Professional Documents
Culture Documents
Kitchen-Dinner Building
Kitchen-Dinner Building
D E F G H I J
POINT NORTHING EASTING
35300
300mm THICK 1
A7 4085716.6073 354676.3695
450
WALL
C1 C4 C4
S-505
1
C1 B7 4085715.5659 354681.6681
100
750
1- 1-
--- ---
600
S-504 S-504 1
S-505
B4 4085699.1794 354678.4476
400mm THICK WALL
7000
300mmTHICK 750
WALL STRUCTURAL F4 4085696.4757 354692.2045
COLUMN
300
C5 F1 4085678.2249 354688.6176
2500
3
C2 C2 C1
300
2 2
S-501 S-501
450 2500
HOLDS
20220
7020
1000
---
S-505 WALL
300mm THICK
350
C3 C3 C4 C6
WALL 450
5
C1
100
C2 C2
250
3366
2 2
850
1-
750 ---
S-505 1
S-504 S-504
1
1- 1- 1
6200
S-504 S-502
---
S-504 ---
S-504
1-
1500 3 3
S-501
---
S-504 S-501 S-501
450
850
500
910
1500
6
C3 C3 C4 C4 C4 C4 C1
350
300mm THICK
1- 1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
WALL
---
S-504
HOLD1 0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
B ISSUED FOR BID 30-JUN-22 SH MP JW
RIG-018-005-150- S-101
DRAWING TITLE
Kitchen/Diner
Basment Foundation Plan
PROJECT NAME
RIG-018-005-150 JO 1189
DRAWN BY: DATE:
S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 100
D E F G H I J
OPEN AREA
4062
1121
4020
2
L=18520mm #12mm @200mm C-C
2980
3
1620
4
20220
6
1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
B ISSUED FOR BID 30-JUN-22 SH MP JW
RIG-018-005-150- S-106
Basement Slab
1 DRAWING TITLE
1 : 100
Kitchen/Diner
Slab Plan-1
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
RIG-018-005-150 JO 1189
DRAWN BY: DATE:
S. HOSHYAR 11/16/22
REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 100
5
--
700
J
--
STRUCTURAL COLUMN
VARIES
STARTER BARS
450 CONCRETE WALL
PROJECTION
#25mm 350 #16mm @300mm C-C
1550
STARTER
VARIES
BARS
9 #20mm WATER STOP
850
16 #20mm @BOTTOM 16 #12mm @TOP TOP AND BOTTOM
BOTH WAYS BOTH WAYS #12mm @200mm C-C
T.O.C. Foundation T.O.C. Foundation
-4.380 m
1401.82 -4.380 m
1401.82
500
500
Base Of Footing Base Of Footing
-4.880 m
1401.32 -4.880 m
1401.32
50mm LEAN CONCRETE
100 1500 100
100 2500 100 50mm LEAN CONCRETE
Section 1-Footing Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL BASEMENT COLUMN FOOTINGS Section 2-Footing Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL
1 2
1 : 20 FOR FOOTING SIZES SEE FOUNDATION PLAN S-101 1 : 20 1.5m WIDE STRIP FOOTINGS SEE DRAWING S-101
FOR PLAN DIMENSIONS
H
--
1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
= = B ISSUED FOR BID 30-JUN-22 SH MP JW
4 #20mm
-0.130 m CLIENT
T.O.C. Foundation
-4.380 m
1401.82
500
Base Of Footing RVF DRAWING NUMBER:
-4.880 m
1401.32 RIG-018-005-150- S-501
50mm LEAN CONCRETE 100 600 100 DRAWING TITLE
Kitchen/Diner
Footing Details
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
RIG-018-005-150 JO 1189
DRAWN BY: DATE:
NOTE: REINFORCEMENT IS TYPICAL FOR ALL KITCHEN AREA COLUMN FOOTINGS
Section 4-Footing Detail Section 3- Footing Detail NOTE: REINFORCEMENT IS TYPICAL FOR ALL
4 3 S. HOSHYAR 21-11-2022
1 : 20 FOR FOOTING SIZES SEE FOUNDATION PLAN S-102 1 : 20 0.6 WIDE STRIP FOOTINGS REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
HOLD1
600 700
5
--
VARIES
700
600
16 #25mm 16 #25mm
PROJECTION
STARER BAR
Detail-C1 Detail-C2
1500
2 3-
FLOOR BEAM(TYP)
T.O. Beam
-0.130 m
1406.07
VARIES
600
800
@100mm C-C
600
800
750
HOLDS
18 #20mm
18 #25mm 1. SUSPENDED FLOOR DETAILS.
