Ambaguio Chapter I-III
Ambaguio Chapter I-III
Ambaguio Chapter I-III
Location:
Area:
Barangays:
Boundaries
IV. INCOME
V. SOCIAL SERVICES
VI. ECONOMY
VII. INFRASTRUCTURE
Administrative infrastructures
VIII. Environment
Solid Waste Management: Fairly Good
General air quality: Good
2
General water quality: Safe
Presented below are dataon local development indicators for the five sectors namely
Social, Economics, Environment, Infrastructure and Institutional.
SOCIAL SECTOR
LARGE
INDICATOR OF PLANNING R SMALLER SPATIAL UNITS
CORE Period
DEVELOPMENT OR AREA SPATIA OF PLANNING AREA
SUB- CONCERN / Time
UNDERDEVELOPME L UNIT
SECTOR S (Year)
NT AMBAGUI Nueva URBAN
RURAL BRGY
O Vizcaya BRGY
PSA
Census
2007- 2007 –
2010 – 2010 – 2007 –
Population size (all 2007 – 2007
Population 421,355 2,503 2010 –10,949
census years available 2010 – 2010
Size 2015 – 2015 – 2015 –12,492
including latest) 13,452 2015
452, 287 2,758
2015 –
15,250
Demography
2007 –
1.02
Population 2010 – 2007 2007 –
Growth Growth rate (0.07) 2010 0.12
Rate 2015 – 2015
0.71
3
mortality
75,605
Crime Rate
10 2016
Index
Public 5 2017
Safety 15 2016
Non-index
9 2017
Crime Solution 100% 2016
Efficiency 92.857% 2017
ECONOMIC SECTOR
LARGE SMALLER
R SPATIAL UNITS
INDICATOR OF PLANNING AREA
SECTOR/ CORE Period/ SPATIA OF PLANNING
DEVELOPMENT OR
SUB- CONCERN Time L UNIT AREA
UNDERDEVELOPME
SECTOR S (Year) RURA
NT Nueva URBAN
AMBAGUIO L
Vizcaya BRGY
BRGY
Percent labor force
employed by age
group 15 years old and 68.98% (2015)
above
Labor and
Employment rate
General Employmen 68.95
t
Dependency ratio,
2015
Young 25. 71%
old age 5.34%
Volume of agricultural
crop production by
major crop
Rice
Crop
Agriculture
Production 3,065.30 2015
Rice
3,086.25 2017
64.50 2015
Corn
69.00 2017
High Value Crops 21,878.61 2015
4
25,073.18 2017
Total Number of
148
Commercial 2016
Services
Establishments 2017
187
ENVIRONMENTAL SECTOR
LARGE SMALLER
R SPATIAL UNITS
INDICATOR OF PLANNING AREA
CORE Period/ SPATIA OF PLANNING
SUB- DEVELOPMENT OR
CONCERN Time L UNIT AREA
SECTOR UNDERDEVELOPME
S (Year) RURA
NT Nueva URBAN
Ambaguio L
Vizcaya BRGY
BRGY
Environmental Code 1 2017
MENRO work force 2
Municipal and 2- MLGU
Barangay Ordinance 8 -Brgys.
Forest Ranger/
1 under MLGU
Bantaygubat
192 Ha. FMP
Communal forest and
3.5 ha. PENARO &
Protection watershed
Forest LGU
of reforestation to 8 brgy
Ecosystem
Biodiversity 5,800 LGU seedlings
160,000 seedlings
Seedling Productions
FMP
Nursery tool
- Wheel
3
barrow
4
- Bolo
Delineation of
1 Brgys.
communal watershed
Temporary RCA 1
1 LGU
compoun
d
MRF
2
Waste barangay
Urban s
Manageme
Ecosystem 1 RHU
nt Septic vault
1 Tiblac
1.
Labang
Mini dump track 1
-Conduct IEC on SWM 8 brgys.
Soil and -Strategic bamboo and
1,500 seedlings
Fresh Water water tree planting
Ecosystem conservatio -Conduct IEC on
8 brgys.
n Watershed
Upland
Agroforestry project-
Agricultural 234 ha.
FMP
Ecosystem
Climate CCAM 1.5 ha.
5
-Greenbelt project or
Strategic tree planting
to vulnerable areas
Septic Vault 2 4
RCA 1
3,065.30 2015
Rice
3,086.25 2017
64.50 2015
Change Corn
Mitigation 69.00 2017
High Value Crops 21,878.61
IV. INFRASTRUCTURE
LARGE SMALLER
R SPATIAL UNITS
INDICATOR OF PLANNING AREA
SECTOR/ CORE Period/ SPATIA OF PLANNING
DEVELOPMENT OR
SUB- CONCERN Time L UNIT AREA
UNDERDEVELOPME
SECTOR S (Year) RURA
NT Nueva URBAN
AMBAGUIO L
Vizcaya BRGY
BRGY
Utilities: Ratio of Population
2,955 2017 12% 88%
Water over the demand
Social
Percentage of
Support Utilities:
Household served by 2,955 2017 40% 25%
Power
electric power
Length(Km) of Roads
0.011 2017 14 4.51
per 1000 Populations
Economic Public
Support Roads Length(Km) of
15.07 KM 2017 27% 27%
Concrete Roads
Percentage of
8.00 2017 60%
Permanent Bridge
Support to Office
Administrative Total office floor 6 sq.m 2017
Space
Services
INSTITUTIONAL SECTOR
LARGE SMALLER
R SPATIAL UNITS
INDICATOR OF PLANNING AREA
SECTOR/ CORE Period/ SPATIA OF PLANNING
DEVELOPMENT OR
SUB- CONCERN Time L UNIT AREA
UNDERDEVELOPME
SECTOR S (Year) RURA
NT Nueva URBAN
AMBAGUIO L
Vizcaya BRGY
BRGY
Local Fiscal Revenue Total Revenue per 4,107.56 2016
6
Management Performanc
capita 4,736.49 2017
e
Organization
Proportion of 22%
and
vacancies to total 2017
Management
plantilla positions
Public
Participation Number of NGOs,
CSOs, and POs 24 2017
accredited
Ambaguio, crowned with natural beauty and established agriculture havenis now taking
its place in the tourism and agricultural industry as evidenced by the increase of tourist
arrivals and surge in agricultural
VISION production respectively which relatively
improved the standard of living of our
constituents.
7
Safe and Dynamic Community;
Emphatic Social Service;
Rural Electrification and Energization;
Valuable and Sustainable Organic Farming;
Inclusive and Accessible IP Education;
Conserved and Protected Environment; and
Eco-Tourism and Sports Developments
I. SOCIAL SECTOR
Gathered in this part are the issues and concerns of the social sector presented per
area or subsector such as the Education, Health and Nutrition, Social Welfare and
Development, Shelter and Settlement, Public Order and Safety and Social Security
and Safety. These issues and concerns were threshed out as a result of the analysis
done per subsector on the current situation of the municipality. Eventually, these will
map the local planners on the listing of development goals, strategies and activities.
1.1. EDUCATION
8
additional
classrooms and
other necessaary
school buildings.
6 4 Deployment of
complementary and
appropriate number
of teachers and
school heads
Zero drop out and 6 4 Institutionalization of
school leaver varied alternative
delivery
modes/instruction-
learning
interventions
100% graduation rate 6 4 Create a child-
and 85% cohort friendly, culture-
survival rate sensitive, and
holistically-relevant
learning
environment.
75% average mean 6 4 Increase
percentage score in achievement rate in
NAT the National
Achievement Tests
6 4 Enhance the
academic
performance of
learners in all
learning areas year
to year
6 4 Upgrade the
accomplishments in
the co-curricular
activities like sports,
scouting, and talent
festival
100% literacy rate 6 4 Institutionalization of
adult education
program
1. On Access to Education
9
100% target. The following table shows the number of school/center exists from
2013 up to 2017.
Likewise, when the 12 kindergarten classes are excluded, the number of classes
organized is mostly multi-grade because of the limited number of classrooms and
number of teachers deployed.
10
CLASSES ORGANIZED 2013 2014 2015 2016 2017
Multi-grade (elementary) 25 30 30 29 31
Mono-grade 36 41 46 49 49
(elementary)
Secondary grades 6 6 7 8 10
ALS A & E and BLP 4 4 4 4 4
Special Education 0 0 0 0 0
Source: DepEd-Ambaguio
When the above situations are not immediately addressed, a significant number
of learners both in the secondary and elementary who do not enroll or participate
in schooling may increase.
The number of drop outs is decreasing while the number of school leavers is
generally fluctuating as comparatively computed from 2013-2017 as shown
below:
11
Percent viz-a-viz 0.4% 0.5% 0.3% 0.2% 0.2%
enrolment
Number of school 17 14 8 12 7
leavers
Percent viz-a-viz 1% 0.75% 0.4% 0.6% 0.3%
enrolment
Source: DepEd-Ambaguio
As of 2017, the cohort survival rate of basic education learners is still low, that is,
only 79% of the previous grade enrollees finish high school. While the
graduation rate that is only 96% completes Grade 6/Grade 10 compared to those
who enrolled in June.
The National Achievement Tests average Mean Percentage Score (NAT MPS) in
the municipality is generally fair as compared to other municipalities in the
province including those in the lowland/urban areas. Based on records available
in the DepED District Office, the following are the computed MPS:
However, the above NAT results, is still far behind the latest national target that
is 76%. On the other hand, the achievement test administered for the secondary
students and Grade 3 pupils are only used for research.
12
5. On Literacy Level of the Community
The functional literacy rate of the community people of the municipality is still
behind the 100% ideal rate. Based from the data available, it is still computed at
73%. This is attributed to the number of adults who have not undergone formal
education at all. Likewise to the limited number of literacy facilitator to cater basic
literacy sessions.
a. Vision-Reality Gap
After thorough study of the present condition of the LGU particularly on Health
and Nutrition Sector vis-a-vis Vision, it appears that vision reality gaps is high as
presented in the table below.
TABLE 9. VISION-REALITY GAP FOR HEALTH AND NUTRITION
CURRENT VISION-
DESCRIPTO SUCCESS WHAT TO DO TO FILL
REALITY REALITY
R INDICATORS THE GAPS
RATING GAP
Empowered Zero child 1.61% 1.61% Decrease malnutrition
Indigenous malnutrition
People Zero under-5 18.72 18.72 Decrease under five
mortality rate mortality rate
Zero maternal 4.26 4.26 Decrease maternal
death rate death rate
Low morbidity rate 442.6 442.6 Decrease morbidity
100% facility- 68.16% 31.86% increase facility based
based delivery delivery
(FBD)
100% deliveries 73.40% 26.60% Increase facility
attended by skilled deliveries attended by
birth attendants SBA
(SBA)
Zero couples with 9% 9% decrease couples with
13
unmet needs unmet need for modern
(couples who want family planning method
to use modern
family planning
methods but
currently not using
any modern family
planning method)
100% households 62% 38% Make safe drinking
(HH) have access water accessible to the
to safe drinking remaining 38%
water
100% households 33.2% Increase households
with sanitary toilet 66.8% with sanitary toilets
Health and nutrition is one of the major concerns of the LGU. Budget allocated
for health programs and projects is increasing yearly with augmentations from
other agencies such as DOH and provincial government; however, despite this
joint support and efforts, there are still issues and concerns to be addressed such
as malnutrition, maternal death( death related to pregnancy or childbirth), under-
5 child death, morbidity or illnesses, facility based deliveries (deliveries or birth in
health facility), deliveries attended by skilled/trained birth attendants, family
planning and sanitation. Details on these issues and concerns are presented
below.
YEAR
NUTRITIONAL
STATUS 2015 2016 2017
This table shows that in 2015, 151(4.51%) children are below the normal weight
for height or wasted, 89(2.51%) in 2016 and 49(1.41%) in 2017. There are
98(2.93%) overweight children in 2015, 2(0.05%) in 2016 and 7(0.2%) in
2017.There is significant yearly decrease in the total number malnourished
children, 299 or 7.21% in 2015, 91 or 2.53% in 2016 and 56 or 1.61% in 2017.
14
The latest (2017) percentage of both overweight (0.2%) and wasted (1.41%) are
below the DOH target for wasted (<5%) and overweight (<3.9%), this can be
attributed to the serious efforts of the LGU through the Nutrition Office to fight
malnutrition.
Factors or causes such as inadequate child care, food insecurity, low income,
and lack of sustained IEC programs on malnutrition may have contributed to the
existence of malnutrition. Failure to address these may lead to increased
malnutrition.
This table shows that in 2015 there is one (1) under-5 child death with a
mortality rate of 3.5 which means that in every 1,000 live births about 3 under-
5 children die, four (4) deaths in 2016 with a mortality rate of 17.9 and 5
deaths in 2017 with a mortality rate of 18.72. The mortality rate for
2017(18.72) is way above the target (0.022) of DOH. There is significant
yearly increase in mortality rate of under-5 children in the locality for the past
3 years. The following factors or causes may have contributed to the
increased mortality rate:
Failure to address the above factors or causes may lead to increased under-5
mortality.
number of deaths 1 0 1
Mortality rate 3.89 0 4.26
15
Source: MHO
This table shows that there is one(1) maternal death in 2015 and 2017 with
mortality rate 3.89 and 4.26 respectively; meaning, in 2017 about 4 mothers
die in every 1,111 deliveries. The mortality rate in 2017(4.26) is far above the
DOH target (0.0009).
The reasons or factors that have contributed to the high maternal mortality
rate as follows:
The main factors or reasons identified which may have contributed to the 2
maternal deaths for the past 3 years is refusal to seek prenatal care and
delayed consultation for complicated labor because of religious belief of the
pregnant women.
This table shows that in 2015 there are 7,054 with a morbidity rate of 445.2
which means that in every 1,000 population, about 445 persons get sick in a
year; there are 8,243 consultations in 2016 with a morbidity rate 504.1and
7,130 consultations in 2017 with a morbidity rate of 442.6.
