CV Bondoc Pee

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

EF 6.

CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF

PROPOSED POSITION : PROFESSIONAL ELECTRICAL ENGINEER


NAME OF FIRM : Katahira & Engineers International (KEI)
NAME OF STAFF : FRED L. BONDOC
REGISTERED PROFESSION : Professional Electrical Engineer
DATE OF BIRTH : 25 June 1957 NATIONALITY: Filipino
YEARS WITH FIRM : 1.25 CURRENT POSITION IN THE FIRM: Sr. Electrical Engineer

EDUCATION
College/University Degree/Title Obtained Inclusive Dates
Mapua Institute of Technology, B. Sc. in Electrical Engineering 1979
Manila, Philippines

TRAININGS/SEMINARS
Title/Description Conducted By Inclusive Dates Venue Involvement*
IIEE Leading The Electrical IIEE Nov. 27-30, 2014 SMX Convention Participant
Practitioner to Global Recognition Center, Mall of
Asia, Pasay City
Construction Occupational Safety PEME Jun. 17-20, 2014 Max Restaurant Participant
and Health Ruston Shaw Blvd
Engineering A Safe & Better Nation IIEE Nov. 14-17, 2012 SMX Convention Participant
Through Excellence in Electrical Center, Mall of
Profession Asia, Pasay City

Electrical Grounding and Bonding IIEE Mar. 16-17, 2012 IIEE National Participant
Headquarter Cubao
Quezon City
PLC – Programming Methods and IIEE Feb. 24-25, 2012 IIEE National Participant
Application Headquarter Cubao
Quezon City

Economic Development Through IIEE Nov. 23-26, 2011 SMX Convention Participant
Clean and Affordable Electricity Center, Mall of
Asia, Pasay City

Electrical Power System Design of IIEE May 6-7, 2011 IIEE National Participant
High Rise Residential and Headquarter Cubao
Commercial Buildings Quezon City

Construction Safety Training and PSPC Jun. 9-10, 2004 IIEE National Participant
Standards Workshop Headquarter Cubao
Quezon City

Consultancy: Fire Safety Awareness PEME Jul. 26 & 29, Spedi Office, 30 Participant
and First Aid Training 2003 Barcelona Cpd
Bagay Toro Quezon
City
HSE Management System Seminar C.S. Del Jul. 15, 2003 Spedi Office, 30 Participant
Rosario Safety Barcelona Cpd
Consultancy
Bagay Toro Quezon
City

Electrical Practioner - Empowering IIEE Jun. 24-26, 1998 IIEE National Participant
Economic Recovery Headquarter Cubao
Quezon City

Accounting for Non Accountant Business Sep. 22, 1995 Philippines Participant
Develop Woman’s
Center (PWU) Universty , Taft
Avenue Manila
Switchgear and Metering IIEE Feb. 27, 1993 IIEE National Participant
Headquarter Cubao
Quezon City

42nd Managers Course UP-ISSI Jul. 26, 1993 UP-ISSI , UP Participant


Diliman Quezon
City
IIEE Moving Forward and Aiming IIEE Nov. 18-21, 1992 SMX Convention Participant
Higher Center, Mall of
Asia, Pasay City

Sufficiency in Electric Energy – A IIEE Nov. 27-29, 1991 SMX Convention Participant
Challenge Towards Center, Mall of
Asia, Pasay City

1st Metro Manila Technical Training IIEE May 20, 1990 IIEE National Participant
Headquarter Cubao
Quezon City

Tomorrows Technology, New IIEE Nov. 28-30, 1990 SMX Convention Participant
Emerging IIEE Center, Mall of
Asia, Pasay City

