Professional Documents
Culture Documents
As-Built: Al Wakrah Stadium and Precinct, Qatar
As-Built: Al Wakrah Stadium and Precinct, Qatar
2 0
C1 @C08-MPS-S-CAH-B-AR-AL-AZ-1403
590
Copyright by the Supreme Committee for Delivery & Legacy (SC). All rights reserved. This document may not,
in whole or in part, be reproduced, stored, transmitted or distributed in any form or by any means, whether
electronic, mechanical, by photocopy, recording or otherwise, without the prior written permission of SC.
Except where otherwise expressly agreed in writing by SC, SC shall have no responsibility or liability for any
loss (direct, consequential or otherwise) which may arise from reliance on or use of this document or the
information contained therein.
N
4 CONTROL ROOM 59 48 35 36 37 38
00 45
59 PT-110 Mecca
60 47 46 39 64
62.0 m²
FFL +10.85 61 62 63
General Notes
FFL +7.85
IFC DOOR ELEVATION REFERENCE NO. IFC DOOR DETAILS REFERENCE NO.
@C08-MPS-S-CAH-B-AR-AL-AZ-1401
· C08-MPS-D-STA-B-AR-AL-AZ-5307-C0 · C08-MPS-D-STA-B-AR-AL-AZ-5281-C1
5 00 +10.45
· C08-MPS-D-STA-B-AR-AL-AZ-5272-C1 · C08-MPS-D-STA-B-AR-AL-AZ-5283-C1
59 · C08-MPS-D-STA-B-AR-AL-AZ-5273-C1 · C08-MPS-D-STA-B-AR-AL-AZ-5284-C1
· C08-MPS-D-STA-B-AR-AL-AZ-5277-C0
@C08-MPS-S-CAH-B-AR-AL-AZ-1402 · C08-MPS-D-STA-B-AR-AL-AZ-5278-C0
00
472
DOOR SCHEDULE REFERENCE NO. METAL DOOR MATERIAL SUBMITTAL REFERENCE NO.
C1 @C08-MPS-S-CAH-B-AR-AL-AZ-1403 HARDWARE SCHEDULE REFERENCE NO. HARDWARE MATERIAL SUBMITTAL REFERENCE NO.
+8.05
6 00 · SC-C08-STA-MPS-SCH-AR-06104 (R03) · SC-C08-CAG-MPS-MAS-AR-00451-R0
59 LOADING ROOM
PT-110
DOOR MANUFACTURER AS PER BS STANDARD - BS 476 PART22
+8.45 9.4 m²
PUMP ROOM FFL +10.85
PT-110
239.3 m²
DOOR HANDING CHART ( ASTM )
PT-110 INSIDE INSIDE INSIDE INSIDE
7 FFL +8.85 CHEMICAL ROOM-2
00 @C08-MPS-S-CAH-B-AR-AL-AZ-1403 RHA LHA RHRA LHRA
59 PT-110
12.1 m² C1
FFL +10.65 OUTSIDE OUTSIDE OUTSIDE OUTSIDE
RH LH RHR LHR
CHEMICAL ROOM-1
8 00
PT-110 OUTSIDE OUTSIDE OUTSIDE OUTSIDE
59
12.6 m²
FFL +10.65
+8.45
FFL +8.35
Z0 As-Built Record Set ELA NKE 22-05-2019
Rev Description Apvr Chk'd Date
Client
TANK 2
WPS-255
254.0 m²
FFL +9.35
@C08-MPS-S-CAH-B-AR-AL-AZ-1401
TANK 1
WPS-255 Main Works Contractor
262.7 m²
FFL +9.35
10
00
0
Subcontractor (Originator)
Project Title
00
0
AS-BUILT
0
As-Built 22-05-2019
Bjorn Walgraeve
Project Director Designed Drawn Checked