TABLE 14. TOP 10 LEADING CAUSES OF MORBIDITY FOR THE PAST 3 YEARS
16
No. of No. of No. of
Causes cases Causes cases Causes cases
Upper Upper Upper
Respiratory Tract 1398 Respiratory 4118 Respiratory 3947
Infection Tract Infection tract Infection
Headache, 476 Hypertension 506 Systemic Viral 506
all types Infection/Influen
za
Acute 395 Allergic 498 Hypertension 349
Gastroenteritis Diseases
Fever 374 Headache, all 409 Headache, all 313
types types
Hypertension 295 Acute 347 Musculoskeletal 270
Gastroenteritis Disorder
Wounds, all 279 Musculo- 328 Wounds, all 270
types skeletal types
Disorders
Influenza 231 Systemic Viral 315 Acute 227
Infection/Influe Gastroenteritis
nza
Hyperacidity 193 Wounds, all 284 Urinary Tract 183
types infection
Urinary Tract 185 Dental Caries 219 Allergic 171
Infection Diseases
Musculoskeletal 143 Anemia 201 Gastritis/Peptic
Disorder Ulcer Disease 159
Source: MHO
This table shows that Upper Respiratory Tract Infection which is a communicable
disease is consistently the first leading cause of morbidity for the last 3 years.
Hypertension, Headache of all types, Acute Gastroenteritis, Wounds, Systemic
Viral Infection/Influenza and Musculoskeletal Disorders are persistently in the top
10 leading causes of morbidity yearly for the past 3 years.
The factors or causes that may have contributed to the high morbidity rate and
persistent leading causes of morbidity are the following:
17
j. Lack of basic laboratory services.
Failure to address the above causes/ factors may lead to increased morbidity
which subsequently may result to Increased medical expenses, decreased
functionality & productivity and worst, increased mortality.
TABLE 15. FACILITY BASED DELIVERIES (FBD) FOR THE PAST 3 YEARS
This table shows that facility based deliveries in 2015 is 152 out of 285 or 53.3%;
223 out of 336 or 66.36% in 2016 and 182 out of 267 or 68.16% which is very
low compared to the 91% DOH target.
The very low percentage of facility based deliveries may be due to the following:
This table shows that only deliveries 199 or % are attended by skilled birth
attendants in 2015, 260 or77.38 % in 2016 and 196 or % in 2017 which is very
low compared to the 99% DOH target. Reasons for the low incidence of
deliveries attended by skilled birth attendants are the following:
18
b. Prefer or more comfortable with traditional birth attendants (hilot)
c. Insufficient skilled birth attendants in the locality,
d. Limited mode of transportation.
Family profiling in 2017 shows that 179 couples out of 1,985 or 9% have unmet
needs for modern family planning methods. This is way below the DOH target
(9%) for unmet need, there is a need to address the reasons or factors which
may have contributed to the high incidence of unmet needs such as:
There are 1,515 households out of 2,445 or 62% only with access to safe potable
water as of 2017. Barangays Labang, Salingsingan and Poblacion have the
lowest percentage of households with access to safe potable water. This low
percentage may attributable to the following reasons:
Failure to address the above issue may lead to the persistent or increased
incidence of waterborne diseases.
There are 1,634 households out of 2,445 or 68.8% only with sanitary toilet.
Barangays Salingsingan, Napo and Dulli have the lowest percentage. The low
percentage may be attributable to the following:
a. Not a household priority,
b. Lack of awareness on the importance of having sanitary toilet,
c. Financial constraint/insufficient free supply of toilet bowls,
d. Lack of water supply.
a. Vision-Reality Gap
After thorough study of the present condition of the LGU particularly on Social
Welfare and Development Sector vis-a-vis Vision, it appears that vision reality
gaps is high as presented in the table below.
TABLE 17. VISION-REALITY GAP FOR SOCIAL WELFARE AND
DEVELOPMENT SECTOR
19
REALITY REALITY
INDICATORS THE GAP
RATING GAP
Empowered Increased /
IPs Better access of
people to social
protection
services
1. Children 83.65% 16.35% •Let the remaining
sector – 16.35% 3-4 years old
increased children attend to Day
attendance in Care Services & sustain
Day Care Service 100% attendance year-
from 83.65% to after
100%
2. Youth sector 4 6 •Let the 60% Out-of-
– Decreased No. School Youths have
of Out of School access to education &/or
Youth go back to school
3. Women –
100% active •Let the remaining 30%
involvement of of women actively
7 3
women in involved in gender-
gender-related related programs
programs
4. Persons with 3 7 •Ensure full
Disabilities- Full implementation of
implementation Magna Carta and the
of Magna Carta Accessibility Law for
for Persons w/ PWDs
Disabilities
5. Senior 8 2 ●Ensure 100%
Citizens/ Elderly accessibility of senior
- 100% citizens to Social
accessibility of Pension pay-out
Social
Pensioners to the
Social Pension
pay-out
6. All Cases of •Ensure all special cases
Women in properly managed and
Especially provided with psycho-
Difficult social interventions
Circumstances
(WEDCs) and
Children in
5 5
Need of Special
Protection
(CNSP) properly
managed and
provided with
psycho-social
interventions
7. Poverty 12.68% 87.32% •Attain self-sufficient
reduction - level of well-being of the
100% Increased 87.32% families from
level of well- survival
being of families
20
from survival to
self-sufficiency
8. 100% active 50% 50% •Let the remaining 50%
involvement/ CSOs involve/
participation of participate actively in
CSOs in planning,
planning, implementation,
implementation, monitoring & evaluation
monitoring & of government programs
evaluation of & projects
government
programs &
projects
particularly on
social welfare
Effective & 9. Fully 7 3 ●Sustain the gains of the
Efficient Functional Fully Functional LSWDO
Local Local Social Award
Governance Welfare and
Development
Office
The Municipal Social Welfare and Development Office (MSWDO) is the only
social welfare instrumentality in the locality. It is solely operating in its maximum
capacity to carry out its functions and services as mandated by law. The functions
of the office were those of the Department of Social Welfare and Development
(DSWD) which were devolved to Local Government Units with the passage of the
New Local Government Code of 1991.
At present, the MSWDO is manned by eight employees; four are regular while
four are under contract of service. It was in 2016 when the head of this office was
full-fledged to which long way from the devolution in 1990, said office was
supervised/ headed by designated Officers-in-Charge of at least four successions.
The MSWDO is faced with the different work challenges with the following
enumeration.
1. There is a gap of 16.35% of 3-4 year old children not attending Day Care
While it is true that the eight barangays complied with the mandate to provide at
least one Child Development Center (CDC) in their area, the locality still needs to
expand considering that not all 3-4 year-old children are served because of the
geographical condition of the municipality. Houses are sporadically located and
not all CDCs are strategically built. In addition to this, some Child Development
Centers need upgrading; of the 30 existing CDCs, 17 are in good condition where
safety needs of the children are at least met, 9 needs improvement due to its poor
condition and 4 needs priority action due to its critical condition. Child
Development Workers as well need to be technically updated to go with the
changing needs of implementing the Day Care Service.
The non-attendance of about 16.35% of 3-4 year old children to Day Care based
on the 2017 data was due to the far distance of CDCs or inaccessibility of learning
facilities. Children especially in far flung Barangays needed to hike for at least one
21
to two hours to and from the center per day, hence, parents tend to leave their
children at home or go with them while they go and work to their farms than to
compromise the safety of their little ones who shall enter the learning facilities
often unaccompanied.
Poverty or financial constraints is one of the main factors why youth within the
municipality are not able to continue their schooling. Some youths are willing and
interested to continue the basic education they attained however, due to the far
distance of secondary and tertiary schools and other learning facilities such as
those offering technical vocational schooling; they are hindered to do so.
Other factors are the lack of parental guidance and indifferent attitude on the
needs of their children. Some parents content themselves of their children’s
expression of lack of interest which results in stopping without having done their
resort of motivating them going back to school.
Majority of those who stopped due to the above reasons resorted to work in the
farm/ vegetable gardens and others engaged in labor works which resulted in
early marriage. Youth as well who are out of school or with lack of educational
background are expected to have low self-esteem, non-literate and unskilled;
worst form is their engagement in socially unacceptable behaviors such as
involvement in illegal drugs and into crimes.
Over the last decade, the municipality has been serious in its campaign on
women empowerment. The municipality wanted to attain a full participation of
women and not only a part or portion of its population. Organization and
mobilization of women’s group has been one of the focuses of the gender and
development programs. With these, women’s participation have progressively
increased; however, there is still a remaining population where patriarchal
influences still emerge and women’s orientation to stay at home & do domestic
responsibilities is still practiced. In a scale of 1 to 10 where 1 is the lowest and 10
is the highest, the current rating of the women’s participation is 7, hence, it
appears that there is still a remaining 30% of the women population who need to
be empowered and involved especially in gender-related programs. When this
percentage of 30% women population remains underpowered, it will result in their
low contribution to development & predisposed to gender-related violence.
Further, everything will become stagnant since it goes with the pedagogy that
when a portion is sick it may drag the others down. In other words, the
achievement of those actively performing will be affected and dragged down by
those underpowered; hence, women empowerment will not be felt.
22
Limited LGU funding is one of the identified reasons of not fully implementing the
Magna Carta for Persons with Disability and the Accessibility Law considering that
these are new to the ears of the community. Inadequate knowledge among the
community on the rights of the PWDs including the sanctions when not prioritized
is relatively high. Further, low awareness on PWD vulnerability is a reason why
the Accessibility Law is not yet fully implemented.
Based from the previous implementation, it was noted that the pay-out is
centralized in the municipal hall and barangay halls due to insufficient staff to do
the home delivery as recommended for those who cannot travel. Poor medical
conditions of some senior citizens hinder them to go to the pay-out venue. They
tend to send representatives but some do not give what is due to the sending
senior citizens. Reportedly, even if they send their relatives, these representatives
have a tendency to claim a portion as their share; some senior citizens complain
on this while some do not report at all. The 20% gap in the attainment of 100%
social pension release on the scheduled date affects the whole population of the
Social Pensioners since the release of the following cash assistance for the
following quarters is delayed as well.
By not addressing the above concerns, the disadvantaged elderly sector will be
left behind without having enjoyed their right to assistance from the government.
In cases where representatives come to receive their social pension, it is very
prone to exploitation of their cash assistance. With these, increased dependency
of these elderlies to their working family members will prevail.
Emergence of child abuse cases was due to lack of awareness of parents and the
community in existing laws. Most victims are those who lived in the far flung
barangays where safety is often unattended. Further, referral system from
barangay Violence against Women and their Children Desk Persons to the
MSWDO and PNP-WCPD is weak. The occurrence of committed crimes/special
cases on Children in Conflict with the Law on the other hand are characterized by
influence of peer groups/barkada. Victims of Children in Conflict with the Law
(CICL) mostly belong to poor families and out of school youth. The victims are
23
also exploited most commonly due to non-submission of reports on time. These
situations stated may also lead to people’s continuous commission of crime when
not given attention. Deprivation of rights to assistance from the government may
prevail.
Inadequate technical persons or social workers to handle special cases are also
major factors. Only two are holding permanent positions to include the one
holding a supervisory function. Further, the position filled in to handle court related
cases is not in lined with the required who is supposed to be Social Welfare
Officer II. Further, the demands on technically updating social workers are not
fully met due to limited fund. This may result in the provision of half-baked
assistance, poor case recording system and worst, worker's burn-out. In end,
clients would be deprived of their rights to assistance from the government
through effective and efficient delivery of social protection services.
Poverty incidence in the municipality is relatively high. Based on the latest Social
Welfare Indicators, of about 87.32% still live below the poverty threshold. They
are under the lower level of well-being which is the survival and subsistence. The
absence of industries in the municipality is one of the reasons of high rate of
unemployment from permanent sources; low employment opportunities are
evident.
When unresolved, these would imply the following effects. No additional source of
income for the family. In farming scenario, there would be static farm produce
having no value-adding concepts in agriculture. Cycle of poverty would be felt
considering when farmers experience bankruptcy due to the cited factors above,
they have to pay it to the supplier through another cycle of farm labor until such
time that they'll pay the expenses, however, a big problem arise when the farmers
experience consistent bankruptcy, this leads to continuous service. With the
problem on poor road condition, here are the implications: late or non-delivery of
farm produce to the market, high transportation cost and poor quality of delivered
products which in end paid very low by the buyers.
24
engaged in farming activities, hence, most of their times are devoted to it.
Inadequate manpower and lack of fund is also a contributor because majority of
these organizations are non-profit groups, they choose not to spend on their own
to attend meetings.
9. There is a gap of 30% to sustain the gains of the LSWDO Fully Functional
Award
By not addressing the above gaps/ needs, this may result in poor delivery of basic
social services considering that these will be given partially or half-baked. Social
welfare and development of the clientele groups will then be compromised.
Further the award will not be sustained; hence, no other grants/ privileges will be
received from higher agencies considering that this is a sub-indicator of the Seal
of Good Local Governance as a mother of all Governance Assessment
spearheaded by the Department of Interior and Local Government.
a. Vision-Reality Gap
After thorough study of the present condition of the LGU particularly on Public
Order and Safety Sector vis-a-vis Vision, it appears that vision reality gaps is
high as presented in the table below.
TABLE 18. VISION-REALITY GAP FOR PUBLIC ORDER AND SAFETY
CURRENT VISION-
SUCCESS WHAT TO DO TO FILL
DESCRIPTOR REALITY REALITY
INDICATORS THE GAP
RATING GAP
25
Create a
peaceful
community by
reducing Index Strengthen PNP
and Non-Index & Force
crime by 95% Multipliers/commu
nity
(COMMUNITY- 9 1 Intensify Anti-
A SAFER Crime measures
PLACE TO LIVE,
WORK AND DO
BUSINESS)
Efficient and
effective
Local
Governance Massive
Drug free
9 1 campaign against
Municipality illegal drugs
The reported causes of this issue are unemployment, poverty, technology and
customary law. Perpetrators committed this kind of crime especially rape
because they have strong belief in the customary law wherein they can settle
amicably. Poverty – parents are busy doing things for their survival and the
perpetrators find opportunities to commit the crime. Technology – perpetrators
are being influenced by the technology wherein they can easily access
pornographic features/view.
If the issue on increasing crime incidence will not be resolved, it will result to
the following:
Fearful citizen
Chaotic community
Decrease number of investors
Unsafe community for women and children
26
2. Prevalence of drug –dependents
On the other hand, the scenario aggravates the occurrence of destructive fires
in the forest areas due tokaingin that causes devastation of Ambaguio’s rich
Natural Resources which eventually affects soil stability leading to landslides.
27
centers and
facilities
purchase of
Relief goods available for
7 3 non-food and
the victim of calamity
food stockpile
establish road
Decreased incidents of
7 3 safety
Vehicular accidents
activities
Presence of medical
services in times of Capacitate the
Disaster/emergencies 4 6 RHU and BHS
ensure safety
of children
Safe school for Children, and teachers
Teachers 7 3 and facilities
Schools are the temporary evacuation centers utilized in times of disaster since
permanent evacuation centers are not yet established in every barangay. As of
28
now, there is ongoing construction of evacuation center in the barangay Poblacion
located at the Municipal hall. Since constructions of buildings is costly, barangay
funds cannot afford to establish their own. Schools as temporary shelter are
maintained by the schools staff for its availability in times of disaster. Furthermore,
intensifying information education campaign with regards to the location of
evacuation centers is being undertaken by the LDRRMO since most of the
constituents are not aware of the presence of temporary evacuation centers within
the municipality.