*Such as participant, speaker or trainer

PROJECTS UNDERTAKEN RELATED TO CONSTRUCTION MANAGEMENT AND SUPERVISION OF ROAD


AND/OR BRIDGE PROJECTS
Title/Description Client Position Completion Date
The Major Projects undertaken are Various Sr. Vice President / Sr. Oct. 2015 – Apr. 2018
the following: (Gov’t. & Private) Electrical Engineer (Intermittent)
1) Unioil Gas Station, Buendia,
Pasay City
2) Electrical Design of Three Storey
Residential Building, Fort
Bonifacio, Taguig City
3) Electrical Design for Tres Plamas
Commercial Building, Levi
Avenue, Taguig City
4) Construction of NTI Shell,
Lapasan, Cagayan de Oro City
5) Construction of NTI Shell, Nula
Tula, Tacloban City
6) Electrical Design of Two Storey
Residential Building with Roof
Deck, White Plains, Quezon City
7) Electrical Design of 12 Storey
Building, Acacia Lane, Cubao,
Quezon City
8) Construction of NTI Shell,
Mobolo, Daet, Camarines
9) Construction of NTI Shell,
Mololos, Bulacan
10) Electrical Design of Three (3)
Storey Residential Building,
Magallanes, Makati City
11) Construction of NTI Shell,
Parugan, Antipolo City
12) Construction of NTI Shell,
Quezon City and Canlubang,
Laguna
13) Electrical Design of Deiling
Project 3 Storey Tower, Bagac,
Bataan
14) Electrical Design of 8 Storey
Tower 3 Marbella Building,
Taguig City
15) Electrical Design of Blissbowl
Interior Outfit SM Megammall,
Manduloyong City
16) Electrical Design of DOH
Regional Office Expansion (Two
Storey), Katipunan, Quezon City
17) Electrical Design Expansion of
DOH Bay Rural Health Facility
(Three Storey), Laguna
18) Electrical Design of Four Storey
Dormitory Building, Araneta
Village, Malabon City
19) Electrical Design Recovery Food
BGC Stopover, Bonifacio, Global
City
20) Electrical Design of Food 150
Blvd. Newport Blvd., Pasay City
21) Electrical Design of CIBO SM
Mega Mall, Madaluyong City
22) Electrical design for Soho, Levi
Avenue, Taguig City
Conceptual Design for Tanauan – San Miguel Sr. Electrical Engineer Aug. 2016 – Dec. 2016
Tagaytay City Expressway Project Holding
Corporation
Detailed Engineering Design of the CITRA Intercity Sr. Electrical Engineer Oct. 2015 – Jul. 2016
South East Metro Manila
Expressway (SEMME) Project
The Major Projects undertaken are Private Vice President / Sr. Feb. 1995 – Sep. 2015
the following: Electrical Engineer
1) Design and Construction of
Seaoil Gas Station
2) Design and Construction of
Petron Gas Station Projects
3) Design and Construction of Jetti
Gas Station Projects
4) Design and Construction of Shell
Gas Station Projects (All over the
Philippines)
5) Design and Construction of
Sabellano Meat and Processing
Plant
6) Design and Construction of
Jollibee Food Corporation
7) Design and Construction of
RAMCAR Corporation – KFC &
Mister Dunot
The Major Projects undertaken are Private Electrical Engineer Jan. 1992 – Jan. 1995
the following:
1) Design and Construction of
Philippine Stock Exchange /
Tecktite Tower I, Ortigas, Pasig
City
2) Various Housing Project /
Filinvest Corporation,
Mandaluyong, Pasig City
The Major Projects undertaken are San Miguel Vice President – Sep. 1987 – Dec. 1991
the following: Corporation Electrical Department
1) San Miguel Foods Inc., Pampanga (SMC)
B-Meg, San Matias, Pampanga
2) San Miguel Campoprio
Corporation, Gen. Trias, Cavite
3) San Miguel Yamamura Asia
Corporation, Anabu 11, Imus,
Cavite
4) SMC / San Fernando Brewery,
San Fernando, Pampanga
5) San Miguel Corporation / Polo
