Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

WALL FENCE

COPING

BOUNDARY
WALL FENCE

N.G.L PLATFORM 00
RL = 1243 m

GRANULAR BACKFILL

Ø50mm WEEP-HOLE
1242 m 170 @500mm C/C
LIGHT FIXTURE WALL BUILT TO PROTECT FROM
FALLING
EXISTING KERB ON EDGE OF COPING
65° PAVED CAR PARK SURFACE SERVICE DUCT WITH
1241 m PLATFORM 01
REMOVABLE COVER
Ø150mm PERFORATED EXISTING KERB
AGRICULTURAL DRAIN-PIPE
4% 4%
RL = 1240 m
1.5%
PAVED CAR PARK SURFACE EXISTING ADMINISTRATION BLOCK
1240 m 1.5% 1.5% EXISTING RETAIN
WALL
150

1239 m
4739
WALL BUILT TO PROTECT COPING
1238 m FROM FALLING

PAVED CAR PARK SURFACE EXISTING TEMPORARY


PLATFORM 02 RL = 1237 m STORES & SITE OFFICE
1.5%
1237 m 4% 4% 1.5% EXISTING RETAIN
WALL

1236 m 150 mm (G5) FILL MATERIAL


OR SELECTED LAYER
COMPACTED TO 93%
1235 m MOD. ASSHTO DENSITY
PROPOSED EXISTING FEMALE HOSTEL
N.G.L PLATFORM 03 LOFFLERSTEN RETAIN
N.G.L PLATFORM 03 EXISTING RETAIN WALL EXISTING RETAIN
RL = 1234 m WALL
1234 m RL = 1234 m WALL

170
Ø50mm WEEP-HOLE
1233 m @500mm C/C
150 mm (G5) FILL MATERIAL
OR SELECTED LAYER
71° COMPACTED TO 93%
MOD. ASSHTO DENSITY PROPOSED CANTILEVER
1232 m N.G.L PLATFORM 04
RETAIN WALL (R.W 03)
Ø150mm PERFORATED N.G.L PLATFORM 04
RL = 1231 m 736
AGRICULTURAL DRAIN-PIPE RL = 1231 m
4% 4%
1231 m
GRANULAR BACKFILL

EXISTING RETAIN
1230 m 5775 2000
WALL 3°
Ø50mm WEEP-HOLE
@500mm C/C 150 mm (G5) FILL MATERIAL
1229 m OR SELECTED LAYER
COMPACTED TO 93%
MOD. ASSHTO DENSITY

1228 m N.G.L PLATFORM 05 Ø150mm PERFORATED


N.G.L PLATFORM 05
RL = 1227 m EXISTING RETAIN
PROPOSED
CANTILEVER RETAIN
RL = 1227 m AGRICULTURAL DRAIN-PIPE WALL
4% 4% WALL (R.W 04)

