NOTES

1. FOR GENERAL NOTES SEE DRAWING:


RIG18-005-150-S-001.
2. WHERE FOUNDATIONS ARE CONSTRUCTED
ON ROCK, 200mm COMPACTED CRUSHED
Z AGGREGATE MAY BE OMITTED SUBJECTED
TO COMPANY APPROVAL.

D E F G H I J
POINT NORTHING EASTING
35300

5400 5400 5900 6200 6200 6200 A1 4085681.9699 354669.5621

300mm THICK 1
A7 4085716.6073 354676.3695

450
WALL
C1 C4 C4
S-505

1
C1 B7 4085715.5659 354681.6681
100

750
1- 1-
--- ---
600
S-504 S-504 1
S-505
B4 4085699.1794 354678.4476
400mm THICK WALL
7000

300mmTHICK 750
WALL STRUCTURAL F4 4085696.4757 354692.2045
COLUMN

300
C5 F1 4085678.2249 354688.6176

2500
3
C2 C2 C1

300
2 2
S-501 S-501

450 2500
HOLDS
20220

7020

1. HOLD FOR DRAINAGE DETAILS.


1
1 650
300mm THICK
1
S-502
1- S-504 S-501

1000
---
S-505 WALL
300mm THICK
350

C3 C3 C4 C6
WALL 450
5
C1
100

C2 C2
250
3366

2 2
850

1-
750 ---
S-505 1
S-504 S-504

1
1- 1- 1
6200

S-504 S-502
---
S-504 ---
S-504
1-
1500 3 3
S-501

---
S-504 S-501 S-501

450

850
500
910

1500
6
C3 C3 C4 C4 C4 C4 C1

350
300mm THICK
1- 1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
WALL
---
S-504
HOLD1 0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
B ISSUED FOR BID 30-JUN-22 SH MP JW

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


1 A ISSUED1 FOR 30% REVIEW
Revision 18-FEB-22
Date 1 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT

RVF DRAWING NUMBER:

RIG-018-005-150- S-101
DRAWING TITLE

Kitchen/Diner
Basment Foundation Plan
PROJECT NAME

BASEMENT FOUNDATION-PLAN B Ops Camp Kitchen/Diner


PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 JO 1189
DRAWN BY: DATE:

S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 100
D E F G H I J

5400 5400 5900 6200 6200 6200

OPEN AREA
4062

1121
4020

2
L=18520mm #12mm @200mm C-C
2980

STRAIGHT AT TOP & BOTTOM

3
1620

4
20220

L=20140mm #12mm @200mm C-C


5400

STRAIGHT AT TOP & BOTTOM

L=6520mm #12 @200mm C-C


STRAIGHT AT TOP & BOTTOM
L=35220mm#12mm @200mm C-C
6200

STRAIGHT AT TOP & BOTTOM

6
1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
B ISSUED FOR BID 30-JUN-22 SH MP JW

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


A ISSUED FOR 30% REVIEW 18-FEB-22 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT

RVF DRAWING NUMBER:

RIG-018-005-150- S-106
Basement Slab
1 DRAWING TITLE
1 : 100
Kitchen/Diner
Slab Plan-1
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 JO 1189
DRAWN BY: DATE:

S. HOSHYAR 11/16/22
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 100
5
--

700
J
--

STRUCTURAL COLUMN

VARIES

STARTER BARS
450 CONCRETE WALL

PROJECTION
#25mm 350 #16mm @300mm C-C

1550

STARTER
VARIES

BARS
9 #20mm WATER STOP

850
16 #20mm @BOTTOM 16 #12mm @TOP TOP AND BOTTOM
BOTH WAYS BOTH WAYS #12mm @200mm C-C
T.O.C. Foundation T.O.C. Foundation
-4.380 m
1401.82 -4.380 m
1401.82
500

500
Base Of Footing Base Of Footing
-4.880 m
1401.32 -4.880 m
1401.32
50mm LEAN CONCRETE
100 1500 100
100 2500 100 50mm LEAN CONCRETE

Section 1-Footing Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL BASEMENT COLUMN FOOTINGS Section 2-Footing Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL
1 2
1 : 20 FOR FOOTING SIZES SEE FOUNDATION PLAN S-101 1 : 20 1.5m WIDE STRIP FOOTINGS SEE DRAWING S-101
FOR PLAN DIMENSIONS