Brewery, Valenzuela, metro,
Manila
6) Pelican Agro Products / FTI
Complex, Taguig, City
The Major Projects undertaken are Various Electrical Designer Jun. 1985 – Aug. 1987
the following: (Gov’t. & Private)
1) Two (2) Storey Building (Jose
Barrias Residence), Malabo City
2) Fashion World Garment Factory,
Malabon City
3) Two (2) Storey Commercial
Building, Calaoocan City
4) Five Town Houses (two lot each),
Calaocan City
5) Candyman Two Storey
Warehouse Building, Malabon
City
6) Adminstration Building of Alcolex
Corporation of the Philippines,
Nasugbu, Batangas
7) Construction of Rebert Co’s
Residence / Commercial
Building, Quezon City
8) Construction of three (3) Storey
Building, Quezon City
9) Construction of AFP Type A & B
Camp Aguinaldo, Quezon City
10) Construction of Penta Housing
Project (Duplex & Single
Detached), Taytay, Rizal
11) Construction of Four (4) Storey
Building (Edward Ty’s
Residence), Quezon City
The Major Projects undertaken are Various Electrical Designer / Jul. 1983 – May 1985
the following: Inspector
1) Bayer Philippines Inc. (Agro-
Chemical Division), Canlubang,
Laguna
2) Canteen Building Telefuken Semi
Conductor Plant, FTI, Taguig City
3) Administration Building
Telefuken Semi Conductor Plant,
FTI, taguig City
4) Grounding of Main Plant
Telefuken Semi Conductor Plant,
FTI, Taguig City
5) Upgrading of Main Feeder Lines
Telefuken Semi Conductor Plant.
FTI, Taguig City
6) Upgrading of Feeder Lines
Motorola Phil’s. Inc. / Semi
Conductor Group, Paranaque,
Metro Manila.
7) Solignum Plant (Jardine Davies /
marketing Division), Paranaque,
Metro Manila
1) Construction of Communication King Fahad Air Electrical Engineer May 1982 – May 1983
Center (Two Floors), Central Security Base / Gov’t. of
Control Facility, Helicopter Saudi Arabia
Squadron, Waste Water Treatment
Plant, Irrigation / Fire Suffresion
Pump Station, Fire Training Facility,
Precision Measurement Equipment
Laboratory, Field Training Facility,
Administration Building,
Unsupressed Engine Test Stand,
Visitors Control and Hanger, King
Fahad Air Base, Saudi Arabia.
The Major Projects undertaken are Various Electrical Engineer Oct. 1980 – May 1982
the following: (Gov’t. & Private)
1) Additional Electrical Works for V-
Luna Medical Center, Quezon City
2) Installation of 1.5HP Compressor
Motor Research and
Development Center, Quezon City
3) Installation of 125 KVA Genset
(Camp Bagong Diwa), Taguig City
4) Subcom Headquarters Building
(Three Storey), Subic Naval Base,
Ologapo City
5) Cabcom Kitchen & Meshall, Clark
Airbase, Angeles City, Pampanga
6) Lingayen Water District, Lingayen,
Pangasinan
7) San Carlos Water District, San
Carlos City, Pangasinan
8) Utility & Machine Shop Building /
MPC Thermal Power Plant, Naga,
Cebu City
Grandstand (Four Floor), Lockers & University of Life Electrical Designer / Jul. 1980 – Oct. 1980
Shower Room, Kiosk, Viewing Deck, Inspector
Disco basement of Dinning Hall,
Diving Pool, Basketball Court, Oval /
Control Room for Amphitheater,
Street Lighting & Perimeter Lighting,
Domitory Building 10 Storey,
University of Life, Pasig City
The Major Projects undertaken are Private Electrical Supervisor Sep. 1979 – Jun. 1980
the following:
1) Domitory Building (Four Storey),
Sampaloc, Manila
2) Orani Public Market, Orani,
Bataan
3) Three (3)Medical School Building
(Two Storey), Dasmarinas, Cavite
4) Forty (40) Units Campus Housing
Project, Dasmarinas, Cavite