1227 m
NATIVE SOIL HEEL R.C STEM
TOE GRANULAR BACKFILL
1226 m
GEOTEXTILE

1225 m 3°
10919
Ø50mm WEEP-HOLE
1224 m @500mm C/C

PROPOSED G.L V-DRAIN SLOPING @


PLATFORM 06 Ø150mm PERFORATED 4% SIDE TO SIDE
1223 m RL = 1222 m AGRICULTURAL DRAIN-PIPE
4% 4%
Ø50mm WEEP-HOLE

1222 m R.C HEEL

R.C FOOTING @ R.C TOE


30MPa
1221 m 10082

1220 m

SECTION A-A NOTES


N

SCALE 1:100 1) All drawings to be read in conjunction with


N.G.L PLATFORM 03 all the relevant Architectural and Civil
CATCH-OFF V-DRAIN drawings.
RL = 1234 m
300 300
L300 UNIT BLOCKS 2) All dimensions on the drawings must be
UNIT = L300 x 170 mm UNIT = L300 x 170 mm PLACED WITH compared to those on the architectural
300 300
WITH SETBACKS WITH SETBACKS (59 mm) drawings before the commencement of
PROPOSED 150 150 MAXIMUM CUT SETBACK (59 mm) construction; any discrepancy shall be
Ø150mm PERFORATED 170
AGRICULTURAL
SLOPE OF 1:1.5 brought to the attention of engineer, without
DRAIN-PIPE IN TOP OF R.C FACE WALL DRAIN delay, for clarification.
GRANULAR FILL Y10 BARS (B1 & B2) @
FOUNDATION WITH 19 mm
163 mm C/C WITH 3) The contractor must coordinate all
CLEAR COVER OF 50
mm 150 mm (G5) MATERIAL CRUSHED STONE applicable services drawings for details and
150 positions of holes and ducts necessary for
750 OR SELECTED LAYER storm water, sewage, drainage and
COMPACTED TO 93% V-DRAIN TO BE 80 mm
electrical services. Any conflicting
MOD. ASSHTO DENSITY THICK WITH MESH-WIRE
FOUNDATION OF LOFFELTAIN RETAINING WALL ref. 193
information must immediately be brought to
SCALE 1:20 71° the attention of the engineer.

8% 8% 4)Dimensions and Levels are shown in metres.


5) All civil drawings to be read in conjunction
300 with the drawings showing the standard
900mm Deep Trench details, the project specifications and the
GEOTEXTILE 300 mm RIPPED, WETTED relevant SABS specifications.
FILL PLATFORM 04 250 FILL PLATFORM 04 250 FILTER FABRIC AND COMPACTED TO 93% 6) The Engineer is to be given the opportunity
RL = 1231 m RL = 1231 m Y16-01-300FF (Hor) 750
272 272 Y16-02-300NF (Hor) 150 MOD AASHTO IN-SITU to inspect all pipes before backfilling
MATERIAL commences.
FACE WALL DRAIN WITH
19 mm CRUSHED STONE 7) The position of all existing services as shown
R10-03@1/m2 clips
AND CATCH-OFF
V-DRAIN
3° 50 mm Ø PVC PIPE PROPOSED TYPICAL SECTION THROUGH on the drawings is only schematic. The
Contractor is responsible for locating and
WEEPHOLES @ 500 mm
EARTH FILL
MAXIMUM CUT
SLOPE OF 1:1.5
GEOTEXTILE
FILTER FABRIC
C/C WITH 150 mm
CLEARANCE FROM DRAIN.
γ = 22,18 kN/m³ Y16-04-300FF
LOFFELTAIN RETAINING WALL protecting all existing services.
8) Assistance from the various local authorities
4500 φ = 30° Y16-04-300NF
REAR FACE WALL RIPPED, WETTED AND SCALE 1:50 to be obtained to assist with the
WITH 3% SLOPE COMPACTED TO 93% MOD identification and location of all existing
AASHTO IN-SITU MATERIAL R10-05@1/m2 clips services.
Ø150mm PERFORATED COVER
AGRICULTURAL DRAIN-PIPE 9) Compaction of backfill to trenches to be
Wall Back: 30mm
Wall Front: 20mm confirmed by in-situ Nuclear Density tests at
V-DRAIN
Base top: 30mm Y16-06-300RF starters a rate of 1 test per 10m of trench.
N.G.L PLATFORM 05 N.G.L PLATFORM 05
Base bottom: 30mm Y16-07-300FF starters
RL = 1227 m RL = 1227 m 10) All exposed reduced excavation beds
8% 8% 8% 8% LENGTH OF PROPOSED RETAINING WALLS and areas to receive foundation shall be
300 MARK(S) LENGTH OF R.W HEIGHT OF R.W cleared, ripped, wetted and compacted to
1000 93% MOD AASHTO to a depth of 150mm
HEEL Rehabilitation L. (R.W 01) 52,080m 3.9m unless noted otherwise.
500 Y16-08-300T2
3000 mm wide R.C STRIP Y16-09-300B2 Proposed L. (R.W 02) 82,880m 3.9m 11) Reference and level beacons will be
FOOTING @ 30MPa 3000 89,040m
TOE Proposed C. (R.W 03) 5.5m
1195 500 1000 Y16-10-300T1 shown to the Contractor by the Engineer at
Y16-11-300B1 Proposed C. (R.W 04) 71,120m 6m
305 the commencement of the Contract and
the Contractor will be responsible for
TYPICAL SECTION THROUGH FOUNDATION AND STEM OF CANTILEVER RETAINING WALL transferring the datum to the Site of Works.
SCALE 1:40

You might also like