Government of Kamataka
Summary of the Mineral Block
(to be made available on the website of e-auction platform provider)
‘As per Gol Notification No:1/15/2015-M.VI Dates 17.2015)
Part A - GENERAL INFORMATION ABOUT MINERAL BLOCK
Features Details
1 | Location
Mineral Block Uduvalli Gold Block
Corner Points
| A 13°55'11.46525" 76°3411.15640" |
B — 13°55'18.22859" 76°35'01.01491" |
| | Latitude, Longitude of Comer Points |C 13°54°08.40588" 76°35'31.15703"
| | as per DGPS D _ 13°53'12.50243" 76°35'23.16190"
| E — 13°54'31.81421" 76°34'22.18489" |
F __13°54'27.86017" _76°34'08.59982"
Villages Uduvalli
| Tehsil/ Taluka Hiriyur |
| District Chithradurga
State Karnataka |
| 2 | Area (hectares/square kilometres) | 675.72 ha
Mineralised Area in Ha.
| Non-mineralised Area in Ha.
Mineralised area approximation for gold |
mineralisation is not attempted with G4
data as the gold mineralisation is subjective |
to many factors and detailed exploration is |
required to ascertain the actual extent of |
mineralisation.
3_| Exploration
|
G4 Level as per Minerals (Evidence of |
ee Mineral Contents) Rules, 2015. |
Exploration Agency Geological Survey of India |
Total Number of Boreholes with |,
il
|__| Meterage
Borehole Spacing (Density)
|
|
Not applicable |
Information Memorandum/ Mine Block Summery
Page 1Government of Kamataka
Quantity of Minerals (Grade-wise)
Gold ore
Total Geological Resources
(Reserves)
Resources have not been estimated in G4
Level exploration. |
Value of Estimated resources of the
Concession area in Indian Rupees
Due to absence of resource estimation,
Value of Estimated Resources is not
calculated. |
Mineralised Zones |
aes ae ih 20 Tength is identified in|
Trend (Dip and Strike) NNE-SSW to N-S strike |
Total Thickness Not established |
‘Accessibility |
Nearest Rail Head Chitradurga Railway Station |
Road 7 km SW of Hiriyur town |
Airport Bengaluru |
Hydrography
Local Surface Drainage Pattern
Rivers/Streams
Dendrtic drainage pattern
Vedavati river flows east further north of
the block. Small less dense dendritic |
drainage is observed in the block flowing
north, west, south and east around the |
Mallapana gudda.
Climate
Mean Annual Rainfall 458 mm
Temperatures (December) 15°C |
‘Temperatures (June) 37°C i:
Topography Undulating topography
Topo Sheet Number 57C/09
Morphology of the Area
Plain land with batholiths.
Information Memorandum/ Mine Block Summery
Page 2Government of Kamataka
| Part B - PARTICULARS OF STATUTORY LICENSES, PERMITS,
PERMISSIONS, CONCESSIONS, APPROVALS AND CONSENTS RELATED TO |
MINING OPERATIONS
Particulars Details/Status
a ar To be obiained by the successful bidder
where ever it is required
5 | Wild life clearance (Sanctuary, eserve | To be obtained by the successful bidder
or special zone clearances) where ever it is required
5 To be obtained by the successful bidder
where ever it is required
yy erent To be obtained by the successful bidder
where ever it is required |
T
5 | Explosive licence To be obtained by the successful bidder
where ever it is required |
- ; ; To be obtained by the successful bidder |
6 | Permission for mine opening :
a where ever it is required
| Permission of installation/ tial ‘To be obtained by the successful bidder
operation of equipment, where ever it is required
| ae ore ko en yucca
I where ever it is required
9 efemsceibaormant To be obtained by the successful bidder
Y Stang SPP where ever it is required
eee ee To be obtained by the successful bidder
where ever it is required
io | an ‘To be obtained by the successful bidder
where ever it is required
| [Clearances relating to work under | 7, be obtained by the successful bidder
12 | an existing transmission line or
eet pee where ever it is required
shifting of the transmission line
To be obtained by the successful bidder
SS ee where ever it is required
To be obtained by the successful bidder |
14 | Consent for Operate (CFO) errs
: To be obtained by the successful bidder
{15 Approval of Mine Plan from IBM. where ever it is required
L . : ‘aaeal
(a To be obiained by the successful bidder,
where ever it is required
Information Memorandum, Mine Block SummeryGovernment of Kamataka
Part C - Particulars of Land
Area Details _|
Total Concession Area 675.72 ha |
1
Forest Land with Status Nil
Government Land with Status
Approximately 366.6 ha as per Land |
land cover data computation.
Private land with Status
"Approximately 309.12 ha as per Land we]
land cover data computation.
Revenue survey details of the area
Land use Land cover map prepared using |
spatial data with Cadastral details is
uploaded for ready reference. The survey |
number wise details of land status with |
extent as per the revenue records (Bhoomi |
database) is also shared for reference.
However, the actual extent and land status
of individual survey numbers may vary in
the ground. The given reference data given
to enable the bidders to get a fair idea of the |
landuse and extent.
Information Memorandum/ Mine Block Summery
Page 4