ON-GOING PROJECTS
Title/Description Client Position Start Date End Date
Construction of NTI Shell, P. Private Sr. Electrical May 2018 Present
Sanchez, Madaluyong City Engineer

MEMBERSHIPS IN PROFESSIONAL SOCIETIES


Name of Society/ Date of Conferment/ License/Professional
Validity Date
Commission Registration Number
Professional Regulation ??????? Professional Electrical ??????
Commission (PRC) Engineer PEE – 1854
Professional Regulation ??????? Assistant Electrical ??????
Commission (PRC) Engineer REE – 7781
Institute of Electrical Engineers ??????? 7781 Lifetime
in the Philippines (IIEE)

LANGUAGES
Proficiency
Language
Speaking Reading Writing
English Excellent Excellent Excellent
Filipino Mother Tongue Mother Tongue Mother Tongue
EMPLOYMENT RECORD:
Period Employing Organization, Locations Summary of Activities Performed relevant
titles of position held of to the Assignment
Client References Projects
Oct. 2015 – SPEDI Construction, Inc. Metro Responsible for the overall management of
Present Sr. Vice President / Sr. Electrical Manila, the project. Checking and keeping track or
(1.33 yrs., Engineer Cagayan De records for all design matters and contractual
(Intermittent) Oro, aspects of the project. Overall in-charge of
Reference:
Tacloban, construction project management and
Name: Joseph Ruel Tiangco
Camarines quality control of electrical works. Oversee
Position: President
Norte, the total day to day operation of the project.
Tel. No.: +63 901 901 6686
Bulacan, Preside regular coordination meetings with
E-
Rizal, the sub-contractors and project proponents.
mail:joseph_00tiangco@yahoo.co
Laguna, Reviewed, monitor and supervise all electrical
m
Bataan works, construction standard including
testing and acceptance.
Oct. 2015 – Katahira & Engineers International Metro Responsible for electrical distribution design
Dec. 2016 Sr. Electrical Engineer Manila, and toll facilities and toll plaza lighting and
(1.25 yrs.) Batangas electrical system. Responsible for the
Reference:
(On-call) production of electrical design drawings,
Name: Noel V. Mediran
technical specifications and bill of quantities.
Position: Deputy Project Manager
Coordinate with others design groups for
Tel. No.: +63 936 9511424
consistency.
E-mail: nvmediran@yahoo.com,ph
Feb. 1995 – Safety – Plus Erectors and Nationwide Responsible for the overall management of
Sep. 2015 Developers, Inc. Philippines the project. Checking and keeping track or
(20.67 yrs.) Vice President / Sr. Electrical records for all design matters and contractual
Engineer aspects of the project. Overall in-charge of
construction project management and
Reference:
quality control of electrical works. Oversee
Name: HR Department
the total day to day operation of the project.
Tel. No.: +63 2 455 6438
Preside regular coordination meetings with
the sub-contractors and project proponents.
Reviewed, monitor and supervise all electrical
works, construction standard including
testing and acceptance.
Jan. 1992 – Eberbach & Company Pasig City Responsible in the preparation of electrical
Jan. 1995 Electrical Engineer design, technical specifications, cost
(3.08 yrs.) estimates and project implementation
Reference:
schedules. Attended project site coordination
Name: MICHAEL Eberbach
meetings and review of materials submittals
Position: Vice President
and shop drawings. Conducted inspection on
Tel. No.:
the installations to ensure that all materials
E-mail: jetteabellen@yahoo.com
and layouts are in accordance to plans and
specifications. Supervised testing and
commissioning of all electrical installations.
Sep. 1987 – Ramdustrial Corporation Metro Responsible for the overall management of
Dec. 1991 Vice President - Electrical Manila, the project. Checked and review electrical
(4.33 yrs.) Department Pampanga, design drawings, cost estimate and quantity
Cavite calculation. Supervised the production of
Reference:
design drawings and technical specifications.
Name: Mr Jun Ramos
Overall in-charge of construction project
Position: Owner
management and quality control of electrical
Tel. No.: (0917) 556 9656
works. Oversee the total day to day operation
E-mail: kwikbuilt@gmail.com
of the project. Preside regular coordination
meetings with the sub-contractors and
project proponents. Reviewed, monitor and
supervise all electrical works, construction
standard including testing and acceptance.
Jun. 1985 – Asia-tech Consultant, Inc. Metro Responsible for electrical design of various
Aug. 1987 Electrical Designer Manila, projects. Responsible for the production of
(2.25 yrs.) Batangas, designs, drawings, technical specifications
