Mell ProcedureNo,|MEIL/IREP/PROC/PHSST/SP/02
POWEE HOUSE SUPER STRUCTURE
01
‘OF SUFACE PREPARATION AND
PAINTING
‘Proje |GREENKO aPOT REP WAWVATELTD, POWER NOISE SUPER STRUCTURE, PRRAPURAW,
Gene [s/s GREE 7
fer Pendtock &heile [pints reel,
ad Ferrvkt Seno!
—> Nome dholl be veribreol.
IF it 1S fer Sofer Structure 3.Ne IQ Shel) be
REVIWED BY ‘APPROVED BY
PREPARED BY MEI MEL, ‘LENT
Name: G VENKATESH KA.PRAKASHL
‘sgn
bate: 19.01.2005 01203sampe
Respensibity
Reterence
Eaoment
foc preparation
Elen of pant
ethod
Fat coat and check method
Ropar of damage paint surface
Fish coat colour and clo coaing
Touch-up pant method statement
Seety
(Genera nots
ecepance tera
Dut nd responsbites ofthe panting
petar
seety measures
PagelBlasting and painting In-charge, concern production Engineer in the shift
and along with respective contractoiis responsible for this activity
5. Reference: Perdennel
180 8501
4-xouuenet:
oper hs above werkt flowing opment Miers ares se
to
Talos
2 Spycam
2 toe
Hopper
Aleter Comprar ofcapacy
tometer
Arai Ppa sch nd ly src wth an bras power Ess
Sanity pero ifern rating sal be wed
8. Sane
5. airCompressoretcapaciy S6@}7™D_ Gon mention He Sacre wot
10.Spay unfbrses Comporiben wth Fiore
inpains Cony 9 pprovee?”
eee we SEEM Decger)
5 SUREAGE PREPARATION:
Al Beaters ‘ecttachorerdt/opot ters Jae dt wiked ete dhol be
oeeceran enjoins me
4. Al other contninants ol grease lho! fe “er eegttye Cheon edifremo
‘incurs hb ced en/na oly Bang
Specimens appoprne dence adage ependingot se ee
Haieiing comet lc nl pressure Teblnngso shad be vente
She wi tnpten cleo born cae as hemline ree
nays 1013/4 om competion anger,
etl ssa eon anys Tan Sos
rym ase shal moet vepenvemert! ef SAD
6. rime sal pled wi anda 2h of rice
repaton
1. compres sl be ling ever ompresors
5
64A rose 80m dane ang ft oe i ped on
oomph sm ma
10, kere. ane borecadingnhetweun sone besting mc pining
1 Sng won prot wen emily bod 8%
{2atertsing nae mpc sk pr 0 8501 pecoson
1 Sind ort chal lon econ abe oe oreo
brehesbly blots suey pointing yore Gol be Lr from exch
rele jim rel point g yor from exch o
Csummboreawn 40 t6/9/ coe dition of foreign Parti foie
‘Selection faint system shal be as per Technica Speciation, 2/70 0/5 1f-2Ce
‘6.0 Quality check of paint: =
{6.1 Before opening the containers ofthe paintoperator shall confirm that
the Quality, Lat number/Batch number, Expiry Date ofthe paint in
42 Fant apentor sed AUPHEle conaines whether te pan
solidified stbottom,
Ce taamat sae hen cejct the paint contains and inform to
productcifupervisor and take the replacement.
2oMethod:-
LA Authorized siled painter is assigned for thls ask by al she respective
22. shin wise painting load and priority is given by production supervisor
based on tghtonthy shipping plan tothe contractor and same is passed on
to the pairs.
2A Airless spray painting machine is used for purpose and ensure surface
finish isprepery done.
24, Painer stall ensure thatthe machine iss ood working condition and
clean thachine thoroughly with the thinner before pouring ther pains
in the machine.
26AL vain shalipe carvied out under the following condition,
25d Attenperature <58C and humidity 85% and Ste temperature <3 #6
‘252. When theres pots of rainfall before the pan could dy
259, stelsurace is wet before painting
aan peeled
‘25.84 When copper slag or other foreign mters are deposited on the
surface to bepainted
en |
236
‘Spefmaknal aint basuel sualcoate saquleed ant we DFT
eguled-omteforrpercont
LE pointer cbes Bilt hove clkor hitroctims for
fupelmoke oP Poin ne oF fonts acl BET _
Hic sa
arhiledle Pele5
The paint container shall be opened just before use
1 thepalnc sto be thinned, the quality and amount of thinner shall
confiemto be instruetion provided by the paint manufacture in data
sheet
‘The thinner paint shall be consumed within the specified time.
Painter shall use agitator to mix paint and shall not adopt any other
reans foifuixing of paint
All ingredients inthe container of paint shall be thoroughly mixed
‘efor usd shall be agitated often enough dringappication to keep
the paii€Romogencous,
E ERE EEE
“The pine shal yg pes in a manner which ensures the breale:
upofall ump @eflee dispersion of pigment anda uniform
composition
Palnt operator shal carefully examine the plat aher misig for
‘uniformity andto venty tt uncmixed pigment remains on the bottom
E
> Seruur shall be gyen wo cont ofzng primer abe obtain gd
is [Ineloele PT ed! Pew Spprove
> Painter shel ppl fie paint as per required DET for Te fist coat for
anelotpn one side. yet film PeicknessWFT)
Painter shall check the WESDFT of the pain whether it 73. meee
‘omimdospeciied/required vale ofthe particle jb.
