Professional Documents
Culture Documents
Noah Edited Document
Noah Edited Document
Noah Edited Document
DESCRIPTION
(BIRR)
1 ROOF PHASE
1.01 Roof - 1 1,456,607.80
1.02 Roof - 2 1,172,960.27
1.03 Roof - 3 2,735,423.10
Sub- total 5,364,991.18
2 STREET SIDE PHASE (Perimeter)
2.01 Street - 1 1,040,340.81
2.02 Street - 2 402,737.22
2.03 Street - 3 464,011.76
2.04 Street - 4 1,019,247.96
2.05 Street - 5 3,536,700.18
2.06 Street - 6 1,815,425.00
2.07 Street - 7 1,697,174.00
Sub- total 9,975,636.93
3 OTHER AREAS
3.01 Grand entrance 1,811,435.02
3.02 Adewa plaza 2,173,925.44
3.03 Atrium 727,878.99
3.04 Court yard 246,025.28
3.05 Children play area 726,530.92
3.06 Level 3 & musicum 1,717,740.62
Sub- total 7,403,536.27
TOTAL PROJECT AMOUNT
22,744,164.38
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Item
Description Unit QTY Rate Total
No
Roof-1
Grass plantation- (1,346m2)
Plantation bed (6.76m2)
Supply good brown or red top soil to roof-1 green area 1,346 m2 and built-in
1.01 m3 811.7 424.2 344,336.9
pots 6.76m2 to a depth of 60cm
1.02 Spreading, filling and leveling of top soil m3 811.7 60.0 48,699.4
1.03 Supply of sand / red ash for the grass area ( 1,346 m2) m3 26.9 1,000.0 26,920.0
1.04 Spreading of sand / red ash for the grass m3 26.9 60.0 1,615.2
1.05 Supply organic manure for all grass area (hen) Sack 336.5 575.0 193,487.5
1.06 Supply organic manure for plantation bed 6.76m2 (cattle) Sack 3.00 520.00 1,560.0
Mixing, Spreading of organic manure two time during plantation and after
1.07 m3 811.7 550.0 446,410.8
plantation of the grass and plants work
sum 1,063,029.8
2.00 PLANTATIONS
2.01 Supply of lawns with grass (1,346m2) Sack 269.2 365.0 98,258.0
sum 208,078.0
3 LOGISTICS
Deliver the grass, organic manure sacks and plants with care and safety.
3.10 (transportation, labor, equipment, material, management and supervision) to Trip 3.0 1,500.0 4,500.0
relocate the right place.
Loading, unloading, Locating plants to their right place with its proper spaces
3.20 Lump sum 1.0 1,000.0 1,000.0
and distance in between each plant
sum 5,500.0
Locating and supervising the Planation of all plants according to the design
including three month gardening works, watering, cutting of lawns, ploughing
4.01 Month 3.0 30,000.0 90,000.0
the plants, weeding, raking, mowing, trimming, pruning and replacement of dead
plants and giving care according to the plant species in ever other two day
sum 90,000.0
SUM 1,456,607.8
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Item
Description Unit QTY Rate Total
No
Roof-2
Grass plantation (1,115m2)
4 Built-in pots (5.78m2)
Supply good brown or red top soil to roof-1 green area 1,115 m2 and built-in pots
1.01 m3 672.5 424.2 285,287.82
5.78m2 to a depth of 60cm
1.02 Spreading, filling and leveling of top soil m3 672.5 60.0 40,348.08
1.03 Supply of sand / red ash for the grass area ( 1,115 m2) m3 22.3 1,000.0 22,300.00
1.04 Spreading of sand / red ash for the grass area m3 22.3 60.0 1,338.00
1.05 Supply organic manure for all grass area (hen) Sack 278.8 575.0 160,281.25
Supply organic manure for built-in pots 5.78m2 (cattle) Sack 2.00 520.00 1,040.00
Mixing, Spreading of organic manure two time during plantation and after
1.06 m3 672.5 550.0 369,857.40
plantation of the grass and plants work
sum 880,452.55
2.00 PLANTATIONS
2.01 Supply of lawns with grass (1,115m2) Sack 223.0 365.0 81,395.00
sum 210,307.72
3 LOGISTICS
Deliver the grass, organic manure sacks and plants with care and safety.
3.10 (transportation, labor, equipment, material, management and supervision) to Trip 2.0 1,500.0 3,000.00
relocate the right place.