Reference:
Rizal and bill of quantities. Coordinate with other
Name: Jorge M. Mayoralgo, Jr.
design groups for consistency.
Position: President
Tel. No.:
E-mail:
Jul. 1983 – Melfon & Associates Metro Responsible in the preparation of electrical
May 1985 Electrical Designer / Inspector Manila, design, technical specifications, cost
(1.92 yrs.) Laguna estimates and project implementation
Reference:
schedule. Reviewed all program of works and
Name: Melusipo Fonollera
overall implementation of lighting and
Position: President
electrical system. Monitored and ensured
Tel. No.:
that the construction works were in
E-mail:
accordance with the plans and specifications,
Supervised the electrical schedule activities to
ensure smooth project completion as well the
quality and workmanship.
May 1982 – Hanil Development Co., Ltd. Kingdom of Responsible for the review of all program of
May 1983 Electrical Engineer Saudi works and overall implementation project
(1.08 yrs.) Arabia management plan of King Fahad Air base.
Reference:
(KSA) Carried out periodic inspection at site to
Name: HR Department
ensure compliance with the approved
Tel. No.: 822 31 704
drawings and specifications. Provides
E-mail: www.hanilldevelop.co.kr
technical expertise and main support to the
Project Manager on electrical aspects.
Responsible for the coordination and control
function of the project site in the electrical
field to ensure timely completion of the
project within establish budget.
Oct. 1980 – Mescon Builders, Inc. Metro In-charge electrical aspects of various
Apr. 1982 Electrical Engineer Manila, projects. Supervised construction activities
(1.58 yrs.) Olongapo, and quality control of all electrical works.
Pangasinan Oversee the total day to day operation of the
project. Daily update of construction
schedule / progress of work.
Jul. 1980 – Environs Systems Group, Inc. Metro Responsible for the preparation of electrical
Sep. 1980 Electrical Designer / Inspector Manila design including technical specification and
(0.25 yr.) bill of quantities. Responsible in the
production of design drawings and cost
estimates.
Sep. 1979 – Hilmarc Construction Corporation Manila, In-charge electrical aspects of various
Jun. 1980 Electrical Supervisor Cavite projects. Supervised construction activities
(0.83 yr.) and quality control of all electrical works.
Oversee the total day to day operation of the
project. Daily update of construction
schedule / progress of work.
Name of Assignment/Project: The Major Projects Undertaken are the following:
1) Unioil Gas Station, Buendia, Pasay City
2) Electrical Design of Three Storey Residential Building, Fort Bonifacio, Taguig City
3) Electrical Design for Tres Plamas Commercial Building, Levi Avenue, Taguig City
4) Construction of NTI Shell, Lapasan, Cagayan de Oro City
5) Construction of NTI Shell, Nula Tula, Tacloban City
6) Electrical Design of Two Storey Residential Building with Roof Deck, White Plains, Quezon City
7) Electrical Design of 12 Storey Building, Acacia Lane, Cubao, Quezon City
8) Construction of NTI Shell, Mobolo, Daet, Camarines
9) Construction of NTI Shell, Mololos, Bulacan
10) Electrical Design of Three (3) Storey Residential Building, Magallanes, Makati City
11) Construction of NTI Shell, Parugan, Antipolo City
12) Construction of NTI Shell, Quezon City and Canlubang, Laguna
13) Electrical Design of Deiling Project 3 Storey Tower, Bagac, Bataan
14) Electrical Design of 8 Storey Tower 3 Marbella Building, Taguig City
15) Electrical Design of Blissbowl Interior Outfit SM Megamall, Manduloyong City
16) Electrical Design of DOH Regional Office Expansion (Two Storey), Katipunan, Quezon City
17) Electrical Design Expansion of DOH Bay Rural Health Facility (Three Storey), Laguna
18) Electrical Design of Four Storey Dormitory Building, Araneta Village, Malabon City
19) Electrical Design Recovery Food BGC Stopover, Bonifacio, Global City
20) Electrical Design of Food 150 Blvd. Newport Blvd., Pasay City
21) Electrical Design of CIBO SM Mega Mall, Madaluyong City
22) Electrical Design for Soho, Levi Avenue, Taguig City
Year: Oct. 2015 – Apr. 2018 (1.33 years, Intermittent)
Location: Metro Manila, Cagayan De Oro, Tacloban, Camarines Norte, Bulacan, Rizal, Laguna, Bataan
Client: Various (Gov’t. & Private)
Main Project Features: The project involved the electrical design and construction of residential building, commercial
building, shell station including perimeter roads and other miscellaneous structures
Positions Held: Sr. Vice President / Sr. Electrical Engineer
