01 July 2022

EAIC / ESP / Product Management


To ZHs/BHs

Subject: PQS scheme

We are pleased to inform PQS scheme on below tabled products with effect from 1st July 2022.
 The scheme is applicable only to ESP-LV Channel partners for the sales done in Channel 02 and not applicable
to other channel partners like ISPs, KDAs, DSPs, ASCs, etc.
 All standard scheme orders must be placed under ZORS.

 A Special promotional discount of 3.5% will be applicable in July’22 over &


above the below scheme discounts.

There are two Scheme options: 1. Month-on-Month Rolling scheme, 2. Same-Month scheme.
Scheme option 1: Month-on-Month Rolling scheme (Sales Value based)
This scheme will be configured in system and can be availed by feeding ZORS orders.
The discount configuration is done depending on the average sales value achieved in previous three calendar months.

Discount to CP as per slabs 3 months average


Slabs Cyl Capacitors + Box Capacitors + Detuned Reactors + TSM SV in L (INR)
1 54.0% ≥ 1.0 & < 1.5
2 54.5% ≥ 1.5 & < 4.5
3 55.0% ≥ 4.5 & < 8.5
4 55.5% ≥ 8.5
Voluntary entry for Rolling Scheme would be considered based on the performance of below Same-Month Scheme.
Those willing to enroll, need to intimate PQS-PMM team before the next calendar month.

Scheme option 2: Same-Month scheme (MRP Value based)


This is applicable to all Channel Partners, who are not under the Rolling Scheme and to be invoiced in same month.
The scheme discounts will be picked automatically while feeding ZORS order, based on the total MRP value of all the
items, as per below table:
Discount to CP as per slabs
MRP in L (INR)
Slabs Cyl Capacitors + Box Capacitors + Detuned Reactors + TSM
1 54.0% ≥ 4.25 & < 10.0
2 54.5% ≥ 10.0 & < 19.0
3 55.0% ≥ 19.0 & < 30.0
4 55.5% ≥ 30.0

1 of 2 | P a g e
Cat no series
1. All the above are basic prices and 18% GST will be extra LTBCF Std duty box 1 to 6 kVAr
LTBCD Std duty box 7.5 kVAr & above
2. Prices of Agri duty capacitors are available in the LTBCM Std duty box with MCB & LED
Scheme ofAgricultural Electrical Products LTCCF Std duty cyl 1 to 6 kVAr
LTCCD Std duty cyl 7.5 kVAr & above
LTBCH Heavy duty box
LTCCH Heavy duty cyl
In case of any clarification, please contact the undersigned.
LTCCN Gas filled cyl
Interpretation of scheme in the event of ambiguity would be as
LTCCR Super Heavy duty cyl
decidedby the company. LTBCP APP box
LTBCU LTXL Ultra Heavy duty box
LTCCU LTXL Ultra Heavy duty cyl
LTFR Copper Reactor
LTAL Aluminum Reactor
LTHR High V-THD Reactor
LTTSM Thyristor switching Module

ESP – Product Management & Marketing

2 of 2 | P a g e