Loading, unloading, Locating plants to their right place with its proper spaces and
3.20 Lump sum 1.0 1,200.0 1,200.00
distance in between each plant
sum 4,200.00
Locating and supervising the Planation of all plants according to the design
including three month gardening works, watering, cutting of lawns, ploughing the
4.01 Month 3.0 26,000.0 78,000.00
plants, weeding, raking, mowing, trimming, pruning and replacement of dead plants
and giving care according to the plant species in ever other two day
sum 78,000.00
SUM 1,172,960.3
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Item
Description Unit QTY Rate Total
No
Roof-3
Grass plantation - (2,605m2)
12 Built-in pots (12.52m2)
Built-in pots along the rail- 31m2
Supply good brown or red top soil to roof-1 green area 2,605 m2 and built-in pots
1.01 m3 1,589.1 424.2 674,164.9
12.52m2 to a depth of 60cm
1.02 Spreading, filling and leveling of top soil m3 1,589.1 60.0 95,346.7
1.03 Supply of sand / red ash for the grass area (2,605 m2) m3 52.1 1,000.0 52,100.0
1.04 Spreading of sand / red ash for the grass area m3 22.3 60.0 1,338.0
1.05 Supply organic manure for all grass area (hen) Sack 651.3 575.0 374,468.8
1.06 Supply organic manure for built-in pots 12.52m2 (cattle) Sack 11 520.0 5,720.0
Mixing, Spreading of organic manure two time during plantation and after
1.07 m3 1,570.5 550.0 863,781.6
plantation of the grass and plants work
2,066,919.9
sum
2.00
PLANTATIONS
2.01 Supply of lawns with grass ( 2,605m2) Sack 521.0 365.0 190,165.0
2.03 Supply of 12 peace's of plants for Built-in pot no 12.0 10,080.0 120,960.0
525,103.2
sum
3 LOGISTICS
Deliver the grass, organic manure sacks and of plants with care and safety.
3.10 (transportation, labor, equipment, material, management and supervision) to Trip 4.0 1,500.0
relocate the right place.
6,000.0
3.20 Loading, unloading, Locating plants to their right place with its proper place Lump sum 1.0 2,400.0
2,400.0
8,400.0
sum
4.00 COMPULSORY GARDENING
Locating and supervising the Planation of all plants according to the design
including three month gardening works, watering, cutting of lawns, ploughing the
4.01 Month 3.0 45,000.0 135,000.0
plants, weeding, raking, mowing, trimming, pruning and replacement of dead
plants and giving care according to the plant species in ever other two day
135,000.0
sum
SUM 2,735,423.1
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street-1
Landscape area (115m2)
Grass area (59m2)
Cobble for seating area (10m2)
Rock garden (12m2 )
Aggregate path (9m2)
Plantation bed (29m2 )
Mound (3m2)
Supply good brown or red top soil to all green area around the site perimeter
1.03 m3 58.8 424.2 24,945.3
(98m2) to a depth of 60cm
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 98.0 60.0 5,880.0
(98m2)
1.06 Supply of sand / red ash for the grass area (59m2) m3 5.9 60.0 354.0
1.07 Spreading of sand / red ash at the grass area m3 5.9 60.00 354.0
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 7.0 575.0 4,025.0
1.09 Supply organic manure for all lawn/grass area (hen) Sack 15.0 520.00 7,800.0
1.11 Mound of soil and rock arrangement to area of 3m2 to a height of 60cm Lump sum 1.0 7,000.0 7,000.0
sum 118,098.3
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling
up with excavated soil
TREES:
INDIGENOUS SP.(TREE)
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 4.0 471.25 1,885.0
2.07 Olea europea subsp. cuspidata (amh. Weira) No 3.0 552.5 1,657.5
FLOWER TREE
SHUREB
2.14 Kiniphofia No 30.0 511.88 15,356.3
2.15 Euphobia milii (amh. Ye shoakelil) No 30.0 65.00 1,950.0
2.16 Phormium No 30.0 877.50 26,325.0
Item No Description Unit QTY Rate Total
2.17 Silver dust No 50.0 471.25 23,562.5
2.18 Canna indica (black leaf) No 20.0 89.38 1,787.5
2.19 Datura suavolens (amh. Trumba) No 20.0 195.00 3,900.0
2.20 Plumbago No 20.0 471.25 9,425.0
2.21 Elephant ears (black leaf) No 20.0 471.25 9,425.0
2.22 Sansevieria No 10.0 138.13 1,381.3
2.25 Euphorbia abyssinica (amh. Kulkual) No 20.0 3,315.00 66,300.0
2.26 Agave different specious No 20.0 877.50 17,550.0
GROUND COVER -