Detail-C3 Detail-C4
4 5
@120mm C-C
VARIES
- -
S-502 S-502
#20mm:1050mm
#25mm:1550mm
STARTER BARS
800 1250
@100mm C-C
750
600
600
0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
B ISSUED FOR BID 30-JUN-22 SH MP JW
20 #25mm 22 #25mm
Base Of Footing
-4.880 m
1401.32
RVF DRAWING NUMBER:
S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
J
STARTER BARS
PROJECTION
5
--
1500
HOLD1
HOLD1
300 150
700
400
158
STARTER BARS
#12 @200mm C-C 700
1000
#12mm @200mm C-C
100
100
#12mm
@250mm C-C #12mm @250mm C-C
HOLDS
#16mm @300mm C-C #16mm @300mm C-C 1. SUSPENDED SLAB CONNECTION DETAILS.
2. VAPOUR BARRIER AND INSULATION
MATERIAL SPECS.
4250
4250
TIES ON ALTERNATE
TIES ON ALTERNATE HORIZONTAL BARS (TYP.)
HORIZONTAL BARS (TYP.) #10mm @300mm C-C
#10mm @300mm C-C
PROJECTION
T.O.C. T.O.C.
STARTER
VAPOUR BARRIER VAPOUR BARRIER
BARS
-3.760 m
1402.44 -3.760 m
1402.44
STARTER
HOLD2
850
850
BARS
HOLD2
100mm INSULATION 100mm INSULATION
T.O.C. Foundation T.O.C. Foundation
MIN. 200mm MIN. 200mm 1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
-4.380 m
1401.82 -4.380 m
1401.82 0 ISSUED FOR CONSTRUCTION 05-10-22 SH DR JW
COMPACTED 25mm COMPACTED 25mm B ISSUED FOR BID 30-JUN-22 SH MP JW
500
CRUSHED AGGREGATE WATER STOP CRUSHED AGGREGATE WATER STOP 1 A ISSUED1 FOR 30% REVIEW
Revision 18-FEB-22
Date 1 SH JW MP
Rev. Purpose of Revision Date Drawn Checked Approved
Base Of Footing Base Of Footing CLIENT
-4.880 m
1401.32 -4.880 m
1401.32
50mm LEAN CONCRETE FOR FOOTING DETAILS FOR FOOTING DETAILS
SEE DRAWING S-501 SEE DRAWING S-501
50mm LEAN CONCRETE
RVF DRAWING NUMBER:
RIG-018-005-150- S-504
Section 1-Wall Detail Section 2-Wall Detail DRAWING TITLE
1 2
1 : 20 1 : 20 Kitchen/Diner
Wall Details-1
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
RIG-018-005-150 JO 1189
DRAWN BY: DATE:
S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
1
--
300
STARTER BARS
PROJECTION
1500
HOLD1
T.O. Beam
-0.130 m
158
700
#12 @200mm C-C
HOLDS
1. SUSPENDED SLAB CONNECTION DETAILS.
2. VAPOUR BARRIER AND INSULATION
#12mm @250mm C-C MATERIAL SPECS.
TIES ON ALTERNATE
HORIZONTAL BARS (TYP.)
#10mm @300mm C-C
130mm FINISHING WATERPROOF AND
2 LAYERS BRC #10mm @200mm C-C INSULATION
12mm 450
(WELDED WIRE MESH
ISOLATION
REINFORCEMENT) BY OTHERS 350
JOINT
200mm CONCRETE SLAB
T.O.C.
1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
HOLD2 VAPOUR BARRIER -3.760 m
1402.44
STARTER
BARS
WATER STOP
Base Of Footing RVF DRAWING NUMBER:
-4.880 m
1401.32
RIG-018-005-150- S-505
FOR FOOTING DETAILS DRAWING TITLE
S. HOSHYAR 21-11-2022
REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20
6 5
STRUCTURAL COLUMN
B.O.Beam
-0.780 m
3 #20mm @BOTTOM
STRUCTURAL COLUMN
6 5
STRUCTURAL COLUMN
T.O. Beam
-0.130 m
B.O.Beam
-0.780 m 1 ISSUED FOR CONSTRUCTION 21-11-22 SH MP JW
-
---
3 #20mm @BOTTOM 0
B
ISSUED FOR CONSTRUCTION
ISSUED FOR BID
05-10-22
30-JUN-22
SH
SH
DR
MP
JW
JW
Kitchen/Diner
Beam Detail-1
PROJECT NAME
B Ops Camp Kitchen/Diner
PROJECT NUMBER: CONTRACT NUMBER:
RIG-018-005-150 JO 1189
DRAWN BY: DATE:
S. HOSHYAR 11/16/22
REVIEWED BY: APPROVED BY:
M. PARKER J. WATSON
HKN DRAWING NUMBER: REVISION: AFE CODE NUMBER:
1 SAR227
SCALE:
1 : 20