0 10000 15000
1 4000 3636.36 3636.36 7000 6363.64
2 4000 3305.79 6942.15 5500 4545.45
3 4000 3005.26 9947.41 4000 3005.26
Payback period
Project 1 2.50
Project 2 2.63 Accept all projects as payback period less than
Project 3 2.38 desired 3 years.
Project 4 1.73
The project should not be selected as the project has negative NPV and Profitability Index less than 1.
ofitability Index less than 1.
Year A Present value Cumulative value B Present value Cumulative value
0 -100000 -100000
1 50000 45454.55 45454.55 10000 9090.91 9090.91
2 50000 41322.31 86776.86 10000 8264.46 17355.37
3 10000 7513.15 94290.01 50000 37565.74 54921.11
4 10000 6830.13 101120.14 30000 20490.40 75411.52
5 10000 6209.21 107329.36 100000 62092.13 137503.65
Payback Period
Project A 2
Project B 4
Project C 3
IRR
Project A 14%
Project B 20%
Project C 22%
NPV
Project A 7329.36
Project B 37503.65
Project C 34485.97
PI
Project U 1.053091
Project V 0.933516
Project W 0.915469
Project X 1.017478
245901.63934
335931.20129
385494.82115
406259.1792
406999.17771
1780586.02