B Plain and Reinforced Concrete Works

Structural Concrete( Ready Mix Concrete, Class A, 7/14 days 3500 PSI )
Footing and Slab-on-Fill, Class A, 14 days
Footing Tie-Beam, Class A, 14 days
Column, Class A, 14 days
Suspended Slab, Class A, 14 days
Suspended Beam/Girder, Class A, 14 days
Structural Concrete for Footing and Slab on Fill (Class A, 28 days)
Footing and Slab-on-Fill, Class A, 28 days
Footing Tie-Beam, Class A, 28 days
Column, Class A, 28 days
Suspended Slab, Class A, 28 days
Suspended Beam/Girder, Class A, 28 days
Lean Concrete (Ready Mix, 28 days 2000 PSI)
Lean Concrete (Manual Mixing )
Reinforcing Steel of Reinforced Concrete Structures for OneStorey, Grade
40/Grade 60
Formworks and Falseworks (for one-storey building)
COST ESTIMATION MANUAL FOR LOW RISE BUILDINGS
TABLE OF CONTENTS
TABLE OF CONTENTS-----------------------------------------------------------------
UNITS, ABBREVIATIONS AND ACRONYMS vi
PREFACE vii
INT 1

GENERAL NOTES 2
A.COSTESTINATION PROCESS 4
B. STANDARD DETAILED UNIT PRICE ANALYSIS (DUPA) SHEETS 10

B.1 Summary Table of Items of Work and Description 11


Part A - Earthworks                                                                                          23
Part B - Plain and Reinforced Concrete Work ----------------“* 38
Part C - Finishing 49
Part D - Electrical                                                                               
Part E - Mechanical                                                                                
C. CALCULATION OF CYCLE TIME FOR HAULING EQUIPMENT 272
C.1 Estimated travel speed, loading/unloading time & allowance for delay 273
C.2 Formula for the calculation of dump truck travel time 273
C.3 Computation of cycle time                                                                                  273
D.1 Basis of Computation                                                                                         275
D.2 Condition for the usage of the labor rates 275
D.3 Sample tabulation of labor rates for NCR 276
E. EQUIPMENT RENTAL RATES                                                                                 277
E.1 List of equipment adopted in the standard DUPA with make, model and capacity 278

FOREWORD

D. COMPUTATION OF LABOR RATE


DEFINITION OF TERMS

Program of Works (POW)


- is the total estimated cost of the project which covers the Civil Works Cost, Engineering S
and Administrative Overhead, Road Right-of-Way Acquisition Cost, Construction Contingency,
shall include information about the project location and limits, quantity and unit cost for each
work, construction duration, funding source, equipment requirements, etc.
Approved Budget for the Contract (ABC)
- is the total estimated agency estimate (direct cost, indirect cost and tax) for civil works contrac
infrastructure projects, wherein it is the ceiling of award of contract for government locally-fun
and reference for comparison of bid costs of contractors for both locally-funded and foreign-assi
Detailed Unit Price Analysis (DUPA)

- is the determination of reasonable unit cost of each item of work which reflects the breakdown
quantities of work items, unit prices of materials, equipment rental rates, labor rates and DPWH-
indirect costs including taxes.
Standard Labor Rates

- are matrices prepared and issued by Department of Public Works and Highways (DPWH) periodic
the required compensation for manpower workforce of different categories, which comprises the mi
approved by the NWPC, DOLE plus the monetary benefits.

ACEL Guidebook 2014


- is a guidebook where rental rates of commonly used equipment for infrastructure projects are
published by Association of Carriers and Equipment Lessors, (ACEL) Inc:
Construction Materials Price Data (CMPD)
- is a compilation of unit prices of construction materials updated quarterly per District En
Office to be used as reference in the pricing of materials component of the pay items of work in
preparation of DUPA, ABC & POW, including new items of work involved in a VO.

DPWH Standard Specifications for Public Works and Highways

- commonly called as “Blue Book”, is a compilation of detailed descriptions of work items in constructin
and highways projects such as roads, bridges, buildings, etc. In other words, a compilation of specificati
standard works acceptable to the OPWH.
- is composed of specifications containing detailed description of the workmanship, material requ
technical dimensions, materials proportion, datum lines and grades and other established referenc
adhere to, e.g. AASHTO, ASTM, etc.; basis of measurement, payment and unit of measure/measu
basis of acceptance and special details that would give the user a clear view of the work to be done.

Low Rise Building


“One-storey up to 5-storeys in height, i.e. from 3.00 m up to a maximum of
15.00 meters above established grade; while not generally requiring an elevator if the buildin
purely residential use; fire escapes and other safety systems are mandatory for all low-rise
buildings/structures.”

Source: Implementing Rules and Regulations of the National Building Code of the Philippines (PD 1096), 2005
Edition

iV
INGS

10

11

202
252
272
273
273
3

75
276
7
278
neering Supervision
tingency, etc. The POW
for each item of

ks contract of
ocally-funded projects
reign-assisted projects.

reakdown showing the


d DPWH-prescribed

) periodically showing
ises the minimum wage as

ojects are based. It is

District Engineering
f work in the

constructing public works


specifications of
erial requirements,
d references to follow or
ure/measurement; and
o be done.

he building/structure is
w-rise

96), 2005 Revised


ACRONYPIS
RC Reinforced Concrète RCD Return Ceiling Diffuser
RCPC Reinforced Concrète Pipe Culvert RLD Return Linear Diffuser
RO Regional Office
RPM Raised Pavement Markers RSB Reinforcing Steel Bar
RSC Rigid Steel Conduit SCD Supply Ceiling Diffuser SLD Supply Linear Diffuser
SPT Standard Penetration Test SSS Social Security System
THHN Thermoplastic High Heat Nylon-coated Thermoplastic Wire
TWHN Thermoplastic Water and Heat resitant Nylon-coated
UPPIO Unified Project Management Office UPVC Unplasticized Polyvinyl Chloride
VO Variation Order
VRF Variable Refrigerant Flow XLPE Cross-Linked Polyethylene
Vi

PREFACE
The Department of Public Works and Highways, in pursuit of continuous development in performi
mission, formulates standards and guidelines to establish common bases in attaining desired outputs. This m
Cost Estimation PlanuaI for Low Rise Buildings, encloses the scheme of deriving the unit cost of common ite
work in building construction using actual average productivity rates for labor-intensive or equipmen
works in accordance with the guidelines established by the Department in
the preparation of Approved Budget for the Contract (ABC).

Since the Department also implements the construction of vertical structures like buildings, the Burea
Construction sees the necessity of establishing guidelines in estimating cost for buildings aligned with the
Department’s mantra of implementing projects at the right cost. Generation of this manual aims to provide
uniform basis in the preparation of reasonable cost estimates specifically for Low Rise Buildings (up to
storeys) which the Department is more involved of. Likewise, this manual will aid in facilitating a more
efficient review and evaluation of Detailed Unit Price Analysis (DUPA) and
Program of Works (POW).

Guidelines presented in this manual are structured to be more applicable for building projects implemented by t
DPWH but may also be used in general building construction. Sources in the formulation of this manual were c
data from previously implemented projects of the Bureau, contributed by nonetheless, its experienced engineer
have long
years of involvement in project implementation.
VÎ Î

INTRODUCTION
Development in construction technology drives the society to invest in building structures designed with new innov
keeping up with the continuous progress in the construction industry, the government likewise has been instituting m
in building
structures upgraded for resiliency at a reasonable cost.
The bulk of the involvement of the DPWH is in the construction of horizontal structures. However, being on
construction agencies of the government, it has been implementing various vertical projects, specifically Lo
Buildings (up to five (5) storey). It has also been providing technical assistance on building construction to
Implementing Offices and other government agencies. Hence, as technical assistance and capacity buildi
this cost estimation manual is formulated to establish a uniform basis or reference in the preparation
review and evaluation of Detailed Unit Price Analysis (DUPA) and Approved Budget for the Contra
(ABC) particularly for government building projects. Further, this manual aims to improve the accuracy
estimates and to fa*ciIitate a more efficient review
and evaluation of DUPA and Program of Works (POW) prepared by the Implementing Offices.

This manual covers only the common pay items of work in building construction with details on the breakdown
costing of materials, labor, equipment including the overhead cost and contingencies. Usage of this manual in th
derivation of unit cost for DPWH projects requires the user’s input for unit rates of materials and labor base
Department’s Construction PlateriaIs Price Data (CMPD) and Standard Labor Rates that are variable f
different locations (i.e. Regional and District Engineering Offices). This manual is limited only
to unit cost derivation, thus, methods and techniques in quantity take off are not discussed.

GENERAL NOTES
1. The capacity of equipment as presented in the standard cost sheet for each item of work may be adju
higher or lower capacity, provided the resulting unit cost is more economical. Rental rates shall still be base
ACEL Guidebook of 2014.
Example: In hauling of materials, use of Dump Truck with higher capacity of fifteen
(15) m instead of ten (10) m capacity as presented will result to a lower price, as the capacity gets bigger,
3 3

lower the resulting cost of P45.46/m of hauling cost from P54.10/m . Furthermore, the utilization of a Pa
3 3

will be optimized.
2. The capacity of ten (10) m for the Dump Truck as presented, may be reduced in cases of extraordinary
3

conditions where the road has a very steep gradient, in a severely deteriorated condition or in cases
bridges with load limitations. It is impractical during the actual hauling to load the full capacity of
Dump Truck. A proper explanation/justifications shall be made, however, in the preparation of estimate.

3. For items of work that involves hauling and disposal of materials where hauling distance was indicated
cases when actual hauling distance is shorter or longer than the assumed hauling distance of 3 km
standard cost sheets, corresponding equipment hours for Dump Truck shall be adjusted based on the cy
analysis. The actual hauling distance should be the nearest possible disposal site determined by the Impleme
Office prior to the preparation of the ABC/POW and shall be indicated in the DUPA.

4. For equipment utilization of less than one (1) day, the scheduled operating hours shall be paid at operat
per hour and the remaining hours of the minimum 8 hours a day shall be considered for payment as bare ren
rates.
5. The utilization of equipment other than the equipment model and capacity presented in the standard cos
may be allowed, provided there is a corresponding justification in the substitution. Rental rates of equipmen
be based from ACEL Guidebook or the Bureau of Equipment Rental Rates guidelines.

6. The presented DUPA is based on a one (I) gang of labor and equipment with the specified output per unit
increase the output, additional equipment and labor may be added or an equipment with a higher capacity may be adopte

7. The production outputs per item of work were established based on normal condition and study cond
by the Bureau of Construction (BOC) field engineers during construction of projects being implemente
BOC. Any deviation to suit actual site condition that tends to increase the total unit cost shall be subjected
approval by the BOC.
8. The application of Mark-Up (OCM and Profit) shall be in accordance with the ranges of the Total Estimate
Cost (EDC) of the project as prescribed under D.O. No. 197, Series of 2016 or latest issuance.

9. The cost of materials component in the Standard Cost Sheets shall be based on the latest Constructio
Materials Price Data submitted quarterly by the District Engineering Offices, which includes payment of loc
and hauling/delivery cost to site.
10. The cost of labor shall be based on the labor rates established for each District Engineering Office,
following the minimum labor wage as approved by the NWPC, DOLE, plus monetary benefits calculated i
accordance with D.O. No. 71, Series of 2012 or latest issuance.

SECTION
COST ESTIMATION PROCESS
A. COST ESTIIKATION PROCESS
DEO
Consultant

RO
BOD & BOC
District Engineering Office (DEO):
1. The Estimator shall determine the items of work involved based on the Approved Plans.
2. The Estimator shall prepare the DUPA, ABC & POW including its attachments applying the items of
involved based on the latest standard labor rates & CMPD, standard cost sheets and D.O. 22, Series of 2015
3. The District Engineer shall approve the ABC & POW, if the project is within the limits of authority dele
him/her.
4. If beyond the authority of the DEO, forward the DUPA, ABC & POW and Approved Constructi
Plans together with the required attachments to the Regional Office for review/evaluation and approv
the project is within the limits of the delegated authority of the Regional Director.
5. If Planning and Design Division of the Regional Office will make an adjustment in the quantities an
delete/add pay item/s in the submitted construction plans, the ABC & POW shall be adjusted accordin
the District Engineering Office and resubmit the same for approval.

Regional Office (RO):


1. The Estimator shall determine the items of work involved based on the Approved Plans.
2. The Estimator shall prepare the DUPA, ABC & POW including its attachments applying the items of
involved based on the latest standard labor rates & CMPD, standard cost sheets and D.O. 22, Series of 2015
3. The Regional Director shall approve the ABC & POW, if the project is within the limits of authority dele
him/her.

4. If beyond the authority of the RO, forward the DUPA, ABC & POW and Approved Construction Pl
together with the required attachments to the Bureau of Construction (BOC) and Bureau of Design (BOD)
respectively, for review/evaluation for approval of the Assistant Secretary for Technical Services, Undersec
for Technical Services or Secretary depending on the limits of authority.
5. If Bureau of Assistant Secretary
Design shall make an adjustment in the quantities and delete/add pay item/s in the submi
Undersecretary
construction plans, the ABC & POW Secretary
shall be adjusted accordingly by the Regional Office and resubmit the sam
approval.
Assistant Secretary
Undersecretary Secretary

Unified Project Management Office (UPMO):


1. The Consultant shall determine the items of work involved based on the Approved Plans.
2. The Consultant shall prepare the DUPA, ABC & POW including its attachments applying the items of work
involved.
3. The Project Director shall conduct review/evaluation of the proposed ABC & POW and recommends its a
to the authorized approving official concerned.
4. Forward the ABC & POW and Approved Construction Plans together with the required attachments to
Bureau of Construction (BOC) and Bureau of Design (BOD) respectively, for review/evaluation to be
approved by the Assistant Secretary for Technical Services, Undersecretary for Technical Services or Sec
depending on the limits of authority.
5. If the Bureau of Design shall make an adjustment in the quantities and delete/add pay item/s in the submitted
construction plans, the ABC & POW shall be adjusted accordingly by the concerned UPMO and resubmit the sa
approval.
Approval of the ABC & POW shall be based on the following (or its latest
issuance):
1. Department Order No. 91, Series of 2012 — Authority of the Assistant Secretary for Technical Services to
Approve Plans, Program of Works and Approved Budget for the Contract for DPWH Locally-Funded and Forei
Assisted Civil Works Projects Costing more than PhP50 Million up to PhP100 Million.
2. Department Order No. 95, Series of 2013 — Reissuance of D.O. No. 9, S. 2011 Re: Conduct of Pre-Procu
Procurement, and Implementation Activities for DPWH Foreign-Assisted Civil Works Projects.
3. Department Order No. 109, Series of 2014 — Approval of Plans, Program of Works (POW) and Approv
Budget for the Contract for DPWH Locally-Funded Projects Costing PhP50 Million and below Impleme
Unified Project Planagement Offices.
4. Department Order No. 140, Series of 2014 — Increased Limits of Delegated Authority to Regional Directo
Approve Plans, Program of Work (POW) and Approved Budget for the Contract (ABC) of Locally-Funded
5. Department Order No. 54, Series of 2011 — Revised Limits of Responsibilities and Authorities of Co
DPWH Offices and Officials in the Conduct of Pre- Procurement, Procurement, and Implementation Act
for DPWH Locally-Funded Civil Works Project.