2.31 Baby tears (different specious ground cover) No 20.0 32.50 650.0
GRASS
2.32 Supply of lawns for area 59M2 Sack 15.0 365.00 5,475.0
sum 666,917.5
3.01 Cobble pavement (compaction and with necessary materials) m2 10.0 2,500.00 25,000.0
sum 25,000.0
sum 205,125.0
5.00 LOGISTICS
Deliver all the Pieces of listed plants with care and safety. (transportation,
5.01 Trip 2.0 1,500.00 3,000.0
labor, management and supervision)
Locating each plants to their right place with its proper spaces and distance in
5.02 Lump sum 1.0 1,200.00 1,200.0
between each plant
sum 4,200.0
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
6.01 Month 3.0 7,000.00 21,000.0
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 21,000.0
SUM 1,040,340.8
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street-2
Landscape area (130m2)
Grass area (85m2)
Plantation bed (45m2 )
Supply good brown or red top soil to all green area around the site perimeter
1.03 m3 78.0 424.2 33,090.72
(98m2) to a depth of 60cm
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 45.0 60.0 2,700.00
(45m2)
Spreading and leveling of top soil, compact with mechanical tampering machine,
1.05 m3 51.0 120.0 6,120.00
for grass areas (lawns) (59m2)
1.06 Supply of sand / red ash for the grass area (59m2) m3 8.5 1,000.0 8,500.00
1.07 Spreading of sand / red ash at the grass area m3 5.9 60.0 354.00
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 12.0 575.0 6,900.00
1.09 Supply organic manure for all lawn/grass area (hen) Sack 22.0 520.00 11,440.00
sum 112,004.72
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
SHUREB -
GROUND COVER -
2.31 Baby tears (different specious ground cover) No 20.0 32.50 650.00
GRASS
2.32 Supply of lawns for area 85m2 Sack 85.0 365.00 31,025.00
sum 238,532.50
sum 24,900.00
4.00 LOGISTICS
Deliver all the 3,474 pieces of listed plants with care and safety. (transportation,
4.01 Trip 3.0 1,500.0
labor, management and supervision) 4,500.00
Locating each plants to their right place with its proper spaces and distance in
4.02 Lump sum 1.0 1,800.0
between each plant 1,800.00
sum 6,300.00
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
5.01 Month 3.0 7,000.0 21,000.00
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 21,000.00
SUM 402,737.2
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street-3
landscape area (148m2)
Grass area (71m2)
Plantation bed (50m2 )
Rock garden (27m2 )
1.00 PREPARATION WORKS
Supply good brown or red top soil to all green area around the site perimeter
1.03 m3 88.8 424.2 37,672.51
(148m2) to a depth of 60cm
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 50.0 60.0 3,000.00
(50m2)
Spreading and leveling of top soil, compact with mechanical tampering machine,
1.05 m3 42.6 120.0 5,112.00
for grass areas (lawns) (71m2)
1.06 Supply of sand / red ash for the grass area (71m2) m3 7.1 1,000.0 7,100.00
1.07 Spreading of sand / red ash at the grass area m3 7.1 60.0 426.00
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 18.0 575.0 10,350.00
1.09 Supply organic manure for all lawn/grass area (hen) Sack 18.0 520.0 9,360.00
sum 121,860.51
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
INDIGENOUS SP.(TREE)
SHUREB -
2.31 Baby tears (different specious ground cover) No 30.0 32.50 975.00
GRASS
2.32 Supply of lawns for area 85m2 Sack 85.0 365.00 31,025.00
sum 283,951.25
3.00 STONE / AGREGATE
sum 24,900.00
4.00 LOGISTICS
Deliver all the 3,474 pieces of listed plants with care and safety. (transportation,
4.01 Trip 3.0 1,500.0
labor, management and supervision) 4,500.00
Locating each plants to their right place with its proper spaces and distance in
4.02 Lump sum 1.0 1,800.0
between each plant
1,800.00
4.03 sum 6,300.00
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
5.01 Month 3.0 9,000.0 27,000.00
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 27,000.00
SUM 464,011.8
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street-4
Landscape area (195m2)
Grass area (135m2)
Plantation bed (60m2 )
Aggregate Path (19m2 )
Supply good brown or red top soil to all green area around the site perimeter
