 Mcft
3.08 Mcum
8 Live Storage of Tank
100% of Yield 108.88 Mcft
3.08
3.08 Mcum

(B) Fixation of L.S.L. (Dead Storage) :


1 Dead Storage considering siltiing
Rate= 0.75 feet per acre/year/Sq. mile (C.A.) 0.75X43560X5.08X50
Calculated for 50 years 1000000
Dead Storage for reserviour
Sill reserve = 1/2 feet per acre/year/Sq. mile (C.A.) 8.31 Mcft
Calculated for 100 years 0.235 Mcum
Required Capacity 0.235 Mcum
2 Corresponding Level at Required Capacity By interpolation
Level Capacity
657.00 0.18504
658.00 0.27761 Per unit
Difference 1.00 0.0926 0.00093 0.5422901789

Difference from Initial capacity 0.050


Level at required Capacity 657.54 m
Adopt Level at R.L 657.55 m
Capacity at L.S.L. (Dead Storage) 0.236 Mcum
Fixation of lowest sill level 657.55 m
3 Hence L.S.L. is fixed at R.L.
© Summer Losses :
1 Area at L.S.L. R.L. 657.55 m
Level Area
657.00 0.08060
658.00 0.10507 Per unit
Difference 1.00 0.0245 0.00024 55
Difference of L.S.L from Initial Level 0.55
Area at Required Level i.e; at L.S.L. 0.09406 M sqm

Now Area 3 feet or 0.9 m below L.S.L.


Below L.S.L. at R.L. 656.65 m
Area 0.9 m below L.S.L. i.e. 656.65 m
Level Area
656.00 0.0594
657.00 0.08060 Per unit
Difference 1.00 0.0212 0.00021157379
Difference of (L.S.L-0.9) from Initial Level 0.65
Area for 0.30M 0.0138
Area at Required Level 0.0732 M sqm
Summer Losses
from dead storage 0.09406+0.0732 x0.90
2
0.0753 Mcum
(D) Fixation of full tank level (F.T.L )
Live Storage from 100% of yield
3.0837 Mcum
Add Dead Storage Capacity 0.236 Mcum
Total 3.32 Mcum
Deduct Summer losses (-) -0.0753 Mcum
Gross Capacity 3.2444 Mcum

Corresponding Level at Required Capacity By interpolation


Level Capacity
670 3.13535
671 3.53501 Per unit
Difference = 1 0.39966 0.0039965842
Difference from lnitial capacity
0.1090 27.2751
Level at Required .Capacity 670.28
3.24725190479708
Level at Required .Capacity 670.28 m
Adopt Full Tank Level (F.T.L.) at R.L. 670.30 m
Capacity at F.T.L. (Full Tank Level) 3.2552 Mcum
Hence F.T.L. is fixed at R.L. 670.30 m
(E) Losses Calculation from Full Tank Level(F.T.L.) at R.L.