PREPARATION OF DETAILED UNIT PRICE ANALYSIS


1. General
a. Determine the scope of works based on approved plans and specification including other requirements
adopting the standard pay items of works per Department Order No. 96, Series of 2016.
b. Calculate the quantity and cost of material component of every item of work based on plans and specif
and prevailing prices of construction materials in the Construction Materials Price Data (CMPD) with
consideration of allowance for waste and/or losses not to exceed 5% of the material’s requirement.
c. Determine the appropriate quantity based on best norms and practices in the construction industry
cost for manpower and equipment requirement to be used based on Standard Labor Rates per Region and la
ACEL rates.
d. Determine the unit cost per item of work as presented in Item 5.
2. Determination of category of work supervisor
The appropriate number and category of supervisor including unskilled labor to be deployed depends
specific type and complexity of an item of work to be done. In this manual, the labor force (crew or gang) w
established based on actual study and best practices observed during the construction of BOC implemented
Example: Item 900-Concrete Works
Foreman 1
Skilled Worker (Mason, carpenter) 2
Unskilled Labor 6

3. Calculation of production output per hour of an item of work


The production output per hour of an item of work should be derived based on the number of days
appropriate manpower and equipment utilized to complete the work in accordance with the right constructio
methodology. In this manual, the production output was derived by the Bureau of Construction (BOC) Eng
based on actual study and best practices during the construction of BOC implemented projects.
Example: Item 900-Concrete Works Volume of Concrete = 21.50 cubic meter
Number of hours to complete the work which includes setting of equipment and accessories, batchin
delivery and pouring of concrete= 6 hours and 21 minutes (6.85 hr)

Type and number of manpower utilized during pouring Foreman I


Skilled Worker (Mason, Carpenter) 2
Unskilled Labor 6
UNITS
ø diameter
" inch
foot
% percent
A ampere
bd-ft board-foot
cfm cubic foot per minute
cm centimeter
cyl cylinder
ea each
ft foot
ft 3
cubic foot
Ga/# Gauge
gal gallon
h hour
ha hectare
hp horsepower
kg kilogram
km kilometer
L liter
Is lump sum
m m2 meter
m3
min square meter
minute
mm millimeter
mt metric ton
pc piece
PhP Philippine Peso
psi pound per square inch
thk thick
tph ton per hour
yd3 cubic yard
ABBREVIATIONS ACRONYMS
AASHTO American Association of State Highway
and Transportatioñ Officials
ABC Approved Budget for the Contract
ACCU Air Cooled Condensing Unit
ACEL Association of Carriers and Equipment
Lessors, Inc.
ACP Asphalt Concrete Pavement
ASTM American Society for Testing and Materials
BI Black Iron
BOC Bureau of Construction
BOD Bureau of Design
CFL Compact Fluorescent Lamp
CHB Concrete Hollow Block
CI Curb Inlet
CMPD Construction Materials Price Data
CP Contractor's Profit
CPMC Central Price Monitoring Committee
CWN Common Wire Nail
DEO District Engineering Office
DO Department Order
DOLE Department of Labor and Employment
EAG ECC Exhaust Air Grilles
ECOLA Employer’s Compensation Contribution Emergency Cost Of Living Allowance
EDC Estimated Direct Cost
EMT Electrical Netal Tubing
FAG Fresh Air Grille
FCU Fan Coil Unit
GI Galvanized Iron
HDPE High Density Polyethylene
IMC Intermediate PletaI Conduit
LED Light Emitting Diode
NCR National Capital Region
NENA National Electrical Manufacturers
Association
NWPC National Wages and Productivity
Commission
OCM Overhead, Contingencies & Miscellaneous
OS & Y Outside Screw/Stem and Yoke Valve
PACU Package Type Airconditioning Unit
PCCP Portland Cement Concrete Pavement
PE Polyethylene
PN Pressure Nominal
POW Program of Works
PPR-C Polyprophylene Random Copolymer
PVC Polyvinyl Chloride
Of Living Allowance
Yes
Is the proje
within the limits of
Authority delegated t
the DEO?

No

Yes
Is the proje within the
limits of
Authority delegated t
the RO?
Type and number of equipment and tools including lightings utilized during pouring:
Transit Mixer 4
Pump-Crete 1
Concrete Vibrator 2
Lighting System (if applicable) 1

Production output per hour=volume of concrete poured/number of


hours consumed to complete the pouring session
= 25.5 cu.m/ 6.85 hr
= 3.72 cu.m/hr

4. Determination of percentages of Overhead, Contingency and Miscellaneous


(OCM) expenses, Profit and Value-Added Tax (VAT}
The percentages of OCM, Profit and VAT to be applied to the estimated direct cost (i.e. cost of material, l
equipment rental) should be based on Department Order (DO) No. 197, Series of 2016 (Guidelines in the
Approved Budget for the
Contract) or latest issuance.

5. Determination of unit cost per item of work


Unit Cost=total unit direct cost (i.e. cost of materials, labor, Equipment) plus indirect cost (i.e. OCM, Profit a
Example: Item 900-Concrete Works

ltemNo:Descnptan DETAILED UNIT PRICE ANALYSIS (DUPA)


Unrl of Measurement Output f›er hour 900 Structural Concrete
m’ 3.72m'

Dealgnctiori loo. of Person/s No. of Hour/s Hourly Rate


c Unsk4fed LaMxer
Sub • Toll for A 129.43
35 10
129.43
1 00 73.26
190.20
1.0D
430.S6
1.00
76S.19

Name and Capacity No at UniU• No. of Hour/s Hourly Rate


B. E.guipmanl
a Concrele Vibrator
b. Pumpc/ete
Minor Tor›ls (109a of Labor Cost)
guó • Total foc B 91,25
1.00
2,076 00

743.02
C. Total (A + B 1.502.21
D. Gutpul per Hour 3 T“2 m°
E. Oirecl Unit Casa IG • 0ï 4O382
Name end Specificaéon Unlt Quantity £4nou (PhP)
F. Matenafs
a Ft ady kJix Class AA Glass B/Class C'Ctass P.7 days/14
4ays‹ 28 days
Sub - Total for F
3,6487J
*’° IOS 3#75O0
3,648.7b
G. Oust Un t Gosh ‹E + F› 4,052 57
H. Oaiheab, Coiitio enc›es & Misrefieneor s OñkJ) Ex ses
15% of G 607.89
t. Gontractor's Profit (C. ) 10a.S ol G 4 05 26
J. Value Added Tax fVAT) S*6 of fit + H + ›) 253 29
IL. 6,319.00

TeOl Unit Cost fG +H +I • JI

6. Cost estimation techniques and best practices


a. Skills in the interpretation of the plans and specifications
b. Wide experience in actual construction and estimating works
c. Familiarity with different types of construction materials and equipment
d. Consideration on actual site condition in the preparation of DUPA
i.e. hauling distance, terrain, etc.
e. Familiarity on laws, policies, guidelines and procedures pertaining to the implementation of gov
infrastructure projects to ensure cost estimates are done at the right cost

SECTION B
STANDARD DETAILED UNIT PRICE
ANALYSIS (DUPA) SHEETS
d during pouring:

er of

ellaneous

direct cost (i.e. cost of material, labor and


7, Series of 2016 (Guidelines in the Preparation of

us indirect cost (i.e. OCM, Profit and VAT)


pment
PA

g to the implementation of government


cost

B
UNIT PRICE
SHEETS
PART A EARTHWORKS QTY UNIT UNIT COST

800(1) Clearing and Grubbing m²


800(2) Clearing and Grubbing (I.s.) l.s

800(3)a Individual Removal of Trees (Small a, 150mm Cl-300 mm Cl)

800(3)b Individual Removal of Trees (Small b, above 300 mm IB up to


500 mm Cl)
Individual Removal of Trees (Small c, above 500 mm CI up to
800(3)c 750 mm Cl)
Individual Removal of Trees (Small d, above 750 mm IB up to
800(3)d 900 mm IB)
800(4) Individual Removal of Trees (large, above 900 mm Cl )
803(1)a Structure Excavation (Common Soil) m³
803(1)b Structure Excavation (Soft Rock) m³
803(1)c Structure Excavation (Hard Rock) m³
803(2) Trimming Works m³
803(3) Soil Stabilization m³
804(1)a Embankment from Structure Excavation m³
804(1)b Embankment from Common Borrow by Equipment m³
805(1) Gravel Bedding m³
Column2
ITEM NO. DESCRIPTION QTY UNIT

PART B PLAIN AND REINFORCED CONCRETE WORKS m³

Structural Concrete (Ready Mix, Class AA/Class A/Class B/Class C/Class


900 m³
P/SeaI Concrete,7 days/14 days/ 28 days)
900(1) Structural Concrete for Footing and Slab on Fill ( Ready Mix Concrete, Class m³
A, 7 days/14 days)
Structural Concrete for Footing Tie Beam, Column, Suspended Slab,
900(1) Girder/Beam (Ready Mix Concrete, Class A, 7 days/14 days)

900(1)c2 Structural Concrete for Footing and Slab on Fill (Class A, 28 days) m³

900(1) Structural Concrete for Footing Tie Beam, Column, Suspended m³


Slab, Girder/Beam (Class A, 28 days)
901(1) Lean Concrete (Ready Mix, 28 days) m³

901(1) Lean Concrete (Manual Mixing) m³

Reinforcing Steel of Reinforced Concrete Structures for One- Storey, Grade


902(1) kg
40/Grade 60
902(1) Reinforcing Steel of Reinforced Concrete Structures for Two upto Five kg
Storey , Grade 40/Grade 60
903(2) Formworks and Falseworks (for two to five-storey building) l.s
903(2) Formworks and Falseworks (for one-storey building) l.s
ITEM NO.
PART C
1000(1)
1001(1)
1001(1)a
1001(1)a
1001(1)b1
1001(1)b2
1001(1)b3
1001(1)b4
1001(1)b5
1001(1)c
1001(1)c
1001(2)
1001(3)
1001(4)
1001(6)
1001(7)
1002(2)
1002(2)a
1002(2)a
1002(3)a
1002(3)a
1002(3)
1002(4)a
1002(4)a
1002(4)
1002(5)
1002(5)
1002(5)
1002(5)
1002(5)h
1002(5)
1002(5)
1002(5)
1002(5)n
1002(5)o
1002(5)p
1002(6)
1002(7)
1003(1)
1003(1)a
1003(1)e
1003(2)
1004(2)
1005
1006
1006(5)
1007
1008
1009(1)a
1010(1)
1010(2)a
1010(2)b
1011(1)
1012(1)
1012(1)
1013(1)
1013(2)
1013(2)c
1014
1014
1016(1)a
1016(1)b
1016(2)
1017
1018(1)
1018
1019(1)
1019(1)d
1020(1)
1021(1)a
1021(3)
1023(1)
1024(1)
1026(1)
1027(1)
1032(1)a
1032(1)b
1032(1)c
1032(2)
1032(4)
1034(1)
1038(1)
1042(1)
1043(1)
1045(1)
1046
1046
1047(1)
1047(2)a
1047(2)b
1047(2)c
1047(3)a
1047(3)b
1047(3)c
1047(3)d
1047(4)
1047(5)
1048(1)
1048(2)
1049(1)a
1052(1)
1052(2)
1052(3)
1052(4)a.1
1052(4)a.2
1052(4)b.1
1052(4)b.2
1052(5)a
1052(5)b
1052(6)
1052(7)a
1052(7)b
1052(8)
1052(9)
1052(10)
1052(11)
1052(12)
1052(13)
1052(14)a
1052(14)b
1052(15)a
1052(15)b
1052(16)a
1052(16)b
1052(17)a
1052(17)b
1052(17)c
1052(17)d
1052(17)e
1052(17)f
1052(18)a
1052(18)b
1052(19)a
1052(19)b
1052(20)
1052(23)a
1052(23)b
1052(23)c
1052(23)d
1052(23)e
1052(23)f
1052(24)a
1052(24)b
1052(24)c
1052(24)d
1052(24)e
1052(24)f
1052(25)
1052(26)
1052(27)a
1052(27)b
1052(22)b
1052 (29)
FINISHING & ARCHITECTURAL
Soil Poisoning
Sewer Line Works
50 mm Cl -100 mm Cl PVC Pipe, Series 600/ Series 1000
150 mm - 300 mm B PVC Pipe, Series 600/ Series 1000
150 mm CI Concrete Pipe
200 mm B Concrete Pipe
250 mm Cl Concrete Pipe
300 mm IB Concrete Pipe
350 mm 0 Concrete Pipe
50 mm B - 100 mm Cl High Density Polyethylene (HDPE) Pipe
150 mm Cl - 300mm IZlHigh Density Polyethylene (HDPE) Pipe
PVC/HDPE Fittings
Concrete Gutter
Storm Drainage and Downspout
Catch Basin (Concrete/CHB)
Junction Box (Concrete/CHB)
Galvanized Iron Fittings
13 mm IB - 50 mm IB Galvanized Iron Pipe
65 mm C/ - 150 mm Cl Galvanized Iron Pipe
13 mm Cl - 50 mm IB Polyprophylene Random Copolymer (PPR- C) Pipe, PN 10/ PN 16/ PN 20
63 mm IB - 100 mm IB Polyprophylene Random Copolymer (PPR C) Pipe PN 10/ PN 16/ PN 20
Polyprophylene Random Copolymer (PPR-C) Fittings
13 mm CI - 50 mm B Polyvinyl Chloride (PVC) Pipe, Blue
65 mm Cl - 100 mm CI Polyvinyl Chloride (PVC) Pipe, Blue
Polyvinyl Chloride (PVC) Fittings, Blue
Plumbing Fixtures
Water Closet/ Urinal with Complete Accessories
Kitchen Sink/Scrub Up Sink/Slop Sink with Complete Accessories
Wall Hung/Countertop/Under Counter Lavatory with Complete Accessories
Floor Drain Plates
Soap Holder (Toilet Soap/ Liquid Soap)
Toilet Tissue Holder/Dispenser
Bidet/ Faucet/ Hose Bibb
Stainless Steel Grab bar
Shower head/ Shower Valve
Facial Mirror
Cold Waterline Pipes and Fittings
Hot Waterline Pipes and Fittings
4.5mm Fiber Cement Board/ 4.5 mm Marine Plywood/ 6 mm Marine Plywood/ 6mm Ordinary Plywood on Meta
4.5mm Fiber Cement Board/ 4.5 mm Marine Plywood/ 6 mm Marine Plywood/ 6mm Ordinary Plywood in Wood
Gypsum Board on Metal Frame Ceiling
4.5mm/ 6.0 mm Fiber Cement Board/ 4.5mm/ 6.0 mm 4’ X 8’ thk fiber cement board/ 4.5mm Marine Plywood/
Finishing Hardware
Residential Casement Steel Windows/ Heavy Duty Side-hinged Ventilator/ Projected Ventilator/ Awning Ventilat
Hollow Steel Door/ Steel Flush Door/ Grille Door/ Steel Louver
Door
Fire Rated Fire Exit Steel Door
Aluminum Glass Door (Sliding Type/Swing Type)
Aluminum Glass Window (Sliding/ Casement/ Awning/ Fixed
Type)
Jalousie Window (Glass)
Frames (Jambs, Sill, Head, Transoms and Mullions)
Hollow Core Flush Door
Wooden Panel Door
Steel/ Aluminum Roll Up Door
Tempered Glass Door (10 mm/ 12mm)
Tempered Glass Windows (8 mm/ 10mm)
Corrugated Metal Roofing
Fabricated Metal Roofing Accessory (Ridge/Hip Rolls/Flashings/Counter Flashing/Valley Roll)
Fabricated Metal Roofing Accessory (Gutter)
Prepainted Metal Sheets (Corrugated, Short Span/ Long Span, below 0.427 thk/ above 0.427 thk)
Prepainted Metal Sheets (Rib Type, Short Span/ Long Span,
below 0.427 thk/ above 0.427 thk)
Waterproofing Cement Base
Liquid Waterproofing
Built-up and Preformed Membrane
50mm a - 100mm a Roof Drain/Canopy Drain/ Gutter Drain with Strainer
Glazed Tiles and Trims
Unglazed Tiles/ Granite Tiles/ Synthetic Granite Tiles
Wood Ti]es (Narra, Tanguile, others)
Laminated Wood Tiles
Vinyl Tiles
Plain Cement Floor Finish
Floor Topping
Granolithic Marble Work
Pea Gravel Finish
Pebble Washout Finish
Cement Plaster Finish
Painting Works (Masonry Painting) *
Painting Works (Wood Painting)
Painting Works (Metal Painting)
Varnishing Works
Ducco Finish
Damproofing (Polyethylene Sheets)
Reflective Insulation
Stainless Steel Door and Frames
PVC Doors and Frames (set)
Perforated Aluminum Ceiling Panels
100 mm CHB Non Load Bearing/Load Bearing (including Reinforcing Steel)
150mm CHB Non-LoadBearing/ Load Bearing (including Reinforcing Steel)
Structural Steel Roof Framing
Structural Steel Roof Framing
Structural Steel Roof Truss
Structural Steel Purlins
Metal Structure Accessories (Anchor Bolts)
Metal Structure Accessories (Sagrods)
Metal Structure Accessories (Turnbuckle)
Metal Structure Accessories (Crossbracing)
Metal Structure Accessories (Crossbracing)
Metal Structure Accessories (Steel Plates)
Carbon Fiber (1 layer)
Glass Fiber
Jet Grouting (0.80 m diameter)
Untreated Timber Piles, furnished
Treated Timber Piles, preserved, furnished
Steel H-Piles, furnished
Precast Concrete Piles, furnished (400mm x 400mm - type A)
Precast Concrete Piles, furnished (400mm x 400mm - type B)
Precast Concrete Piles, furnished (450mm x 450mm - type C)
Precast Concrete Piles, furnished (450mm x 450mm - type D)
Precast, Prestressed Concrete Piles, furnished (400 mm x 400 mm)
Precast, Prestressed Concrete Piles, furnished (450 mm x 450 mm)
Structural Steel Sheet Piles, furnished
Precast Concrete Sheet Piles, furnished (0.50 m x 0.35 m)
Precast Concrete Sheet Piles, furnished (0.50 m x 0.35 m),
(Ready Mix Concrete)
Untreated Timber Piles, driven
Treated Timber Piles, driven
Steel H-Piles, driven
Steel Pipe Piles, furnished and driven
Structural Steel Sheet Piles, driven
Precast Concrete Sheet Piles, driven
Precast Concrete Piles, driven (soft strata)
Precast Concrete Piles, driven (hard strata)
Precast, Prestressed Concrete Piles, driven (soft strata)
Precast, Prestressed Concrete Piles, driven (hard strata)
Test Piles, furnished and driven (type A, B, C or D), soft strata
Test Piles, furnished and driven (type A, B, C or D), hard strata
Concrete Piles cast in Drilled Holes, 0.80 m IB, fc’ = 28 MPa (ordinary soil condition)
Concrete Piles cast in Drilled Holes, 1.00 m B, fc’ = 28 MPa (ordinary soil condition)
Concrete Piles cast in Drilled Holes, 1.20 m IB, fc’ = 28 MPa (ordinary soil condition)
Concrete Piles cast in Drilled Holes, 1.50 m IB, fc’ = 28 MPa (ordinary soil condition)
Concrete Piles cast in Drilled Holes, 1.80 m Cl, fc’ = 28 MPa (ordinary soil condition)
Concrete Piles cast in Drilled Holes, 2.00 m IZI, fc’ = 28 MPa (ordinary soil condition)
Concrete Piles cast in Steel Shells, furnished and driven
Concrete Piles cast
in Steel Shells, furnished and driven (Ready Mix Concrete)
Concrete Piles cast in Steel Pipes, furnished and driven
Concrete Piles cast in Steel Pipes, furnished and driven (Ready Mix Concrete)
Pile Shoes
Bored Piles, 0.80 m IB (ordinary soil condition)
Bored Piles, 1.00 m 0 (ordinary soil condition)
Bored Piles, 1.20 m Cl (ordinary soil condition)
Bored Piles, 1.50 m 0 (ordinary soil condition)
Bored Piles, 1.80 m Cl (ordinary soil condition)
Bored Piles, 2.00 m B (ordinary soil condition)
Permanent Casing (0.80 m Cl)
Permanent Casing (1.00 m Cl)
Permanent Casing (1.20 m AZ)
Permanent Casing (1.50 m Cl)
Permanent Casing (1.80 m CI)
Permanent Casing (2.00 m IB)
Splicing of RC Piles with Epoxy (400 mm x 400 mm)
Splicing of RC Piles with Epoxy (450 mm x 45d mm)
Pile Integrity Testing (Sonic), ordinary soil condition
Pile Integrity Testing (PIT), ordinary soil condition
High Strain Dynamic Testing (PDA), ordinary soil condition
Micro Piles In Drilled Holes, 0.20m Cl (ordinary soil condition)
QTY UNIT

