Professional Documents
Culture Documents
Mht-Qc-El-2000 - Power Layout
Mht-Qc-El-2000 - Power Layout
Mht-Qc-El-2000 - Power Layout
CONTROL ROOM
Reviewed By Consultant
A APPROVED
B APPROVED WITH COMMENT
TELEPHONE
C NOT APPROVED
DEVICE
THIS REVIEW IS TO VERIFY GENERAL CONFORMANCE WITH THE DESIGN CONCEPT AND IT DOES NOT RELIEVE THE
CONTRACTOR OF HIS OBLIGATIONS UNDER THE CONTRACT.
SIGNATURE:
I.T. ROOM
Drawing Revisions
MAINE CONTRACTOR:
SUB CONTRACTOR:
CLIENT:
PROJECT:
QATAR COOL CONTROL
ROOM FIT OUT WORK
TITLE:
POWER LAYOUT
Scale AS SHOWN
Drawn SYA Designed SYA
Drafting AG
Design AG
Check Check
Approved AG
Date 14-01-2023
CONTROL ROOM LAYOUT This Drawing must not be used for Construction unless signed as Approved
MHT-QC-EL-2000
Rev. 02
* The drawing is copyright by ARCUBE GROUP WLL. No other use, copying or transmission in whole or in part may be made without the written permission. All copy rights reserved.