The document provides information about three electrical connections including the location of the from and to points, type of conduit, size of wires, length, installation path, and breaker details. It connects panels in the process building to areas in the dedusting and product weighing sections. The total length of the three connections is 127 meters.
The document provides information about three electrical connections including the location of the from and to points, type of conduit, size of wires, length, installation path, and breaker details. It connects panels in the process building to areas in the dedusting and product weighing sections. The total length of the three connections is 127 meters.
The document provides information about three electrical connections including the location of the from and to points, type of conduit, size of wires, length, installation path, and breaker details. It connects panels in the process building to areas in the dedusting and product weighing sections. The total length of the three connections is 127 meters.
from lokasi to lokasi type satuan note breaker satuan
total Process Building ruang panel weight feeder elv. sisi timur area dedusting di elv. 300-DBN-05 Panel 24 Vac Aemco NYFGbY 3 C x 4 mm2 56 m lewat ladder + pasang conduit pakai spare breaker 1 ph 8 m 7.300 16.000 (barat daya Granulator) ruang panel weight feeder elv. sisi timur Product Weigher 81- 2 300-DBN-05 Panel 24 Vac Aemco NYFGbY 3 C x 4 mm 50 m lewat ladder pakai spare breaker 1 ph 0 m 7.300 MWQ-310 elev. 9.235 dinding utara process building dinding utara process building Vessel Lighting 2 300-LPN-01 A elv 0.000 (area bawah pipe elv 0.000 (area bawah pipe NYFGbY 3 C x 4 mm 21 m lewat ladder pakai spare breaker 1 ph 0 m Panel rack) rack)