l.s

l.s
D. ELECTRICAL

1100(1) 15 mm B - 25 mm Cl Rigid Steel Conduit (RSC)/Intermediate metal Conduit


(IMC)/ Electrical Metal Tubing (EMT)
32 mm B - 40 mm IB Rigid Steel Conduit (RSC)/ Intermediate metal
1100(1) Conduit (IMC)/ Electrical Metal Tubing (EMT)
50 mm Cl - 65 mm IB Rigid Steel Conduit/ Intermediate metal Conduit
1100(1)
(IMC)/ Electrical Metal Tubing (EMT)
1100(1) 80 mm IB - 100 mm Cl Rigid Steel Conduit (RSC)/ Intermediate metal
Conduit (IMC)/ Electrical Metal Tubing (EMT)
1100(3) 15 mm Cl - 25 mm IB Flexible Metal Conduit

1100(6) 15 mm B - 32 mm IZ Polyvinyl Chloride (PVC) Pipes

1100 PVC/RSC/ IMC/ EMT Conduit Fittings

1100 Junction/ Utility/ Pull/ Square Box

1100(30) Conduit Works, Boxes and Fittings

1101(2) 1.6 mm2 - 5.5 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2) 8.00 mm2 - 22 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2) 30.00 mm2 - 38 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2) 50.00 mm2 - 60 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2) 80.00 mm2 - 125 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2) 150.00 mm2 - 250 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2) 325.00 mm2 - 400 mm2 Electric Wire (TW/THHN/TWHN2)

1101(2)a23 500.00 mm2 Electric Wire (TW/THHN/TWHN2}

1101(4) XLPE Electric Wires

1101(7) 2.00 mm2 - 5.5 mm2 Bare Copper Wire

1101(7) 8.00 mm2 - 22.00 mm2 Bare Copper Wire

1101(7) 30.00 mm2 - 38.00 mm2 Bare Copper Wire

1101(7) 50.00 mm2 - 60.00 mm2 Bare Copper Wire

1101(7) 80.00 mm2 - 125.00 mm2 Bare Copper Wire

1101(7) 200.00 mm2 - 250.00 mm2 Bare Copper Wire


1101 Switches

Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Heavy Duty


Convenience Outlet/Receptacle, Grounding Type (GT)/ Weather Proof
1101
Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Pop-up
Type/Floor Triplex Convenience Outlet/Receptacle, Grounding Type (GT)

Duplex Convenience Outlet/Receptacle, Grounding Type (GT) / Weather


Proof Duplex Convenience Outlet/Receptacle, Grounding Type (GT)/
Special Purpose Convenience Outlet/Receptacle, Grounding Type for ACU,
1101
WH, etc/ Explosion Proof Type Duplex Convenience Outlet/Receptacle,
Grounding Type (GT)/ Duplex Convenience Outlet/Receptacle with Ground
Fault Circuit Interupter

Pop-up Type/Floor Single Convenience Outlet/Receptacle, Grounding Type


(GT)/ Pop-up Type/Floor Duplex Convenience Outlet/Receptacle,
1101 Grounding Type (GT)/ Explosion Proof Type Single Convenience
Outlet/Receptacle, Grounding Type (GT)/ Single Convenience
Outlet/Receptacle with Ground Fault Circuit Interrupter

1101(42) Wires and Wiring Devices

Panel Board with Main Breaker/Branches, 3 wires, 1 neutral, 250 Amp -


1102 400 Amp
1102 Panel Board with Main Breaker/Branches, 3 wires, 1 neutral, 50 Amp - 200
Amp
NEMA I (Enclosed Circuit Breaker) Single Phase or Three Phase
1102 Commercial/Industrial Type
NEMA 3R (Enclosed Circuit Breaker) Single Phase or Three Phase
1102
Commercial/Industrial Type
1102 Motor Control Center with main, branch breaker and motor starter (NEMA
1, NEMA 3R and 4X) Flush or Surface Mounted
Generator (Stand by and Continuous), Synchonizing Panel for Generator,
1102(8) High Voltage Switch Gear
Main Enclosed Automatic Circuit Breaker 50 AT, 60 AT, 70 AT , 3P, 240V:
1102
NEMA I, NEMA 3R, NEMA 4x Flushed/ Surface Mounted
1102 Main Enclosed Automatic Circuit Breaker 50 AT, 60 AT, 70 AT , 2P, 240V
NEMA I, NEMA 3R, NEMA 4x Flushed/ Surface Mounted
Main Enclosed Automatic Circuit Breaker 100 AT, 125 AT, 205 AT , 225 AT,
1102 3P, 240V NEMA I, NEMA 3R, NEMA 4x Flushed/
Surface Mounted
Main Enclosed Automatic Circuit Breaker 100 AT, 125 AT, 200 AT , 2P, 225 AT,
1102 2P, 240V NEMA I, NEMA 3R, NEMA 4x
Flushed/ Surface Mounted

1102 Low Voltage Switch Board Main 2500-4000 AT, 3P, 240V NEMA I with Breaker

1102 Main Enclosed Automatic Breaker 250-500 Amp


1103(1) Lighting Fixtures

Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 1
1103(2)
Bulb
Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 2
1103(2)
Bulbs
Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 3
1103(2)
Bulbs
Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 4
1103(2)
Bulbs
Downlight/Pinlight Fixture with One- Compact Fluorecent Lamp (CFL) or LED
1103(5)
Bulb, 1 Bulb
Downlight/Pinlight Fixture with Two- Compact Fluorecent Lamp (CFL) or LED
1103(5)
Bulb, 2 Bulb
1103(11) High Bay Aluminum Reflector, Dome Luminaire

1103(12) Die-Cast Aluminum Floodlight with Electrocoat Paint Finish


QTY UNITS
240

241

242
243

244

245

246

247

d 24

249

250

251
ITEM NO. DESCRIPTION

PART E MECHANICAL

1200 Air Conditioning and Refrigiration System

1201(1) Water Pumping System

1202(1) Automatic Water Sprinkler System

1202(2)a Fire Pump with complete control and standard accessories

1202(2)b Jockey Pump with complete control and standard accessories

1202(3)a Sprinkler Head, upright/pendent/wall

1202(3)b Alarm Check Valve

1202(3)c Flow Meter

1202(3)d OS & Y Gate Valve 175 psi

1202(3)e Pressure Gauge

1202(3)f Pressure Relief Valve

1202(3)g Floor Control Valve

1202(3)h1 Inspector Test Valve

1202(3)h2 Inspector Test Connection

1202(4) 25 mm Cl - 50 mm IB Black Iron (B.I.) Pipe

1202(4) 65 mm CI -150 mm IB Black Iron (B.I.) Pipe

1202 Fittings
1202(10) Fire Hose Valve siames 150 mm CI x 2 w x 65 mm IB with cap

1202(11) Fire Hose Cabinet

1202(12) Fire Extinguisher


QTY UNITS
Unit of Measurement Output per rn2
hour 500.00 m2
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per Region/Distr
a. Construction Foreman 2 1.00 based on minimum wage as approved by
b. Unskilled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 2 1.00 See latest ACEL rental rates.


a. Dumptruck (12 yd3) 1 1.00
b. Payloader (1.50 m^) 1 1.00
c. Bulldozer (155 hp), D65A-8
Note:
Assumed hauling distance is 3 km. If actual hauling
distance is shorter or longer than 3 km, the time of dump
truck will be adjusted accordingly based on the hauling
cycle analysis.
Based on assumed 150 mm cut all throughout. A
corresponding adjustment in the output shall be
computed based on the actual field requirements.
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 500.00 m2
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% ofG I
K.
Value Added Tax (VAT)
5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


te Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

e latest ACEL rental rates.

Amount (PhP)
Uni Is
t of 1.00 Is
Me
A.
asu Designation No. of Personls No. of Hour/s Hourly Rate
rem
ent Labor 800(4)
Out See derivations for Item
put Nos. 800(1), 800(3) and
per Sub - Total for A
hou
r

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 800(4)

C. Total (A + B)
D. Output per Hour = 1.00
E. Is
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 0(4)
See derivations for Item
Nos. 800(1), 800(3) and 80
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies &
l. Miscellaneous (OCM)
Expenses 15%/
12%/ 10%/ 8% of G
Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT)
K. Total Unit Cost (G + H + I + J)
Not 5% of (G + H + I)
e:
1.
The
"lu
mp
su
m”
unit
of
me
asu
rem
ent
as
per
Blu
e
Bo
ok,
sha
ll
be
bas
ed
on
the
deri
ved
out
put
s of
Ite
m
No.
800
(1),
800
(3),
and
800
(4)
Amount (PhP)

Amount (PhP)

Amount (PhP)
Item No./Description Individual Removal of Trees (Small a, 150mm Al-300 mm)
Unit of Measurement ea
Output per hour 1 ea

A. Labor Designation No. of Person No. of Hour/s Hourly Rate Amount (PhP)
a. Construction Foreman 1 0.33 ₱0.00
b. Skilled Laborer 1 0.33 ₱0.00
c. Unskilled Laborer 1 0.33 ₱0.00

₱0.00
₱0.00

Sub - Total for A

B. Equipment Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)
Backhoe (0.8m2) 1 0.25 ₱0.00
Dumptruck (12 yd*) 1 0.17 ₱0.00
Chain Saw 1 0.17 ₱0.00
Minor Tools (5% of Labor Cost) ₱0.00
₱0.00
₱0.00
Note: ₱0.00
Add Boom Truck if ₱0.00
necessary for trimming in ₱0.00
urban areas. ₱0.00
₱0.00
Sub - Total for B

F. Materials Name and Specification QTY Unit Unit Cost Amount (PhP)
₱0.00
a. Rope, 1" Cl - 5 uses ₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
₱0.00
Sub - Total for F ₱0.00

G.
Direct Unit Cost (E + F)
H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8%
I. Contractor's Profit 15%/ 12%/ 10%/of G
J. Value Added Tax (VAT) 12% (G+H+I)
K. Total Unit Cost (G + H + I + J)
Item No./Description 800(3)b Individual Removal of Trees (Small b, above 300 mm g) up to 500 mm $) ea
Unit of Measurement Output 1.00 ea
per hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 0 67 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 0.67 based on minimum wage as approved by
b. Skilled Laborer 2 0.67 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 0.50 See latest ACEL rental rates.


a. Backhoe (0.80 m3) 1 0.33
b. Dumptruck (12 yd3) 1 0.33
c. Chain Saw
Minor Tools (5% of Labor Cost)
Note:
Add Boom Truck if necessary for trimming in urban areas.
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.00 ea
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials 20.00 Prices of materials are variable per Regio


a. Rope, 1" jzl - 5 uses District based on the prevailing unit price
Sub - Total for F locality which include payment of local ta
hauling cost to the project site.
Refer fa the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H.
I.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
m $) ea

urly Rate Amount (PhP)

Rates are variable per Region/District


d on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

y Rate Amount (PhP)

e latest ACEL rental rates.

t Cost Amount (PhP)

s of materials are variable per Region/


ct based on the prevailing unit prices in the
y which include payment of local taxes and
ng cost to the project site.
fa the Construction Material Price Data
lished quarterly by Central Office Price
oring Committee.
A. Designation No. of Person/s No. of Hourls
Labor 1 3.33
a. Construction Foreman 1 3.33
b. Skilled Laborer 2 3.33
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s


Equipment 1 2.50
a. Backhoe (0.80 m*) 1 1.67
b. Dumptruck (12 yd3) 1 1.67
c. Chain Saw
Minor Tools (5% of Labor Cost)
Note:
Add Boom Truck if necessary for trimming in
urban areas.
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.00 ea
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity
Materials m 2000
a. Rope, 1" IZI - 5 uses
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
J. Value Added Tax (VAT) 10%/8% ofG I
K. 5% of(G + H + I) I

Total Unit Cost (G + H + I + J)


Hourly Rate Amount (PhP)

Labor Rates are variable per


Region/District based on minimum
wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)


See latest ACEL rental rates.

Unit COSt Amount (PhP)


Prices of materials are variable per
Region/ District based on the prevailing
unit prices in the locality which include
payment of/oca/ taxes and hauling cost
to the project site.
Refer to the Construction Material Price
Data established quarterly by Central
Office Price Monitoring Committee.

5%/ 12%/ 10%/ 8% of G


I

(G + H + I + J)
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 6.67 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 6.67 based on minimum wage as approved by
b. Skilled Laborer 2 6.67 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 5.00 See latest ACEL rental rates.


a. Backhoe (0.80 m3) 1 3.33
b. Dumptruck (12 yd3) 1 3.33
c. Chain Saw
Minor Tools (5% of Labor Cost)
Note:
Add Boom Truck if necessary for trimming in urban areas.
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.00 ea
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials 20.00 Prices of materials are variable per Regio


a. Rope, 1" $ - 5 uses based on the prevailing unit prices in the
Sub - Total for F which include payment of local taxes and
cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
Contractor’s Profit (CP) 10%/ 8% of G
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

Rates are variable per Region/District


on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

rly Rate Amount (PhP)

latest ACEL rental rates.