There are 5.9 % (93) underweight (UW) and severely underweight (SUW)
preschool children,1.6 %(29) wasted and severely wasted School Children (SC),
who are vulnerable to hazards. Knowing that all area of Ambaguio is susceptible to
rain induce landslide, this makes all the malnourished school and preschool
children 100% vulnerable to such hazards.
5. Unresponsive Rural Health Unit, Birthing Clinic and Barangay health stations
in times of disaster
There is one Rural Health Unit (RHU) in the municipality, it is located in Brgy.
PoblacionAmbaguio. Eight (8) Brgy.Health stations (BHS) situated in every
barangay of Ambaguio. The total health personnel is composed of 1 Physician,1
Public Health Nurse,8 permanent midwives deployed to the 8 barangay of
ambaguio,1 sanitary inspector, 2 job order Ambulance Driver and 1 utility.Currently
the Physician Nurse and midwife have training in Basic Basic Life support and First
Aid. Other personnel like the ambulance driver is not equipped with such training.
While in the Brgy. Health station there is 1 midwife assisted with 5 Volunteer
Barangay Health workers. 75% of these Barangay Health workers are trained with
basic First aid but has limited training in Basic Life support. While these personnel
are equipped with knowledge and skills in assessing and managing diseases they
lack training in Emergency Medical Response such as in mass casualty incidence
in vehicular crash. Vehicular accident is the common accident faced by the
motorcycle riders and Tracks in Ambaguio due to rough road condition.
29
highly recommended to fully equip the facilities since in times of emergency and
crisis the RHU and BHS personnel are underman which results to unsatisfactory
services.Furtheremore, high susceptibility to landslide of these buildings make an
unsafe environment that’s why relocation, renovation and infrastructure support are
needed to address the problem.
II. ECONOMIC SECTOR
This chapter discusses what the municipality will pursue during the plan period in order
to sustain its growth through programs, projects, and policy recommendations that will
enable investments, business, and industry to continue to productively and gainfully
engage with the municipality’s development and growth.
As a developing upland municipality, Ambaguio is slowly taking its place as a major
agricultural producer in the province amidst the challenges of attaining its vision to be
an agro-forest haven. In positioning itself as an emerging investment destination, the
municipality consistently pursues its objectives along increased agricultural productivity,
sustainable agriculture practices, flourishing local cottage industry, renewable energy,
eco-tourism/agro-tourism revenues, and domestic investments. These economic
objectives, backed up by adequate infrastructure and services, are expected to
influence changes to the rural landscape. These changes, in turn, will lead the
municipality to become accessible to market centers and its adjoining municipalities.
Along with the economic development thrust, however, culture and arts preservation
and appreciation shall continue to be given priority attention towards achieving an
ecologically balanced community inhabited by empowered indigenous people.
2.1. AGRICULTURE
a. Vision-Reality Gap
After thorough study of the present condition of the LGU particularly on Agriculture
Sector vis-a-vis Vision, it appears that vision reality gaps is high as presented in the
table below.
TABLE 20. VISION-REALTIY GAP FOR AGRICULTURE
DESCRIPTO SUCCESS CURREN VISION- WHAT TO DO TO
R INDICATORS T REALITY FILL THE GAP
REALITY GAP
RATING
Competitive Increased in 4 6 Increase the
Economy production and production and
profitability of farmers profitability of
farmers
Maintained quality of 5 5 Ensure maintained
agricultural products quality agricultural
and minimal loss products and
during and after minimal loss during
harvest and after harvest
Easy access to 4 6 Ensure easy access
market to market
Increased organic 2 8 Increase the organic
products products
Increased in livestock 2 8 Increase the
and poultry livestock and poultry
production production
Increased in fish 2 8 Increase fish
production and production and
30
productive use of ensure productive
communal bodies of use of CBW
water
Increased and 3 7 Ensure increased
sustained backyard and sustained
production of backyard production
nutritious crops per of nutritious crops
household year- per household year-
round round
Agro-forest Increased agro-forest 3 7 Increase the agro-
Haven of area and production forest area and
region 02 production
Farmers are experiencing low production and profitability due to inadequate or lack of
access to agricultural infrastructure support like irrigation facilities, farm machineries,
access farm to market road (FMR), post-harvest facilities and absence of agricultural
trading center in the locality. Most of the farmers have limited technical know-how on
modern farming technology due to limited number of competent agricultural extension
workers to render technical assistance. Municipality’s average yield in rice is 3.6
metric tons per hectare which is low as compared to 3.9 metric tons per hectare
national average yield.
31
Most often farm product of the locality is valued at lower price when it arrive to the
market because the quality is depreciated while transporting along rugged FMR and
due to poor packaging because of absence of post-harvest facilities and insufficient
skill of farmers on proper packaging. Surplus agricultural products are thrown due to
absence of value adding/processing machine in the municipality.
Poultry production in Ambaguio is very low due to different factors. Primitive way of
poultry raising using native chicken is common practice which production is not even
enough to meet the demand of the family. Production is slow because, farmers have
not adapted yet the new technology, like use of incubator and brooder to boost the
production. Often, poultry production is affected by pest and diseases that sometimes
eliminate all the chicken in a place where it occurred. As results, no alternative source
of income and most residents buy poultry products from other town. Due to high cost
of quality poultry, culled chicken is bought and consumed which is detrimental to
health due to chemicals used in raising said chicken.
There is also limited production of livestock products in the locality because only a
handful of farmers are engaged in livestock production due to absence of source of
quality stocks. Difficulty in transporting needed feedstuffs due to poor condition of
roads makes production cost high. Limited technical know-how of farmers on modern
livestock production is another reason of low productivity.
As to communal bodies of water (CBW) such as creeks, rivers and lake, decrease of
catch and deplete has been observed due to over fishing and use of illegal fishing
gear/gadget such as electrocute, and poison. Presence of residents dumping their
wastes to CBW is also alarming. Result of Microbial Analysis of Water Sample in
Matuno River, one of the CBW, done by Provincial Health Office (PHO) revealed that
the total coliform and fecal coliform was greater than 1.1MPN/100ml as compared to
safe water that should be less than 1.1. There is therefore need to mobilize the
deputized fish warden and establish fish sanctuary to restore and maintain the
production of said resources.
There is a need to promote organic agriculture and enhance the existing farming
practices that use no synthetic inputs because farmers are shifting to inorganic
farming resulting to decrease in organically produced products. Organic farmers are
forced in adapting use of chemical inputs due to decreased in yield because of
intensive cropping like in irrigated rice that used to be one cropping a year but now
two cropping. Most vegetable crops are heavily applied with chemical fertilizers and
pesticides due to lack of organic fertilizer supply and limited knowledge on integrated
pest management (IPM).
32
7. Insufficiency and Seasonal Production of Nutritious Crops per Household
Continued decline of forests has been the prevalent issues confronting the LGU which
consequently lead to the degradation of its biodiversity and aesthetic value. One factor
that degrades the forest is the kaingin or slash and burn farming practice which is
common way of making upland agricultural production which being done on steep
slopes making the soil loose and eventually carried away by surface runoff that
consequently depletes the soil fertility. Monocropping is another current farmers’
practice that adversely affect the environment due to outbreak of pest and diseases,
the soil is also stripped resulting to soil erosion.
Agroforestry the practice of integrating the raising of trees into farming is the
recommended farming practice in the locality but the residents has low adaption of
said technology. Lack of high quality and diverse planting materials is one constraint in
establishing agro-forest farms.
33
Increased number of 3 7 Invite more potential
Business investors Investors
100% of Business 9 1 Make the 1%
Establishments Business
secured Business Establishment
Permit secure Business
Permit
Competitive Established Public 0 10 Establishment of
Economy Market Public Market
Established online 0 10 Establish online
Business Business
Registration Registration
Capability building to 1 9 Conduct seminars &
Business owners trainings
Established slaughter 0 10 Establish slaughter
house house
Established Trading o 10 Establish Trading
post post
Established 0 10 Establish
Pasalubong Center Pasalubong Center
The municipality lacks public market and processing center by the reason that no
donors and no available lot of the municipality to construct a public market,
processing centers and others for the constituents bring their products. As a result,
constituents have to transport their farm produces to lowlands commonly at the
Nueva Vizcaya Agricultural Trading and Bayombong Public market because there is
no facilities to accommodate their products. Therefore, there is a need to establish
facilities on purpose for all farm products and others in order to generate income for
the LGU and community as a whole
34
3. No establish online Business Registration
The municipality also lacks Information Technology Experts and Systems for
business purposes and others especially nowadays mostly people engage in
gadgets. Intervention must be identified in order to address all the need or
requirement when it comes to information technologies or systems. Electrification
must expand also because at present only four barangay have been energize but
some sitios of this barangays are not yet energize including the left four barangays
that still have no energy. The problem of Internet is also anchored here because the
presence of electricity is also the way to install internet which is the way to transact in
online business registration that requires by the national agencies. At this moment in
time, registration is made manually although some are computer aided but usually
applicants fill out manually to the office or in their houses.
Some problem that cause bankruptcy on the part of the business sector and different
organizations is the lack of interest and acknowledgement of business management
and administration because entrepreneurs focuses in vegetable production and
directly sell their products to the middlemen. The entrepreneurs have limited
knowledge on how to enhance their commercial activity because as we observe we
have no big companies in the locality. Therefore, orientations, seminars or trainings
must be given consideration for them to enhance their capabilities on how to grow a
business easily. Further, businessmen finds business activity as a secondary source
of income because they were enlighten as vegetable gardener as we observe also
most of the people finance their money to gardening (Source: Municipal Agriculture
Office).
At present, animals are butchered anywhere unsanitary in the municipality that will
causes food borne diseases among consumers. Therefore, construction of slaughter
house is direly needed to cater all butchering activity for a hygienic or consumable
meat. On the other hand, it will employ capable butcher that will help reduce the low
employment rate of the locality. In the previous years the office of Business Permits &
Licensing permits Two (2) applicants because we cannot totally forbid it but we see to
it that they comply with the requirements before operating.
Currently, all vegetable products are brought to the Nueva Vizcaya Agricultural
Trading because there is no trading post in the municipality of Ambaguio. At this
moment, farmers are experiencing damage of products when transport to distant
places and costly on their part to transport products at distant place especially when
costs of vegetables are very low. That’s why we observe in some cases that farmers
pricelessly throw their farm products along the roads or everywhere. Sometimes it is
improper on the part of the LGU but in as much as we want to help them we are
hampered by fund insufficiency. But the other side, the LGU allotted fund for availing
stall at NVAT for all farmers of Ambaguio. In this way, we can help them trade their
farm products to the most acceptable prices on their part.
7. No establish PasalubongCenter
35
Currently, visitors and tourist directly buy products in the town from the displayed
items in front of the different sari-sari stores or thru order if there are available. The
presence of facility is advantageous to the community and visitors for a One Stop
Shop. Establishments of Pasalubongcenter can improve the tax efficiency of the LGU
and can uplift living condition of community. Previously, if we’ve respected visitors
from higher agencies we can’t immediately offer a giveaways to them from the
different products of Ambaguio because there is No Center that collects all products
from the town to be displayed that can attract visitors.
2.3. TOURISM
a. Vision-Reality Gaps
After thorough study of the present condition of the LGU particularly on Tourism
Sector vis-a-vis Vision, it appears that vision reality gaps is high as presented in the
table below.
TABLE 22. VISION-REALITY GAP FOR TOURISM
CURREN
VISION-
DESCRIPTO SUCCESS T WHAT TO DO TO
REALIT
R INDICATORS REALITY FILL THE GAP
Y GAP
RATING
Develop
accessibility/connectiv
Accessibility/ 3 ity to and from tourism
7
connectivity of sites connecting them
destinations to service areas
Provision of facilities
Functional facilities 2 within tourism sites
8
within tourism sites and surrounding
areas
Ability to deliver 2
8
quality and Develop and attract
talent in the public
36
and private sector
competitive tourism providing tourism
services services
Ambaguio’s tourism potentials rest on its eco-tourism spots and rich cultural
heritage. Yet, another area that should be looked into is farm tourism which
offers big prospects. Despite having the assets that will draw tourists and hikers
to the municipality, statistics show an insignificant number of tourist arrivals.
Tourists are composed mostly of mountaineers who hike to the highest point in
Ambaguio, Mt. Pullol and those who use the municipality as entry point to the
famous Mt. Pulag.
The small number of tourist arrivals is partly because Ambaguio is less known to
mountaineers and outdoor enthusiasts. Little effort is given to the promotion of
tourism as a source of livelihood despite the municipality’s vision to be an agro-
forest destination. This has resulted to reliance to agriculture alone for economic
growth and not realizing the income potential from tourism and its related
industries.
37
enterprises. This has led to the continued abuse of natural resources and
prevalence unsustainable practices in agriculture.
Other the major setbacks are the difficulty of access to identified tourism
destinations and lack of facilities therein which is attributed to lack or insufficiency
of locally sourced funds.
The municipality has yet to craft its Municipal Tourism Development Plan which will
embody the projects, programs and activities of the LGU on tourism. This is so
because of the absence of tourism office personnel, lack of technical knowledge and
budget for the crafting of the plan. There are also no legislations that sets regulatory
fees and policies on the use of tourism destinations.
The participation of the private sector in creating a vibrant tourism industry has also
needs to be tapped. The municipal tourism council which is composed of public and
private stakeholders is has to be reorganized and empowered to gain progress as
far as trade and commerce relating to tourism is concerned.
7. Culture and tradition is not given importance as an added attraction for tourism
purposes
38
CURREN
VISION-
DESCRIPTO SUCCESS T WHAT TO DO TO
REALIT
R INDICATORS REALITY FILL THE GAP
Y GAP
RATING
Implement mitigation
Landslide event
4 6 and prevention
prevented
projects
Competitive
safe and secure Secure the Tourism
4 6
tourism spots spots
Frontliners in tourism are the tour guides.their role is important in keeping the
journey of tourist fun and safe.As of now,there is no organization of tour guides in
the municipality.In order to make the tourist safe ,these tour guide must have
basic skills training in first aid and Search and Rescue.Accident may happen all
the time that’s why this must be considered. Equipping them with this knowledge
and skills will provide quick action and prevent loss lives in the middle of
trekking.The Local Government Unit aims to provide necessesarry training for the
tour guides
39
III. INFRASTRUCTURE AND LAND USE SECTOR
a. Vision-Reality Gaps
After thorough study of the present condition of the LGU particularly on
Infrastructure and Land Use Sector vis-a-vis Vision, it appears that vision reality
gaps is high as presented in the table below.
