LIST OF MACHINERIES REQUIRED FOR PRE-ENGINEERED

BUILDING (PEB) FABRICATION PLANT


(PRODUCTION CAPACITY @ 7~10 MT PER DAY)
S.NO. NAME OF THE MACHINERIES QTY
1 Air cooled arc welding m/c 2
2 Oil cooled arc welding m/c 1
3 MIG welding 400amps m/c 1
4 Pull through welding 1500MM m/c 1
5 Assemble tack welding m/c 1
6 CNC Plasma cutting machine m/c 1
7 Pug cutting m/c 2
8 Bolt threading m/c 1
9 Plate bending m/c 1
10 Magnetic core cutting m/c 2
11 "Z/C" roll forming + decoiler m/c 1
12 Roof sheet roll forming + decoiler m/c 1
13 Sheet crimping m/c 1
14 Sand blasting + misc m/c 1
15 E.O.T 10 MT capacity 1

Total cost of machineries = 250000 USD (Approx)

WORK FORCE REQUIRED :

Machine Opertator 4
Welder 2
Fitter 3
Helper 5