Cost Amount (PhP)

s of materials are variable per Region/ District


on the prevailing unit prices in the locality
include payment of local taxes and hauling
o the project site.
to the Construction Material Price Data
ished quarterly by Central Office Price
oring Committee.
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 8.33 Labor Rates are variable per Region/Dist
a. Construction Foreman 1 8.33 based on minimum wage as approved by
b. Skilled Laborer 2 8.33 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate Amount (PhP)

Equipment 1 6.25 See latest ACEL rental rates.


a. Backhoe (0.80 m3) 1 4.16
b. Dumptruck (12 yd3) 1 4.16
c. Chain Saw
Minor Tools (5% of Labor Cost)
Note:
Add Boom Truck if necessary for trimming in urban areas.
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials m 20.00 Prices of materials are variable per Regio


a. Rope, 1" $ - 5 uses District based on the prevailing onif price
Sub - Total for F locality which include payment of local ta
hauling cost to the project sife.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note: The presented DUPA is based on a one (1) gang of labor and equipment with the specified output of 1.00 ea for 8.33h.
To increase the output, additional equipment and labor may be added.
urly Rate Amount (PhP)

Rates are variable per Region/District


d on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

urly Rate Amount (PhP)

e latest ACEL rental rates.

t Cost Amount (PhP)

s of materials are variable per Region/


ct based on the prevailing onif prices in the
y which include payment of local taxes and
ng cost to the project sife.
to the Construction Material Price Data
lished quarterly by Central Office Price
oring Committee.
8.33h.
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 3 1.00 based on minimum wage as approved by
b. Unskilled Laborer Refer fo the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 1.00 See latest ACEL rental rates.


a. Backhoe (0.80 m3) 2 1.00
b. Dump Truck (12 yd*)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 20.00 m*
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials

G. Direct Unit Cost(E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit(CP) 10%/ 8% of G
J. Value Added Tax(VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. Additional labor and/or equipment may be added for dispossal of surplus excavated material.
te Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
Schedule of Labor Rates.

te Amount (PhP)

t ACEL rental rates.

Amount (PhP)
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 3 1.00 based on minimum wage as approved by
b. Unskilled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 2 1.00 See latest ACEL rental rates.


a. Dump Truck (12 yd3) 1 0.50
b. Backhoe (0.80 m*) 1 0.50
c. Backhoe with Breaker (0.80 m3) Minor Tools (10% of Labor
Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 14.00 m3
E. Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1 Contractor's Profit (CP) 10%/8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I + J) I
te Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

te Amount (PhP)

t ACEL rental rates.

Amount (PhP)
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Coristruction Foreman 3 1.00
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment 2 1.00
a. Dump Truck (12 yd3) 1 0.25
b. Backhoe (0.80 m3) 1 0.75
c. Backhoe with Breaker (0.80 m3) Minor Tools (10% of Labor
Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 4.00 m*
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity

Materials

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

H + I)
I + J)
Item No./Description Unit of 803(2) Trimming Works
Measurement 2
Output per hour 5.00 md

A. Labor Designation No. of Person/s No. of Hour/s

1 1.00
a. Construction Foreman 4 1.00
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.00 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1. Contractor’s Profit (CP)
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

H + I) I

I + J) I
Item No./Description 803(3) Soil Stabilization
Unit of Measurement Output per 2

hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)

D. Output per Hour =


E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : This Item shall depend on the method recommended by the designer. Attach at least 3 quotations from specialty
contractor.
Amount (PhP)

Amount (PhP)

Amount (PhP)
Item No./Description Unit of Measurement
804(1)a Embankment from Structure Excavation m*
Output per hour 9.84 m*

A. Designation No. of Person/s No. of Hourls

Labor 1 1.00
a. Construction Foreman 3 1.00
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment 1 0.75
a. Plate Compactor (5 hp) 1 0.75
b. Backhoe (0.80 m3)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 9.84 m*
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
l. 15%/ 12%/ 10%/ 8% of G I
J. Contractor's Profit (CP)
K. 10%/ 8% ofG I

Value Added Tax (VAT) 5% of(G + H + I) I


Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Regiori/Disfrict based on minimum wage as approved by DOLE. Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

H + I) I
Item No./Description Unit of 804(1)b Embankment from Common Borrow by Equipment
Measurement 9.84 m3
Output per hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distr


a. CoxDuctionForeman 3 1.00 based on minimum wage as approved by
b. Unskiled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 0.75 See latest ACEL rental rates.


a. Plate Compactor 1 0.75
b. Backhoe (0.80 m*)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 9.84 m3
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials m‘ 1.25 Prices of materials are variable per Regio


a. Embankment Materials District based on the prevailing unit prices
(w/ 25% Shrinkage Factor) locality which include payment of local tax
hauling cost to the project site.
Refer to the Construction Material Price O
established quarterly by Central Office Pri
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
urly Rate Amount (PhP)

Rates are variable per Region/District


d on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

urly Rate Amount (PhP)

e latest ACEL rental rates.

Amount (PhP)

s of materials are variable per RegioN


ct based on the prevailing unit prices in the
y which include payment of local taxes and
ng cost to the project site.
to the Construction Material Price Oafa
lished quarterly by Central Office Price
oring Committee.
Item No./Description Unit of 804(4) Gravel Bedding
Measurement 1.20 m3
Output per hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distr


a. Coristruction Foreman 3 1.00 based on minimum wage as approved by
b. Unskilled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate Amount (PhP)

Equipment 1 0.50 See latest ACEL rental rafes.


a. Plate Compactor
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.20 m!
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials m‘ 1.05 Prices of materials are variable per Regio


a. Gravel Bedding (G1) District based on the prevailing unit prices
(w/ 5% Shrinkage Factor) locality which include payment of local tax
hauling cost fa the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K.
K. Total Unit Cost (G + H + I + J)
te Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
Schedule of Labor Rates.

Amount (PhP)

t ACEL rental rafes.

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t fa the project site.
Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 900 Structural Concrete (Ready Mix, Class AA/Class A/Class B/Class C/Class P/Seal Concrete, 7 days/14 days/ 28
Unit of Measurement Output m*
per hour 3.72 m3

Designation No. of Person/s No. of Hour/s Hourly Rate


A
. Labor
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/Dist
b. Skilled Laborer 2 1.00 based on minimum wage as approved by
c. Unskilled Laborer
Refer to the Schedule of Labor Rates.
Sub - Total for A
6 1.00

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 2 1.00 See latest ACEL rental rates.


a. Concrete Vibrador 1 0.27
b. Pumpcrete
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.72 m*
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials m* 1.05 Prices o/'materials are variable per Regio


a. Ready Mix, Class AA/Class B/Class C/Class P, 7 days/14 District based on the prevailing unit price
days/ 28 days locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet shall be used for concrete pouring by pumpcrete. Item Nos. 900(1)a1, 900(1)b1, 900(1)c1, 900(2)a,
900(2)b, 900(2)c, 900(3)a, 900(3)b, 900(3)c, 900(4)a, 900(4)b, 900(4)c, 900(5) and 900(6) shall used this cost sheet.
ass P/Seal Concrete, 7 days/14 days/ 28 days)

Amount (PhP)

r Rates are variable per Region/District


d on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

Amount (PhP)

ee latest ACEL rental rates.

Amount (PhP)

s o/'materials are variable per Region/


ct based on the prevailing unit prices in the
ty which include payment of local taxes and
ng cost to the project site.
to the Construction Material Price Data
lished quarterly by Central Office Price
oring Committee.
1, 900(1)b1, 900(1)c1, 900(2)a,
shall used this cost sheet.
Item No./Description 900(1) Structural Concrete for Footing and Slab on Fill ( Ready Mix Concrete, Class A, 7 days/14 days) m*
Unit of Measurement Output 3.32 m*
per hour
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per RegioNDist
a. Construction Foreman 2 1.00 based on minimum wage as approved by
b. Skilled Laborer 6 1.00 DOLE.Refer to the Schedule of Labor Ra
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 2 1.00 See latest ACEL rental rates.


a. Concrete Vibrator 1 1.00
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.32 m3
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.05 Prices of materials are variable per Regi


a. Ready Mix Concrete, 7 days/14 days District based on the prevailing unit price
Sub - Total F locality which include payment of local ta
hauling cost to the project site.
Refer to the Construction Material Price
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) ]


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
I. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet shall be used for concreting footings and slab on fill by using ready mix concrete and manual pouring of
concrete applicable for Item Nos. 900(1)b2 and 900(1)c2.
s A, 7 days/14 days) m*

ate Amount (PhP)

s are variable per RegioNDistrict


minimum wage as approved by
er to the Schedule of Labor Rates.

ate Amount (PhP)

est ACEL rental rates.

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
ng of
Item No./Description 900(1) Structural Concrete for Footing Tie Beam, Column, Suspended Slab, Girder/Beam (Ready Mix Concrete, Cla
Unit of Measurement 0.947 m3
Output per hour Note :

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 2 1.00 based on minimum wage as approved by
b. Skilled Laborer 6 1.00 DOLE.Refer to the Schedule of Labor Ra
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 2 1.00 See latest ACEL rental rates.


a. Concrete Vibrator
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.947 m3
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.05 Prices of materials are variable per Regio


a. Ready Mix Concrete, 7 days/14 days District based on the prevailing unit price
Sub - Total F locality which include payment of local fax
hauling cosf to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet shall be used for concreting footing tie beam, column, suspended slab, girder/beam by using ready mix
concrete and manual pouring of concrete applicable for Item Nos. 900(1)a3, 900(1)a4, 900(1)a5, 900(1)a6, 900(1)b3, 900(1)b4, 900(1)b5, and 900(1)b6.
Girder/Beam (Ready Mix Concrete, Class A, 7 days/14 days)

urly Rate Amount (PhP)

Rates are variable per Region/District


d on minimum wage as approved by
E.Refer to the Schedule of Labor Rates.

y Rate Amount (PhP)

ee latest ACEL rental rates.

Amount (PhP)

s of materials are variable per Region/


ct based on the prevailing unit prices in the
y which include payment of local faxes and
ng cosf to the project site.
to the Construction Material Price Data
lished quarterly by Central Office Price
oring Committee.
ready mix
900(1)b4, 900(1)b5, and 900(1)b6.
900(1)c2 Structural Concrete for Footing and Slab on FiII (Class A, 28 days) 3
Item No./Description 0.357 m*

Unit of Measurement

Output per hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor
a. Coristruction Foreman 1 1.00
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
b. Unskilled Laborer 4 1.00
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment
a. One Bagger Mixer See latest ACEL rental rates.
1 1.00
Minor Tools (10% of Labor Cost) 0.00
Sub - Total for B

C.
D. Total (A + B) 000
E. Output per Hour = 0.357 m*
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt
Materials
a. Gravel 1.00
Prices of materials are variable per Region/
b. Sand bags 0.50
Refer to the Construction Material Price Da
c. Portland Cement 9.10
Sub - Total for F

G.
H.
1. Direct Unit Cost (E + F)
J. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
K.
Contractor’s Profit (CP) 10%/ 8% of G
Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet shall be used for concreting footings and slab on fill by using manual mixing and manual pouring of
concrete.
Rate Amount (PhP)

ates are variable per Region/District based on minimum wage as approved by DOLE.Refer to the Schedule of Labor Rates.

Rate Amount (PhP)

est ACEL rental rates.

Amount (PhP)
f materials are variable per Region/ District based on the prevailing unit prices in the locality which include payment of local taxes and hauling cost to the project site
the Construction Material Price Data established quarterly by Central Office Price Monitoring Committee.
nd hauling cost to the project site.
Item No./Description 900(1) Structural Concrete for Footing Tie Beam, Column, Suspended Slab, Girder/Beam (Class A, 28 days)
Unit of Measurement Output 0.270 m*
per hour

A Designation No. of Person/s No. of Hourls Hourly Rate


.
Labor 1 1.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 4 1.00 Refer to the Schedule of Labor Rates.
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00 See latest ACEL rental rates.


a. One Bagger Mixer
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.270 m*
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Regio


a. Gravel 0.50 District based on the prevailing unit price
b. Sand 9.10 locality which include payment of local ta
c. Portland Cement hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
bags Monitoring Committee.

G. Direct Unit Cost (E + F)


H.
l.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet shall be used for concreting footing tie beam, column, suspended slab, and girder/beam by using manual
mixing and manual pouring of concrete applicable for Item Nos. 900(1)c3, 900(1)c4, 900(1)c5 and 900(1)c6. Ideally, this cost sheet shall be used for one-sto
buildings involving one to two spans in remote areas.
Girder/Beam (Class A, 28 days)

Amount (PhP)

r Rates are variable per Region/District


d on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

Amount (PhP)

ee latest ACEL rental rates.

Amount (PhP)

s of materials are variable per Region/


ct based on the prevailing unit prices in the
ty which include payment of local taxes and
ng cost to the project site.
to the Construction Material Price Data
lished quarterly by Central Office Price
oring Committee.
sing manual
his cost sheet shall be used for one-storey to two-storey
Item No./Description Unit of 901(1) Lean Concrete (Ready Mix, 28 days)
Measurement 3.72 m3
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Coristruction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Dist
c. Unskilled Laborer 2 1.00 based on minimum wage as approved by
Sub - Total for A 6 1.00 DOLE.Refer to the Schedule of Labor Ra

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 2 1.00 See latest ACEL rental rates.


a. Concrete Vibrator 1 0.27
b. Pumpcrete
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.72 m*
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.05 Prices of materials are variable per Regio


a. Ready Mix Concrete, Lean Concrete, 28days District based on the prevailing unit price
Sub - Total for F locality which include payment of local ta
hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% ofG I
J.
J. Value Added Tax (VAT) 5% of(G + H + I) I

K. Total Unit Cost (G + H + I + J) j


Amount (PhP)

s are variable per Region/District

inimum wage as approved by


r to the Schedule of Labor Rates.

Amount (PhP)

est ACEL rental rates.

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 901(1) Lean Concrete (for manual mixing) m*
Measurement 0.357 m*
Output per hour
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/Distr
a. Construction Foreman 1 1.00 on minimum wage as approved by DOLE
b. Skilled Laborer 4 1.00 the Schedule of Labor Rates.
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00 See latest L


a. One Bagger Mixer ACE
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B) 000
D. Output per Hour = 0.357 m*
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials 1.00 Prices of materials are variable per Regio


a. Gravel 0.50 based on the prevailing unit prices in the
b. Sand 6.00 which include payment of local taxes and
c. Portland Cement cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
bags Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% of G
J.
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet shall be used for lean concrete by using manual mixing and manual pouring of concrete.
Amount (PhP)

ates are variable per Region/District based


mum wage as approved by DOLE.Refer to
edule of Labor Rates.

Amount (PhP)

renfa/ rates.
0.00

000

Amount (PhP)

f materials are variable per Region District


n the prevailing unit prices in the locality
clude payment of local taxes and hauling
he project site.
the Construction Material Price Data
hed quarterly by Central Office Price
ng Committee.
Item No./Description 902(1) Reinforcing Steel of Reinforced Concrete Structures for One-Storey, Grade 40/Grade 60 kg
Unit of Measurement Output 143.438 kg
per hour
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 3 1.00 based on minimum wage as approved by
b. Skilled Laborer 12 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment 1 0.50 See latest ACEL rental rates.


a. Bar Cutter 1 0.50
b. Bar Bender
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 143.438 kg
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg kg 1.00 Prices of materials are variable per Regio


a. Deformed Reinforcing Steel 0.015 District based on the prevailing unit price
b. #16 Galvanized Iron Wire locality which include payment of local ta
c. Consumables (5% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Offi”ce P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% of G I
J. Value Added Tax (VAT) 5% of (G + H + I) I
K. Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos 902(1)a1 and 902(1)a2.
40/Grade 60 kg

te Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

est ACEL rental rates.

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
e Construction Material Price Data
quarterly by Central Offi”ce Price
Committee.
Item No./Description Unit of 902(1) Reinforcing Steel of Reinforced Concrete Structures for Two upto Five Storey kg
Measurement 129.094 kg
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 3 1.00 based on minimum wage as approved by
b. Skilled Laborer 12 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 0.50 See latest ACEL rental rates.


a. Bar Cutter 1 0.50
b. Bar Bender
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 129.094 kg
E. Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg kg 1.00 Prices of materials are variable per Regio


a. Deformed Reinforcing Steel 0.015 District based on the prevailing unit price
b. #16 Galvanized Iron Wire locality which include payment of local ta
c. Consumables (5% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
ey kg

te Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
Schedule of Labor Rates.

ate Amount (PhP)

est ACEL rental rates.