TABLE 24. VISION-REALITY GAP FOR INFRASTRUCTURE AND LAND USE
CURRENT VISION-
DESCRIPTO SUCCESS WHAT TO DO TO FILL
REALITY REALIT
R INDICATORS THE GAP
RATING Y GAP
Support to
Economic
Services
Presence of
safe access Make all Barangays
road to all accessible in all-weather
Accessible 2 8
barangays with road condition with
ancillary road ancillary road facilities
facilities
Presence of
Ensure proper
motorpool with
maintenance of heavy
complete 0 10
equipment and service
equipment/tool
vehicles of the LGU
s
Presence of Construction of
support 2 8 infrastructure support
facilities facilities
Construction/
Functional and Improvements/
Resilient 2 8 Rehabilitation of drainage
Drainage system/Flood control
System
Presence of
other means of Transportation system is
0 10
modern available
Competitive transportation
Economy Fast and Communication facilities
Reliable is in place
3 7
Communicatio
n System
Provide Electrification to
Availability of all sitios
electricity in all 2 8
Sitios
Presence of
power Establishment of Power
generating 0 10 Generation
facilities
Empowered Support to
IPs Social
Services
40
100%
Household Make all household have
have access to 3 7 access to safe water
safe water
Eventually, when not given prior attention, this will cause more number of
households to suffer from insufficient water supply and prevalence of water borne
diseases.
41
The municipality also lacks facilities on health especially on birthing and dental
facilities. There is a need to improve our health facilities in order that our
constituents will avail quality medical services in our own municipality. Having
medical treatment to hospitals and clinics in the nearby towns and cities is too
expensive.
In addition, the municipality also lacks facilities on information technology for
educational purposes especially nowadays that there is a fast pace of information
technology. Interventions must be done in order for the municipality not to be left
behind with regard to problems stated above.
4. Inadequate Drainage Systems
The municipality of Ambaguio has inadequate drainage systems. This is caused by
inadequate funds and the topographic location of the municipality. If this problem
will not be addressed, the municipality is in peril of landslide, flooding to residential
areas and farm lands. It will also result in poor environment due to non-treatment
of waste water coming from the sewerage.
5. Inadequate Power Electricity
The municipality of Ambaguio has inadequate power electricity. There are three (3)
barangays that have electrification service by NUVELCO, but some sitios of this
barangay do not have yet electricity. There are also three (3) barangays that have
electrification service by IFELCO. There are two remaining barangay that have no
electricity at all. This are causes by insufficient fund of the LGU to finance the
electrification and sometimes by sporadic location of houses.
If this will not be resolved, it will result in poor economic activities, access to
information and recreational activities of the constituent.
6. Inadequate Drainage Systems
The municipality of Ambaguio has inadequate drainage systems. This is caused by
inadequate funds and the topographic location of the municipality. If this problem
will not be addressed, the municipality is in peril of landslide, flooding to residential
areas and farm lands. It will also result in poor environment due to non-treatment
of waste water coming from the sewerage.
7. Absence of Power Generation
The municipality has no power generating producers. There are some investors
willing to invest but some Indigenous People community who will be affected by
this project resist. If this is continue, the municipality will not have power generating
producers. Thus, it will result in high electricity rate. The income of the LGU is
minimal and will continually 98% IRA dependent.
8. Inadequate Cell sites and Internet Provider
There are only two cell sites available in the municipality and one internet provider
established in Poblacion. Thus, phone signal is not available on some low-lying
areas of the municipality. There is also one internet provider but due to non-
competition, the monthly rate is high.
If this will not be addressed, the constituent of the municipality will be left behind on
the use of advance information technology.
9. Limited Mode of Transportation
42
In the municipality, the only mode of transportation is by land through vehicles. The
single motor (habal-habal in local term) is the popular mode of transporting
passenger. If unresolved, it will result to high cost of transportation and slow
mobility of the populace. Moreover, the safety of the riding public is compromised.
10. Absence of Motorpool and Technically Skilled Personnel
In the municipality, there is no Motorpool established. The temporary motorpool is
infront of the municipal hall compound. During repair, there are no complete
equipment and tools to use which cause delay and efficient repair of the heavy
equipment and service vehicle. Thus, there is an interruption of delivery of services
to the public especially on by administration project where equipment is much
needed.
Rehabilitation of critical roads and bridges are prioritized by the Local Government
Unit knowing its vast effect to the whole municipality. Furthermore, warning
signage and precautions regarding hazardous roads and bridges are created and
installed by the concern offices. Clearing operation is also continuously conducted
to maintain accessibility after certain hazard passed.
43
MDRRM 6 4 Ensure safety of
Plan well vulnerable sectors to
implemented hazards and risk
Disaster 4 6 Make 100% disaster
prepared and prepared and resilient
resilient community
community
Climate 5 5 Implement Climate
Change Change Adaptations
Adaptation program/projects
Plan well
implemented
44
accidents
Responsive 2 8 Provision of full pledge
Municipal MENRO head and
Environment complete staff
and Natural
Resources
Office
Educated IPs 3 7 educate Ips regarding soil
regarding soil and water conservation
and water farm practice
conservation
Waste 6 4 Make solid waste
management management system
systems in operational.
place
Responsive 3 7 Make community plan
involvement and implementation of
of reforestation programs in
communities place
on
reforestation,
management
and
protection
programs
Presence of 5 5 Make community plan
biodiversity and implementation of
protection biodiversity protection and
and managements programs
management in place
projects,
programs
and activities
Presence of 0 10 Acquisition of lot
Public
cemetery
Ecologically FLUP and 4 6 Strictly enforce Forest
balanced CLUP well Land Use Plan and
community implemented Comprehensive Land Use
Plan
Functional 5 5 Make the Forest
Forest Protection Multi-sectoral
Protection Committee fully functional
Multi-sectoral
Committee
Zero casualty 9 1 establish strategic
in the management
occurrence of
45
different
Hazards(natu
ral and
manmade)
47
land technology (SALT)
100% 4 6 Provision of enough fund
rehabilitated and holistic involvement
communal NGOs, brgy. officials and
forest DENR
Zero(0) 5 5 Full implementation of
incidence of forestry laws
timber
poaching
Zero(0) 5 5 prohibit kaingin farming
incidence of and encroachment to the
kaingin and protected areas and
encroachmen implementation of forestry
t to protected laws
areas
48
farmers training on Sloping Agricultural Land Technology (SALT), Agroforestry,
contour farming, greenbelt, Global warming and climate change must also be
discussed and implemented.
3. Occurrence of Destructive Forest fires
One of the causes of forest fires is the Kaingin System. This tradition activity of
the population of the whole barangays of the municipality is dominant despite
intensified implementation of existing laws on forest fire protection.
49
resulted to less priority of members to participate. In summary, they have
backlogs to site development from 2016-2017 targets within its 6 years
implementation and 10 year duration programs has limited impact to the
rehabilitation of declining forest of the municipality.
4.5. CLIMATE CHANGE MITIGATION AND DRRM
8. Hazard Prone Areas
The municipality is generally mountainous with steep slopesdominated by above
50% category of 14,808.4096 or 92.32% hectares of the total land area, making it
more susceptible to land slide and soil erosion, especially during heavy rainfall,
rock fall and mud flow were experienced to roads and agricultural lands.
Bridges across the Matuno River and proposed bridges to Catnaan and Bukig
River are highly susceptible to flash flood and strong water current plus huge
rocks and logs cause so much devastation to infrastructure. Other exposed to
hazards are box culvert, reinforce concrete pipe culvert and hanging foot bridges.
Landslide and soil erosion control projects for slope and river bank protection
must be properly implemented in identified hazard prone to minimize landslides
and flash floods.
8. Five Thousand Eight Hundred Eighty Four (5884) has.of agricultural
lands and 191.30 has. high risk croplands to landslide:
The continuous slash and burn, cutting of trees in forest are the predisposing
factors to the occurrence of landslides in the area. Knowing that vast percentage
of population practice farming,Kaingin or the slash and burn method is
50
rampant .This practice seems to be normal for the farmers; however they are not
aware of its effect. The Local government unit of Ambaguio perceives that this
method cannot be prevented that’s why contour farming and Slope agricultural
land technology (SALT) are being introduced to the community.
V. INSTITUTIONAL SECTOR
Institutional Sector plays an important role in the development of every LGU.
Hence, in-depth analysis of the present condition of this sector of governance is
vital to check whether it’s functioning well and efficiently and effectively delivering
the services being required. With the aim to come up with a very good plan, the
Institutional Development Team has thoroughly reviewed, assessed, and
judiciously analysed the data gathered to have a full picture of the present status
of this LGU. The Team focuses its situational analysis on organization and
management, systems and procedures, local legislation, and compliance to the
principles of good governance of this municipal government comprehensively
presented hereafter.
a. Vision-Reality Gap
After thorough study of the present condition of the LGU particularly on
Institutional Sector vis-a-vis Vision, it appears that vision reality gaps is high as
presented in the table below.
TABLE 26. VISION REALITY GAP FOR INSTITUTIONAL SECTOR
DESCRIPTO SUCCESS CURREN VISION- WHAT
R INDICATORS T REALIT
TO DO TO FILL
REALITY Y GAP
THE GAP
RATING
Effective and
Efficient
Efficient and Ensure effective
Local
Effective and efficient
Governance
delivery of 6 4 delivery of
government services
services
Ensure Efficient
Efficient and
and Effective
Effective
5 5 formulation of
Development
Development
Plans
Plans
51
Ensure
Participatory
7 3 participation in
Governance
local governance
Sustain and
Transparent improve
8 2
Governance transparency in
local governance
Ensure
proper/responsiv
e implementation
Accountable of PPAs
6 4
Governance Ensure
compliance on
the provisons of
ARTA
Provision of
funds for the
upgraded
purchase of
communicatio 4 6
upgraded
n system
communication
systems
MDRRM Plan 6 4
well Ensure safety of
implemented vulnerable
52
sectors to
hazards and risk
Responsive
organize
volunteers to
volunteers ready
respond in
5 5 to respond in
times of
times of disaster
disaster and
and emergencies
emergencies
Provision of fund
Responsive
3 7 for complete staff
LDRRM Office
of MDRRMO
Corollary to this, upgrading the standards for employment particularly the localized
Assessment Standards of the LGU would empower the organizational workforce.
Intensive talent sourcing could be of great help as well.
53
Figure 3. Municipal Organizational Structure
55
2. Absence of HRD Plan
This LGU doesn’t have enough resources to formulate the Human Resource
Development Plan. Fund allocation is being strangled from the very start of budget
process due to insufficiency of funds. Personnel in-charge particularly the HRMO is
only designated from its immense role in the Municipal Planning and Development
Office. Hence, the formulation of such HRD Plan is so difficult to do not including
the technical skills needed in the plan preparation which this LGU can not, at
present, fully provide having few technically-capable employees. As a result, this
LGU can’t fully addressed issues and concern on Human Resource Management.
3. No separate HRMO and Permanent HR Practitioner
This municipality has no separate office established for Human Resource
Management and Development. Just like other poor LGUs, the HRMD is still
attached or under the management of the Office of the Municipal Mayor as one of its
section. There’s no permanent employee handling the HRMD, for the currently
assigned HRMO is only designated one from the Municipal Planning and
Development Office. Hence, the performance is relatively low considering the bulk of
work of the personnel designated. With a separate Office with permanent HR
Practitioners, the HRMD plans and programs shall be properly managed and
implemented.
4. Recruitment systems needs strengthening
At present, talent sourcing is done through publication at CSC Bulletin and in three
conspicuous places within the municipality in compliance to CSC Rules on
Appointment. Database of eligible for easy tracking of qualified applicants is still not
completed. Hence, this LGU is just waiting for few walk-in applicants. With the
enhanced recruitment system, the LGU could establish strong and competent
human resources.
In 2014, the LGU has crafted and adopted the Merit Selection Plan and System for
Ranking Positions, a plan used by this LGU in hiring and promoting employees
through strict observance of the merit, fitness and equality principles in the selection
of employees for appointment to positions in the career and non-career service in all
levels. With the issuance of MC 24, 2017 --- New Omnibus Rules and Appointment
and Other Human Resource Actions, updating of the MSP-SRP is necessary in
order to comply with the provision of the issued MC. If this will not be updated, the
MSP-SRP can’t be fully implemented.
56
7. Insufficient Workforce
Of the One Hundred Fifty Two (152) total personnel working in the Municipal
government only 79 or 51.97 percent are of permanent status, 2 or 1.32 percent are
co-terminus employees while 71 or 46.71 percent are employees on a Job Order
basis. Those with permanent status are mostly heads of offices and are at least
holders of bachelor’s degree. Hence, a review of the Organizational Structure and
Office Functions seems a priority in order to identify important positions for hiring
and placement in this LGU. If not addressed, delivery of basic services may be
sacrificed.
Regular Employees
48.47% Co-terminus Employees
43.56% Employees on Job Order
Basis
Elected Officials
1.23%
Source: HRMO
57
9. Low Performance Impact
The Summary of Ratings shows that the performance rating of municipal employees
range from very satisfactory to outstanding. This means that performance targets
are met. However, reality shows that there are issues and concerns that remain
unresolved in spite of the LGUs efforts in addressing such through the delivery of
mandated services. This can be attributed to the very minimal target set by the LGU
as reflected in the Performance Target of every office. Innovations or initiatives from
the employees are also rare. This may be attributed to the non-institutionalized
incentives and awards system. If this will continue, this LGU could hardly meet its
real target or its vision.
80
10. 70
11.
12. 60
Total Number of Employees
50
Poor
40 Satisfactory
Very Satisfactory
30 Outstanding
20
10
0
1st Semester 2nd Semester
Source: HRMO
58
In this LGU, having few employees with technical and managerial skills has been an
old issue leaving them shattered due to various workloads. Hence, strengthening the
manpower though capacity development program and hiring of additional employees
possessing the mentioned skills is vital in order to ensure that the LGU can
efficiently and effectively manage and implement numerous plans, programs and
projects required or needed for the development of the municipality.