1.03 m3 117.0 424.2 49,636.08
(195m2) to a depth of 60cm
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 60.0 60.0 3,600.00
(60m2)
Spreading and leveling of top soil, compact with mechanical tampering machine,
1.05 m3 81.0 120.0 9,720.00
for grass areas (lawns) (135m2)
1.06 Supply of sand / red ash for the grass area (135m2) m3 13.5 1,000.0 13,500.00
1.07 Spreading of sand / red ash at the grass area m3 13.5 60.0 810.00
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 15.0 575.0 8,625.00
1.09 Supply organic manure for all lawn/grass area (hen) Sack 34.0 520.0 17,680.00
sum 167,921.08
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
INDIGENOUS SP.(TREE)
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 8.00 471.25 3,770.00
2.07 Olea europea subsp. cuspidata (amh. Weira) No 3.00 3,315.00 9,945.00
FLOWER TREE
SHUREB
GROUND COVER -
Item No Description Unit QTY Rate Total
2.31 Baby tears (different specious ground cover) No 15.00 32.5 487.50
GRASS
2.32 Supply of lawns for area 135m2 Sack 34.0 365.0 12,410.00
sum 793,126.88
sum 24,900.00
4.00 LOGISTICS
Deliver all the 3,474 pieces of listed plants with care and safety. (transportation,
4.01 Trip 3.0 1,500.0
labor, management and supervision) 4,500.00
Locating each plants to their right place with its proper spaces and distance in
4.02 Lump sum 1.0 1,800.0
between each plant
1,800.00
sum 6,300.00
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
5.01 Month 3.0 9,000.0 27,000.00
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 27,000.00
SUM 1,019,248.0
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street-5
Landscape area (216m2)
Grass area (86m2)
Plantation bed (45m2 )
Aggregate Path (32m2 )
Supply good brown or red top soil to all green area around the site perimeter
1.03 m3 196.8 424.2 83,490.43
(328m2) to a depth of 60cm
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 210.0 60.0 12,600.00
(210m2)
Spreading and leveling of top soil, compact with mechanical tampering machine,
1.05 m3 81.0 120.0 9,720.00
for grass areas (lawns) (135m2)
1.06 Supply of sand / red ash for the grass area (86m2) m3 8.6 1,000.0 8,600.00
1.07 Spreading of sand / red ash at the grass area m3 8.6 60.0 516.00
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 53.0 575.0 30,475.00
1.09 Supply organic manure for all lawn/grass area (hen) Sack 22.0 520.0 11,440.00
sum 265,081.43
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
INDIGENOUS SP.(TREE)
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 20.0 471.25 9,425.00
2.07 Olea europea subsp. cuspidata (amh. Weira) No 10.0 552.50 5,525.00
FLOWER TREE
SHUREB
GROUND COVER -
2.31 Baby tears (different specious ground cover) No 40.0 32.50 1,300.00
GRASS
Sack
2.32 Supply of lawns for area 86M2 22.0 365.00 8,030.00
sum 3,218,518.75
sum 25,800.00
9.00 LOGISTICS
Deliver all the 3,474 pieces of listed plants with care and safety. (transportation,
9.01 Trip 3.0 1,500.0
labor, management and supervision)
4,500.00
Locating each plants to their right place with its proper spaces and distance in
9.02 Lump sum 1.0 1,800.0
between each plant
1,800.00
sum 6,300.00
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
10.01 Month 3.0 7,000.0 21,000.00
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 21,000.00
SUM 3,536,700.2
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street - 6
Landscape area (394m2)
Grass area (318m2)
Plantation bed (76m2 )
1.03 Supply good brown or red top soil to all green area (394m2) to a depth of 60cm m3 236.4 -
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 76.0 -
(76m2)
Spreading and leveling of top soil, compact with mechanical tampering machine,
1.05 m3 190.8 -
for grass areas (lawns) (318m2)
1.06 Supply of sand / red ash for the grass area (318m2) m3 31.8 -
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 22.0 575.0 12,650.00
1.09 Supply organic manure for all lawn/grass area (hen) Sack 79.0 520.0 41,080.00
sum 183,750.00
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
INDIGENOUS SP.(TREE)
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 30.0 471.25 14,137.50