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 903(2) Formworks and Falseworks (for two to five-storey building) rn2
Measurement 4.5 m2
Output per hour
Designation No. of Person/s No. of Hourls Hourly Rate
A
. Labor
Installation
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/Dist
4 1.00 based on minimum wage as approved by
b. Skilled Laborer
6 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer Stripping
a. Construction Foreman
b. Unskilled Laborer 1 0.56
Sub - Total for A
6 0.56

Name and Capacity Quantity No. of Day/s Daily Rental Rate

B. Equipment Rental cost for scaffoldings may vary per


Area = 205.01 m2 Region/District.
a. H-Frame 1.7 m x 1.2m, set 2 pcs H-frames
4 pcs diagonal cross braces 4 pcs horizontal braces 40 14.00
8 pcs joint pins
b. Shoring Jack, 3.8 m full extension
c. Adjustable U-head Jack, 0.6m
d. Adjustable Base Jack, 0.6m
e. 1-1/2" GI Pipe x 6.0 m
f. 1-1/2” GI Pipe x 3.0 m
g. 1-1/2" GI Pipe x 4.0 m
h. 1-1/2" GI Pipe x 1.0 m 62 14.00
i. Tie Rod x 0.60m 80 14.00
j. Round Wing Nut Note :
80 14.00
Area of consideration was based on the total area of formworks
for 2 bays of standard school building, 9.5 m x 62 14.00
9.0 m, and height of 3.2m. 16 14.00
Sub - Total for B 32 14.00
216 14.00
278 14.00 -^
558 14.00

C. Sub - Total for C (B :- Area)


D. Output per Hour = 4.5 m*
E. Direct Unit Cost (A + D) + C
F. Name and Specification Unit Quantity Unit Cost

Materials pc bd ft 0.347 Prices of materials are variable per Regio


a. Phenolic Board (0.019 x 1.2 x 2.4) - 5 uses 4.727 District based on the prevailing unit price
c. Good Lumber - 3 uses locality which include payment of local ta
b. Consumables (5% of Materials Cost) hauling cost to the project sife.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) j


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

l. Contractor’s Profit (CP) 10%/ 8% of G I

J. Value Added Tax (VAT) 5% of (G + H + I) I

K. Total Unit Cost (G + H + I + › I


Note : 1. This cost sheet analysis is only applicable for Formworks and Falseworks considering steel scaffoldings for two to five storey buildings.
2. Area of consideration includes beams, columns, and suspended slabs.
Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

for scaffoldings may vary per


trict.

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project sife.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
o five storey buildings.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 903(2) Formworks and Falseworks (for one-storey building)
Measurement FM2
Output per hour 3.24 md.
A Designation No. of Person/s No. of Hour/s
.
Labor, 1 1.00
Installation 2 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 1 0.41
c. Unskilled Laborer Stripping 6 0.41
a. Construction Foreman
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity Quantity No. of Day/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Sub - Total for C (B + Area)


D. Output per Hour = 3.24 m*
E.
Direct Unit Cost (A + D) + C
F. Name and Specification Unit Quantity

Materials pcs bd ft kg 0.347


a. Ordinary Plywood - 3 uses 7.190
b. Good Lumber - 3 uses 0.21
c. Assorted Common Wire Nails
d. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
l.
J.
K.
G.
H.
l.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I) I

Total Unit Cost (G + H + I + J)


Note : 1. This cost sheet analysis is only applicable for Formworks and Falseworks considering wood scaffoldings for a one-storey
building.
LYSIS (DUPA)
ilding)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Daily Rental Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
H + I) I

I + J)
ng wood scaffoldings for a one-storey
Item No./Description 1000(1) Soil Poisoning L
Unit of Measurement Output per 5.40 L
hour
A. Designation No. of Person/s No. of Hourls Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Disiric


a. Construction Foreman 1 1.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 2 1.00 the Schedule a Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.40 L
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials L 1.00 Prices of materials are variable per Region


a. Soil Poisoning based on the prevailing unit prices in the lo
Sub - Total for F which include payment of local taxes and h
cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J.
K.
G.
H.
I.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/Disirict based


m wage as approved by DOLE. Re er to
le a Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1001(1)a 50 mm {Z) -100 mm $ PVC Pipe, Series 600/ Series 1000
Unit of Measurement Output 3.00 m
per hour

Designation No. of Personls No. of Hourls Hourly Rate

A Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE. R
Sub - Total for A 2 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region/


a. 50 mm - 100 mm CI PVC Pipe, Series 600/Series 1000 based on the prevailing unit prices in the loc
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Price
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1001(1)a1, 1001(1)a2,1001(1)a3, 1001(1)a5, 1001(1)a5, and 1001(1)a7.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Re er to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1001(1)a 150 mm - 300 mm Cl PVC Pipe, Series 600/ Series 1000
Unit of Measurement Output 4.00 m
per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

A Labor
. a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE.
Sub - Total for A 2 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 4.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region


a. 150 mm IB PVC Pipe, Series 600/ Series 1000 based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Oa
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor’s Profit (CP) 10%/ 8% of G


J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J) I
Note: 1. Use this cost sheet for Item Nos. 1001(1)a4, 1001(1)a8, 1001(1)a9, 1001(1)a10 and 1001(1)a11.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Oafa
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1001(1)b1 150 mm B Concrete Pipe
Measurement 1.00 m
Output

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 098 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 2 0.98 on minimum wage as approved by DOLE. R
Sub - Total for A 4 0.98 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment 0.09
a. Plate Compactor (5 hp)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1.00 m
E. Direct Unit Cost (C :— D)

Name and Specification Unit Quantity Unit Cost

F.
Materials
a. Portland Cement
b. Sand 0.19 Prices of materials are variable per Region/
c. Concrete Pipe (150 mm 6) bag 0.01 based on the prevailing unit prices in the /o
d. Sand Bedding/Selected sandy soil which include payment of/oca/
Sub - Total for F 1.00 taxes and hauling cost to the project site. R
0.05 the Construction Material Price Data establ
gr/arfer/y by Central Office Price
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% ofG

J. Value Added Tax (VAT) 5% of(G + H + I) (


K.
K. Total Unit Cost (G + H + I + J) I
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the /oca/ify
de payment of/oca/
hauling cost to the project site. Refer to
uction Material Price Data established
y Central Office Price
Committee.
A. Designation No. of Person/s No. of Hour/s Ho urly Rate Amount (PhP)

Labor 1 1.07 Labor Rates are variable per RegioNDistrict b


a. Construction Foreman 2 1.07 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 4 1.07 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Ho urly Rate Amount (PhP)

Equipment t) 0.11
a. Plate Compactor (5 hp) Minor Tools for
(10% of Labor Cos
Sub - Total

B
C. Total (A + B)
D. Output = 1.00 m
E. Direct Unit Cost (C + D)
Name and Specification
Unit Quantity Unit Cost Amount (PhP)

F. Materials
a. Portland Cement
b. Sand 0.25 Prices of materials are variable per Region/ D
c. Concrete Pipe (200 mm $) bag 0.01 based on the prevailing unit prices in the loca
d Sand Bedding/Selected sandy soil include payment of local
Sub - Total for F 1.00 faxes and hauling cost to the project site.
0.05 Refer to the Construction Material Price Oafa
established quarterly by Central Office Price
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
urly Rate Amount (PhP)

Rates are variable per RegioNDistrict based on


um wage as approved by DOLE. Refer to the
dule of Labor Rates.

urly Rate Amount (PhP)

t Cost Amount (PhP)

s of materials are variable per Region/ District


d on the prevailing unit prices in the locality which
e payment of local
and hauling cost to the project site.
to the Construction Material Price Oafa
ished quarterly by Central Office Price
oring Committee.
Designation No. of Person/s No. of Hour/s

Labor 1 1.17
a. Construction Foreman 2 1.17
b. Skilled Laborer 4 1.17
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment 0.12
a. Plate Compactor (5 hp)
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification
Unit Quantity

Materials bag 0.32


a. Portland Cement 0.02
b. Sand 1.00
c. Concrete Pipe (250 mm $) 0.06
d Sand Bedding/Selected sandy soil
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/ 8% ofG
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by OOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project sife.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Item No./Description Unit of 1001(1)b4 300 mm gl Concrete Pipe
Measurement pc 1 pc
Output
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.26
a. Construction Foreman 2 1.26
b. Skilled Laborer 4 1.26
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment 0.13
a. Plate Compactor (5 hp)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F.
Name and Specification Unit Quantity

Materials bag 0.38


a. Portland Cement 0.02
b. Sand 1.00
c. Concrete Pipe (300 mm 0) 0.06
d Sand Bedding/Selected sandy soil
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J.
K.
G.
H.
I. Contractor’s Profit (CP)
J. 10%/ 8% ofG I

K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J)


Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
+ I) I

+ J)
Item No./Description Unit of 1001(1)b5 350 mm If Concrete Pipe
Measurement 1.00 m
Output

Designation No. of Person/s No. of Hourls Hourly Rate

A Labor
a. Construction Foreman
b. Skilled Laborer 1 1.35 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 2 1.35 on minimum wage as approved by DOLE. R
Sub - Total for A 4 1.35 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 0.14
a. Plate Compactor (5 hp)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag 0.44 Prices of materials are variable per Region


a. Portland Cement 0.03 based on the prevailing unit prices in the lo
b. Sand 1.00 which include payment of local taxes and h
c. Concrete Pipe (350 mm IZI) 0.07 cost to the project s/Ie.
d Sand Bedding/Selected sandy soil Refer to the Construction Material Price Da
Sub - Total for F established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor's Profit (CP) 10%/ 8% of G (


J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J) I
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project s/Ie.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1001(1)c 50 mm 0 - 100 mm IZI High Density Polyethylene (HDPE) Pipe
Measurement 3.00 m
Output per hour :

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a. 50 mm Cl High Density Polyethylene (HDPE) Pipe
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/ 8% of G
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1001(1)c1, 1001(1)c2, and 1001(1)c3.
ne (HDPE) Pipe

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unif prices in the locality
which include payment of local faxes and hauling cosf
to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
+ I)
+ J)
Unit of Measurement
Output per hour 4.00 m

A Designation No. of Personls No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 4.00 m
E.
Direct Unit Cost (C :- D)
F.
Name and Specification Unit Quantity

Materials 1.0o
a. 150 mm Cl High Density Polyethylene (HDPE) Pipe
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor's Profit (CP) 10%/8% ofG
K.
G.
H.
l.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1001(1)c4, 1001(1)c5,1001(1)c6 and 1001(1)c7.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
+ I)
+ J)
Unit of Measurement ea
Output per hour 1 ea
A Designation No. of Person/s No. of Hour/s Hourly Rate

Labor ed in the installation of pipes.) Labor Rates are variable per Region/Distri
(Labor cost for these items are to be considered/ includ on minimum wage as approved by DOLE.
Sub - Total for A the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 ea
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials ea 1.00 Prices of materials are variable per Region


a. PVC/HDPE Fittings (Elbow/ Clean Out/ Coupling/ Wye/ Tee/ based on the prevailing unif prices in the lo
Reducer/ P-trap/ Bushing/ Plug) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost(E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit(CP) 10%/ 8% of G I

J. Value Added Tax(VAT) 5% of(G + H + I) I


K. Total Unit Cost (G + H + I + I I
Note : 1. All items under Item No 1001(2) are considered as fittings. Use this cost sheet for Item Nos. 1001(2)a to 1001(2)w.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unif prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1001(3) Concrete Gutter
Measurement
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor

Sub - Total for A


B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)
D. Output per Hour =
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg
a. Item 900 - Reinforced Concrete FM2
b. Item 902 - Reinforcing Steel
a. Item 903 - Formworks and Falseworks
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% of G
J.
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This item shall be based on the standard Detailed Unit Price Analysis (DUPA) of each component item such as
Item Nos. 900,902, and 903.
Amount (PhP)

Amount (PhP)

Amount (PhP)
as
Item No./Description Unit of 1001(6) Catch Basin (Concrete/CHB) ea
Measurement 1.00 ea
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
a. Item-803 - Structure Excavation
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output = 1.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg
a. Item 900 - Reinforced Concrete
b. Item 902 - Reinforcing Steel
c. Item 1046 - CHB Wall
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
Contractor’s Profit (CP) 10%/ 8% of G
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. These items are variable in dimensions based on actual condition which combines component items, hence standard estimate
shall be based on the standard Detailed Unit Price Analysis (DUPA) of each component item such as Items 803, 900, 902
Amount (PhP)

Amount (PhP)

Amount (PhP)
andard estimate
2
A. Designation No. of Personls No. of Hour/s Hourly Rate

Labor
a. Item 803 - Structure Excavation
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output = 1.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
a. Item 900 - Reinforced Concrete
b. Item 902 - Reinforcing Steel
c. Item 1046 - CHB Wall
Sub - Total for F
kg m2

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. These items are variable in dimensions based on actual condition which combines component items, hence standard estimate shall be based on the
Unit Price Analysis (DUPA) of each component item such as Items 803,900,902
and 1046.
Amount (PhP)

Amount (PhP)

Amount (PhP)

tandard estimate shall be based on the standard Detailed


A Designation No. of Personls No. of Hour/s Hourly Rate

Labor d 1001(2).
See c/er/vafions for item Nos. 1001(fl)a, fl001(I)c, an
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

..z
c. Total (A + B)
D. Output = 1.00 I.s.
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials / 1001(2).
See derivations for Item Nos. 1001(1)a, 1001(1)c, anc
Sub - Total for F

G.
H. Direct Unit Cost (E + F)
I.
J. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
K.
Contractor’s Profit (CP) 10%/ 8% of G

Value Added Tax (VAT) 5% of (G + H + I)


J.
K.

Total Unit Cost (G + H + I + J)


Note: 1. The "lumpsum" unit of measurement as per Blue Book shall be based on the derived outputs of Item Nos. 1001(1)a, 1001(1)c,
and 1001(2)
Amount (PhP)

Amount (PhP)

Amount (PhP)

I
I
I
01(1)a, 1001(1)c,
Designation No. of Person/s No. of Hour/s
A Labor

See derivations for Item Nos. 1001(1)c, 1001(3), 1001(4), 1001(5), 1001(6) and 1001(7).
B. Equipment Sub - Total for A Name and Capacity No of Unit/s No. of Hour/sq
C. Sub - Total for B Total (A + B)
D. Output = 1.00 I.s.

E. Direct Unit Cost (C + D)


Name and Specification Unit Quantity

F. Materials
See rferivat/ons for Item /Vos. 1001(1)c, 1001(3), 1001(4), 1001(5), 1001(6) and 1001(7).
Sub - Total for F
G. Direct Unit Cost (E + F)
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G

1. Contractor’s Profit (CP) 10%/ 8% of G


J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. The "lumpsum" unit of measurement as per Blue Book shall be based on the derived outputs of Item Nos. 1001(1)c, 1001(3), 1001(4), 1001(5), 10
Hourly Rate Amount (PhP)

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

I)
+ J)
of Item Nos. 1001(1)c, 1001(3), 1001(4), 1001(5), 1001(6) and 1001(7).
Item No./Description 1002(2)a 13 mm $ - 50 mm AZ Galvanized Iron Pipe pc
Unit of Measurement Output 1 pc

A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)


.
Labor 1 2.00 Labor Rates are variable per Region/District b
a. Construction Foreman 1 2.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 2 Schedule of Labor Rates.
c. Unskilled Laborer 2.00
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region/ D


a.13 mm IB - 50 mm Cl Galvanized Iron Pipe based on the prevailing unit prices in the loca
b. Consumables (5% of Materials Cost) include payment of local taxes and hauling co
project site.
Refer to the Construction Material Price Data
established quartedy by Central Office Price
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1002(1)a1, 1002(1)a2, 1002(1)a3, 1002(1)a4, and 1002(1)a5.
urly Rate Amount (PhP)

Rates are variable per Region/District based on


um wage as approved by DOLE. Refer to the
dule of Labor Rates.

Amount (PhP)

Amount (PhP)

of materials are variable per Region/ District


on the prevailing unit prices in the locality which
e payment of local taxes and hauling cost to the
t site.
to the Construction Material Price Data
ished quartedy by Central Office Price Monitoring
mittee.
Item No./Description 1002(2)a 65 mm Ø - 150 mm Ø Galvanized lron Pipe pc
Unit of Measurement Output 1 pc

Designation No. of Person/s No. of Hour/s Hourly Rate

A Labor
a. Construction Foreman
b. Skilled Laborer 1 1.50 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.50 on minimum wage as approved by DOLE. R
Sub - Total for A 2 1.50 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region/


a. 65 mm Cl - 150 mm Clx 6 m Galvanized Iron Pipe based on the prevailing unit prices in the loc
b. Consumables (5% of Materials Cost) which include payment of local faxes and ha
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Price
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

l. Contractor’s Profit (CP) 10%/ 8% of G


J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(1)a6, 1002(1)a7, 1002(1)a8, and 1002(1)a9.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ Oisfricf


he prevailing unit prices in the locality
de payment of local faxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(2) Galvanized Iron Fittings
Measurement p*
Output per hour 1 pc

A Designation No. of Person/s No. of Hour/s Hourly Rate

Labor d in the installation of pipes.)