(i) Kharif Requirement of September (+) October 0.00 Mcum
(ii) Evaporation Losses on Kharif
Capacity at F.T.L. 670.30 3.2552 Mcum
Capacity at 0.3M below F.T.L. 0.3 m
670.00 m
Capacity 0.3m below F.T.L. i.e; 670.00 m
Level Capacity
669 2.76721
670 3.13535 Per unit
Difference 1.00 0.36814 0.003681385635
Difference of (F.T.L. -0.3) from Initial Level 1.00
670.00
Capacity at Required Level 670.00 3.13535 Mcum
Net Loss for Kharif 0.1199 Mcum
Area at L.S.L. 0.09406 Msqm
Area 0.3m below F.T.L. i.e; 670.00
Level Area
669 0.35232 Per unit
670 0.38419 0.00031871658
Difference 1.00 1 0.03187
Difference of (F.T.L. -0.3) from Initial Level 0.0000
Area at Required Level 0.3842 Msqm
(iii) Evaporation Losses on Rabi [Area at {F.T.L. -0.30m} + Area at L.S.L.] x 0.60
2.00
Rabi Losses (0.3842 + 0.09406) x 0.60
2.00
Rabi Losses 0.1434739 Mcum
(F) Gross Capacity Calculation
(i) Kharif Requirement of September (+) October 0.000 Mcum
(ii) Evaporation Losses in Kharif 0.1199 Mcum
(iii) Evaporation Losses in Rabi 0.1435 Mcum
(iv) Rabi Requirement [100% Live Capacity - EL in Kharif - EL in Rabi - Summer Losses]
100% Live Capacity 3.08
EL in Kharif 0.1199
EL in Rabi 0.1435
Summer Losses 0.0753
Rabi Requirement 2.7450
(v) Dead Storage at L.S.L. 0.236
Gross Capacity of (i)+(ii)+(iii)+(iv)+(v)
3.24435 Mcum
CHECK BY FORMULA
Live Storage Gross Storage Dead Storage
3.2552 0.236
3.0193
Designed Irrigation
Take 20% of live storage for lift 0.60386
So live storage for flow irrigation 2.41543
Irrigation by lift @200ha per Mcum 200 120.77 Ha
121.00
Irrigation by flow @180ha per Mcum 180 434.78 Ha
435.00
Total 556 Ha
Total Say 556 Ha
Total Designed Irrigation
Kharif(K) 0.00
Rabi( R) 556.00
Perinial(P) 0.00
Live storage
For irrigation through canals K/0+R/435+P/0
For irrigation through lift K/121+R/0+P/0
200 180.00 131
121 435.00 0
For irrigation through canals 2.4167
For irrigation through lift 0.6050
3.0217
Which is almost Live Capacity 3.0193
fixed Hence OK
(G) Fixation of Maximum Water Level (M.W.L.)
By taking 1.5 m Flood Lift M.W.L. F.T.L. 1.50
670.30 1.50
M.W.L 671.80 m

