Professional Documents
Culture Documents
Skema Jaringan Maro
Skema Jaringan Maro
SP M.1
A = 28876 ha
Q = 29.41 m3/s
L = 619 m
SP M.9
A = 16752 ha
Q = 17.18 m3/s
Jagebob 9 BM.9 L = 3253 m
Kamnosari Agrindo
1144 ha 0.95 m3/s Mimi Baru Sermayam New (3)
962 ha 0.92 m3/s 888 ha 0.92 m3/s
1557 ha 53 l/s 1033 ha 0.71 m3/s
SP M.10
A = 15720 ha
Q = 16.47 m3/s
L = 4313 m
BM.10
Tanah Miring 8 Tanah Miring 7
1276 ha 1.70 m3/s 851 ha 1.14 m3/s
SP M.11
A = 13593 ha
Q = 13.63 m3/s
L = 2665 m
BM.11
Tanah Miring 5 Tanah Miring 4
859 ha 1.12 m3/s 1017 ha 1.33 m3/s
SP M.12
A = 11718 ha
Q = 11.18 m3/s
L = 1891 m
Tanah Miring 2
BM.12
1416 ha 1.87 m3/s
Province
DIRECTORATE OF IRRIGATION AND LOWLAND Papua
DIRECTORATE GENERAL OF WATER RESOURCES
Legend MINISTRY OF PUBLIC WORKS AND HOUSING Consultancy Services f or : Project
Preparation Consultant (PPC) Firm f or
Development of the Merauke Irrigation
System in Papua, Indonesia Phase-I
Free Intake Primary Canal Schematic Diagram of Maro Irigation System
District
(xx / xxx)
A MACDONALD
B = Net Area (Ha) Team Leader Wicher Boissevain
B C Register Number
C = Design Discharge (l/s) Koordinator Parlinggoman (x - xx - xx - xx)
Off-take Structure Ketua/ Ang. 1 Pathurachman Date Contract Number