(Labor-cost for these items are to be considered/include
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region


a. Galvanized Iron Fittings (Elbow/ Tee/ Reducer-Tee/ Socket/ based on the prevailing unit prices in the lo
Coupling/ Reducer Coupling) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note . 1. Use this cost sheet for Item Nos. 1002(2)b to 1001(2)f.
Amount (PhP)

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1002(3)a 13 mm B - 50 mm $ Polyprophylene Random Copolymer (PPR-C) Pipe, PN 10/ PN 16/ PN 20 pc
Unit of Measurement Output 1 pc

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.33 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.33 on minimum wage as approved by DOLE. R
Sub - Total for A 2 1.33 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/sq Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)

D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region


a. 13 mm Cl - 50 mm Cl x 4.00 m Polyprophylene Random based on the prevailing unit prices in the lo
Copolymer (PPR-C) Pipe, PN 10/ PN 16/ PN 20 which include payment of local taxes and h
b. Consumables (5% of Materials Cost) cost to the project si/e.
Sub - Total for F Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(3)a1 to 1002(3)a18.
PN 16/ PN 20 pc

Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project si/e.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1002(3)a 63 mm $ - 100 mm $ Polyprophylene Random Copolymer (PPR-C) Pipe PN 10/ PN 16/ PN 20 pc
Unit of Measurement Output 1 pc

A. Designation No. of Personls No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/District b


a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 2 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Ho urly Rate

Equipment t)
Minor Tools (10% of Labor Cos for
Sub - Total

B
C. Total (A + B)
D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region/ Di


a. 63 mm Cl - 100 mm Cl x 4.00 m Polyprophylene Random based on the prevailing unit prices in the locali
Copolymer (PPR-C) Pipe PN 10/ PN 16/ PN 20Copolymer (PPR-C) include payment of local taxes and hauling cos
Pipe project site.
b. Consumables (5% of Materials Cost) Refer to the Construction Material Price Data
Sub - Total for F established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(3)a19 to 1002(3)a28.
/ PN 16/ PN 20 pc

ate Amount (PhP)

s are variable per Region/District based on


age as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


e prevailing unit prices in the locality which
ment of local taxes and hauling cost to the

Construction Material Price Data


quarterly by Central Office Price Monitoring
Item No./Description Unit of 1002(3) Polyprophylene Random Copolymer (PPR-C) Fittings pc
Measurement 1 pc
Output
A Designation No. of Person/s No. of Hourls Hourly Rate

Labor d in the installation of pipes.) Labor Rates are variable per Region/Distric
(Labor.cost for these items are to be considered/include on minimum wage as approved by DOLE.
Sub - Total for A the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


C. Total (A + B)
D. Output= 1 pc
E. Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials pg 1.00 Prices of materials are variable per Region


a. Polyprophylene Random Copolymer (PPR-C) Fittings (Elbow/ Tee/ based on the prevailing unit prices in the lo
Female Threaded Tee/ Female Elbow/ Female Threaded Adaptor/ which include payment of local taxes and h
Male Threaded Adaptor/ End Cap) cost to the project site.
Sub - Total for F Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(3)b to 1001(3)I.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ Oisfricf


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1002(4)a 13 mm IZI - 50 mm $ Polyvinyl Chloride (PVC) Pipe, Blue
Unit of Measurement Output : pc
per hour 1 pc

A. Designation No. of Person/s No. of Hourls Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/District b


a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 2 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per hour = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pg 1.00 Prices of materials are variable per Region/ D


a. 13 mm Cl - 50 mm Cl x 3 m Polyvinyl Chloride (PVC) Pipe, blue based on the prevailing unit prices in the loca
b. Consumables (5% of Materials Cost) include payment of local taxes and hauling co
Sub - Total for F project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor’s Profit(CP) 10%/ 8% of G I
K.
G.
H.
I.
J.
K. Value Added Tax(VAT) 5% of(G + H + I) I
Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1002(4)a1, 1002(4)a2, 1002(4)a3, 1002(4)a4, 1002(4)a5, and 1002(4)a6.
Amount (PhP)

es are variable per Region/District based on


wage as approved by DOLE. Refer to the
of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/ District


the prevailing unit prices in the locality which
yment of local taxes and hauling cost to the
e.
he Construction Material Price Data
d quarterly by Central Office Price Monitoring
e.
Item No./Description 1002(4)a 65 mm IZI - 100 mm {ZI Polyvinyl Chloride (PVC) Pipe, Blue pc
Unit of Measurement Output 1 pc

A Designation No. of Person/s No. of Hour/s


.
Labor 1 0.75
a. Construction Foreman 1 0.75
b. Skilled Laborer 2 0.75
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/sq

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity

Materials pc 1.00
a. 65 mm Cl 100 mm B x 3 m Polyvinyl Chloride (PVC) Pipe, blue
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
J. 10%/ 8% ofG I

K.
Value Added Tax (VAT)
5% of(G + H + I) I
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(4)a7, 1002(4)a8, and 1002(4)a9.
C) Pipe, Blue pc

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost fo the
project sife.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
+ J)
Item No./Description 1002(4) Polyvinyl Chloride (PVC) Fittings, Blue pc
Unit of Measurement Output 1 pc

A Designation No. of Personls No. of Hour/s Hourly Rate Amount (PhP)

Labor d in the installation of pipes.) Labor Rates are variable per Region/Distric
(Labor-cost for these items are to be considered/include on minimum wage as approved by DOLE.
Sub - Total for A the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Ho urly Rate

Equipment
Sub

- Total for B
C. Total (A + B)
D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region


a. Polyvinyl Chloride (PVC) Fittings, Blue (Elbow/ Tee/ Tee- based on the prevailing unit prices in the lo
Reducer/ Elbow Reducer/ Socket/ Coupling/ Reducer/ Male which include payment of local taxes and h
Threaded Adaptor/ Female Threaded Adaptor/ Cap) cost to the project sife.
Sub - Total for F Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(4)b to 1001(4)1.
ate Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/ District


he prevailing unit prices in the locality
ude payment of local taxes and hauling
project sife.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5) Plumbing Fixtures
Measurement I.s.
Output 1.00 l.s.

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
See derivation fior item I\fos. Y002{5ja to J002 (5)s.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/sq Hourly Rate

Equipment

Sub - Total for B


C. Total (A + B)
D. Output = 1.00 I.s.
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
See c/erivafion /br item /Vos. 1002(5)a to 1002 (5)s.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
I. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. The "lumpsum" unit of measurement as per Blue Book shall be based on the derived outputs of Item Nos. 1002(5)a to
1002(5)s.
Amount (PhP)

Amount (PhP)

Amount (PhP)
002(5)a to
Item No./Description Unit of 1002(5) Water Closet/ Urinal with Complete Accessories set
Measurement 1 set
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 2.00 Labor Rates are variable per Region/Distri
a. Con6truction Foreman 1 2.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 1 2.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Water Closet / Urinal with complete accessories based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project s/Ie.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1002(5)a and 1002(5)b.
Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/ District


he prevailing unit prices in the locality
ude payment of local taxes and hauling
project s/Ie.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5) Kitchen Sink/Scrub Up Sink/Slop Sink with Complete Accessories set
Measurement 1 set
Output
Designation No. of Person/s No. of Hour/s Hourly Rate
A.
Labor
a. Construction Foreman
b. Skilled Laborer 1 2.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 2.00 on minimum wage as approved by DOLE.
Sub - Total for A 1 2.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Kitchen Sink/Scrub Up Sink/Slop Sink with complete accessories based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G j
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I) I

K. Total Unit Cost (G + H + I + J)


Note : 1. Use this cost sheet for Item Nos. 1002(5)c, 1002(5)d and 1002(5)e.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5) Wall Hung/Countertop/Under Counter Lavatory with Complete Accessories set
Measurement 1 set
Output
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 200 Labor Rates are variable per Region/Distri


a. Construction Foreman 1 200 on minimum wage as approved by DOLE.
b. Skilled Laborer 1 the Schedule of Labor Rates.
c. Unskilled Laborer 2.00
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Lavatory (Wall Hung/Countertop/Under Counter) based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local faxes and h
Sub - Total for F cost to the project site.
Refer to the Con”struction Material Price D
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
l.
J.
K.
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(5)f and 1002(5)g.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local faxes and hauling
project site.
e Con”struction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5)h Floor Drain Plates set
Measurement 1 set
Output
A Designation No. of Person/s No. of Hour/s
.
Labor 1 0.40
a. Construction Foreman 1 0.40
b. Skilled Laborer 1 0.40
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials set 1.00


a. Floor Drain Plate
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
J. 10%/8% ofG
K.
Value Added Tax (VAT)
5% of(G + H + I) I
G.
H.
I.
J.
K.
Total Unit Cost
(G + H + I + ) I
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to fhe
project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price Monitoring
Committee.
Item No./Description 1002(5) Soap Holder (Toilet Soap/ Liquid Soap) pc
Unit of Measurement Output 1 pc

Designation No. of Person/s No. of Hour/s Hourly Rate

A Labor
a. Construction Foreman
b. Skilled Laborer 1 0.75 Labor Rates are variable per Region/Distri
c. Unskilled Laborer 1 0.75 on minimum wage as approved by DOLE. R
Sub - Total for A 1 0.75 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)

D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Soap Holder (Toilet Soap/ Liquid Soap) based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer fo the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(5)i and 1002(5)j.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5) Toilet Tissue Holder/Dispenser pc
Measurement 1 pc
Output
Designation No. of Person/s No. of Hour/s Hourly Rate
A
. Labor
a. Construction Foreman
b. Skilled Laborer 1 0.75 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 0.75 on minimum wage as approved by DOLE.
Sub - Total for A 1 0.75 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region


a. Toilet Tissue Holder/Dispenser based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G I

I. Contractor’s Profit (CP)


10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(5)k and 1002(5)I.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5) Bidet/ Faucet/ Hose Bibb
Measurement pc
Output 1 pc

Designation No. of Personls No. of Hourls Hourly Rate

Labor
A a. Construction Foreman
b. Skilled Laborer 1 0.40 Labor Rates are variable per Region/Distri
Sub - Total for A 1 0.40 on minimum wage as approved by DOLE.
the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Bidet/ Faucet/ Hose Bibb based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cosf to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1002(5)m, 1002(5)q, and 1002(5)r.
Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1002(5)n Stainless Steel Grab bar
Measurement 0.45 m
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE. R
Sub - Total for A 2 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.45 m
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region/


a. 40 mm jzl Stainless Steel Grab Bar based on the prevailing unit prices in the loc
b. Consumables (5% of Materials Cost) which include payment of local taxes and ha
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Dat
established quarterly by Central Office Price
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

i. Contractor’s Profit (CP) 10%/ 8% ofG I

J. Value Added Tax (VAT) 5% of(G + H + I) I

K. Total Unit Cost (G + H + I + J) I


Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
e of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


e prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1002(5)o Shower head/ Shower Valve
Unit of Measurement Output per set
hour 1 set

A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set 1.00


a. Shower head/ Shower Valve
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
i.
J.
K.
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project sife.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Item No./Description Unit of 1002(5)p Facial Mirror
Measurement rn2
Output per hour 0.4 m*

A Designation No. of Person/s No. of Hour/s


.
Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour - 0.4 m’
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials T2 1.00
a. Facial Mirror
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K.
G.
H.
1.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price Monitoring
Committee.
+ I)
+ J)
Item No./Description Unit of 1002(6) Cold Waterline Pipes and Fittings I.s.
Measurement 1.00 I.s.
Output per hour
A. Designation No. of Personls No. of Hour/s Hourly Rate

Labor
See c/erivafion fbr items 1002(1) fo Items Y002{5j
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
See derivation for items 1002(1) to items 1002(5)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.00 I.s.
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
See r/erivation for /fems 1002(1) to Items 1002(5)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
I. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. The ”lumpsum" unit of measurement as per Blue Book shall be based on the derived outputs of Item No. 1002(1)a to
Item No. 1001(5).
Amount (PhP)

Amount (PhP)

Amount (PhP)
2(1)a to
Item No./Description Unit of 1002(7) Hot Waterline Pipes and Fittings l.s.
Measurement 1.00 I.s.
Output per hour
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor
See rferivation for Item /\/os. 1002(3)a to 1002(3)1.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment

Sub - Total for B


C. Total (A + B)
D. Output per Hour = 1.00 I.s.
E. Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials
See der/vat/on for Item /Vos. 1002(3)a to 1002(3)1.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1
1 Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. The ”lumpsum" unit of measurement as per Blue Book shall be based on the derived outputs of Item No.1002(3)a to 1002(3)1.
Amount (PhP)

Amount (PhP)

Amount (PhP)
2(3)a to 1002(3)1.
Item No./Description 1003(1) 4.5mm Fiber Cement Board/ 4.5 mm Marine Plywood/ 6 mm Marine Plywood/ 6mm Ordinary Plywood on Metal F
Unit of Measurement Output per rn2
hour 1.243 m2

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/District
c. Unskilled Laborer 1 1.00 minimum wage as approved by DOLE. Refer
Sub - Total for A 2 1.00 Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.243 m2
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials
a. 4.5mm Fiber Cement Board/ 4.5 mm Marine Plywood/ 6 mm pc 0.365
Marine Plywood/ 6mm Ordinary Plywood
b.Metal Furring (size variable on plan and and specifications ) 3m
length pc 1.131
c. Carrying Channels (size variable depends on plans and
specifications)
pc 0.357 Prices ofmaferia/s are variable per Region/
d. Hanger Bars/Rod (size variable depends on plans and District based on the prevailing unit prices in
specifications)
e. Channel clip pc 1 the locality which include payment of local
f. Wall Angle taxes and hauling cost to the project site.
g. Rivets Refer to the Construction Material Price Data
h. 1” Metal Screw p* 6 established quarterly by Central Office Pric
Note: 0.238 Monitoring Committee.
pc
Quantities were derived from plans and specifications of a
standard school building with carrying channels spaced by 1.20 m pc 14
and metal furring spaced by
0.40 m on center. pc 4
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1003(1)a1, 1003(1)b1, 1003(1)c1, and 1003(1)d1.
6mm Ordinary Plywood on Metal Frame Ceiling

Amount (PhP)

s are variable per Region/District based on


age as approved by DOLE. Refer to the
f Labor Rates.

Amount (PhP)

Amount (PhP)

aferia/s are variable per Region/


ed on the prevailing unit prices in
which include payment of local
auling cost to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1003(1)a 4.5mm Fiber Cement Board/ 4.5 mm Marine Plywood/ 6 mm Marine Plywood/ 6mm Ordinary Plywood in Wood F
Unit of Measurement Output per 1.489 md
hour

A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/District


a. Construction Foreman 1 1.00 on minimum wage as approved by DOLE. R
b. Skilled Laborer 2 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Ho urly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for

B
C. Total (A + B)
D. Output per Hour = 1.489 m°
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 0.365 Prices of materials are variable per Region/


a. 4.5mm Fiber Cement Board/ 4.5 mm Marine Plywood/ 6 mm bd.ft kg 9.257 based on the prevailing unit prices in the loc
Marine Plywood/ 6mm Ordinary Plywood 0.139 which include payment of local taxes and ha
b. Good Lumber cosf to the project site.
c. Assorted Nails Refer to the Construction Material Price Data
Note established quarterly by Central Office Price
Quantities are derived from a ceiling system with ceiling Monitoring Committee.
nailers spaced at 0.40 m on centers.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1003(1)a2, 1003(1)b2, 1003(1)c2, and 1003(1)d2.
6mm Ordinary Plywood in Wood Framing Ceiling

ate Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1003(1)e Gypsum Board on Metal Frame Ceiling
Unit of Measurement Output 1.340 md
per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Distric


a. Con"struction Foreman 1 1.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 2 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.340 m2
E. Direct Unit Cost (C + D)
Name and Specification Unit Unit Cost

F. Materials
a. Gypsum Board pc 0.365
b.Metal Furring (size variable on plan and pc 1.13
c. Carrying Channels (size variable depends on plans and
specifications) pc 0.36 Prices of materials are variable per Region
d. Hanger Bars/Rod ((size variable depends on plans and based on the prevailing unit prices in
specifications) the locality which include payment of local
e. Channel clip pc 1.00 faxes and hauling cost to the project site. R
f. Wall Angle Construction Material Price Data
g. Rivets pc pc 6 established quarterly by Central Office Pric
h. 1" metal screw Note: 0.238 Monitoring Committee
Quantities were derived from plans and
pc 14
specifications of a standard school building with carrying
channels spaced by 1.20 m and metal furring spaced by
0.40 m on center.
Sub - Total for F
specifications)
e. Channel clip
f. Wall Angle
g. Rivets
h. 1" metal screw Note:
Quantities were derived from plans and
specifications of a standard school building with carrying
channels spaced by 1.20 m and metal furring spaced by pc 4
0.40 m on center.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I +J) I
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in
which include payment of local
auling cost to the project site. Refer to the
on Material Price Data
d quarterly by Central Office Price
Committee
Item No./Description 1003(2) 4.5mm/ 6.0 mm Fiber Cement Board/ 4.5mm/ 6.0 mm 4’ X 8’ thk fiber cement board/ 4.5mm Marine Plywood/ 6.0
Unit of Measurement Output per Plywood/ 6.0 mm Ordinary Plywood on Metal Frame Double Wall Partition
hour 0.776 m^

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE. R
Sub - Total for A 2 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 0.776 fTi2
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 0.730 Prices of materials are variable per Region


a. 4.5mm/ 6.0 mm 4' X 8' thk fiber cement board/ 4.5mm Marine 1.181 based on the prevailing unit prices in the lo
Plywood/ 6.0 mm Marine Plywood/ 6.0 mm Ordinary Plywood 117.00 which include payment of local faxes and ha
b. Metal Studs (size variable depends on plan and specs.) 3 m length 4.00 cost to the project sife.
c. Rivets Refer to the Construction Material Price Da
d. 1" Metal Screw established quarterly by Central Office Pric
Sub - Total for F Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I) I
K. Total Unit Cost (G + H + I + J) I
Note: 1. Use this cost sheet for Item Nos. 1003(2)a1, 1003(2)b1, 1003(2)c1, 1003(2)d1 and 1003(2)e1.
board/ 4.5mm Marine Plywood/ 6.0 mm Marine

Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


e prevailing unit prices in the locality
de payment of local faxes and hauling
project sife.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1004(2) Finishing Hardware
Unit of Measurement Output set
1 set

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor d in the installation of doors, windows, and other fabricated materials.)
(Labor cost for these items are to be considered/include
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)

D. Output =
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Finishing Hardwares (Lockset/Latches, Bolts, Door Closer, based on the prevailing unit prices in the lo
Knobs/Handles/ Hinges/ Ladder/ Grab Bar) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1004(2)a to 1004(2)i.
Amount (PhP)

cated materials.)