2.07 Olea europea subsp. cuspidata (amh. Weira) No 3.0 552.50 1,657.50
FLOWER TREE
SHUREB
GROUND COVER -
2.31 Baby tears (different specious ground cover) No 50.0 32.50 1,625.00
GRASS
Sack
2.32 Supply of lawns for area 318 M2 80.0 365.00 29,200.00
sum 1,585,175.00
3.00 LOGISTICS
Deliver all pieces of listed plants with care and safety. (transportation, labor,
3.01 Trip 5.0 1,500.0
management and supervision)
7,500.00
Locating each plants to their right place with its proper spaces and distance in
3.02 Lump sum 1.0 3,000.0
between each plant
3,000.00
sum 10,500.00
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
4.01 Month 3.0 12,000.0 36,000.00
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 36,000.00
SUM 1,815,425.0
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Street - 7
Landscape area (270m2)
Grass area (173m2)
Plantation bed (19m2 )
Cobble for seating area (24m2)
Rock garden (42m2 )
Aggregate path (12m2)
Mound (8 m2)
1.03 Supply good brown or red top soil to all green area (270 m2) to a depth of 60cm m3 162.0 424.2 68,726.88
Spreading and leveling of top soil for shrub, perennial and annual plantations
1.04 m2 19.0 60.0 1,140.00
(19m2)
Spreading and leveling of top soil, compact with mechanical tampering machine,
1.05 m3 103.8 120.0 12,456.00
for grass areas (lawns) (173m2)
1.06 Supply of sand / red ash for the grass area (173m2) m3 17.3 1,000.0 17,300.00
1.07 Spreading of sand / red ash at the grass area m3 17.3 60.0 1,038.00
Sack
1.08 Supply organic manure for shrub , perennial and green area (cattle) 6.0 -
1.09 Supply organic manure for all lawn/grass area (hen) Sack 44.0 575.00 25,300.00
1.11 Mound of soil and rock arrangement to area of 3m2 to a height of 60cm Lump sum 1.0 550.00 550.00
sum 210,750.88
2.00 PLANTATIONS
Supply and plantation of trees (indigenous & exotic ),bushes, shrubs and
perennials (ground covers, herbs flowers) Hight of 0.5m -2.00m, including
excavation of plant holes average width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
INDIGENOUS SP.(TREE)
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 30.0 471.30 14,139.00
2.07 Olea europea subsp. cuspidata (amh. Weira) No 3.0 552.50 1,657.50
FLOWER TREE
SHUREB
GROUND COVER -
2.31 Baby tears (different specious ground cover) No 50.0 32.50 1,625.00
GRASS
Sack
2.32 Supply of lawns for area 318 M2 64.0 365.00 23,360.00
sum 1,445,549.00
sum 205,125.00
4.00 LOGISTICS
Deliver all pieces of listed plants with care and safety. (transportation, labor,
4.01 Trip 5.0 1,500.0
management and supervision)
7,500.00
Locating each plants to their right place with its proper spaces and distance in
4.02 Lump sum 1.0 3,000.0
between each plant
3,000.00
10,500.00
Supervising the Planation of all plants according to the design location of the
plants, including three month gardening works, watering, cutting of lawns,
5.01 Month 3.0 12,000.0 36,000.00
ploughing the plants, weeding, raking, mowing, trimming, pruning and
replacement of dead plants and giving care according to the plant species.
sum 36,000.00
SUM 1,697,174.0
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Grand entrance
Landscape area (421m2)
6 Concret planter in between the stairs (66m2)
Grass area (71m2)
Plantation bed (238m2 )
1.00
PREPARATION WORKS
1.01 Supply good brown or red top soil to all green area at the grand m3 252.6 424.2 107,163.02
entrance (421m2) with a depth of 60cm
Spreading and leveling of top soil in every 60cm thickness layer and
1.02 m3 42.6 60.0 2,556.00
compact with mechanical tampering machine, for grass areas (lawns)
(71m2)
1.03 Spreading and leveling of top soil for shrub, perennial and annual m2 350.0 1,000.0 350,000.00
plantations (350m2)
1.04 m3 7.1 60.0 426.00
Supply of sand / red ash for the grass area (71m2)
1.05 m2 71.0 60.0 4,260.00
Spreading of sand / red ash for the grass area of 10mm
1.06 Sack 60.0 575.0 34,500.00
Supply organic manure for all green area (cattle)
1.07 Sack 18.0 520.0 9,360.00
Supply organic manure for all lawn/grass area (hen)
sum 647,195.02
2.00
PLANTATIONS
