personal time is required, such as conferences, joint venture activities, etc.? diem+Reimb
55 What type of bond guarantees payment on all obligations arising from the Payment bond
contract?
56 What type of compensation is applied to most of Gov't projects and entails Lump sum
more paper works and is advantageous to both client and architect.
57 Professional Fee for the Project Manager. 2-5%
58 If the Project Manager is hired by the owner, who shall have the Project manager
responsibility of hiring the Construction Manager?
59 True or false, based on the Civil Code, the Project Manager has no legal True
responsibility insofar as design and construction is concerned.
60 His primary responsibility is the exercise of overall cost control which relieves Project manager
the owner of many of the anxieties that usually beset, particularly those
concerned with forecasting cost and completion dates.
61 In the architect's code of ethics, to whom does the architect has Public
responsibility to seek opportunities for constructive service in civic and urban
affairs?
62 What PD created the PRC which regulates the practice of various PD 223
professionals.
63 Architect XYZ uses paid advertisements without sanction by professional People
consensus and years of experience. His action is unethical with respect to
his relation to whom?
64 Additional information on contract documents issued to bidders before date Bid Bulletin
of bidding.
65 The offer of a bidder to perform the work described by the contract Proposal
documents when made out and submitted on the prescribed proposal form,
properly signed and sealed.
66 The cashier's check or surety bond accompanying the proposal submitted by Proposal bond
the bidder, as a guarantee that the bidder will enter into a contract with the
owner for the construction of the work, if the contract is awarded to him.
67 Instructions which may be issued prior to the bidding to supplement and/or Special
modify drawings, specifications, and/or general conditions of the contract. provisions
68 Written or printed description of work to be done describing qualities of Specifications
material and mode of construction.
69 Means information, advice or notification pertinent to the project delivered in Written notice
person or sent by registered mail to the individual, firm or corporation at the
last known business address of such individual, firm or corporation.
70 Includes labor or materials or both as equipment, transportation, or other Work
architect that materials and equipment left by the contractor which do not
belong to him can be used and rent of such shall be borne by the failing
contractor.
89 True or false, in case of suspension of work, all unpaid work executed True
including expenses incurred during suspension shall be evaluated by the
architect and charged to the owner.
90 True or false, the owner has no right to claim liquidated damages if he takes False
over the work from the contractor for failure to complete the project.
91 How many days prior to canceling an insurance be given to the owner 10 days
stipulating the intention to cancel?
92 How many percent of the contract amount is the Performance Bond? 15%
93 How many percent of the contract amount is the Payment Bond? 15%
94 A contract provision setting forth the damages a party must pay in the event Penalty clause
of his breach.
95 Basic Fee for Physical Planning Type 1 or site such as industrial estates, 5,000 for first 50
commercial centers, sports complex, resorts, etc. hectares
96 Predecessor of PD 1096 R.A. 6451
97 What presidential decree institutionalized the profession of environmental PD 1308
planning?
98 It is a right enforceable against specific property to secure payment of an Liens
obligation.
99 Minimum basic fee for simple projects. 6%
100 Minimum basic fee for alterations/renovations. 50%