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1005 Residential Casement Steel Windows/ Heavy Duty Side-hinged Ventilator/ Projected Ventilator/ Awning Ventilator
Unit of Measurement Output per 2
hour 0.18 md

A Designation No. of Personls No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distric


a. Construction Foreman 1 1.00 on minimum wage as approved by DOLE. R
b. Skilled Laborer 1 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 0.25 See latest ACEL rental rates


a. Welding Machine
Minor Tools (10% of Labor Cost)
Note:
It is assumed that fabrication of already
completed. Thus, labor an shall be
based on installation time
Sub - Total for

steel windows are d


equipment output only.
B

C. Total (A + B)
D. Output per Hour = 0.18 m’
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials FF|2 1.00


a. Residential Casement Steel Windows/ Heavy Duty Side-hinged Prices of materials are variable per Region/
Ventilator/ Projected Ventilatorl Awning Ventilatorl Grille Window based on the prevailing unit prices in the loc
b. Consumables (5% of Materials Cost) which include payment of local taxes and ha
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Price
Monitoring Committee.

G.
Direct Unit Cost (E + F) I
H.
Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor's Profit (CP) 10%/8% ofG

J.
Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost
(G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1005(1), 1005(2), 1005(3), 1005(4), and 1005(5).
ected Ventilator/ Awning Ventilator/ Grille Window

ate Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Rate Amount (PhP)

test ACEL rental rates

Amount (PhP)

materials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.

I
I
Item No./Description Unit of 1006 Hollow Steel Door/ Steel Flush Door/ Grille Door/ Steel Louver Door
Measurement rn2
Output per hour 0.26 m2

A. Designation No. of Person/s No. of Hourls Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/District b


a. Con”struction Foreman 1 1.00 minimum wage as approved by DOLE. Refer t
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate Amount (PhP)

Equipment 1 0.25 See latest ACEL rental rates


a. Welding Machine
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.26 m!
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials FF|2 1.00


a. Hollow Steel Door/ Steel Flush Door/ Grille Door/ Steel Louver Prices of materials are variable per Region/ D
Door based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling cos
Sub - Total for F project site. Refer to the Construction Materia
Data established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
l. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1006(1), 1006(2), 1006(3) and 1006(4).
ate Amount (PhP)

s are variable per Region/District based on


age as approved by DOLE. Refer to the
Labor Rates.

ate Amount (PhP)

atest ACEL rental rates

Amount (PhP)

aterials are variable per Region/ District


e prevailing unit prices in the locality which
ment of local taxes and hauling cost to the
Refer to the Construction Material Price
shed quarterly by Central Office Price
Committee.
A Designation No. of Person/s No. of Hourls Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distric


a. Construction Foreman 1 1.00 on minimum wage as approved by DOLE. R
b. Skilled Laborer 2 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate Amount (PhP)

Equipment 1 0.25 See latest ACEL rental rafes


a. Welding Machine
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.26 m’
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials T2 1.00
a. Fire rated Fire Exit Steel Door Prices of materials are variable per Region/
b. Consumables (3% of Materials Cost) based on the prevailing unit prices in the loc
Sub - Total for F which include payment of local taxes and h
cost to the project site.
Refer to the Construction Material Price Da
established guarterly by Central Office Price
Monitoring Committee.

G.
Direct Unit Cost (E + F) I
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor's Profit (CP) 10%/ 8% ofG

J. Value Added Tax (VAT) 5% of(G + H + I)


K. Total Unit Cost (G + H + I + J)
ate Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

ate Amount (PhP)

est ACEL rental rafes

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
guarterly by Central Office Price
Committee.

I
I
Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
A
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distri
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE.
Sub - Total for A 1 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.26 m2
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region


a. Aluminum Glass Door (Sliding Type/Swing Type) based on the prevailing unit prices in the lo
b. Consumables (3% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1007(1)a and 1007(1)b.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per Region/District b
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.36 m!
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials 2 1.00 Prices of materials are variable per Region/ D


a. Aluminum Glass Window (Sliding/ Casement/ Awning/ Fixed based on the prevailing unit prices in the local
Type) include payment of local taxes and hauling co
b. Consumables (3% of Materials Cost) project site.
Sub - Total for F Refer to the Construction Material Price Data
established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1 Contractor’s Profit (CP) 10%/ 8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1008(1)a, 1008(1)b, 1008(1)c and 1008(1)d.
te Amount (PhP)

are variable per Region/District based on


age as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

terials are variable per Region/ District


e prevailing unit prices in the locality which
ment of local taxes and hauling cost to ffie

Construction Material Price Data


quarterly by Central Office Price Monitoring
Item No./Description Unit of 1009(1)a Jalousie Window (Glass)
Measurement rn2
Output per hour 0.27 m*

A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/District


a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.27 m2
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials FM2 1.00 Prices of materials are variable per Region/ D


a. Jalousie Window (Glass) based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling co
Sub - Total for F project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP) 10%/ 8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I + ) I
ate Amount (PhP)

s are variable per Region/District based on


age as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


e prevailing unit prices in the locality which
ment of local taxes and hauling cosf fo the

Construction Material Price Data


quarterly by Central Office Price Monitoring
Item No./Description Unit of 1010(1) Frames (Jambs, Sill, Head, Transoms and Mullions) set
Measurement 1 set
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 2.00 Labor Rates are variable per RegioNDistric


a. Coriñtruction Foreman 1 2.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 1 2.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region


a. Jambs, Sill, Head, Transoms and Mullion based on the prevailing unit prices in the lo
b. Consumables (5% of Materials Cost) which include payment of local faxes and h
Sub - Total for F to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
J. 10%/ 8% ofG I

K. Value Added Tax (VAT) 5% of(G + H + I) I


G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J) I
Amount (PhP)

s are variable per RegioNDistrict based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local faxes and hauling cost
ct site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1010(2)a Hollow Core Flush Door
Measurement rn2
Output per hour 0.32 md

Designation No. of Person/s No. of Hourls Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Dis
c. Unskilled Laborer 1 1.00 based on minimum wage as approved b
Sub - Total for A 1 1.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.32 m*
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials FF|2 1.00 Prices of materials are variable per Reg


a.Hollow Core Flush Door District based on the prevailing unit price
Sub - Total for F locality which include payment of local t
hauling cost to the project site.
Refer to the Construction Material Price
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J.
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ich include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1010(2)b Wooden Panel Door
Measurement 0.36 m*
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

A Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE. R
Sub - Total for A 2 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour - 0.32 m2
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials FM2 1.00 Prices of materials are variable per Region


a. Wooden Panel Door based on the prevailing unit prices in the lo
Sub - Total for F which include payment of local taxes and h
cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1011(1) Steel/ Aluminum Roll Up Door set
Measurement 1.00 set
Output
Designation No. of Person/s No. of Hour/s Hourly Rate

A Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 14.71 on minimum wage as approved by DOLE.
Sub - Total for A 1 14.71 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1.00 set
E. Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials Set 1.00 Prices of materials are variable per Region


a. Steel/ Aluminum Roll Up Door based on the prevailing unit prices in the lo
b. Consumables (3% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer fo
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1012(1) Tempered Glass Door (10 mm/ 12mm)
Unit of Measurement Output per 0.26 md
hour

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor
A
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distric
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE.
Sub - Total for A 1 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hourls Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.26 m
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials T2 1.00 Prices of materials are variable per Region


a. Tempered Glass Door (10 mm/ 12mm) based on the prevailing unit prices in the lo
b. Consumables (3% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Da
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT)
5% of(G + H + I)
K.
K. Total Unit Cost
(G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1012(1)d1 and 1012(1)d2.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Designation No. of Person/s No. of Hourls Hourly Rate

A
. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distri
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE.
Sub - Total for A 1 1.00 the Schedule of Labor Rates.

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.36 m2
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit COSt

Materials 2 1.00 Prices of materials are variable per Region


a. Tempered Glass Windows (8 mm/ 10mm) based on the prevailing unit prices in the lo
b. Consumables (3% of Materials Cost) which include payment of local taxes and h
Sub - Total for F cost to the project site.
Refer to the Construction Material Price Oa
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I +J) I
Note : 1. Use this cost sheet for Item Nos. 1012(1)e1 and 1012(1)e2.
Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer to
le of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Oata
quarterly by Central Office Price
Committee.
Unit of Measurement Output per 2
hour 2.076 m*
Designation No. of Person/s No. of Hourls Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Dist
c. Unskilled Laborer 1 1.00 based on minimum wage as approved by
Sub - Total for A 2 1.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.076 m2
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.05 Prices of materials are variable per Regio


a. Corrugated Roofing Sheet 10 District based on the prevailing unit prices
b. Tek screw/J-bolt with washers locality which include payment of local tax
c. Consumables (3% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Offi'ce P
Monitoring Committee.

G. Direct Unit Cost (E + F) i


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Offi'ce Price
Committee.
A Designation No. of Person/s No. of Hour/s Ho urly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/Distr
a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 1 1.00 Refer to the Schedule of Labor
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Ho urly Rate

Equipment )
Minor Tools (10% of Labor Cost B
Sub - Total for

C. Total (A + B)
D. Output per Hour = 10.6 m
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.05 Prices of materials are variable per Regio


a. Ridge/Hip Rolls/Flashings/Valley Roll/ Counter Flashing 19.00 District based on the prevailing unit prices
(0.60 mm) locality which include payment of local tax
b. Blind Rivets hauling cost to the project site.
c. Consumables (3% of Materials Cost) Refer to the Construction Material Price D
Sub - Total for F established quarterly by Central Office Pri
ps Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
Contractor's Profit (CP) 10%/ 8% of G
J.
K.
Value Added Tax (VAT)
5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this costing sheet for Item Nos. 1013(2)a, 1013(2)b, 1013(2)e, and 1013(2)f.
Amount (PhP)

r Rates are variable per Region/District


d on minimum wage as approved by DOLE.
to the Schedule of Labor

Amount (PhP)

Amount (PhP)

s of materials are variable per Region/


ct based on the prevailing unit prices in the
ty which include payment of local taxes and
ng cost to the project site.
to the Construction Material Price Data
lished quarterly by Central Office Price
oring Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per RegioNDistr


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 1 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 11.80 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials m pc ps 1.00 Prices of materials are variable per Regio


a. Gutter (0.6 mm) 3.00 based on the prevailing unit prices in the
b. 12" x 1" Plain GI Strap 16.00 which include payment of/oca/ taxes and
c. Blind Rivets cost to the project site.
d. Consumables (3% of Materials Cost) Refer to the Construction Material Price D
Sub - Total for F established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
Contractor’s Profit (CP) 10%/ 8% ofG
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) I
Amount (PhP)

s are variable per RegioNDistrict


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region District


he prevailing unit prices in the locality
de payment of/oca/ taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Ho urly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for

B
C. Total (A + B)
D. Output per Hour = 2.076 m2
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit COSt

Materials T2 1.05 Prices of materi6 S are variable per Regio


a. Prepainted Metal Sheets (Corrugated, Short Span/ Long ps 10 based on the prevailing unit prices in the
Span, below 0.427mm thk/ above 0.427mm thk) which include payment of local faxes and
b. Tek screw/J-bolt with washers cost to the project site.
c. Consumables (3% of Materials Cost) Refer to the Construction Material Price D
Sub - Total for F established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

1 Contractor’s Profit (CP) 10%/ 8% ofG


J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I + J) t
Note : 1. Use this cost sheet for Item Nos. 1014(1)a and 1014(2)a.
Rate Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
he Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materi6 S are variable per Region District


the prevailing unit prices in the locality
ude payment of local faxes and hauling
e project site.
he Construction Material Price Data
d quarterly by Central Office Price
g Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distri


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Ho urly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for

B
C. Total (A + B)
D. Output per Hour = 2.769 m2
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Regio


a. Prepainted Metal Sheets (Rib Type, Short Span/ Long Span, 10.00 District based on the prevailing unif prices
below 0.427mm thk/ above 0.427mm thk) locality which include payment of local fax
b. Tek screw/J-bolt with washers hauling cost to the project site.
c. Consumables (3% of Materials Cost) Refer to the Construction Material Price D
Sub - Total for F established quarterly by Central Office Pri
pc Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1014(1)b and 1014(2)b.
ate Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per RegioN


sed on the prevailing unif prices in the
ch include payment of local faxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1016(1)a Waterproofing Cement Base
Unit of Measurement Output 1.875 md
per hour

Designation No. of Person/s No. of Hour/s

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00
c. Unskilled Laborer 1 1.00
Sub - Total for A 1 1.00

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.875 m2
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 2 1.05
a. Cement-based waterproofing
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
H + I)
(G + H + I + J)
Item No./Description Unit of 1016(1)b Liquid Waterproofing
Measurement m*
Output per hour 5.772 rñ*

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per RegioNDistr
c. Unskilled Laborer 1 1.00 based on minimum wage as approved by
Sub - Total for A 1 1.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 5.772 m2
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials gal gal 0.04 Prices of materials are variable per Regio
a. Primer Coat 0.03 District based on the prevailing unit price
b. Liquid Waterproofing locality which include payment of local ta
c. Consumables (3% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
Amount (PhP)

s are variable per RegioNDistrict


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1016(2) Built-up and Preformed Membrane
Measurement rn2
Output per hour 4.805 md

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 1 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 4.805 m*
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials gal 0.10 Prices of materials are variable per Regio


a. Asphalt Primer 1.05 District based on the prevailing unit price
b. Preformed Membrane locality which include payment of local ta
c. Consumables (5% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H.
I.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/ 8% ofG ]
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1017 50mm a - 100mm a Roof Drain/Canopy Drain/ Gutter Drain with Strainer set
Unit of Measurement Output 1 set

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor- 1 0.50 Labor Rates are variable per Region/Dist


a. Skilled Laborer 1 0.50 based on minimum wage as approved by
b. Unskilled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Regio


a. 50mm a - 100mm a Roof Drain/Canop Drain/ Gutter Drain District based on the prevailing unit price
with Strainer locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
l.
J.
K.
G.
H.
l.
J. Contractor’s Profit (CP) 10%/ 8% of G I

K. Value Added Tax (VAT) 5% of (G + H + I)


Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1017(1)a1, 1017(1)a2, 1017(1)a3, 1017(1)a4, 1017(2)b1, 1017(2)b2, 1017(2)b3,
1017(2)b4, 1017(3)c1, 1017(3)c2 and 1017(3)c3
t

Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1018(1) Glazed Tiles and Trims
Measurement rn2
Output per hour 1.365 md

A Designation No. of Personls No. of Hourls


.
Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 5 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.365 m*
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials FM2 1.050


a. Glazed Tiles bags 0.325
b. Cement bags bags 0.026
c. Sand 0.125
d. Tile Grout 0.143
e. Tile Adhesive (25 kg)
f. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H.
I.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G I
I.
J.
Contractor’s Profit (CP)
10%/8% ofG I

K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost (G + H + I + J) ]
A)

Houriy Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Offi’ce Price
Monitoring Committee.