Source: HRMO
The Municipal Engineering Office is undermanned and has limited workforce with
only two Engineers and two CSC eligible while the rest are field workers. As the
office mandated to design, implement and monitor infrastructure projects that
conforms to the national standards, advance engineering skills is necessary. Having
such skills shall speed up the preparation of sustainable engineering designs;
ensure efficient implementation of projects and judicious monitoring of projects. If
this issue will not be resolved, then, engineering services won’t be less efficient and
less effective.
59
15. Decades-old working environment
This LGU has an approved Program on Awards and Incentives for Service
Excellence (PRAISE), a mechanism for identifying, selecting, rewarding and
providing incentives to deserving employees. One of its provisions is the allocation
of at least 5% share from the Human Resource Development Fund to ensure its
implementation. However, due to insufficiency of funds, the 5% share is so hard to
realize, thus, recognition of employee’s service is, at present, done through
awarding of commendation during Flag Ceremony or awarding of Certificate and
passing of Resolutions by the Sangguniang Bayan. If this will continue, the quality
and efficiency in the delivery of services may be affected.
Through the years, only few employees are given a chance to attend
seminars/trainings. Most of them are those holding technical and managerial
positions. Rank and File employees particularly those in the first level positions are
stocked in their office doing their regular functions with less improvement. Though
the HRMO is conducting annual gathering of all municipal officials and employees
where re-orientation and relaying/sharing of knowledge or information acquired in
the seminars are the highlights of the activity, still first-hand knowledge is different
and the impact is strong on the part of the participants. Hence, giving opportunities
to all employees will not just boost their confidence but will improve their
performance and delivery of services accordingly.
If this issue will be ignored, then, this LGU can’t fully achieve organizational growth.
60
capacity development interventions should have been beneficial in improving
organizational competencies resulting to more effective public service delivery-the
manifestation of good governance.
Based on HRMO records, only few employees benefitted promotion as shown in the
graph below. This is due to insufficiency of funds that hampers the creation of higher
positions especially technical and managerial positions. Most of the positions being
created and filled in are clerical and non-technical positions which make the
organizational structure imbalance and poor performance.
13
2
1
61
the existence of assistance from the municipal government through allocation of
funds for continuing education of employees is a beneficial investment in building an
organization packed with competent professionals that meets the demand of time.
This LGU has not yet created/legislated a program for retirees. Nevertheless, a
simple Send-off Program and conferment of the Service Awards - a certificate given
to retirees whether under optional or compulsory retirement schemes - are held
during a fitting ceremony on or before the date of their retirement. Pre-retirement
Program which aims to familiarize the would-be retirees from the government
service on the government retirement plans and benefits as well as available
business opportunities or other productive options/pursuits is still a plan. Conducting
such will help the retirees maintain their productivity after leaving the government
service. If this issue will be given attention, then, retirees would feel disregarded.
The LGU haven’t crafted yet its employee’s handbook, where laws and policies,
LGU vision and goals, including the roles and responsibilities of every employee are
compiled. Having such will guide each employee in the execution of their duties and
responsibilities towards the attainment of the LGU vision. Without it, employees may
tend to forget their primary duties or violate policies unintentionally.
The LGU has a Citizen’s Charter locally called Tullaggan- a Kalanguya term which
means agreement between the LGU and the Community. This was approved last
August 2009 and was not updated since then. Hence, some provisions of the
Tullagan need updating and upgrading. In line with this, the HRMO in partnership
with Department of the Interior and Local Government (DILG) conducted
Orientation-Workshop on Citizen’s Charter Formulation. However, the Local
Revenue Code of this LGU must also be updated for integration of the
tax/fees/charges in the Citizen’s Charter. If still this issue won’t be addressed in due
time will result to poor quality and inefficiency in the delivery of services.
Though orientation was conducted and the process for filing complaints is posted at
the HRM Office, still no complaints had ever been formally filed for action of the
Grievance Committee based on HRMO records. This may be attributed to the innate
culture of the Kalanguya where issues and concerns are being settled by the parties
concerned with the interventions of their peers. Nevertheless, as mandated, still
grievances should undergo through procedures for proper treatment. Hence,
62
strengthening the Grievance Machinery through intensive information drive shall be
pursued.
If this issue will be disregarded, then, issues will be just everywhere and no specific
actions will be taken to address such.
27. Non-compliance of some to CSC Rules and Regulations, Local Policies and
other laws governing public servants
If this persists, the organization may collapse and the delivery of services may be
sacrificed.
This LGU is still incapable of establishing HRIS with Information Technology (IT)
Experts to do such thing. The HRMO is currently using the traditional way of
managing and producing records and information of employees which makes the
process tedious and the documents vulnerable to loss, theft, and the like. In this era
where technology is a necessary thing, this LGU shall fund the establishment of
HRIS, an electronic system for managing personnel records and producing
reports/documents for the following purposes: managing of all employees
information; reporting and analysing employees information; payroll integration;
computerized Daily Time Record using Biometric Machine (DTR); on-line access to
leave credits and leave of absence application and the like. Having such will bring
forth a well-organized record that is accessible and hassle-free.
5.2.DEVELOPMENT PLANNING
1. Poor plan-budget linkage
Plan-budget linkage is vital to ensure the effective delivery of PPAs through the
appropriate budget allocation. Plan and budget preparation is a regular activity in
the LGU. Trainings and seminars are being conducted and attended on to
capacitate the LGU in Plan and Budget Formulation and Linkaging. However, still
this LGU have not mastered such. For instance, PPAs in the Annual Budget should
be culled from the approved AIP. However, during the budget preparation some of
the PPAs are not in the AIP or vice versa. Hence, the LGU has to undergo revision
of either of the two or both that resulted to the passing of Supplemental AIP or
63
Supplemental Budget over and over. Activities like in-depth review of plans and
budget and intensive seminar on Plan-Budget Linkaging can possibly address this
issue.
2. Limited knowledge and skills on development planning
. Municipal Planning Development Office is the brain of the LGU. It’s where all
development plans emanate, without it the LGU as government entity would not fully
perform its mandated duties. Supposedly, MPDO having the most critical role in
local development should have a strong and competent manpower to effectively
execute its duties and responsibilities as stipulated in the Local Government Code of
1991 (RA 7160). But for LGU Ambaguio, MPDO is considerably weak as far as
64
manpower complement is concerned. At present, the Office has only four (4) regular
employees. Two of them are Environmental Planners doing all the technical task of
the Office while the others are purely clerical. In effect, not all services are delivered,
submitted and completed on time. Hence, hiring of additional competent staff
especially Engineers, Social Welfare and Environmental Planners are direly needed
to ensure that the mission of the office will be achieved or delivered
5. Outdated plans
For a plan to be responsive and resolute, it has to reviewed and updated regularly.
Planning Team of Ambaguio is gradually updating some of the various plans the
LGU have to revise or streamline. This is to ensure that LGU plans conform to the
national policies and nothing was left behind in development. However, as presented
in the previous issues in the LGU, manpower insufficiency especially those with
technical skills and fund shortage delays the implementation of PPAs particularly the
formulation and updating of important development plans. For example is the
lingering updating of the Comprehensive Land Use Plan, a plan for the long-term
management of the local territory. Almost eight (8) since the previous CLUP expired,
until now the LGU doesn’t have yet an updated CLUP duly approved by theHLURB .
Outdated plans are not ineffective in part sometimes. Hence, strengthening of LGU
Planning Team and increasing of funds for to support PPAs for planning is
demanded to address this issue.
65
The Sangguniang Bayan Office (SBO) doesn’t have an establish Legislative
Information Tracking System, a computerized system that keeps, tracks, monitors
the implementation and stores proposed and approved ordinances and resolutions.
The SBO is currently using a simple database to track down resolutions and
ordinance which is relatively good. However, in order to strengthen the capability of
the Sanggunian to effectively discharge its duties, it has to provide an efficient filing
and retrieval system of legislative outputs through information technology. Hence,
the Sanggunian has to install/set-up proper indexing of resolutions and ordinances
like the Legislative Tacking System for easy retrieval files for inquiry or review. In no
LTS will be established, status of ordinances, codes, resolutions and other issues
that needs immediate action won’t be properly monitored and acted upon.
4. Absence of Officer-In charge after Session
Local Government Code of 1991 mandates the Legislative Body to conduct session
once a week and the Sangguniang Bayan of Ambaguio never fail to have their
session every Monday. The SB supports especially their presence in every
programs and activities of the LGU are very important as it boost the moral of the
office in charge and inspires the participants to be more cooperative. Hence, with the
presence of the SB not only during session but through out the working days is
important. This can be done through designation of the “officer of the day” in a
manner of rotation from among the SB members.
5. Legislative Public Hearing
Local governments are requires by law to hold legislative public hearings. It aims to
obtain public inputs on important legislative policy matters that affect a wide range of
citizens, such as comprehensive land use plans and annual budget. In Ambaguio,
sometimes public hearings become ineffective. This may be attributed to some
factors like absence of advance and wide publication of the event, non-
establishment of purposes of the public hearings and absence of identified people to
act as moderator, and low community participation. This maybe addressed through
attendance to Trainings and encouragement of community participation through the
conduct of information drives on the importance of public hearings to effectively fulfil
the primary purpose of legislative public hearing. If this will not be fixed, it will have
an effect on the quality and implementation of such ordinances or actions of the
Legislative Body.
5.4. GOOD GOVERNANCE
66
2. Limited Funds for Capacity Development of CSO
The Municipal Government recognizes the role of CSO in local governance. Hence,
the LGU regularly allocates funds for CSO Program and which includes Program for
their Capacity Development. In 2015, a 5-day CSO Capacity Development Seminar
was conducted in partnership with the DILG. This BuB-Funded seminar attended
aims to strengthen the partnership between the LGU and CSO and to capacitate
them in organizational and financial management. No more similar trainings have
ever been conducted. And if ever there are not all CSO are being accommodated
due to insufficiency. Hence, not all CSO have the capacity to engage or participate
in the local government operations and administration.
If the CSO will not be given proper care, they will become ineffective partners of the
LGU.
3. CSO and Private Sector Participation in Implementation and Monitoring of
Projects needs strengthening
The municipal government ensures the involvement of CSO and Private Sector in
the implementation and monitoring of programs, projects and activities of the LGU.
To strengthen the partnership, the LCE through the issuance of Executive Orders in
which CSO are involved like EO No. 1, S2015 organizing the Project Monitoring and
Inspectorate Team and EO No. 15, S 2015 requiring the participation of Civil Society
Organizations in all phases of Procurement Process. The Mayor had also
designated a CSO Coordinator to manage CSO concerns. However, still the LGU
has to continuously strengthen CSO participation and encouraging and reaching
more CSO members to take part in the development of the municipality. Hence,
conduct of information drive and capacity development to all CSO operating within
the municipality shall be ensured.
4. Citizen’s Participation needs strengthening
Citizen’s participation in all aspects of governance is encouraged by the Municipal
Government. All accredited NGOs are represented in the Municipality’s Special
Bodies and other councils and boards created through an Executive Order by the
Municipal Mayor. The six (6) Local Special Bodies are organized and made
functional. The composition of these Special Bodies is in accordance with what is
prescribed in the Local Government Code of 1991. Other councils and boards were
also organized in pursuance to the issuances by National Government Agencies
such as the Solid Waste Management Board, the Municipal Council for the
Protection of Children, the Municipal Disaster Coordinating Council, the Municipal
Anti-Drug Abuse Council among others.
5. Low Participation of the NGAs to Project Monitoring and Implementation
The participation of the top representatives from the national government agencies
located/attached to this LGU is continually low. Despite of their expected productive
contributions for the development of this LGU, they rather attend to their own
workloads and send less necessary representatives instead. This maybe because of
complexity of schedules these representatives in their respective agencies or their
indifference to this LGU. For increase and sustained participation of these top
representatives, as direly needed, this LGU should established/legislate
mechanisms that encourage their support.
67
6. Low Awareness on RA 8713 or Indigenous People’s Rights Act (IPRA) of
1997
Ambaguio is inhabited by Indigenous People particularly the Kalanguyas. Being
dominated by IP and awarded with Certificate of Ancestral Domain Title shall
primarily uphold and conform to the provisions of IPRA, an act that recognize,
protect and promote the rights of indigenous cultural communities/indigenous
people. However, due to low awareness of this Act, IPs of Ambaguio couldn’t
invoked their rights and perform their responsibilities. Hence, information drive on
IPRA shall be conducted to promote awareness and consequently compliance and
implementation of Act. Creation of Taskforce to implements programs like updating
of ADSDPP and implementation of Philippine Indigenous People’s Ethnographies is
also suggested.
If this will not be addressed, the IPs can not invoke their rights and can’t fully
participate in the government programs intended for them.
7. LimitedFunds to support Programs for Transparent Governance
The LGU is not behind as far as transparency is
concerned. The institutionalization and implementation
of the Full Disclosure Policy (FDP) somehow
guarantees that transparency will be on top. The FDP
Team publishes Magazines and Brochures name
“Pangamtaan” (right oicture) , a Kalanguya term which
means “medium of information”. This publication
features the Financial Report and latest programs,
projects and implemented by the LGU. Regular posting
of Financial Reports to all FDP Bulletin established in
the Municipal and Barangay and in the LGU
Facebook Page and FDP Portal is also being done. FIGURE 10. LGU
And to ensure massive information on local PANGAMTAAN MAGAZINE
government operations, the municipality has
established its own website which is features information about the locality.
However, the LGU can not fully utilized and manage the website due to absence of
IT experts or administrator to effectively manage it.
70,000.00
30,000.00
25,000.00
20,000.00
Source: MBO
68
It can be seen in the table below that funds allotted for FDP range only from Twenty
Thousand (P20,000.00) to Seventy Thousand (P70, 000.00)fro Year 2014-2017.
Hence increased of funding to ensure sustainability and improvement of the
programs is compelled to cope with the increasing demand for transparent
governance.
8. Insufficient Project Monitoring
The LGU has an organized Project Monitoring and Inspectorate Team through
Executive Order No.1, s2015. The team is task to regularly conduct monitoring of
projects implemented within the jurisdiction of Ambaguio. However, due limited
knowledge/skills on project monitoring that makes the supervision of projects
especially on infrastructure projects vulnerable. If this will continue, implementation
of projects will delay and compliance to set standards will not be monitored. Hence,
trainings on project monitoring are necessary to ensure compliance to standards in
the implementation of projects.
This LGU is oftenly delayed in the implementation of its programs, projects and
activities. This is attributed to limited technical skills and manpower to implement the
PPAs, weather condition and non-compliance of the contractors on the project
contract. Delayed implementation of PPA’s means delayed delivery of services.
