Evaluasi Trial Alat Giling " Reducing Deposit" Raw Material

Total Batang : 7200


Durasi Trial : 3 hari

1 Analisa dimensi as loop & batukan


D 01 D 02
As loop
0 6.30 6.30
1 6.25 6.25
2 6.25 6.25
3 6.25 6.25
4 6.25 6.25
batukan
0
1
2
3
4

2 Tingkat Deposit Material


As Loop D1 D2
Section 1 0.30 0.30
Section 2 0.20 0.10
Section 3 0.30 0.30
Total 0.80 0.70

Batukan
Section 1 0.15 0.15
Section 2 - -
Section 3 0.15 0.15
0.30 0.30