Ie chs WRUOIT is found lens than the required vale alight cost
wilbppplied and again the painter wil eck the WETADFT of
the paint- Once, DET s found meeting the required valug the
pees turned to thother side after drying.
‘After completing the frst coat on elther sles painter will wait il the
proper Crng takes place as per paint specication ata sheet before
Spnlvingthe second coat.
Once the frst cot is completely dried as per specification time
Interval the painter shall check the BABE DFT with the elacometer
along with QGif, found satstactory the piece wil be released for
naan xwwFT- tet Lilo Hictknesp
path PET bry plm AOcckned
Jebclele sreteAfter each cots completed and the curing time is vey painter
‘nee tne tht proper coatings apie wth the requted
DPC paasagsmetes
‘After each coat the job wil be offered to internal QC for check
Based onrandom inspection of QC the jab will be released for
furtter process
Pain: shall log all the work done and the no of jabs painted in his
Jog sheet andsubmit tothe production supervisor for his review
otivbles
‘After completion of ete pant sais and curing noes painter
shall requesihe paint QC enginerfr Inspection.
Before leaving the work place painter shall ensure thatthe machine
1s thoroughly cleaned and free from all paints, this has tobe done to
svi ying opis in oft ie.
[At atte endgwork place shal be clean! fom al dust, dry paint
and rap, ‘fom
9. REPAIR OF DAMAGE PAINT SUREACE:
> Quickly remove the Primer fom damaged area by sat re paper and Mechanics)
Sereppngto expose the white meta
> Pains application a pr teckeieal specication
10,pocuMENTATION,
> Reals of measurement of temperatures, lative humidity, surface Profile, Film
‘Thickness, adhesion ests with signature of appropiateauthority.
> Typeoftesingeauiments and calibra,
Coles bate numbers of pln material sed.
stages of inspection as follows:
4. Surface Preparation
2 Primer aplication
{3.Each Coat Paint 7
> D.F* shall be checked and record ater application ofeach coat and extra coat of pat.
> Should be applied t make up the BF.T speed without ny extra costo owner.
Fy WET Shall be veritieel e0 rorelom bodis
SDPETS WET Shell BE "Sore bo CoAuctt ron wi theveo
Fish cnt a olour coding shal beac per eck spectieaton C2 PPro ved]
Docent
Feu sg nhl ay pang operation
Seva Ae ect hal yantler eperare nd dst tenperre
bare rout peinigande vey nro! ol
‘he puntan topcase ase eile han hel
treater ne ve 3a ee Pol enpeae
Panta alt cape en
Prctnaitoce adopter spond retin.
Sander powell beta pean an sta esing
Panay eet corte ee es
Tuthapsenl be oe Oe a tlreaping bee cet any aap
Damagakurface.to.bg roughened to remove loose coats and comer should be
FenhretwS perrcuorqune preparation ornate
Tout mera besa compe wt hop adeant
Tact sho lo emma omen,
Aneta salle seed
Wiican ale cepeceaot hee preprordreving nd cha
retain
13. SAEED,
Safety Precision salle flowed during the entre operation,
4 GenoralNates:
1. Base and Fardener pins shal be mite with correct aio and mixing shallbe done by
chan means.
Prime pats stl be applied in a.covered shade to avo fling and sticking dusting
partials on wet paint surface. During paoting aplication ferrules surface shal be covered
From strong ow Ai tiw any ary out ner paral ot pane mare which may
‘causes uneven and defective pint surface.
‘Av east 20 mm rom circumferential eg fel pints hale not coated wit coal tar
epoxy in workshop. However, blasting and primer coat sal b applied That portion shall
be coatedafter welding and NDT of edits.
(nly Mansacturers recomended thinner shal be wed for adjustment paint mature
density, required
For asutfice in vier and ial coating pnts sale rom same manufacture for
beter performance of pit.
Pawel?° Mechenite!
1 sri Papa surface wl biased Comparators rfl au).
XAcceptonce Mera 1S or ferAppreved obewwingt
16 Duties and esponsibility ofthe painting operator.- Ze/n.%¢9/p
Inspection of normal mechanical function ofthe ir less machine
Checking the air hoses and paint hoses for any leaks and damages.
Adjust thea pressur a required and ensure the flow conta
Ensure optimum paints been uned nd loss wastage occurs.
Daily checdng and cleaning of al equipment prior putin use.
Proper misng ofthe pain and ensuring noel over on the oo.
Maintain the machine in good working condition along withthe area he
working.
12, Safety measure: =
412.L1.Use of ear plug, helmet, safety shoes, goggles, mask and hand
loves ls compulsory.
17.12 Use of mouth mask is compulsory while palnting,
12.13 Do not stand below the job while handling withthe crane,
412.14 Check and ensure the capacity of job and crane.
4128 Do not permit the worl is ike cutting, welding and grinding
nearby painting
126 Check and ensure the waste paint must be disposed lift the
‘material
2.2 Check and ensure the waste palnt must be disposed off on regular