Hence, an intervention should be done like hiring of additional manpower with the
appropriate technical skills, having a good implementation schedule, close
monitoring projects and strict imposition of sanctions to erring/non-conforming
contractors.
In compliance with the Anti-Red Act of 2009, the LGU has a crafted its Citizen’s
Charter called Tullagan which is posted in front the Offices. Employees particularly
those having direct contact with client are somehow aware of the Act. A Re-
Orientation on Anti Red-Tape Act is being conducted to ensure compliance of the
Act. However, still there are issues on discourtesy and non-observance of the No-
Noon Break Policy. Apparently, if this will not be acted upon, the LGU will not be
inefficient enough in the delivery of services to clients. Hence, strict compliance of
the ARTA shall be observed to ensure prompt delivery of services.
The internal audit system is not yet fully established and the current Internal
Audit System Officer is only a designate. Thus, there is no office dispensed with
the responsibility to fully oversee the internal audit in the LGU. If this prevails, the
maximization of the use of the different resources will not materialize.
69
13. Financial Management Information System (FMIS) is not yet automated
Another effect of the manual accounting process is its susceptibility to being by-
passed since there is no program that cannot be easily overrode by the users.
Thus, clients can easily go around the various protocols in the disbursement
process resulting sometimes to unchecked completeness of the disbursement
papers’ attachments. If this continues, there will always be numerous Audit
Observation Memoranda from the Commission on Audit.
70
17. The LGU is IRA-dependent due to limited local revenue sources
71
Source: MTO
In terms of Fiscal Autonomy, on the average, the revenue from local sources only
accounts to 2% of the whole revenue source; thereby making the Internal
Revenue Allotment share provide the 98% revenue needed by the LGU in its
annual operations. This indicates that the LGU is still an IRA-dependent
municipality. The reasons for this is the limited business investments in the
municipality, and the duplication of Real Property Units. Some barangays are not
also fully tax mapped and constituents in the boundary dispute area evade
paying taxes by telling that they have already paid in the other LGU claimant.
Other tax declarants also do not pay taxes alleging that their property is untitled.
If these circumstances prevail, there will always be insufficiency of funds since
the limited income cannot augment the expenses of the LGU.
18. The Local Treasury Office is understaffed with technical personnel
SECOND LEVEL 1
FIRST LEVEL 7
Source: HRMO
Some proponents submit PPAs for funding that are not in the investment plans.
During the budget process, the projects that are included for funding are
sometimes not integrated in Annual Investment Plan, LDIP, ELA and other
related plans. This will result to numerous budget review actions and
supplemental AIPs. This will also delay the approval of the budget and more
importantly this will cause failure in the Public Financial Management
Improvement Plan which is assessed during FDP Evaluation.
The current quality of internet service signal if low due to insufficient gigabytes
share by the different offices. This will result to poor quality of internet signal and
thus cause delay in processing transactions.
The current office building used by the different offices cannot already
accommodate the growing needs of the LGU. The current space is too narrow for
a better filing system and a favorable working environment. Moreover, during
peak days, the space allotted for clients is not sufficient to accommodate them. If
72
this continues, the filing system of the offices will not improve as well as
employees will not be more productive causing delay in the delivery of service as
well as the best kind of service due to clients will not be realized.
The Municipal Budget Office, currently, has three permanent personnel including
the Municipal Budget Officer and one is designated as a Supply Officer. This
situation is an additional upshot of the current staffing pattern and organizational
structure of the LGU that does not conform to its needs as well as the
insufficiency of funds to alleviate the already over PS Cap limit spending.
However, if this is not addressed, there will be poor quality of service as well as
delayed delivery due to the multi-tasking of staff.
5.5. ORGANIZATIONAL RESILIENCY
1. Not Fully functional and responsive MDRRMO/OPCEN
There is insufficient manpower in the LDRRM Office of LGU. Currently, 2 permanent
employees is hired in the LDRRM office, the Local Disaster Risk Reduction Officer I
and Radio operator. According to RA 10121 sec. 12 the LDRRM Officer shall be
assisted by three (3) functional staff that will handle 1) administrative and
training,2)research and planning,3) Operation and warnings. The salary grade
standard for the LDRRM officer do not conformed with the standard set in the Joint
Memorandum Circular no.14.Furthermore, there is no standard building for the office
and no permanent Disaster Operation center to be used by the in times of
calamities.
Lack of personnel in the MDRRMO/OPCEN will lead to unresponsive office in times
of emergency situation. This will lead to ineffective DRRM services, potential death,
injuries and damage to properties.
73
If this problem is not addressed, rescuers will not be able to carry out their duties
and functions in saving lives and properties. Seemingly, another high safety risk on
the part of the rescuers will also be at stake during disaster operations.
No training in ICS, IMT and RDANA of the LDRRMO staff and Council member
results into poor management. Inefficient Search and rescue group will lead to
delayed rescue operation in times of disaster. Therefore, capacity building is needed
to have responsive rescue team to prevent loss of lives and damage to properties
74
The LDRRM office maintain 100 pack of food stockpile, at the same time the
MSWDO continually ask for assistance in the DSWD Office for the supply of
stockpiles.However,non-food stock pile such clothings,blankets and other materials
for the evacuation center is not yet established. Fund allocation for the stockpile is
charged to the 5% LDRRM Fund to procure the foreseen needs nonetheless the
amount of fund is limited. In the situation that massive evacuation will occur, the food
and non-food stockpile will be insufficient.
I.1. EDUCATION
There is a limited number of schools and majority of classes in elementary grades
in Ambaguio are combined otherwise called as multi-grade classes. These are
attributed to various reasons and conditions like, but not limited to, the following:
75
Shortage of the number of teachers deployed
With these situations, the Schools District of Ambaguio has collaboratively created
the 5-Point goals aimed to be achieved from CY 2018-2023. That is, through the
finely selected strategies and activities that would certainly and resolutely address
the gaps and issues on education hereunder stated. In which, also, every goal
identified has a success indicator that could serve as a means of verifying its
attainment.Hence, the following statements are presented accordingly with the
major final outputs of education, that is, on Access; on Retention; on Completion;
and on Achievement.
ON ACCESS OF EDUCATION
SUCCESS INDICATOR: ENOUGH NUMBER OF SCHOOLS AND CLASSES
Goal 1
Strategy A
Non-project/Services
76
Locate the areas where additional schools/classes could be
established.
Project
Strategy B
Non-project/Services
Project
Strategy C
Non-project/Services
Project
77
Hire/designate the selected applicant or aspirant to the school in-
need.
ON RETENTION OF LEARNERS
Goal 2.
To alleviate number of drop outs and school leavers in all elementary and
secondary schools.
Strategy
Non-project/Services
Projects
ON COMPLETION OF LEARNERS
Goal 3.
78
To attain 100% graduation rate and 85% survival rate in all elementary and
secondary schools.
Strategy
Non-project/Services
Projects
Goal 4
Strategy A
79
Non-project/Services
Project
Strategy B
Non-project/Services
Projects
80
Strategy C
Non-project/Services
Project
Goal 5
Strategy
Non-project/Services
Project
81
The Health sector Development Plan for 2018-2022 is focused on the issues &
concerns to be addressed to attain its vision: A Municipality with complete health
facilities, empowered & committed people co-existing in a clean and green
environment. This Mission is in lined with the LGU’s vision: Ambaguio as Agro-
Forest Haven of Region 02 inhabited by empowered Indigenous People living an
ecologically balanced community with accessible, sustainable and Competitive
economy with effective and efficient Local Governance.
SUCCESS INDICATOR: ZERO CHILD MALNUTRITION
Goal 1
Strategy A
Non-project
Strategy B
Non-project
Strategy C
Project
Non-project
Strategy D
Non-Projects
82
Distribution of seeds/seedlings/cuttings
Projects
Strategy E
Micronutrient Supplementation
Non-projects
Vitamin A supplementation
Iron supplementation
Iodine Supplementation
Strategy F
Food Fortification
Non-Projects
Salt testing
Strategy G
Food Assistance
Projects
83
Provision of foods at lower subsidized price
Strategy H
Non-projects
Project
Development/reproduction & distribution of nutrition IEC materials
Strategy I
Non-projects
Deworming
Strategy J
Livelihood Assistance
Projects
84
Strategy K
Non-Projects
Strategy L
Non-projects
Project
Legislation
Non-projects
Conduct of meetings
Project
Goal 2
85
Strategy A
Non-Project
Strategy B
Non-Project
Strategy C
Legislation
Strategy D
Projects
Construction/concreting of roads
Strategy E
Non-Project
Projects
86
Procurement of additional ambulance or patient transport vehicle and
monitoring vehicle (motorcycle)
Legislation
Strategy F
Non-Projects
Conduct IECs
Project
Procurement of vaccines
To decrease maternal death rate until zero maternal mortality rate is attained
Strategy A
Non-Project
Conduct of IECs
Strategy B
Non-Projects
87
Conduct IEC on maternal care
home visitation
Projects
Strategy D
Strategy A
Non-Project
Strategy B
Non-Project
Strategy C
Non-Projects
88
Master listing of target groups
Non-Projects
Non-Project
Projects
Procurement of sufficient medicines, medical supplies and vaccines
Legislation
Strategy F
Projects
89
Strategy H
Projects
Road construction/concreting
Strategy A
Non-Project
Legislation
Strategy B
Non-Project
Project
Non-Project
90
Tracking & referral of Non-Philhealth pregnant women to MSWDO for
Philhealth enrolment
Strategy D
Make the birthing clinic accessible during time of birth/ bring women
about to give birth closer to the birthing facility
Projects
Strategy E
Non-Projects
Project
Strategy A
Legislation
Strategy B
91
Non-Project
Strategy C
Legislation
Strategy D
Increase awareness
Non-Project
Strategy E
Non-Project
Strategy A
Non-Project/ Service
Strategy B
92
Non-Project
Project
StrategyA
Make potable water system within reach for the 38 % HH without access
to potable water
Non-Projects
Project
Goal 9
Project
Non-Project/ Service
93
This sector of social services is generally concerned with the sectoral groups. It is
concerned with the welfare and development of children, youth, women, senior citizens,
persons with disabilities, family and community. With the increasing demand of societal
problems and to address other related concerns, the office as well is involved in the
implementation of mandates such as that on case management of special cases on
women abuse, children abuse and Children in Conflict with the Law; Day Care Services;
solo parent services, disaster risk reduction and management with its emergency
assistance, relief and rehabilitation, after care and follow-up services and the like. Self-
Employment Assistance and Sustainable Livelihood Projects and the PantawidPamilya
are also being implemented. To address the identified gaps based on current reality, the
following goals, strategies and interventions are enumerated which is geared toward the
attainment of the vision of the locality particularly on empowerment of the Indigenous
Peoples/ Community and for effective and efficient delivery of services.
Goal 1
Strategy A
Non-Project/Services
Project
Legislation
Strategy B
Non-project/Services
Mentoring/coaching of CDWs
94
Attendance to Educational Study Tour and benchmarking
Goal 2
Strategy A
Intensify campaign for the return of the OSYs into school and sustain
accessible education
Non-Project/ Services
Legislation
Strategy B
Non-Project/ Services
Provision of skills training thru lobbying with PLGU, TESDA, DTI, DOLE,
DSWD and other public and private institutions
Strategy C
Non-Project/ Service
95
SUCCESS INDICATOR: 100% ACTIVE INVOLVEMENT OF WOMEN IN GENDER-
RELATED PROGRAMS
Goal 3
Strategy A
Non-project/Services
Strategy B
Non-project/Services
Project
Goal 4
To ensure full implementation of Magna Carta for Persons with Disability and the
Accessibility Law
Strategy A
Non-project/Services
96
Reorganization of PWD Associations
Strategy B
Non-project/ Services
Projects
Legislation
Goal 5
Strategy
Non-project/Services
97
Hiring of OSCA Aide/ Administrative Aide
Projects
Goal 6
Strategy A
Non-Projects
Strategy B
Non-Projects
Project
Strategy C
Non-Project
98
Attendance to trainings, seminars and technical updates relative to
case management
Strategy D
Project
Goal 7
Strategy A
Non-projects/Services
Projects
Legislation
Strategy B
Non-projects/Services
Projects
99
Introduction of new farming technologies to farmers
Goal 8
Strategy A
Non-projects/Services
Goal 9
Strategy
Meet the required indicators and innovate more for the sustenance of the
award
Non-Project/ Services
100
a.)Administrative Section
b.)Program Management: Family and Community Welfare
Program, Women Welfare Program, Children and Youth
Welfare Program, PWD Welfare Program, Senior Citizens
Welfare Program, ECCD and Day Care
c.) Financial and Material Resource Management
d.) Case Management
e.) Physical Structures and Safety
Legislation
The peace and order situation in the municipality of Ambaguio is generally peaceful,
manageable and under control. The crimes transpired were given proper actions to
clear and solve the crime transpired. In fact, in the year 2017, the local police resolved
100% crime solution efficiency for all crime incidents recorded.
The favorable condition is brought by the peace-loving characteristics of the people and
the improved system of cooperation and coordination among local officials, law
enforcement agencies and the respect of customary laws as enshrined under the
Ancestral Domain Sustainable and Protection Plan (ADSPP) of the Kalanguya
community.
The Peace and Order and Public Safety Plan (201-2019) of the Municipality was
approved by the Municipal Peace and Order Council on February 15, 2017 and
subsequently adopted by the Sangguniang Bayan on February 27, 2019.
Pursuant to DILG MC No. 2016-24 dated October 24, 2016 and in line with the country’s
commitment to the Sustainable Development Goals (SDGs), the POPS Plan of
Ambaguio has integrated the National Security Policy in its formulation.
The presence of CAFGU CAA also has helped maintained the peace and order of the
municipality as they provided support security to threats manifested by disgruntled and
disoriented individuals from within and from outside the municipality. Their continued
presence is highly sought to ensure visibility and security support augmentation.
Since the implementation of Project Double Barrel, Ambaguio Police Station recorded
fifty (22) drug personalities who voluntarily surrender themselves and not to indulge to
any illegal drug activities through the massive campaign and strict implementation of
Project “TOKHANG”. Out of the fifty (22) drug surrenderers, some of them had already
undergone the drug assessment and none of them needs medical attention based on
the assessment result from the Treatment and Rehabilitation Center of DOH R02.