Activities Performed: Responsible for the overall management of the project. Checking and keeping track or records
for all design matters and contractual aspects of the project. Overall in-charge of construction project management
and quality control of electrical works. Oversee the total day to day operation of the project. Preside regular
coordination meetings with the sub-contractors and project proponents. Reviewed, monitor and supervise all
electrical works, construction standard including testing and acceptance.
Name of Assignment/Project: Conceptual Engineering Design for Tanauan – Tagaytay City Expressway Project
Year: Aug. 2016 – Dec. 2016 (0.42 year)
Location: Batangas
Client: San Miguel Holding Corporation (SMHC)
Main Project Features: The project involved the conceptual design of Urban Toll Expressway including viaduct,
bridges, overpass/underpass, toll plazas and electrical works.
Positions Held: Sr. Electrical Engineer
Activities Performed: Responsible for the production of preliminary electrical design, drawings, technical
specifications and bill of quantities. Coordinate with other design groups for consistency.
Name of Assignment/Project: Detailed Engineering Design of the South East Metro Manila Expressway (SEMME)
Project
Year: Oct. 2015 – Jul. 2016 (0.83 year)
Location: Metro Manila
Client: CITRA Intercity Tollways, Inc. (CITI)
Main Project Features: The project involved the detailed engineering design of 34.024 kms expressway. The project
road type is combination of elevated and at-grade with 2 x 3 lanes including 44 ramps, toll plazas and electrical and
mechanical works.
Positions Held: Sr. Electrical Engineer
Activities Performed: Responsible for electrical distribution design and toll facilities and toll plaza lighting and
electrical system. Responsible for the production of electrical design drawings, technical specifications and bill of
quantities. Coordinate with others design groups for consistency.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) Detailed Design and Construction of Seaoil Gas Station
2) Detailed Design and Construction of Petron Gas Station Projects
3) Detailed Design and Construction of Jetti Gas Station Projects
4) Detailed Design and Construction of Shell Gas Station Projects (All over the Philippines)
5) Detailed Design and Construction of Sabellano Meat and Processing Plant
6) Detailed Design and Construction of Jollibee Food Corporation
7) Detailed Design and Construction of RAMCAR Corporation – KFC & Mister Dunot
Year: Feb. 1995 – Sep. 2015 (20.67 years)
Location: Nationwide
Client: Private
Main Project Features: The project involved the detailed design and construction of electrical components of Seaoil
Gas Station, Petron Gas Station, Jetti Gas Station, Shell Gas Station, Meat and Processing Plant, Jollibee Food
Corporation and RAMCAR Corporation nationwide. The project also including perimeter lighting of the above-
mentioned projects.
Positions Held: Vice President / Sr. Electrical Engineer
Activities Performed: Responsible for the overall management of the project. Checking and keeping track or records
for all design matters and contractual aspects of the project. Overall in-charge of construction project management
and quality control of electrical works. Oversee the total day to day operation of the project. Preside regular
coordination meetings with the sub-contractors and project proponents. Reviewed, monitor and supervise all
electrical works, construction standard including testing and acceptance.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) Detailed Design and Construction of Philippine Stock Exchange / Tecktite Tower I, Ortigas, Pasig City
2) Various Housing Project / Filinvest Corporation, Mandaluyong, Pasig City
Year: Jan. 1992 – Jan. 1995 (3.08 years)
Location: Pasig City
Client: Private
Main Project Features: The project involved the detailed design and construction of high rise commercial building
including various housing project, access roads and street lightings.
Positions Held: Electrical Engineer
Activities Performed: Responsible in the preparation of electrical design, technical specifications, cost estimates and
project implementation schedules. Attended project site coordination meetings and review of materials submittals
and shop drawings. Conducted inspection on the installations to ensure that all materials and layouts are in
accordance to plans and specifications. Supervised testing and commissioning of all electrical installations.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) San Miguel Foods Inc., Pampanga B-Meg, San Matias, Pampanga