Supply and plantation of trees,bushes, shrubs and perennials (ground
covers, herbs flowers) hight of 0.5m -1.00m, including excavation of
plant holes avarage width 0.3cm, min. depth 60 cm and filling up
with excavated soil
TREES:
2.01 Cypress tree No 28.0 552.5 15,470.00
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 15.0 471.3 7,068.75
2.07 Citrus aurantium (amh. Lomi, engl. Lime) No 7.0 958.8 6,711.25
2.09 SHUREB
2.35 HERBS
2.45 CLIMBER
GRASS
2.47 Supply of lawns for area 71M2 sack 15.0 365.0 5,475.00
sum 1,044,240.00
sum 73,500.00
Locating each plants to thier right place with its proper spaces and
4.02 Lump sum 1.0 3,000.0 3,000.00
destance in between each plant
sum 10,500.00
sum 36,000.00
SUM 1,811,435.0
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Adwa plaza
Landscape area (435m2)
Grass area (84m2)
Plantation bed (351m2 )
1.00
PREPARATION WORKS
1.01 Supply good brown or red top soil to all green area at the grand m3 587.3 424.2 249,134.94
entrance (435m2) with a depth of 1.35 m
1.03 Filling, Spreading and leveling of top soil for shrub, perennial and m2 351.0 1,000.0 351,000.00
annual plantations (351m2)
1.04 m3 8.4 60.0 504.00
Supply of sand / red ash for the grass area (84m2)
1.05 m2 84.0 60.0 5,040.00
Spreading of sand / red ash for the grass area of 10mm
1.06 Sack 88.0 575.0 50,600.00
Supply organic manure for all green area (cattle)
1.07 Sack 22.0 520.0 11,440.00
Supply organic manure for all lawn/grass area (hen)
sum 993,730.44
2.00
PLANTATIONS
TREES:
2.01 Cypress tree No 5.0 552.50 2,762.50
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 15.0 471.25 7,068.75
FRUIT TREE:
SHUREB
2.05 Impatiens different color No 200.0 227.50 45,500.00
HERBS
2.30 Bay tree No 7.0 4,940.00 34,580.00
CLIMBER
2.39 IVY No 120.0 170.63 20,475.00
GROUND COVER
2.43 Sedum stonecrop No 80.0 -
GRASS
2.47 Supply of lawns for area 71M2 sack 15.0 365 5,475.00
sum 1,148,695.00
Locating each plants to their right place with its proper spaces and
3.02 Lump sum 1.0 3,000.00 3,000.00
distance in between each plant
sum 10,500.00
sum 21,000.00
SUM 2,173,925.44
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
sum 413,583.4
2.00 PLANTATIONS
TREES:
Dracaena steudneri (amh. Itsepatos,
2.01 No 8.0 471.3 3,770.0
Moata / "Yukka")
2.02 Hyphaene thebaica (Zmbaba) No 4.0 4,127.5 16,510.0
Phoenix reclinata (amh. Yehabesha
2.03 No 4.0 15,000.0 60,000.0
zembaba)
2.04 Frangipani No 5.0 552.5 2,762.5
SHUREB
2.05 Artemisia sp. (amh. Ariti) No 40.0 308.8 12,350.0
2.06 Ornamental grasses No 60.0 471.3 28,275.0
2.07 Papyrus No 60.0 89.4 5,362.5
2.08 Canna indica No 60.0 89.4 5,362.5
2.09 Spider plant No 80.0 56.9 4,550.0
2.10 Sanservieria plants (snake plant) No 60.0 138.1 8,287.5
2.11 Datura suavolens (amh. Trumba) No 50.0 195.0 9,750.0
2.12 Aloe sp. (amh. Iret) No 40.0 308.8 12,350.0
2.13 Elephant ears (black leaf) No 20.0 471.3 9,425.0
2.14 Cymbopogon martini (Tedj sar) No 80.0 162.5 13,000.0
Item No Description Unit QTY Rate Total
2.15 Begonias No 80.0 308.8 24,700.0
2.16 Geranium No 80.0 40.6 3,250.0
2.17 Sansevieria No 50.0 138.1 6,906.3
2.18 Ferns No 30.0 162.5 4,875.0
2.19 Dracaena No 10.0 1,202.5 12,025.0
GROUND COVER
2.20 Sedum stonecrop (different specious) No 60.0 -
2.21 Cactus plants (different specious) No 20.0 138.1 2,762.5
2.22 Succulent plants (different specious) No 60.0 138.1 8,287.5
Baby tears (different specious ground
No 50.0 32.5 1,625.0
cover)
HERBS
2.23 Rosmarinus officinalis (Azmarino) No 30.0 48.8 1,462.5
2.24 Mnthal spicata (nana) No 20.0 56.9 1,137.5
2.25 Parsley No 20.0 121.9 2,437.5
2.26 Ruta chalepensis(Tena le Adam) No 20.0 40.6 812.5
2.27 Lemon Balm No 20.0 56.9 1,137.5
2.28 Peppermint No 20.0 56.9 1,137.5
2.29 Ocimum lamifolium (Damakase) No 10.0 162.5 1,625.0
2.30 Lippia adoensis (Koseret) No 10.0 162.5 1,625.0
CLIMBER -
2.31 Creeper No 15.0 170.6 2,559.4
2.32 Jasminum odoratum No 20.0 633.8 12,675.0
sum 282,795.6
3.00 DELIVERY OF PLANTS
Deliver all the listed plants with care and
safety. (transportation, labor, equipment,
3.01 Lump sum 5.0 1,500.0 7,500.0
material, management and supervision) to
relocate the right place.