However, a Drug-Cleared Certifications were issued by Regional Oversight Committee
on Barangay Drug Clearing Operation under the Chairmanship of the Philippine Drug
101
Enforcement Agency (PDEA) to Barangays of Ammoweg and Salingsingan on February
15, 2018.
Vehicular accidents are one also of the problems committed along the provincial road
and streets in Ambaguio. Our statistics shows that there were 16 accidents recorded.
This is contributed by the drivers who are still minors, reckless driving, under the
influence of intoxicating liquor and road condition. These incidents posed great degree
of concern among the other motorists and different sectors of the society, thus resulted
in the loss of lives, physical injuries and damage to properties. Despite strict
implementation and enforcement of traffic rules and regulations, vehicular incidents still
remain unabated. . However, statistics shows that for the year 2017 there is only one
vehicular incident in the municipality.
The municipality has only one Bureau of Fire Protection personnel as Fire Prevention
Officer but there is no established office at the moment.
Most of the fire incidents were caused by accidental due to recklessness and or
negligence due to lack of awareness/consciousness of other people on fire prevention
while other caused by people intentionally set on fire to cause damage to other or clean
their farm yards (Kaingin). Fire prevention program has been strengthened through the
intensified conduct of fire safety inspections on all buildings and establishments and the
continuous conduct of information, education campaign, lectures, drills, seminars and
trainings among the populace of this municipality to reduce the occurrence of fire and
prevent damage to properties and loss of lives among the people in Ambaguio.
Goal 1
Strategy
Non-projects/Services
102
Conduct of highly proficient trainings for Security Officers
Project
Legislation
Goal 2
Strategy A
Non-projects/Services
Police visibility
Strategy B
Non-project/Service
Barangay visitations
Goal 3
Strategy A
Non-Project/Services
103
Coordinate with MADAC, BADAC to give copy of their Drug Watch
list
Strategy A
Non-project/Services
Strategy C
Non-projects/Services
Goal 5
Strategy
Non-project/services
104
-Safety awareness and basic fire response lecture
-Organization of Barangay fire brigade.
Project
Under Health Sector, health facilities such as health station are all susceptible to
landslides. These Health Station is the only source of health services that can be
availed by the constituents. If these buildings are destroyed or damaged by hazards
there will be disruptions of health services. Therefore, we can anticipate increase in
morbidity and mortality cases. As we build safe health infrastructures, we also aim to
train the health care providers to respond in times of emergencies that may or may
not brought by hazards.
Goal 1
Strategy
Capacity Building
105
Non-Projects
Skills training for the CSO volunteers and Vulnerable sector of the
community
procurement and installation early warning devices to every barangay
Goal 2
To increase awareness of the presence/location of evacuation centers
Strategy
Capacitation and IEC
Non-Projects
intensified IEC through community assemblies
conduct of evacuation drills
Project
Creation and installation of evacuation guide maps and posting to the
conspicuous places
Legislation
Implementation of pre-emptive and force evacuation
Goal
106
ToEstablishment of standard evacuation centers with complete basic facilities
Strategy A
Non-projects
Conduct of Information education communication campaign(IEC)
Establish early warning system
Projects
Construction of permanent evacuation centers(municipal and
barangay)
Renovation of the temporary evacuation centers
Upgrading of the identified evacuation centers
Implementation of Core Shelter Projects
Legislation
Enforcing the Force and preemptive evacuation
Adopting the “Twinning system” of evacuation
Strategy A
Legislation
MOA with sari-sari stores
MOA with NFA
MOA with Business establishments
MOA with Humanitarian Institutions
Strategy B
Non-Projects
107
Establish Population database
Masterlisting of vulnerable families,individuals
Creation of updated of hazard Maps
Updating the Community Disaster Risk assessment(CDRA)
Project
Strategy C
Non-projects
Projects
Strategy A
Upgrading of medical facilities
Projects
108
expansion and concreting of standard RHU and BHS buildings
procurement /acquisition of Additional ambulances
Procurement of Laboratory equipment
Legislation
maintain accreditation of RHU,BHS and Birthing facilities to
Philhealth,MCP,DOTS
Resolution requesting fund allocation from Provincial/national agencies for the
upgrading of medical facilities
Strategy B
Empowering and mobilizing health personnel
Non-Projects
provision of continuous trainings for the personnel such as Basic life
support, medical emergencies, First aids, screening of certain disease
Provision of training to advanced medical management to emergency
situations
organizing Emergency Medical responder group
Project
hiring of additional Human resource such as Nurses, Medical technologist,
sanitary inspector and midwives, driver
Legislation
Executive order organizing Emergency Medical Responders
Creation of ordinance for the different position for the Health staff
Strategy C
Strengthening linkages and networking
Legislation
MOA with higher Medical facilities(public and private) and other
agencies
Strategy D
Ensure safe environment
Projects
slope protection
Riprapping of landslide prone area within RHU vicinity
Tree and bamboo planting in the vicinity
Installation of warning signages to the area
109
II. ECONOMIC DEVELOPMENT PLAN
2.2. AGRICULTURE
The Economic Sector is concerned of developing the sources of income in the
municipality such as agriculture, tourism, commerce and trade. This sector
wanted to address the issues and concerns in economic through the following
goals and strategies:
Maintain the quality of agricultural products and minimal loss during and after
harvest by providing various post-harvest facilities needed, provision of value
adding machine to process the surplus agricultural products and to provide
additional source of livelihood. Conduct training on value adding or food
processing. Capacitate the farmers on proper sorting and packaging to achieve
the right market price.
Increase the quality livestock and poultry production by providing trainings to the
farmers, conduct regular vaccination through MLGU Livestock Technologist and
upgrading of the stocks to ensure profit of the animal raisers.
Increase fish production and ensure productive use of communal bodies of water
to have not only additional source of income but nutrition of the residents.
Trainings on fish production need to be conducted, establish fish hatchery to
make fingerlings available and render technical assistance to fisher folks. Strictly
implement the environmental and fisheries laws by mobilizing the deputized fish
warden to restore and protect the communal bodies of water. Fish sanctuary is
needed in order to maintain the aquatic resources.
110
Ensure increased and sustained backyard production of nutritious crops per
household year-round through strict implementation of the Municipal Ordinance
on Backyard Gardening, provision of technical assistance and quality planting
materials to encourage every household establish backyard garden to make
nutritious food in the home.
Goal 1
Strategy A
Non-Projects/Services
Strategy B
Project
Strategy C
Non-Projects/Services
111
Procurement of hand tractors, rotavators, brush cutters, power
sprayers and planters and distribute to accredited farmers’
associations.
Strategy C
Non-project/Service
Legislation
Strategy D
Non-projects/Services
Goal 2
To ensure quality agricultural products and minimal loss during and after harvest
Strategy A
Non-projects/Services
Strategy B
Non-projects/Services
112
Procurement of refrigerated vans
Projects:
Goal 3
Strategy A
Project
Strategy B
Project
Strategy C
Project
Strategy D
Project
113
SUCCESS INDICATOR: INCREASED ORGANIC PRODUCTS
Goal 4
Strategy A
Legislation
Strategy B
Project
Non-projects/Services
Strategy C
Project
Construction of greenhouse
Strategy D
Promote composting
Non-Projects/Services
114
Construction of composting facilities
Provision of shredder
Strategy E
Non-Project/Service
Goal 5
Strategy A
Non-Projects/Services
Strategy B
Non-Project/Services
Strategy C
Non-Project/Service
Strategy D
Non-Project/Service
115
Conduct of vaccination regularly
Strategy D
Upgrading of livestock
Non-Projects/Services
Strategy E
Poultry dispersal
Non-Project/Service
Strategy 7
Non-Project/Service
Goal 6
Strategy A
Non-Project/Service
Strategy B
116
Non-Projects/Services
Production/procurement of fingerlings/elvers
Project
Strategy C
Non-Project/Service
Strategy D
Non-Project/Service
Strategy E
Non-Project/Service
Legislation
117
Goal 7
Strategy A
Non-Projects/Services
Strategy B
Non-Project/Service
Strategy C
Non-Projects/Services
Goal 8
Strategy A
Legislation
118
Regulate practice of kaingin system
Strategy B
Non-Project/Service
Strategy C
Non-Projects/Services
Goal 1
Strategy A
Non-project/Service
119
Project
Strategy B
Legislation
Strategy C
Legislation
Strategy D
Non-projects/Services
Projects
Legislation
Goal 2
Strategy
Goal 3
Strategy
Funding
Non-project/Service
Project
Legislation
Goal 4
Strategy
Funding
Project
Legislation
121
Creation of Local Investment economic & Promotion officer
Goal 5
Strategy
Funding
Non-project/Service
Project
Legislation
Goal 6
Strategy
Funding
Non-project/Service
Project
Legislation
Goal 7
Strategy
122
Request resolution for funding
Project
Legislation
Goal 8
Established PasalubongCenter
Strategy
Project
Legislation
2.4. TOURISM
Endowed with mountainous landscape and natural scenic views and landmarks,
Ambaguio offers endless adventures. Combined with its major industry which is
agriculture, the scenery makes a good fit for the municipality’s vision as “agro-forest”
haven. The economic prospects of eco-tourism will potentially help the municipality
boost its economy through the development of its eco-tourism sites like Mount Pullol,
the Matuno River and the trek to Mt. Pulag via Ambaguio trail, etc. Agri-tourism on the
other hand will likely succeed if pursued through the development of LGU owned farm
tourist destination and assisting investors/farmers to establish farm destinations.
As an indigenous community, culture and arts is a good addition to the attraction that
can be offered by showcasing and preserving the cultural heritage of the Kalanguyas
and Ayangans.
The success of tourism projects, programs and activities will be difficult to achieve in
the absence of a permanent tourism personnel and its support staff. There is also a
need to establish a physical tourism office which can serve as tourist assistance desk.
123
To provide direction for tourism interventions, a Municipal Tourism Development Plan
must be made available.
Issues and concerns under in tourism under the economic sector can be addressed
through the following goals and strategies:
Goal 1
Strategy
Non-Projects
Goal
Strategy
Projects
124
Establishment of LGU farm tourism destinations
Legislation:
Goal 3
To concrete roads leading to tourist destinations and install facilities for tourists
Strategy
Non-Project
Projects
Goal 4
Strategy
Non-Project
Project
Legislation
Goal 5
125
To make available accommodation and other services for tourists
Strategy
Non-project
Goal 6
To boost tourism through culture and arts as added part of tourism attraction
Strategy
Non-projects
Projects
Legislation
To lessen the effect, the management of the land through agricultural technology such
as SALT is recommended to be adopted by our constituents. Another, the promotion of
a high value crops that are easily planted, grown and maintained. Furthermore, the use
126
of drought-resistant crops is highly recommended by our agriculturist. However, the
implementation of this program are yet realized.
Goal
To adopt of proper agricultural methods
Strategies A
Promote agricultural technologies
Projects:
adopt Slope agricultural Land Technology (SALT)
Promote Drought resistant crops
Adopt the production of high value crops
Strategy B
To provide Livelihood programs
Projects
Mushroom production
Seedling preservation
This also aims to increase the revenue by topping and harnessing the rich
water resources through the structures of Mini-hydro power plant projects.
127
Likewise considered are the Construction, Rehabilitation and Improvement of
the existing water systems to suffice the need for the potable drinking water to
prevent water borne diseases and improve the health condition of the
populace.
Goal 1
Strategy A
Non-project/Service
Project
Strategy B
Legislation/LegislativeMeasure
Project
Goal 1
128
To Construct/Improve/Rehabilitate of Core Local Roads and bridges with
ancillary road facilities
Strategy A
Projects
Non-projects/Services
Craft ordinance for the appropriation of fund for the maintenance and
sustainability of the completed projects.
Legislation
Drafting of ordinance
Strategy C
Project
Legislation
Preparation of resolutions
Goal 1
129
To establish Public Buildings and support facilities
Strategy A
Acquire lot
Non-projects/Services
Legislation
Strategy B
Project
Legislation
Preparation of resolutions
Strategy C
Non-project/service
Project
Construction of buildings and facilities
Strategy D
Craft ordinance for the appropriation of fund for the maintenance and
sustainability of the completed projects.
Legislation
Drafting of Ordinance
Appropriation of fund for annual maintenance
Goal 2
130
To construct/Improve/Rehabilitate drainage facilities.
Strategy A
Project
Preparation of feasibility study
Legislation
Preparation of resolutions
Strategy B
Non-projects/Services
Project
Construction of drainage/flood control
Strategy C
Craft ordinance for the appropriation of fund for the maintenance and
sustainability of the completed projects.
Legislation
Goal 2
Strategy A
131
Craft resolution to be submitted to the national agencies to appropriate
fund for the expansion of electrification.
Non-project/service
Preparation of resolutions
Strategy B
Project
Legislation
Goal 3
Strategy A
Project
Legislation
Preparation of resolution
Strategy B
Legislation
132
Preparation of resolution
Strategy C
Non-project/service
ProjectS
Legislation
Goal 4
Strategy A
Legislation
Preparation of resolutions
Strategy B
Projects
Legislation
133
MOA with NTC, cable network and other entities
Goal 5
Strategy A
Legislation
Preparation of resolutions
Strategy B
Projects
Construction of terminals
Goal 6
Strategy
Projects
Legislation
134
3.4. RESILIENT INFRASTRUCTURE
Roads, bridges, schools, churches and other buildings that are situated in
the municipality are all susceptible to landslide. While we can’t prevent the
occurrence of landslide this LGU are on its way of mitigating the effects of
landslide. Through the help of the LDRRM Council, Sangguniang Bayan
and NGO there is continuous implementation of projects and programs
using the 5% LDRRM Fund and other funds to maintain roads and
bridges, to rehabilitate infrastructures. As a result of consensus decision
making, policies ad project are made. Furthermore, building all weather
roads, slope protection in landslide-prone areas, flood-control projects is
longed this LGU.
Goal
To implement engineering intervention on landslide protection works to Roads
Strategy
Provision of infrastructure support
Non-Project
Projects
135
concreting of provincial, municipal and barangay roads highly
vulnerable to landslide
riprapping of the landslide prone areas
Conduct of infrastructure audit in all barangay
Retrofitting of existing structures
Legislation
Enactment of ordinance regulating the road right of ways and
imposition of mandatory provision of safety facilities.
Strategy
Ensure public safety and road safety at all times.
Non-Project
Inventory of needed safety/warning devices.
Installation of road safety devices.
Rehabilitation of damage public structure.
On-call Emergency response.