2) San Miguel Campoprio Corporation, Gen. Trias, Cavite
3) San Miguel Yamamura Asia Corporation, Anabu 11, Imus, Cavite
4) SMC / San Fernando Brewery, San Fernando, Pampanga
5) San Miguel Corporation / Polo Brewery, Valenzuela, Metro, Manila
6) Pelican Agro Products / FTI Complex, Taguig, City
Year: Sep. 1987 – Dec. 1991 (4.33 years)
Location: Metro Manila, Pampanga, Cavite
Client: San Miguel Corporation (SMC)
Main Project Features: The project involved the electrical design and construction of commercial buildings and
various outlets of San Miguel Corporation located in Pampanga, Cavite and Metro Manila. The works includes but
not limited to power supply, distribution system, lighting system and communication system.
Positions Held: Vice President - Electrical Department
Activities Performed: Responsible for the overall management of the project. Checked and review electrical design
drawings, cost estimate and quantity calculation. Supervised the production of design drawings and technical
specifications. Overall in-charge of construction project management and quality control of electrical works. Oversee
the total day to day operation of the project. Preside regular coordination meetings with the sub-contractors and
project proponents. Reviewed, monitor and supervise all electrical works, construction standard including testing
and acceptance.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) Two (2) Storey Building (Jose Barrias Residence), Malabo City
2) Fashion World Garment Factory, Malabon City
3) Two (2) Storey Commercial Building, Calaoocan City
4) Five Town Houses (two lot each), Calaocan City
5) Candyman Two Storey Warehouse Building, Malabon City
6) Adminstration Building of Alcolex Corporation of the Philippines, Nasugbu, Batangas
7) Construction of Rebert Co’s Residence / Commercial Building, Quezon City
8) Construction of three (3) Storey Building, Quezon City
9) Construction of AFP Type A & B Camp Aguinaldo, Quezon City
10) Construction of Penta Housing Project (Duplex & Single Detached), Taytay, Rizal
11) Construction of Four (4) Storey Building (Edward Ty’s Residence), Quezon City
Year: Jun. 1985 – Aug. 1987 (2.25 years)
Location: Metro Manila, Batangas, Rizal
Client: Various (Gov’t. & Private)
Main Project Features: The project involved the electrical design of residential buildings, garment factory,
commercial building warehouse, administration buildings and AFP Camp Aguinaldo. The project also includes
perimeter lightings, power supply, distribution system, lighting system and communication system.
Positions Held: Electrical Designer
Activities Performed: Responsible for electrical design of various projects. Responsible for the production of designs,
drawings, technical specifications and bill of quantities. Coordinate with other design groups for consistency.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) Bayer Philippines Inc. (Agro-Chemical Division), Canlubang, Laguna
2) Canteen Building Telefuken Semi Conductor Plant, FTI, Taguig City
3) Administration Building Telefuken Semi Conductor Plant, FTI, taguig City
4) Grounding of Main Plant Telefuken Semi Conductor Plant, FTI, Taguig City
5) Upgrading of Main Feeder Lines Telefuken Semi Conductor Plant. FTI, Taguig City
6) Upgrading of Feeder Lines Motorola Phil’s. Inc. / Semi Conductor Group, Paranaque, Metro Manila.
7) Solignum Plant (Jardine Davies / Marketing Division), Paranaque, Metro Manila
Year: Jul. 1983 – May 1985 (1.92 years)
Location: Metro Manila, Laguna
Client: Private
Main Project Features: The project involved the electrical design and upgrading of commercial building, canteen
building, administration building, grounding of main plant, main feeder lines and solignum plant.
Positions Held: Electrical Designer / Inspector
Activities Performed: Responsible in the preparation of electrical design, technical specifications, cost estimates and
project implementation schedule. Reviewed all program of works and overall implementation of lighting and
electrical system. Monitored and ensured that the construction works were in accordance with the plans and
specifications, Supervised the electrical schedule activities to ensure smooth project completion as well the quality
and workmanship.
Name of Assignment/Project: Construction of Communication Center (Two Floors), Central Security Control
Facility, Helicopter Squadron, Waste Water Treatment Plant, Irrigation / Fire Suffresion Pump Station, Fire
Training Facility, Precision Measurement Equipment Laboratory, Field Training Facility, Administration Building,
