& SIMHAPURI ENERGY LIMITED
Document No. Issue No/Date Revision No/Date
ee ‘SEL/EMD/SOP/01 09/24.04.2014 00/24,04.2014 |
Title Procedure for Synchronization of TG with grid.
Revision status Record:
Revision | Date Page no. | Details of Changes Reason for
No. changes.
Document Approval sheet:
Prepared by Signature
Core team members | MVV S Srinivas & Team
Reviewed by Signature r
HOD A Lakshminarayana A cago nodes
Tssued& Controlled by Signature
MR C Holiram
‘Approved by Signature
Station Head Jayant Sagade
CONTROLLED COPY
Standard Operating Procedure Page 1 of 4g& SIMHAPURI ENERGY LIMITED
Document No. Issue No/Date Revision No/Date
MACUL ENE ‘SELIEMDISOP/O1 01/24.04.2014 00/24.04.2014
Title Procedure for Synchronization of TG with grid.
1.0 Purpose:
This Procedure is intended to provide guidance and instructions for Synchronization of TG
with grid
2.0 Scope:
This procedure is applicable to Synchronization of TG with grid for Unit-1 to 4,
3.0 Responsibility:
3.1 All the personnel involved in carrying out supervising the above activities are required to
ensure implementation of this procedure and may consult any other relevant documents
indicated under Reference section below.
3.2 In the event of any changes required in the procedure such changes may be requested with
Site MR, who would take appropriate action with approval from respective departmental
heads.
4.0 Procedure:
4.4 Details of Hazard Involved
4.1.1 Electrical shock due insulation failure of control wiring.
4.1.2. Fire due to short circuit.
4.2 Safety Precautions
4.2.1 Stand on the Insulated rubber mat while doing any electrical operations on the panel.
4.2.2. Ensure proper earthing of panel.
4.3 Activities
4.3.1 Check the master trip relays 864, 86B & 86C in GRP-A and GRP-B are in reset
position.
4.3.2 Check all MCBS (1QSA, 2QSA, 1QSB, 2QSB, 1QFS, 2QFS&Q101) in AVR Regulator
panel are in on position
4.3.3 Check all MCCBS (1QF1, 1QF2, 2QF1, 2QF2) in AVR power converter panel are in on
position.
4.3.4 Reset if any fault indications In AVR-A & AVR-B. Keep local/remote selector switch in
local mode for both AVR-A & AVR-B in AVR regulator panel.
4.3.5 Ensure turbine speed reached to rated RPM and SWITCH on field breaker (41MK) from
AVR power converter panel,
4.3.6 Keep RUN/QUIT selector switch in RUN position in both AVR-A & AVR-B.
4.3.7 Select MASTER/SLAVE selector switch (1QK A/B) in position A for selecting AVR-A as
master (AVR-B as slave) or in position B for AVR-B as master (AVR-A as
slave).Generally AVR-A will be master and AVR-B will be slave.
‘Standard Operating Procedure CONTROLLED*eOrySIMHAPURI ENERGY LIMITED
Document No. Issue No/Date Revision No/Date
auaruaiewenay |" “SEL/EMD/SOP/O1 01/24.04.2014 00/24.04.2014
Title Procedure for Synchronization of TG with grid
4.3.8 Switch on Exc-S ON/OFF switch in master AVR. Observe the generator voltage will rise
automatically up to 15.1KV and switch OFF Exc-S button, Now raise the generator
voltage up to 16.75KV using voltage Rise/Lower button on master AVR.
4.3.9 Keep local/remote switch in both AVR-A & AVR-B in remote mode on AVR regulator
panel.
4.3.10 Select the respective Circuit Breaker from Breaker Selector Switch.
4.3.11 Keep LIVE/DEAD bus selector switch in live mode
Auto Synchronization:
4.3.12 Keep AUTO/MANUAL selector switch in AUTO mode.
4.3.13 Match generator voltage and frequency with grid voltage and frequency by controlling
excitation voltage and R.P.M respectively and switch on Auto synchronizer button,
4.3.14 Switch on synchronoscope
4.3.15 Observe the rotation of synchronoscope .It should be slow clock wise motion,
4.3.16 After reaching synchronoscope at 12 degrees clock position close command will be
issued to breaker by auto synchronizer. Once the TG is synchronized with grid, increase
the generation on TG to a minimum value of 5 MW to avoid chances of reverse power
protection operation.
4.3.17 Keep synchronoscope selector from IN to OUT position.
4.3.18 Keep breaker selection in off position.
4.3.19 Keep Live/Dead bus selection in off position,
4.3.20 Switch ON power factor Auto control mode from DCS after reaching 15MW generation.
Manual Synchronization:
4.3.21 Keep AUTO/MANUAL selector switch in MANUAL mode.
4.3.22 Control the generator voltage using voltage raise/lower button and control the frequency
Using speed raise/lower button and match with grid voltage and frequency.
4.3.23 Switch on synchronoscope
4.3.24 Observe the rotation of synchronoscope. It should be in slow clock wise motion.
4.3.25 After reaching synchronoscope at 12 degrees clock position close the TNC switch of
respective breaker. Once the TG is synchronized with grid, increase the generation on
TG toa minimum value of § MW to avoid chances of reverse power protection operation.
4.3.26 Keep synchronoscope selector from IN to OUT position.
4.3.27 Keep breaker selection in off position.
4.3.28 Keep Live/Dead bus selection in off position.
4.3.29 Switch ON power factor Auto control mode from DCS after reaching 15MW generation,
5.0 References:
CONTROLLED COPY
TG-Electrical volumes
‘Standard Operating Procedure Page 3 of 4@
SIMHAPURI ENERGY LIMITED
Document No. Tssue No/Date Revision No/Date
MARL ENED ‘SEV/EMD/SOP/01 01724.04.2014 00/24.04.2014
Title Procedure for Synchronization of TG with grid.
6.0 Records
‘SEUEMD/F/O1
SEVEMDIF/02
SEVEMDIFI10
SEVEMDIF/11