Legislation
Implementation of the road right of ways ordinance
Goal
Strategy
Capacity building
Projects
Conduct of school based training for Basic Life support and first aide
Creation of evacuation maps in every schools
136
Non-Projects
Provision of technical support to School’s Disaster Risk reduction
Council
regular conduct of drills
Intensified Information Education campaign through symposium
including Parent Teachers Association(PTA)
Legislation:
organization of School
strengthen School based DRRM council
Strategy
Ensure upgrading of dilapidated bridges
Projects
construction of the Reinforced concrete bridges
Hiring of consulting services
Non-Projects
lobby for fund allocation/ sourcing out of funds
Legislation
137
measure to disasters and rehabilitating or preserving the quality of natural resources
to support the requirements of sustainable development.
The LGU-Ambaguio thru the Municipal Environment and Natural Resources Office
shall bring forth a preserved and safe environment that is beneficial to the people in
the nearest future. The MENRO shall transport into being fruitful, progressive, and
balanced ecosystem and shall maintain a strong holistic partnership with the society,
the stakeholders, and other agencies.
The declining forest cover force the LGU to establish land use zones wherein
specific area is designated and delineated for each use, develop and manage each
zone consistent with watershed and biodiversity conservation. This involves the
strengthening partnership with the DENR, BLGU and NGOs. Policy or ordinance
formulations harmonize to national laws, Environmental Code and ADSDPP that
could regulate the utilization of forest products and stop destructive activities of
community to existing, residual/ regenerating and forest plantations.
Goal 1:
Strategy
Non-project/Service
Goal 2
Strategy
Non-project/Service
138
Allocation of funds for full pledge MENRO head position and
personnel
Goal 3
Strategy A
Non-project/Service
Strategy B
Non-project/Service
Goal 4
Strategy A
Non-project/Service
Strategy B
Non-project/Service
139
Allocation of funds for search and rewards to best brgy
implementers on forest protection and management
Strategy A
Non-project/Service
Legislation
Strategy B
Non-project/Service
Strategy C
Non-project/Service
Goal 6
To update and strictly enforce Forest Land Use Plan and integrate to
Comprehensive Land Use Plan
Strategy
Non-projects/Services
140
Issuance of executive order to committee members and TWG for the
update of FLUP
Adoption of FLUP
Goal 7
Strategy
Non-project/Service
Project
Legislation
Goal 8
Strategy
Non-project/Services
141
Purchase of nursery tools and equipment
Projects
Goal 9
Strategy
Non-projects/Services
Projects
142
Goal 10
Strategy
Non-projects/Services
Goal 11
Strategy
Non-project/Service
Project
Goal 12
Strategy
Non-projects/Services
143
Technical assistance to the conduct of training on alternative livelihood to
LGU services to eliminate timber poaching
Goal 13
Strategy
Non-projects/Services
Project
The LGU shall institutionalized Solid Waste Management program and improve the
waste disposal system in the Municipality and implement RA 9003 particularly
cleanliness, orderliness, waste reduction and waste diversion at source. The LGU shall
prioritize the construction of multipurpose roads to every barangays without access for
waste, road going to proposed SLF, construction of SLF, purchase of waste
transportation equipment and waste diversion facilities that will make solid waste
management fully operationalize.
Goal 1
Strategy
Non-projects/Services
144
Creation of cooperative engage in recycling and composting of
waste
Projects
145
Goal 2
Strategy
Non-projects/Services
Legislation
Goal 3
Strategy
Non-project
Goal 4
146
Strategy
Non-project/Service
Project
Legislation/Legislative Measure
Strategy
Non-project/Service
Project
Improve the condition of Rivers and other tributary creeks (Bukig, Camandag, &Matuno
River)
In collaboration to other agencies, the LGU shall improve the condition of Rivers and
other tributary creeks (Bukig, Camandag, &Matuno River) in partnership to DENR-FMP
especial projects. One major component of it and vital to the municipality being
mountainous area is the promotion of soil and water conservation farm practices to
sustain fresh water ecosystem. One example of this is the enhancement of indigenous
agroforestry to sustain forest cover at same time source of lumbers and other products
out of it that could supplement basic needs of the community.
Goal 1
Non-projects
Projects
Legislation
Goal 2
Strategy
Non-projects/Services
148
Regular monitoring and evaluation on SWM to communities
adjacent to sources/bodies of water and fresh water ecosystem
Projects
Legislation
Goal 3
Strategy
Non-project/Service
Legislation
149
rehabilitation of fresh water and forest ecosystem sub-sector and also to disaster
preparedness in addressing adverse effect of climate change. The main purpose of it is
to have balanced ecosystem, economic activities are not affected while environment is
maintained or not abused considering that the slope of the whole municipality is majority
50 % above.
Goal 1
Promote sustainable Land use management or soil and water conservation farm
practices
Strategy
Non-project/Services
Goal 2
Strategy
Non-projects/Services
Project
Goal 3
150
Strategy
Non-projects/Services
Project
Goal
To decrease agricultural land and forest land susceptibility to landslides.
Strategy A
Implement environmental/forest protection measures
Project:
implementation of agroforestry
Strategy B
Legislation
151
IV.5. CLIMATE CHANGE MITIGATION AND DRRM
The LGU shall ensure balanced environment to reduce risk from climate change thru
conduct IEC and establishment of mitigating projects/ programs. To build or construct
resilient infra projects, establishment of greenbelt and strategic growing tree to
vulnerable areas to avoid worst occurrence of landslide and soil erosion/ surface run-off
that damage properties and possible loss of lives.
Goal 1
Strategy
Projects
The success in the implementation of the various sectoral plans constituting the
Ambaguio Comprehensive Development Plan is dependent on an appropriate
formal organizational structure, a dynamic set of systems and procedures, and a
productive and relevant human resource base. In this advance information
technology era, the expectation to deliver is high and the adverse impact from
pitfalls is great.
While not perfect, the Local Government Code of 1991 unloaded greater
administrative powers to LGUs foremost of which is fiscal administration. After
almost two decades of implementation, clamors for more evidence from the
relevance of the Code still reverberate throughout the archipelago. In this
chapter, aspirations and strategies are laid down to serve as guide in ensuring
that this CDP will materialize. Whether, they will form part of the Executive-
Legislative Agenda is not only for the Municipal Government officials alone to
decide. This is the social responsibility of the constituencies whose involvement
in community-oriented activities is not only allowed, but encouraged in the Code.
Thus, a critical component of this section is an effective advocacy for people’s
participation in plan implementation.
152
achieving its goals and objectives. After all, the most important asset of
any organization is its human resource.
Goal:
Strategy a
Non-Projects/Services:
Legislation:
Strategy B
Non-Projects/Services:
Strategy C
Non-Projects/Services:
153
Adherence to policies and guidelines in hiring and placement
of personnel
Legislation:
Strategy D
Non-Projects/Services:
Reconstitution of HRMPSB
Legislation:
Strategy E
Non-Projects/Services:
Legislation:
Strategy F
154
Support Career Development Programs for LGU Officials and
Employees
Non-Projects/Services:
Strategy G
Non-Projects/Services:
Strategy H
Non-Project/Service:
Legislation:
Adoption of SPMS
Strategy I
Non-Projects/Services:
Legislation:
Strategy J
155
Ensure full compliance of officials and employees to the
provisions of RA 6713 and other CSC (Civil Service
Commission) rules and regulations
Non-Projects/Services:
Strategy K
Non-Projects/Services:
Strategy L
Non-projects/Services:
Strategy M
Projects:
156
Installation of Information System
Strategy N
Non-Project/Service:
Strategy O
Project:
Strategy P
Non-Projects/Services:
Development Planning is a tool to solve problem. It’s a tool in mapping out the
future of the area not just physically by socially and economically. In LGU,
Planning function of the LGU is lodged in the Local Development Council as
provided in the Local Government Code of 1991. Numerous plans have to be
developed or crafted by the LGU other than the two major (2) plans stipulated in
LG Code-the Comprehensive Land Use Plan and Comprehensive Development
Plan. Hence, to ensure that development planning would be efficiently and
effectively performed or carried out by the LGU, the Body/Council/Team/Office
primarily engage in planning shall be capacitated and given priority. Presented
below are the necessary actions or interventions that the LGU has to undertake
on the area of development planning.
157
Goal:
Strategy A
Non-Project/Service:
Strategy B
Non-Project/Service:
Strategy C
Non-Project/Service:
Strategy D
Non-Projects/Services:
Goal:
Strategy A
Non-Projects/Services:
Strategy B
Non-Project/Service:
Good governance is what makes up public institution effective and efficient in the
conduct of public affairs and management of public resources. Good governance
has many characteristics. Among of which is Transparency, where people should
be able to clearly see how and why decision was made and where and
government funds are being utilized. Accountability is also fundamental
requirement to good governance. Local government has an obligation to report,
explain and be answerable for the consequences of decisions it has made on
behalf of the community it represents.
Goal
159
To sustain and improve transparency in local governance
Strategy
Non-Projects/Services:
Goal
Strategy A
Non-Projects/Services:
Strategy B
Non-Projects/Services:
160
Imposition of sanctions to non-complying contractors
Goal:
Strategy A
Non-Projects/Services:
Provision of incentives
Legislation:
Strategy B
Non-Project/Services:
Strategy C
Non-Project/Service
161
Strategy D
Non-Project/Service
Strategy E
Empower IP Community
Non-Project/Services
Legislation:
Adoption of ADSDPP
Goal
Strategy A
Non-Project
Project
162
Acquisition and installation of electronic NGAS/alternative
integrated accounting system
Strategy B
Non-project
Strategy C
Non-Project
Project
Legislation
Strategy D
Non-Project
Strategy E
Non-Project
Hiring of an IAS
Legislation
163
Creation of the IAS position and establishment of the office
Strategy F
Non-project
Project
Legislation
Strategy G
Non-Project
164
Legislation
Strategy H
Non-project
Project
Strategy I
Project
Strategy J
Project
Strategy K
Non-Project
Legislation
165
shall be equipped with personnel. According to RA 10121, the LDRRM Officer shall be
assisted by three (3) staffs responsible in the three (3) section of the Office namely:
Research and Planning Section; Administrative and Training and, Warnings and
Operations. These three sections comprises the overall services of the LDRRM Office.
Furthermore, these sections is vital to attain our ultimate goal which is to make our
community resilient as evidences by Zero Casualty and disaster-prepared community.
Currently, the LDRRMO is striving to deliver services despite of inadequate human
resources, equipment and facilities.
SUCCESS INDICATOR: FUNCTIONAL MDRRMO/OPCEN
Goal
Strategy A
Capacity building
Non-Projects
creation of emergency response team
Creation of executive order giving full incentives for the Emergency rescue
team/Search and rescue Team.
Strategy B
Ensure availability and efficiency of DRRM facilities
Non Projects
Projects
construction of Standard OPCEN/MDDRM OFFICE
procurement of rescue vehicles and heavy equipment
166
Upgrading of communication network and devices :
Legislation
Strategy C
Non projects
Goal
To establish complete and appropriate logistics
Strategy A
Non-project
Preparing and updating of the different plans such as the LDRRM Plan,
Contingency Plan, Local Climate Change and Action Plan (LCCAP),
Annual Investment Plan (AIP) and Evacuation Plan.
Legislation
creation of position for LDRRMO pursuant to standard
167
creation of position for the 3 regular staff responsible for (1)administration
and training (2)operation and warning (3)research and planning
Approval and Adaptation of the different plans Such as the LDRRM
Plan,Contigency Plan, Local Climate Change and Action
Plan(LCCAP),Annual Investment Plan(AIP) and Evacuation Plan.
Assign key position for Incident Command system ,Incident management
Team and RDANA Team through executive order
Establish Memorandums of agreement (MOA) between:
-Sari-sari stores
-Hospitals
-Pharmacies
-Volunteer groups
-Transportation groups
-Telecommunication companies
-Local construction companies
-Humanitarian organization
-Faith based organization
-Funeral parlors
Strategy B
Projects
Provision of DRRM and Admin personnel Training
- Provide Full course training in Incident Command system (ICS)
for the IMT
- Provide Full course training in Rapid Damage Assessment and
Needs Analysis (RDANA) and Post Damage Assessment and
Needs Analysis (PDANA) for the DANA Team
- Community based Monitoring system
- DRRMO competency building and development
- Alliance building
Conduct training on the following:
- Basic Orientation on CBDRRM at Barangay Level
- Hazard and risk Assessment
- Climate and weather forecast
- Early warning system and monitoring
- Infrastructure audit
168
- Risk communication
- Media management
- Training of Humanitarian personnel in Camp Management
Conduct Training of Security ,Lifeline and SRR Personnel like the ff:
- Flood /swift water search and rescue
- Basic life support9First-aid)
- Basic Sanitary Inspection and forensic Investigation in managing
dead
Strategy C
Equip with Hardware and supplies
Non-project
Establish directory of emergency hotlines in municipality(DRRM
Hotline,Rescue,PNP ,BFP,MHO)
Projects
The DRRMO procure the
- Procurement of Supplies (First Aid-kits, cadaver bags
etc),Equipment( Ambulance,dumptrucks,siren,megaphoneetc)
- Maintain stockpiles(Gasoline and
sxtrabatteries,Portablegenerator,solar powered
generator,Flashlights,Potablewater,Food packs,
Maintain standby relief goods packs,prepare community kitchen
supplies and equipments(MSWDO)
Purchase early warning equipment(rain gauge,water level
marker,windvane,centralizehotline,vehicles,telephone,ensure internet
connection,two-way Radio,GPS device and communication equipment
Establish Public weather bulletin boards area of conference and briefing
Strategy A
Capacity Building
Projects
Flood /swift water search and rescue
Basic life support and first aid
169
Non-Projects
Reorient baranagya DRRM C on their roles and responsibilities
conduct forum regarding DRRM issues
establish strong linkages with the barangay official
provide technical support
Strategy B
Non-Projects
Maintain clear instruction by instituting chain of command
Identify the key players in Disaster response operation and their roles and
responsibilities such as the Responsible Officer, Incident Management
team, Response cluster, RDANA Team etc
Projects
Construct standard or designate Emergency Operation Center(OPCEN)
Develop and disseminate a community/family guide for disaster
preparedness and response.
Legislation
Creation of executive order giving full incentives for the Emergency rescue
team/Search and Rescue Team.
Reorganizing the Local disaster Risk Reduction and management Council
through executive order as needed
Resolution adopting the Incident Command System
Organizing a Community of Disaster Volunteers in every Barangay sincere
Issue Local DRR communication protocol
170
SUCCESS INDICATOR: PRESENCE OF STANDARD STOCK ROOMS FOR
STOCKPILE
Goal
Project
171