Maro River

SP M.1
A = 28876 ha
Q = 29.41 m3/s
L = 619 m

Sermayam New (2)


Erom 2 Erom 1 Sermayam 2 Sermayam 1 Sermayam New(1) SP M.8
Jagebob 8 SP M.2 SP M.3 SP M.4 SP M.5 SP M.6 SP M.7 380 ha 0.26 m3/s
321 ha 0.44 m /s 3
1303 ha 3
1.73 m /s 2186 ha 3
2.98 m /s 1791 ha 3
2.43 m /s 1007 ha 3
0.69 m /s A = 17132 ha
A = 25590 ha A = 24740 ha A = 23419 ha A = 22116 ha A = 19930 ha A = 18139 ha
1044 ha 0.88 m3/s Q = 17.45 m3/s
Q = 27.56 m3/s Q = 25.72 m3/s Q = 25.27 m3/s Q = 23.55 m3/s Q = 20.57 m3/s Q = 18.14 m3/s L = 2849 m
BM-1 L = 6273 m BM-2 L = 4931 m BM.3 L = 2891 m BM.4 L = 9.229 m BM.5 L = 5202 m BM.6 L = 7413 m BM.7 BM-8

SP M.9
A = 16752 ha
Q = 17.18 m3/s
Jagebob 9 BM.9 L = 3253 m
Kamnosari Agrindo
1144 ha 0.95 m3/s Mimi Baru Sermayam New (3)
962 ha 0.92 m3/s 888 ha 0.92 m3/s
1557 ha 53 l/s 1033 ha 0.71 m3/s

SP M.10
A = 15720 ha
Q = 16.47 m3/s
L = 4313 m
BM.10
Tanah Miring 8 Tanah Miring 7
1276 ha 1.70 m3/s 851 ha 1.14 m3/s

SP M.11
A = 13593 ha
Q = 13.63 m3/s
L = 2665 m
BM.11
Tanah Miring 5 Tanah Miring 4
859 ha 1.12 m3/s 1017 ha 1.33 m3/s

SP M.12
A = 11718 ha
Q = 11.18 m3/s
L = 1891 m
Tanah Miring 2
BM.12
1416 ha 1.87 m3/s

Semangga New Tanah Miring New Tanah Miring 3


6042 ha 4.17 m3/s 857 ha 0.59m3/s SP M.13 1107 ha 1.45 m3/s
A = 9195 ha
BM.16 BM.15 BM.14 BM.13 Q = 7.87 m3/s
L = 3413 m

SP M.16 SP M.15 SP M.14


A = 1359 ha A = 4836 ha A = 8338 ha
Q = 1.88 m3/s Q = 5.56 m3/s Q = 7.28 m3/s
Serapu L = 8027 m L = 5872 m Semangga 2 L = 8338 m

1359 ha 1.88 m3/s Kuprik Sidomulyo Semangga 1 2296 ha 3.11m3/s


3 3
2249 ha 2.07 m /s 1229 ha 1.61 m /s

Province
DIRECTORATE OF IRRIGATION AND LOWLAND Papua
DIRECTORATE GENERAL OF WATER RESOURCES
Legend MINISTRY OF PUBLIC WORKS AND HOUSING Consultancy Services f or : Project
Preparation Consultant (PPC) Firm f or
Development of the Merauke Irrigation
System in Papua, Indonesia Phase-I
Free Intake Primary Canal Schematic Diagram of Maro Irigation System
District

Secondary Canal Drafter Dini Oktriani


Merauke
Division Structure M
A = Name of Tertiary MOTT
M Euroconsult Mott MacDonald
by and associates
Design Eng. David J. Meigh
Sheet Number

(xx / xxx)
A MACDONALD
B = Net Area (Ha) Team Leader Wicher Boissevain
B C Register Number
C = Design Discharge (l/s) Koordinator Parlinggoman (x - xx - xx - xx)
Off-take Structure Ketua/ Ang. 1 Pathurachman Date Contract Number

Phases II (PMI) Anggota 2 Andi Wildaniah

Checked by Anggota 3 Josias Carean


Direksi
Division Structure with Disclaimer : Anggota 4 Paulus Thoban (dd/mm/yy) (xxxx)
Off-take This document is issued for the party which commissioned it and for specific purpose connected with the captioned project Anggota 5 Mezaac Ellias Tomasila
only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the
consequences of this document being relied upon by any other party, or being used for any other purpose, or containing Anggota 6 Rahmad Dwiputra