Locating each plants to their right place
3.02 with its proper spaces and distance in Lump sum 1.0 3,000.0 3,000.0
between each plant
sum 10,500.0
4.00 COMPULSORY GARDENING
sum 21,000.0
SUM 727,879.0
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
1 PREPARATION WORKS
1.01 Supply good brown or red top soil to all green area at m3 477.3 424.2 202,488.1
level 3 and museum to different planter pots to a depth
of 80cm
1.02 Filling of top soil for shrub, perennial and annual m3 477.3 60.0 28,637.8
plantations
Spreading and leveling of top soil, compact with
1.05 mechanical tampering machine, for grass areas (lawns) m3 56.4 1,000.0 56,400.0
(94m2)
1.06 Supply of sand / red ash for the grass area (173m2) m3 9.4 60.0 564.0
1.07 Spreading of sand / red ash at the grass area m3 17.3 60.0 1,038.0
1.09 Supply organic manure for all lawn/grass area (hen) Sack 24.0 520.0 12,480.0
TREES:
Endemic plants
2.01 Erythrina burana (Brana/Korch) No 3.00 -
2.02 Erythrina brucei (Kwara / Korch) No 3.00 -
2.03 Kniphofia (Yejb Shinkurt) No 3.00 5,000.0 15,000.00
2.04 Ethiopian Knapweed (Itse'Yohans) No 3.00 -
3 PLANTER (Fiber)
3.01 Fiber planter pot pic 185.00 5,000.0 925,000.00
3.02 80g Geotextile for all planter m2 300.0 - -
3.03 Sand m3 3.0 2,000.0 6,000.00
3.04 Red ash m3 3.0 1,000.0 3,000.00
sum 949,340.00
6 DELIVERY OF PLANTS
sum 21,000.00
SUM 1,717,740.6
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
Court yard
Landscape area (326m2)
Path ( 94m2)
planter pot 6m2
Plantation bed (138m2)
Aggregate path(88m2)
1 PREPARATION WORKS
1.01 Supply good brown or red top soil to all green area at level 3 and
museum to the area of 326m2 to a depth of 60cm m3 143.4 424.20 60,830.3
1.02 Filling, Spreading and leveling of top soil for shrub, perennial and 575
annual plantations m2 135.0 77,625.0
1.03 Sack 520
Supply organic manure for shrub , perennial and green area (cattle) 35.0 18,200.0
1.04 Proportionally mixing and Spreading of organic manure after 550
plantation or during replacing excavated soil for the plants holes. m3 143.4 78,870.0
sum 235,525.28
2 PLANTATIONS
GROUND COVER
2.20 Sedum stonecrop (different specious) No 40.00 -
2.21 Cactus plants (different specious) No 20.00 -
2.22 Succulent plants (different specious) No 40.00 -
Baby tears (different specious ground cover) No 50.00 -
HERBS
2.23 Rosmarinus officinalis (Azmarino) No 40.00 -
2.24 Mnthal spicata (nana) No 20.00 -
2.25 Parsley No 20.00 -
2.26 Ruta chalepensis(Tena le Adam) No 20.00 -
2.27 Lemon Balm No 20.00 -
2.28 Peppermint No 20.00 -
2.29 Ocimum lamifolium (Damakase) No 10.00 -
2.30 Lippia adoensis (Koseret) No 10.00 -
CLIMBER
2.31 Creeper No 5.00 -
2.32 Jasminum odoratum No 5.00 -
SHUREB
2.15 Impatiens different color No 20.00 -
2.16 Salvia No 20.00 -
2.17 Vinca No 20.00 -
2.18 Lantana different color No 20.00 -
2.19 Rain lily No 20.00 -
2.2 Desniy No 20.00 -
2.21 Aptenia No 20.00 -
2.22 Sanservieria plants (snake plant) No 20.00 -
2.23 Datura suavolens (amh. Trumba) No 20.00 -
2.24 Aloe sp. (amh. Iret) No 10.00 -
2.25 Artemisia sp. (amh. Ariti) No 40.00 -
2.26 Cymbopogon martini (Tedj sar) No 10.00 -
2.27 Ornamental grasses No 10.00 -
2.28 Begonias No 20.00 -
2.29 Geranium No 40.00 -
2.3 Ficus vasta No 40.00 -
2.31 Ferns No 20.00 -
2.32 Dracaena No 32.00 -
2.33 Ball Ficus No 10.00 -
2.34 Frangipani No 5.00 -
sum -
Item No Description Unit QTY Rate Total
3 PATH
Deliver all pieces of listed plants with care and safety. (transportation,
6.01 labor, equipment, material, management and supervision) to relocate Lump sum 5.0 1,500.00 7,500.00
the right place.