(G) Fixation of Top Bund Level (T.B.L.)


As per BODHI circular for this size of project free board of 2.00 m
is required
Therefore T.B.L. M.W.L. 2.00
671.80 2.00
673.80 m
(G) Principal Levels Fixed as Below:
T.B.L 673.80 m
M.W.L. 671.80 m
F.T.L. 670.30 m
L.S.L. 657.55 m
N.B.L. 649.34 m
Maximum Height of Dam 24.46 m
Designed Irraigation Ha Ha.
Kharif (K) 0.00 Ha.
Rabi(A) 556.00 Ha.
Perennial (P) 0.00

(V.A.Siddiqui) (A.N.Sharma)
Sub Divisional Officer Executive Engineer
K.T.P. Canal Sub Dn. No. -2 Water Resources Dn.
Chhindwara (M.P) Chhindwara (M.P)

(D.K. Mishra) (R.K. Shrivastava)


Superintending Engineer Chief Engineer
Water Resources Circle Wainganga Basin Water
Chhindwara (M.P) Resources Department
Seoni (M.P)
CHINDA TANK PROJECT
CAPACITY TABLE

Contour Area of Area of Difference in Capacity in Cumulative


S No value contour contour contour A1+A2 √A1*A2 between contour capacity Remark

in M in Sqm in MSqm From To In M In Mcm In Mcm


1 649.34 0 0 649.3 0 0 0 0
2 650 17.412 0.000017412 649.34 650 0.66 0.000017412 0 3.83064E-06 0.000004
3 651 963.818 0.000963818 650 651 1 0.00098123 0.0001295454 0.0003702584517 0.0004
4 652 3397.201 0.003397201 651 652 1 0.004361019 0.0018094981 0.0020568390425 0.0024
5 653 13210.924 0.013210924 652 653 1 0.016608125 0.0066992659 0.0077691303155 0.0102
6 654 26478.291 0.026478291 653 654 1 0.039689215 0.0187030129 0.0194640759534 0.0297
7 655 43222.599 0.043222599 654 655 1 0.06970089 0.0338298766 0.0345102555497 0.0642
8 656 59440.105 0.059440105 655 656 1 0.102662704 0.0506868407 0.0511165149092 0.1153
9 657 80597.484 0.080597484 656 657 1 0.140037589 0.0692150483 0.0697508791013 0.1850
10 658 105069.132 0.105069132 657 658 1 0.185666616 0.0920234084 0.0925633414517 0.2776 L.S.L. - 657.55M
11 659 126032.138 0.126032138 658 659 1 0.23110127 0.1150742688 0.1153918462723 0.3930
12 660 150533.035 0.150533035 659 660 1 0.276565173 0.1377388843 0.1381013524242 0.5311
13 661 174292.302 0.174292302 660 661 1 0.324825337 0.1619776194 0.1622676521443 0.6934
14 662 197070.062 0.197070062 661 662 1 0.371362364 0.1853315806 0.1855646481942 0.8789
15 663 216264.432 0.216264432 662 663 1 0.413334494 0.2064442904 0.2065929281203 1.0855
16 664 235908.462 0.235908462 663 664 1 0.452172894 0.2258729943 0.2260152960885 1.3115
17 665 257037.126 0.257037126 664 665 1 0.492945588 0.2462462854 0.2463972911322 1.5579
18 666 278623.96 0.27862396 665 666 1 0.535661086 0.2676129704 0.2677580187918 1.8257
19 667 301045.358 0.301045358 666 667 1 0.579669318 0.289617765 0.2897623609896 2.1155
20 668 325239.057 0.325239057 667 668 1 0.626284415 0.3129084664 0.3130642938028 2.4285
21 669 352317.723 0.352317723 668 669 1 0.67755678 0.3385077311 0.3386881703561 2.7672
22 670 384189.381 0.384189381 669 670 1 0.736507104 0.3679085864 0.3681385634521 3.1353 F.T.L - 670.30M
23 671 415329.682 0.415329682 670 671 1 0.799519063 0.3994561971 0.3996584200487 3.5350
24 672 446381.683 0.446381683 671 672 1 0.861711365 0.4305758498 0.4307624049411 3.9658 M.W.L - 671.80M
25 673 478903.033 0.478903033 672 673 1 0.925284716 0.4623565095 0.4625470751621 4.4283
26 674 519261.947 0.519261947 673 674 1 0.99816498 0.498674364 0.4989464480097 4.9273 T.B.L - 673.80M
27 675 566007.411 0.566007411 674 675 1 1.085269358 0.5421310822 0.5424668133892 5.4697
28 676 627957.057 0.627957057 675 676 1 1.193964468 0.5961781177 0.596714195241 6.0664

Where C=Capacity in Mcft between successive contours.


A1, A2 = Area in acress of successive contrours.
h=Contour interval in feet.

(B.R.Paradkar) (V.A.Siddiqui) (A.N.Sharma)