Unsupressed Engine Test Stand, Visitors Control and Hanger, King Fahad Air Base, Saudi Arabia.
Year: May 1982 – May 1983 (1.08 years)
Location: Kingdom of Saudi Arabia (KSA)
Client: King Fahad Air Base / Gov’t. of Saudi Arabia
Main Project Features: The project involved the construction of Communication Center (Two Floors), Central
Security Control Facility, Helicopter Squadron, Waste Water Treatment Plant, Irrigation / Fire Suffresion Pump
Station, Fire Training Facility, Precision Measurement Equipment Laboratory, Field Training Facility,
Administration Building, Unsupressed Engine Test Stand, Visitors Control and Hanger, King Fahad Air Base, Saudi
Arabia.
Positions Held: Electrical Engineer
Activities Performed: Responsible for the review of all program of works and overall implementation project
management plan of King Fahad Air base. Carried out periodic inspection at site to ensure compliance with the
approved drawings and specifications. Provides technical expertise and main support to the Project Manager on
electrical aspects. Responsible for the coordination and control function of the project site in the electrical field to
ensure timely completion of the project within establish budget.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) Additional Electrical Works for V-Luna Medical Center, Quezon City
2) Installation of 1.5HP Compressor Motor Research and Development Center, Quezon City
3) Installation of 125 KVA Genset (Camp Bagong Diwa), Taguig City
4) Subcom Headquarters Building (Three Storey), Subic Naval Base, Ologapo City
5) Cabcom Kitchen & Meshall, Clark Airbase, Angeles City, Pampanga
6) Lingayen Water District, Lingayen, Pangasinan
7) San Carlos Water District, San Carlos City, Pangasinan
8) Utility & Machine Shop Building / MPC Thermal Power Plant, Naga, Cebu City
Year: Oct. 1980 – Apr. 1982 (1.58 years)
Location: Metro Manila, Olongapo, Pangasinan
Client: Various (Gov’t. & Private)
Main Project Features: The project involved the electrical works of above-mentioned projects.
Positions Held: Electrical Engineer
Activities Performed: In-charge electrical aspects of various projects. Supervised construction activities and quality
control of all electrical works. Oversee the total day to day operation of the project. Daily update of construction
schedule / progress of work.
Name of Assignment/Project: Detailed Design of Grandstand (Four Floor), Lockers & Shower Room, Kiosk,
Viewing Deck, Disco basement of Dinning Hall, Diving Pool, Basketball Court, Oval / Control Room for
Amphitheater, Street Lighting & Perimeter Lighting, Domitory Building 10 Storey, University of Life, Pasig City
Year: Jul. 1980 – Sep. 1980 (0.25 year)
Location: Metro Manila
Client: University of LIfe
Main Project Features: The project involved the detailed design of electrical component of the above-mentioned
project.
Positions Held: Electrical Designer / Inspector
Activities Performed: Responsible for the preparation of electrical design including technical specification and bill of
quantities. Responsible in the production of design drawings and cost estimates.
Name of Assignment/Project: The Major Projects undertaken are the following:
1) Domitory Building (Four Storey), Sampaloc, Manila
2) Orani Public Market, Orani, Bataan
3) Three (3)Medical School Building (Two Storey), Dasmarinas, Cavite
4) Forty (40) Units Campus Housing Project, Dasmarinas, Cavite
Year: Sep. 1979 – Jun. 1980 (0.83 year)
Location: Manila, Cavite
Client: Private
Main Project Features: The project involved the construction of dormitory building, public market, school building
and 40 unit’s campus housing project.
Positions Held: Electrical Supervisor
Activities Performed: In-charge electrical aspects of various projects. Supervised construction activities and quality
control of all electrical works. Oversee the total day to day operation of the project. Daily update of construction
schedule / progress of work.
Certification:
I Fred L. Bondoc, certify that to the best of my knowledge and belief, these data correctly describe me, my
qualifications, and my experience.
I further commit that I shall work for the Construction Management and Supervision of the New Clark City (NCC)
to Subic-Clark-Tarlac Expressway (SCTEX) Access Road as (nominated position) of (name of bidding firm) once
awarded the contract.

(PLEASE INSERT YOUR ELECTRONIC SIGNATURE)


FRED L. BONDOC Date: 08 May 2018
[Signature over printed name of nominated key staff] Day/Month/Year

AKIRA IWASHITA Date: 08 May 2018


[Signature over printed name of authorized representative of the firm] Day/Month/Year

You might also like