H
--
1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
= = B ISSUED FOR BID 30-JUN-22 SH MP JW
4 #20mm

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


A ISSUED FOR 30% REVIEW 18-FEB-22 SH JW MP
T.O. Beam TOP AND BOTTOM 600 #12mm @200mm C-C Rev. Purpose of Revision Date Drawn Checked Approved

-0.130 m CLIENT
T.O.C. Foundation
-4.380 m
1401.82

500
Base Of Footing RVF DRAWING NUMBER:

-4.880 m
1401.32 RIG-018-005-150- S-501
50mm LEAN CONCRETE 100 600 100 DRAWING TITLE

Kitchen/Diner
Footing Details
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 JO 1189
DRAWN BY: DATE:
NOTE: REINFORCEMENT IS TYPICAL FOR ALL KITCHEN AREA COLUMN FOOTINGS
Section 4-Footing Detail Section 3- Footing Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL
4 3 S. HOSHYAR 21-11-2022
1 : 20 FOR FOOTING SIZES SEE FOUNDATION PLAN S-102 1 : 20 0.6 WIDE STRIP FOOTINGS REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
HOLD1

600 700
5
--

VARIES

700
600
16 #25mm 16 #25mm

PROJECTION
STARER BAR

Detail-C1 Detail-C2
1500

2 3-
FLOOR BEAM(TYP)
T.O. Beam
-0.130 m
1406.07
VARIES

600
800
@100mm C-C

600

800
750

HOLDS
18 #20mm
18 #25mm 1. SUSPENDED FLOOR DETAILS.

Detail-C3 Detail-C4
4 5
@120mm C-C
VARIES

- -
S-502 S-502
#20mm:1050mm
#25mm:1550mm
STARTER BARS

800 1250
@100mm C-C
750

1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW

600

600
0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
B ISSUED FOR BID 30-JUN-22 SH MP JW

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


T.O.C. Foundation 1 A ISSUED1 FOR 30% REVIEW
Revision 18-FEB-22
Date 1 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
-4.380 m
1401.82
CLIENT
500

20 #25mm 22 #25mm
Base Of Footing
-4.880 m
1401.32
RVF DRAWING NUMBER:

50mm LEAN CONCRETE Detail-C5 Detail-C6


FOOTING-SEE 6 7 RIG-018-005-150- S-502
WATER STOP AT ALL DRAWING S-501 DRAWING TITLE

EXTERIOR COLUMNS FOR DETAILS Kitchen/Diner


Column Details-1
ALL STIRRUPS AND TIES ARE #10mm PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
Section 2-Column Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL COLUMNS
1 RIG-018-005-150 JO 1189
1 : 20 FOR COLUMN SIZES SEE COLUMN DETAILS DRAWN BY: DATE:

S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
J

STARTER BARS
PROJECTION
5
--

1500
HOLD1
HOLD1
300 150
700
400

DOWL TO 400mm WALL


T.O. Beam T.O. Beam
-0.130 m
1406.07 -0.130 m
158

158

STARTER BARS
#12 @200mm C-C 700

1000
#12mm @200mm C-C

100

100

#12mm
@250mm C-C #12mm @250mm C-C
HOLDS
#16mm @300mm C-C #16mm @300mm C-C 1. SUSPENDED SLAB CONNECTION DETAILS.
2. VAPOUR BARRIER AND INSULATION
MATERIAL SPECS.

4250

4250
TIES ON ALTERNATE
TIES ON ALTERNATE HORIZONTAL BARS (TYP.)
HORIZONTAL BARS (TYP.) #10mm @300mm C-C
#10mm @300mm C-C

130mm FINISHING WATERPROOF AND 130mm FINISHING WATERPROOF AND


2 LAYERS BRC #10mm @200mm C-C INSULATION INSULATION
2 LAYERS BRC #10mm @200mm C-C 12mm
(WELDED WIRE MESH 350 (WELDED WIRE MESH 450
ISOLATION
REINFORCEMENT) BY OTHERS 12mm ISOLATION JOINT REINFORCEMENT) BY OTHERS
450 JOINT

200mm CONCRETE SLAB 200mm CONCRETE SLAB

PROJECTION
T.O.C. T.O.C.