Sub Engineer Sub Divisional Officer Executive Engineer
Water ResourceSub Division, Amarwada Water Resources Division
Chhindwara
(B.R.Paradkar) (V.A.Siddiqui) (A.N.Sharma)
Sub Engineer Sub Divisional Officer Executive Engineer
Water ResourceSub Division, Amarwada Water Resources Division
Chhindwara
Chinda TANK PROJECT
Comparative analysis for flood lift
DESIGN OF SPILL CHANNEL(For flood lift-0.90m)
Design Data :-
Catchment Area = 13.17 SqKM = 5.08 Sqmiles
Flood Discharge Q = 19x(A)0.84 (Where A = Catchment Area)
Q = 19x(56.34)0.84
Q = 165.66 Cumec 5849.29291
Safe Permissible Velocity = 2.4 M/sec
Head due to Velocity = V²/ 2g (2.4)²/ 2x9.81
= 0.29
Flood lift = 0.90
FTL = 670.300
MWL = 671.200
Note :- Waste Weir with 2.40m. Vertical Fall
Q Q=Dischrage in Cumec
Length of Waste Weir = L =
c x (h)3/2 c=1.80 Constant
h=Flood lift in M
561.62
L =
1.80x(0.9)3/2
L = 107.7877441
Provide 170.00m. 110.00 M
DESIGN OF SPILL CHANNEL(For flood lift-1.20m)
Design Data :-
Catchment Area = 13.17 SqKM = 5.08 Sqmiles
Flood Discharge Q = 19x(A) 0.84
(Where A = Catchment Area)
Q = 19x(56.34)0.84
Q = 165.66 Cumec 5849.29291
Safe Permissible Velocity = 2.4 M/sec
Head due to Velocity = V²/ 2g (2.4)²/ 2x9.81
= 0.29
Flood lift = 1.20
FTL = 670.300
MWL = 671.500
Note :- Waste Weir with 2.40m. Vertical Fall
Q Q=Dischrage in Cumec
Length of Waste Weir = L =
c x (h)3/2
c=1.80 Constant
h=Flood lift in M
561.62
L =
1.80x(1.2)3/2
L = 70.01019346
Provide 70.00m. 70.00 M
DESIGN OF SPILL CHANNEL(For flood lift-1.50m)
Design Data :-
Catchment Area = 13.17 SqKM = 5.08 Sqmiles
Flood Discharge Q = 19x(A)0.84 (Where A = Catchment Area)
Q = 19x(56.34)0.84
Q = 165.66 Cumec 5849.29291
Safe Permissible Velocity = 2.4 M/sec
Head due to Velocity = V²/ 2g (2.4)²/ 2x9.81
= 0.29
Flood lift = 1.50
FTL = 670.300
MWL = 671.800
Note :- Waste Weir with 2.40m. Vertical Fall
Q Q=Dischrage in Cumec
Length of Waste Weir = L =
c x (h)3/2 c=1.80 Constant
h=Flood lift in M
561.62
L =
1.80x(1.5)3/2
L = 50.09521654
Provide50.00m. 50.00 M
Higher cutting in spill channel in initial reach due to hillock,flood lift is provided 1.5m

(Rahul Borkar)
Sub Divisional Officer (S.S.Mokasdar)
Water ResourceSub Division, Amarwada Executive Engineer
Water Resources Division
Chhindwara
CHINDA TANK PROJECT
DAM EARTH WORK
FLOOD LIFF-1.50M
L W H RATE UNIT AMOUNT
(A) 420 (5+25)/2 5.00 31500
(B) 420 (12.5+46.25)2 11.25 138796.9
(C) 420 (12.5+22.5)/2 4.00 29400
(D) 420 (22.5+31.5)/2 3.00 34020
(E) 420 (49.25+63.37)/2 3.55 83958.21
(F) 420 (34.5+65.7)/2 7.80 165765.6
483440.7 91 43993102
FLOOD LIFF-1.20M
(A) 420 (5+25)/2 5.00 31500
(B) 420 (12.5+45.35)2 10.95 133026.1
(C) 420 (12.5+22.5)/2 4.00 29400
(D) 420 (22.5+31.5)/2 3.00 34020
(E) 420 (48.35+62.55)/2 3.55 82675.95
(F) 420 (34.5+64.50)/2 7.50 155925
466547 91 42455779
FLOOD LIFF-0.90M
(A) 420 (5+25)/2 5.00 31500
(B) 420 (12.5+44.45)2 10.65 127368.7
(C) 420 (12.5+22.5)/2 4.00 29400
(D) 420 (22.5+31.5)/2 3.00 34020
(E) 420 (47.45+61.65)/2 3.55 81334.05
(F) 420 (34.5+63.30)/2 7.20 149385.6
453008.3 91 41223758
SPILL CHANNEL
FLOOD LIFF-1.50M
400 (70.87+50)/2 5 120870 81 9790470
FLOOD LIFF-1.20M
400 (110.87+90)/2 5 200870 81 16270470
FLOOD LIFF-0.90M
402 (140.87+120)/2 5 262174.4 81 21236122

Option Dam Amt Spill Amt Total


1 FLOOD LIFF-1.50M 43993102 9790470 53783572
2 FLOOD LIFF-1.20M 42455779 16270470 58726249
2 FLOOD LIFF-0.90M 42455779 21236122 63691902

(Rahul Borkar) (S.S.Mokasdar)


Sub Divisional Officer Executive Engineer
(B.R.Paradkar) Water Resources Division
Sub Engineer Water ResourceSub Division,
Amarwada Chhindwara

You might also like