Professional Documents
Culture Documents
Panorama CaseStudy
Panorama CaseStudy
• Parking Systems
• Types of Parking
• Techniques of Parking
• Parking Studies
• Case-Study
• Conclusion
Parking System
It is carried out separately for both cars and bikes as the rate of
arrival and departure of both is far different from each other.
Accumulation Counts:
Accumulation Counts:
Arrival
20
20
17
18
15
16 14 14
14
12 10
10
8
6
4
2
0
4:00-4:30 4:30-5:00 5:00-5:30 5:30-6:00 6:00-6:30 6:30-7:00
Arrival
Accumulation Counts:
Accumulation Diagram
350
300
250
No. of cars
200
Cumm Arive
150 Cumm Dept
Cummulation
100
50
0
0 1 2 3 4 5 6 7
Time Period
Accumulation Counts for bikes
Accumulation Counts for bikes
Arrival
20
20
17
18
15
16 14 14
14
12 10
10
8
6
4
2
0
4:00-4:30 4:30-5:00 5:00-5:30 5:30-6:00 6:00-6:30 6:30-7:00
Accumulation Counts for bikes
Accumulation Diagram
500
450
400
350
No. of Bikes
300
100
50
0
0 1 2 3 4 5 6 7
Time Period
Conclusion:
• Turnover = 3
• Probability of Rejection = 1.15%
• Average duration = 1 hour = 60 minutes
Parking measurement and Analysis
Occupancy:
Parking measurement and Analysis
occupancy
87.83
90.00 83.48
78.26
80.00
69.57
66.09
70.00
60.87
60.00 55.65
OCCUPANCY
50.00
40.00
30.00
20.00
10.00
0.00
4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00
TIME
Results