(FOR CIVIL DEFENSE USE)

2 0
C1 @C08-MPS-S-CAH-B-AR-AL-AZ-1403
590
Copyright by the Supreme Committee for Delivery & Legacy (SC). All rights reserved. This document may not,
in whole or in part, be reproduced, stored, transmitted or distributed in any form or by any means, whether
electronic, mechanical, by photocopy, recording or otherwise, without the prior written permission of SC.
Except where otherwise expressly agreed in writing by SC, SC shall have no responsibility or liability for any
loss (direct, consequential or otherwise) which may arise from reliance on or use of this document or the
information contained therein.

DO NOT SCALE THIS DRAWING.


3 00
59 Key Plan:
1 2 3 4 5 6 7 8 9 10 11 12 40 41 42
55 54 53 52 13 14 15 16 17 18 19 20 43 44
56 57 51 21 22 23 24 25 26 27 28 65
58 50 49 29 30 31 32 33 34

N
4 CONTROL ROOM 59 48 35 36 37 38
00 45
59 PT-110 Mecca
60 47 46 39 64
62.0 m²
FFL +10.85 61 62 63

General Notes
FFL +7.85
IFC DOOR ELEVATION REFERENCE NO. IFC DOOR DETAILS REFERENCE NO.
@C08-MPS-S-CAH-B-AR-AL-AZ-1401
· C08-MPS-D-STA-B-AR-AL-AZ-5307-C0 · C08-MPS-D-STA-B-AR-AL-AZ-5281-C1
5 00 +10.45
· C08-MPS-D-STA-B-AR-AL-AZ-5272-C1 · C08-MPS-D-STA-B-AR-AL-AZ-5283-C1
59 · C08-MPS-D-STA-B-AR-AL-AZ-5273-C1 · C08-MPS-D-STA-B-AR-AL-AZ-5284-C1
· C08-MPS-D-STA-B-AR-AL-AZ-5277-C0
@C08-MPS-S-CAH-B-AR-AL-AZ-1402 · C08-MPS-D-STA-B-AR-AL-AZ-5278-C0
00
472
DOOR SCHEDULE REFERENCE NO. METAL DOOR MATERIAL SUBMITTAL REFERENCE NO.

· SC-C08-STA-MPS-SCH-AR-06105 (R03) · SC-C08-CAG-MPS-MAS-AR-00363-R1

C1 @C08-MPS-S-CAH-B-AR-AL-AZ-1403 HARDWARE SCHEDULE REFERENCE NO. HARDWARE MATERIAL SUBMITTAL REFERENCE NO.
+8.05
6 00 · SC-C08-STA-MPS-SCH-AR-06104 (R03) · SC-C08-CAG-MPS-MAS-AR-00451-R0
59 LOADING ROOM
PT-110
DOOR MANUFACTURER AS PER BS STANDARD - BS 476 PART22
+8.45 9.4 m²
PUMP ROOM FFL +10.85
PT-110
239.3 m²
DOOR HANDING CHART ( ASTM )
PT-110 INSIDE INSIDE INSIDE INSIDE
7 FFL +8.85 CHEMICAL ROOM-2
00 @C08-MPS-S-CAH-B-AR-AL-AZ-1403 RHA LHA RHRA LHRA
59 PT-110
12.1 m² C1
FFL +10.65 OUTSIDE OUTSIDE OUTSIDE OUTSIDE

INSIDE INSIDE INSIDE INSIDE

RH LH RHR LHR
CHEMICAL ROOM-1
8 00
PT-110 OUTSIDE OUTSIDE OUTSIDE OUTSIDE
59
12.6 m²
FFL +10.65

FFL +8.35 No Description


SAFETY, HEALTH AND ENVIRONMENT INFORMATION
9 Hazards identified during the design phase are contained in the CDM Hazard Register
00
59 SC-C08-CAG-MPS-REG-HS-00001. Only the Significant Hazards are identified by the CDM Call-out boxes on the
IFC drawings. This exercise does not absolve the user of this document of his responsibility to carry out a
detailed risk assessment before any construction, maintenance or demolition work is carried out.

+8.45

FFL +8.35
Z0 As-Built Record Set ELA NKE 22-05-2019
Rev Description Apvr Chk'd Date
Client
TANK 2
WPS-255
254.0 m²
FFL +9.35
@C08-MPS-S-CAH-B-AR-AL-AZ-1401

Project Manager Construction Supervision Consultant

TANK 1
WPS-255 Main Works Contractor

262.7 m²
FFL +9.35
10
00
0

Subcontractor (Originator)

EXCEL METAL INDUSTRIES.


TEL+974 44321111, FAX +974 44414144
web :www.excelqatar.com
P.O. BOX: 106, DOHA, QATAR
20

Project Title
00
0

B Al Wakrah Stadium and Precinct, Qatar


Drawing Title

PUMP STATION - STEEL DOORS KEY PLAN


FOR LEVEL 1 - ZONE 1
10
00

AS-BUILT
0

Purpose of Issue Seal Date

As-Built 22-05-2019
Bjorn Walgraeve
Project Director Designed Drawn Checked

MPSJV AKK MRA


Model File Ref: Scale A1 (594x841) Revision No
LEVEL 1 POTABLE WATER PUMPING STATION - STEEL DOORS KEY PLAN N/A NTS
1 SCALE: 1 : 100
A
Scale 1 : 100 Drawing No
Z0
0 1 2 5 10 m C08-MPS-S-CAH-B-AR-01-01-1400