STARTER
VAPOUR BARRIER VAPOUR BARRIER

BARS
-3.760 m
1402.44 -3.760 m
1402.44
STARTER

HOLD2
850

850
BARS

HOLD2
100mm INSULATION 100mm INSULATION
T.O.C. Foundation T.O.C. Foundation
MIN. 200mm MIN. 200mm 1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
-4.380 m
1401.82 -4.380 m
1401.82 0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
COMPACTED 25mm COMPACTED 25mm B ISSUED FOR BID 30-JUN-22 SH MP JW

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


500

500
CRUSHED AGGREGATE WATER STOP CRUSHED AGGREGATE WATER STOP 1 A ISSUED1 FOR 30% REVIEW
Revision 18-FEB-22
Date 1 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
Base Of Footing Base Of Footing CLIENT
-4.880 m
1401.32 -4.880 m
1401.32
50mm LEAN CONCRETE FOR FOOTING DETAILS FOR FOOTING DETAILS
SEE DRAWING S-501 SEE DRAWING S-501
50mm LEAN CONCRETE
RVF DRAWING NUMBER:

RIG-018-005-150- S-504
Section 1-Wall Detail Section 2-Wall Detail DRAWING TITLE
1 2
1 : 20 1 : 20 Kitchen/Diner
Wall Details-1
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 JO 1189
DRAWN BY: DATE:

S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
1
--

300

STARTER BARS
PROJECTION
1500
HOLD1

T.O. Beam
-0.130 m
158

700
#12 @200mm C-C

HOLDS
1. SUSPENDED SLAB CONNECTION DETAILS.
2. VAPOUR BARRIER AND INSULATION
#12mm @250mm C-C MATERIAL SPECS.

#16mm @300mm C-C


4250

TIES ON ALTERNATE
HORIZONTAL BARS (TYP.)
#10mm @300mm C-C
130mm FINISHING WATERPROOF AND
2 LAYERS BRC #10mm @200mm C-C INSULATION
12mm 450
(WELDED WIRE MESH
ISOLATION
REINFORCEMENT) BY OTHERS 350
JOINT
200mm CONCRETE SLAB
T.O.C.
1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
HOLD2 VAPOUR BARRIER -3.760 m
1402.44
STARTER

0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW


850

BARS

B ISSUED FOR BID 30-JUN-22 SH MP JW

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


1 A ISSUED1 FOR 30% REVIEW
Revision 18-FEB-22
Date 1 SH JW MP
100mm INSULATION Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT
MIN. 200mm T.O.C. Foundation
COMPACTED 25mm -4.380 m
1401.82
CRUSHED AGGREGATE
500

WATER STOP
Base Of Footing RVF DRAWING NUMBER:
-4.880 m
1401.32
RIG-018-005-150- S-505
FOR FOOTING DETAILS DRAWING TITLE

50mm LEAN CONCRETE SEE DRAWING S-501 Kitchen/Diner


Wall Details-2
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
Section 3-Wall Detail
1 RIG-018-005-150 JO 1189
1 : 20
DRAWN BY: DATE:

S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
6 5

STRUCTURAL COLUMN

54 #10mm @100mm C-C 4 #25mm @TOP


T.O. Beam
-0.130 m

B.O.Beam
-0.780 m
3 #20mm @BOTTOM

STRUCTURAL COLUMN

Section 1-Beam Detail


1
1 : 20

6 5

STRUCTURAL COLUMN

54 #10mm @100mm C-C -


4 #25mm @TOP
---

T.O. Beam
-0.130 m

B.O.Beam
-0.780 m 1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
-
---
3 #20mm @BOTTOM 0
B
ISSUED FOR CONSTRUCTION
ISSUED FOR BID
05-10-22
30-JUN-22
SH
SH
DR
MP
JW
JW

Y:\Civils\Shared\01 - Drawings\RIG18-005 B Ops Camp\RIG18-005-250 - LAUNDRY\CADD current


A ISSUED FOR 30% REVIEW 18-FEB-22 SH JW MP
5300 Rev. Purpose of Revision Date Drawn Checked Approved
CLIENT
STRUCTURAL COLUMN

RVF DRAWING NUMBER:

Section 2-Beam Detail


2 RIG-018-005-150- S-506
1 : 20
DRAWING TITLE

Kitchen/Diner
Beam Detail-1
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:

RIG-018-005-150 JO 1189
DRAWN BY: DATE:

S. HOSHYAR 11/16/22
REVIEWED BY: APPROVED BY:

M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20