Locating each plants to their right place with its proper spaces and
6.02 Lump sum 1.0 3,000.00 3,000.00
distance in between each plant
sum 10,500.00
7 COMPULSORY GARDENING
GRAND TOTAL -
SPECIFICATION AND BILL OF QUANTITIES
FOR
ADWA KM 0.00 PROJECT
1 PREPARATION WORKS
1.01 Supply good brown or red top soil to the area of 342m2 to a depth of 424.2
60cm m3 205.2 87,054.0
1.02 Filling, Spreading and leveling of top soil for shrub, perennial and 60.0
annual plantations m2 342.0 20,520.0
1.04
Proportionally mixing and Spreading of organic manure after
plantation or during replacing excavated soil for the plants holes. m3 205.2 550.0 112,860.0
sum 238,634.05
2 PLANTATIONS
TREES:
2.01 Cypress tree No 28.0 552.50 15,470.00
2.02 Dracaena steudneri (amh. Itsepatos, Moata / "Yukka") No 15.0 471.25 7,068.75
2.03 Hyphaene thebaica (Zmbaba) No 15.0 4,127.50 61,912.50
2.04 Phoenix reclinata (amh. Yehabesha zembaba) No 15.0 15,000.00 225,000.00
GROUND COVER
2.20 Sedum stonecrop (different specious) No 20.00 -
2.21 Cactus plants (different specious) No 20.00 138.13 2,762.50
2.22 Succulent plants (different specious) No 20.00 138.13 2,762.50
2.23 Baby tears (different specious ground cover) No 20.00 32.50 650.00
HERBS
2.23 Rosmarinus officinalis (Azmarino) No 10.00 48.75 487.50
2.24 Mnthal spicata (nana) No 10.00 56.88 568.75
2.25 Parsley No 10.00 121.88 1,218.75
2.26 Ruta chalepensis(Tena le Adam) No 10.00 40.63 406.25
2.27 Lemon Balm No 10.00 56.88 568.75
2.28 Peppermint No 10.00 56.88 568.75
2.29 Ocimum lamifolium (Damakase) No 10.00 162.50 1,625.00
2.30 Lippia adoensis (Koseret) No 10.00 162.50 1,625.00
CLIMBER
2.31 Creeper No 5.00 170.63 853.13
2.32 Jasminum odoratum No 5.00 633.75 3,168.75
SHUREB
2.15 Impatiens different color No 20.00 227.50 4,550.00
2.16 Salvia No 20.00 81.25 1,625.00
2.17 Vinca No 20.00 81.25 1,625.00
2.18 Lantana different color No 20.00 390.00 7,800.00
2.19 Rain lily No 20.00 276.25 5,525.00
2.2 Desniy No 20.00 81.25 1,625.00
2.21 Aptenia No 20.00 40.63 812.50
2.22 Sanservieria plants (snake plant) No 20.00 138.13 2,762.50
2.23 Datura suavolens (amh. Trumba) No 20.00 195.00 3,900.00
2.24 Aloe sp. (amh. Iret) No 10.00 308.75 3,087.50
2.25 Artemisia sp. (amh. Ariti) No 40.00 308.75 12,350.00
2.26 Cymbopogon martini (Tedj sar) No 10.00 162.50 1,625.00
2.27 Ornamental grasses No 10.00 471.25 4,712.50
2.28 Begonias No 20.00 308.75 6,175.00
2.29 Geranium No 40.00 40.63 1,625.00
2.3 Ficus vasta No 40.00 633.75 25,350.00
Item No Description Unit QTY Rate Total
2.31 Ferns No 20.00 162.50 3,250.00
2.32 Dracaena No 32.00 1,202.50 38,480.00
2.33 Ball Ficus No 10.00 633.75 6,337.50
2.34 Frangipani No 5.00 552.50 2,762.50
sum 462,696.88
3 DELIVERY OF PLANTS
Deliver all pieces of listed plants with care and safety. (transportation,
3.01 labor, equipment, material, management and supervision) to relocate Lump sum 2.0 1,500.00 3,000.00
the right place.
Locating each plants to their right place with its proper spaces and
3.02 Lump sum 1.0 1,200.00 1,200.00
distance in between each plant
sum 4,200.00
4 COMPULSORY GARDENING
GRAND TOTAL -