I
I + J) ]
Output per hour 1.95 m2
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Distr


a. Construction Foreman 5 1.00 based on minimum wage as approved by
b. Skilled Laborer 5 1.00 Refer to the Schedule of Labor
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.95 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials +2 1.050 Prices of materials are variable per Region


a. Unglazed Tiles/ Granite Tiles/ Synthetic Granite bag bag 0.325 based on the prevailing unit prices in the
b. Cement 0.026 which include payment of local taxes and
c. Sand 0.125 cost to the project site.
d. Tile Grout Refer fa the Construction Material Price D
Sub - Total for F established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
Contractor’s Profit (CP) 10%/ 8% ofG
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
l.
J.
K.
Total Unit Cost (G + H + I + J)
Note : 1. Use this costing sheet for Item Nos. 1018(2), 1018(3) and 1018(4).
Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor

Amount (PhP)

Amount (PhP)

materials are variable per Region District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Output per hour 1.56 m
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distr
c. Unskilled Laborer 5 1.00 on minimum wage as approved by DOLE
Sub - Total for A 5 1.00 to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)

D. Output per Hour = 1.56 m2


E. Direct Unit Cost (C :— D)
Name and Specification Unit Quantity Unit Cost

F. Materials Prices of materials are variable per Regio


a. Wood Tiles FI92 District based on the prevailing unit price
b. Glue Adhesive 1.050 locality which include payment of local ta
c. Cement hauling cost to the project site.
d. Sand L 0.500 Refer to the Construction Material Price D
e. Polyurethane Floor Varnish Sealer bag 0.325 established quarterly by Central Offi”ce P
f. Polyurethane Floor Varnish Topcoat m* 0.026 Monitoring Committee.
g. Polyurethane Reducer
h. Consumables (5% of Materials Cost) L 0.400
Sub - Total for F L 0.200
L 0.06

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

i. Contractor's Profit (CP) 10%/8% ofG I


J. Value Added Tax (VAT) 5% of(G + H + I) I

K. Total Unit Cost (G + H + I + J) I


A Designation No. of Person/s No. of Hour/s Hourly Rate
.
A
.
Labor 1 1.00 Labor Rates are variable per Region/Di
a. Construction Foreman 5 1.00 based on minimum wage as approved b
b. Skilled Laborer 5 1.00 Refer fo the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.95 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials L 1.050 Prices of materials are variable per Regio


a. Laminated Wood Tiles bag 0.500 District based on the prevailing unit price
b. Glue Adhesive 0.325 locality which include payment of local ta
c. Cement 0.026 hauling cost fa the project site.
d. Sand Refer to the Construction Material Price D
e. Consumables (5% of Materials Cost) established quarterly by Central Office P
Sub - Total for F Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
Contractor's Profit (CP) 10%/ 8% ofG
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Amount (PhP)

s are variable per Region/District based


m wage as approved by DOLE. Refer
edule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Offi”ce Price
Committee.

Amount (PhP)
tes are variable per Region/District
minimum wage as approved by DOLE.
he Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
st fa the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dis


a. Construction Foreman 2 1.00 based on minimum wage as approved b
b. Skilled Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 4.385 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 2 1.050 Prices of materials are variable per Regi


a. Vinyl Tiles L 0.500 District based on the prevailing unit price
b. Glue Adhesive bag 0.726 locality which include payment of local ta
c. Cement 0.055 hauling cost to the project site.
d. Sand Refer to the Construction Material Price
e. Consumables (3% of Materials Cost) established quarterly by Central Office P
Sub - Total for F Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
10%/8% ofG I
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) I
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ich include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A. Designation No. of Person/s No. of Hourls Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 3 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.95 m2
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag 0.726 Prices of materials are variable per Regio


a. Cement 0.055 District based on the prevailing unit price
b. Sand locality which include payment of local fa
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor's Profit (CP) 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Dist
c. Unskilled Laborer 1 1.00 based on minimum wage as approved by
Sub - Total for A 3 1.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 6.545 m2
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag 0.693 Prices of materials are variable per Regio


a. Cement 0.055 District based on the prevailing unit price
b. Sand locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1021(3)a and 1021(3)b.
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local faxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A Designation No. of Person/s No. of Hourls Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 3 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.95 m2
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag 0.726 Prices of materials are variable per Regio


a. Marble chips 0.055 District based on the prevailing unit price
b. Portland cement 1.00 locality which include payment of local ta
c. Divider strips hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Oirect Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP)
10%/ 8% ofG j
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.95 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag 0.795 Prices of materials are variable per Regio


a. Cement 0.013 District based on the prevailing unit price
b. Pea Gravel 0.039 locality which include payment of local ta
c. Sand hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP)
10%/8% ofG I
J.
K. Value Added Tax (VAT) 5% of(G + H + I) I
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1026(1) Pebble Washout Finish
Measurement m*
Output per hour 1.785 md

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dis


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 5.95 m2
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag m* 0.795 Prices of materials are variable per Regio


a. Cement 0.013 District based on the prevailing unit price
b. Pea Gravel 0.039 locality which include payment of local ta
c. Sand hauling cosf to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.
G. Direct Unit Cost (E + F) I
H.
I. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
J. Contractor’s Profit (CP)
K. 10%/ 8% of G
Value Added Tax (VAT)
5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
h include payment of local taxes and
to the project site.
Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1027(1) Cement Plaster Finish
Measurement rn2
Output per hour 7.125 md

Designation No. of Personls No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distr
c. Unskilled Laborer 2 1.00 on minimum wage as approved by DOLE
Sub - Total for A 4 1.00 to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 7.125 m2
E. Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials bag cu.m 0.330 Prices of materials are variable per Regio
a. Cement 0.027 District based on the prevailing unit price
b. Sand locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer
edule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Regiori/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1032(1)a Painting Works (Masonry Painting) rri2
Measurement 2.10 m*
Output per hour
A. Designation No. of Person/s No. of Hour/s

Labor- 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.10 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials gal gal gal gal 0.02


a. Concrete Neutralizer 0.04
b. Concrete Sealer/Primer 0.05
c. Patching Compound 0.08
d. Semi Gloss Latex (two coat only)
e. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J.
K.
G.
H.
I. Contractor’s Profit (CP)
J. 10%/8% ofG I

K. Value Added Tax (VAT) 5% of(G + H + I)


Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
H + I)
I + J)
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1032(1)b Painting Works (Wood Painting)
Measurement 2
Output per hour 1.89 m2

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.89 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials gal gal gal 0.05


a. Glazzing Putty pint 0.04
b. Flat Wall Enamel 0.04
c. Enamel Quick Dry 0.25
d. Paint Thinner 0.01
e. Tinting Color (Optional)
f. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H.
I.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
J. 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J) I
PA)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer fo the Construction Material Price Data
established quarterly by Central Offi'ce Price
Monitoring Committee.
H + I)
Output per hour 2.00 m-2
A. Designation No. of Personls No. of Hour/s

Labor. 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.00 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials gal gal L 0.04


a. Red Oxide Primer pint 0.10
b. Enamel Paint 0.25
c. Paint thinner 0.01
d. Tinting Color (Optional)
e. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I) j
G.
H.
i.
J.
K.
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost fa the project site.
Refer fo the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I) j
I + J)
A. Designation No. of Person/s No. of Hour/s

Labor. 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.945 m2
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials gal 004


a.Varnish
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
Contractor’s Profit (CP) 10%/8% ofG
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I)
I + J)
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.512 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials gal gal gal gal pint 0.05


a. Glazzing Putty 0.04
b. Flat Wall Enamel 0.04
c. Enamel Quick Dry 0.01
d. Paint Thinner 0.01
e. Tinting Color (Optional)
f. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per RegioN


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I)
I + J)
A. Designation No. of Person/s No. of Hourls

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 37.559 m2
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials 1.000
a. 6 mils Polyethylene Sheets
b. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% ofG
I. Contractor's Profit (CP)
10%/ 8% ofG
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Offi”ce Price
Monitoring Committee.

H + I)
I + J)
Item No./Description Unit of 1038(1) Reflective Insulation
Measurement FM2
Output per hour 5.56 m2

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.56 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.000
a. Reflective Insulation
b. Consumbles (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J.
K.
G.
H.
I.
J. Contractor's Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Pales.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
H + I)
I + J) I
Item No./Description Unit of 1042(1) Stainless Steel Door and Frames rn2
Measurement 0.32 md
Output per hour
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.32 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials F192 1.000


a. Stainless Steel Doors and Frames
b. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J.
K.
G.
H.
I.
J. Contractor's Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Regiori/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
H + I)
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.315 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials Fn2 1.000


a. PVC Doors and Frames
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% ofG I
I. Contractor's Profit (CP)
10%/8% ofG I
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) 1
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit 1045(1) Perforated Aluminum Ceiling Panels
of Measurement : rn2
Output per hour 0.763 m*

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 0.763 m*
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials 1.000
a. Perforated Aluminum Ceiling Pannel with frames
b. Consumables (3% of Materials Cost)
Sub - Total for F
G. Direct Unit Cost (E + F)
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J) I
PA)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local faxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
H + I)
Output per hour 3.825 md
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Distr
c. Unskilled Laborer 2 1.00 based on minimum wage as approved by
Sub - Total for A 1.00 Refer to the Schedule of Labor Rates.
3

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00
a. One-bagger mixer
Minor Tools (10% of Labor Cost)
Sub - Total for B See latest ACEL rental rates.

c. Total (A + B)
D. Output per Hour = 3.825 m*
E. Direct Unit Cost (C :- D)
Name and Specification Unit Quantity Unit Cost

F. Materials
a. 100 mm thk CHB (Non-Load Bearing/Load pc bag CU.m 13.00 Prices of materials are variaò/e per Regio
b. Cement
kg kg 0.525 District based on the prevailing unit price
c. Sand
0.04 locality which include payment of local ta
d. Reinforcing Steel
3.24* hauling cost to the project site.
e. #16 Tie wire
0.05 Refer to the Construction Material Price D
*Quantity derived from 10mm 8 bars spaced at 0.4 m
established quarterly by Central Office Pr
vertically and every 3 /ayers of CHB
Monitoring Committee.
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. This cost sheet shall be used for Item Nos. 1046(1)a and 1046(2)a.
Amount (PhP)

Rates are variable per Region/District


on minimum wage as approved by DOLE.
to the Schedule of Labor Rates.

Amount (PhP)

ee latest ACEL rental rates.

Amount (PhP)

of materials are variaò/e per Region/


t based on the prevailing unit prices in the
y which include payment of local taxes and
g cost to the project site.
to the Construction Material Price Data
ished quarterly by Central Office Price
oring Committee.
Output per hour 3.180 m*
Designation No. of Person/s No. of Hourls Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Dist
c. Unskilled Laborer 2 1.00 based on minimum wage as approved by
Sub - Total for A 3 1.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment 1 1.00 See /afest ACEL rental rates.


a. One-bagger mixer
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 3.180 m2
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials Prices of materials are variable per Regio


a. 150 mm thk CHB (Load Bearing) District based on the prevailing unit price
b. Cement pc 13.00 locality which include payment of local ta
c. Sand bag 1.500 hauling cost to the project site.
d. Reinforcing Steel Refer to the Construction Material Price D
e. #16 Tie wire cu.m 0.04
established quarterly by Central Office Pr
”Quantity derived from 10mm 8 bars spaced af 0.4 m kg 3.24* Monitoring Committee.
vertically and every 3 layers of CHB kg 0.05
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
Note : 1. This cost sheet shall be used for Item Nos. 1046(1)b and 1046(2)b.
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

fest ACEL rental rates.

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ich include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Unit of Measurement I.s.
Output per hour I.S.
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor.
See derivations for Item Nos. 1047(2) - 1047(6)
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
See derivations for Item Nos. 1047(2) - 1047(6)
Sub - Total for B

C. Total (A + B)
D. Output per Hour =
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
See derivations for Item Nos. 1047(2) - 1047(6)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

Amount (PhP)

Amount (PhP)
Item No./Description Unit of 1047(2)a Structural Steel Roof Framing kg
Measurement 85.00 ktj
Output per hour
A. Designation No. of Personls No. of Hour/s

Labor 1 1.00
Fabrication 2 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 0.49
3
c. Unskilled Laborer 0.49
3
Erection
a. Skilled Laborer
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.75
a. Welding Machine 1 0.25
b. Cutting Outfit 1 0.49
c. Truck Mounted Crane (20-25 mt) Minor Tools (10 % of
Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 85.00 kg
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg kg kg 1.00
a. Structural Steel Framing including cross 0.011
b. Acetylene 0.022
c. Oxygen 0.020
d. Welding Rod
e. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1. Contractor’s Profit (CP)
10%/ 8% of G I
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
G.
H.
1.
J.
K.
Total Unit Cost (G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I)
I + J) I
Item No./Description Unit of 1047(2)b Structural Steel Roof Truss
Measurement kg
Output per hour 85.00 kg

A. Designation No. of Person/s No. of Hourls

Labor 1 1.00
Fabrication 2 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 3 0.49
c. Unskilled Laborer 3 0.49
Erection
a. Skilled Laborer
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.75
a. Welding Machine 1 0.25
b. Cutting Outfit 1 0.49
c. Truck Mounted Crane (20-25 mt) Minor Tools (10 % of
Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 85.00 kg
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity

Materials kg kg kg kg 1.00
a. Structural Steel Truss 0.011
b. Acetylene 0.022
c. Oxygen 0.020
d. Welding Rod
e. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor's Profit (CP) 10%/8% ofG ]
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost fo the project site.
Refer fa the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

]
H + I)
I + J)
A. Designation No. of Personls No. of Hour/s

Labor 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 4 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 2 1.00
a. Welding Machine
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 90.45 kg
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg 1.05
a. Structural Steel Purlins 0.020
b. Welding Rod
c. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
10%/ 8% ofG I
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) I

Total Unit Cost (G + H + I + J)


Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit COSt Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost fa the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I + J)
A. Designation No. of Person/s No. of Hour/s

Labor 1 0.10
a. Construction Foreman 1 0.10
b. Skilled Laborer 1 0.10
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 90.45 kg
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity

Materials pc 1.00
a. Anchor Bolt
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/ 8% ofG

K. Value Added Tax (VAT) 5% of(G + H + I) (


G.
H.
1.
J.
K.
Total Unit Cost (G + H + I + J) )
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local faxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

(
)
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1047(3)b Metal Structure Accessories (Sagrods) pc
Unit of Measurement Output 1 pc

A. Designation No. of Person/s No. of Hour/s

Labor 1 0.10
a. Construction Foreman 1 0.10
b. Skilled Laborer 1 0.10
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacité No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials pc 1.00
a. Sagrod with nuts and bolts
Sub - Total for F

G. Direct Unit Cost (E + F)


H.
1.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J) I
LYSIS (DUPA)

Hourly Rate Amount (PhP)

Labor Rates are variable per RegioNDistrict based


on minimum wage as approved by DOLE. Refer to
the Schedule of Laóor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unif prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
H + I)
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1047(3)c Metal Structure Accessories (Turnbuckle) pc
Unit of Measurement Output 1 pc
per hour
A. Designation No. of Person/s No. of Hour/s

Labor 1 01 5
a. Construction Foreman 1 0.15
b. Skilled Laborer 1 0.15
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials pc 1.00
a. Standard Turnbuckle
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1.
J.
K.
G.
H.
1.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
LYSIS (DUPA)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer fa
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
H + I)
I + J)
Item No./Description Unit of 1047(3)d Metal Structure Accessories (Crossbracing) pc
Measurement 1 ps
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 0.25 Labor Rates are variable per Region/Dist
a. Construction Foreman 1 0.25 based on minimum wage as approved by
b. Skilled Laborer 1 0.25 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials pc 1.00 Prices of materials are variable per Regio


a. Cross Bracing based on the prevailing unit prices in the
b. Consumables (3% of Materials Cost) which include payment of local taxes and
Sub - Total for F cost fa the project sife.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
Contractor's Profit (CP) 10%/ 8% ofG
J.
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
te Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project sife.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1047(4) Metal Structure Accessories (Crossbracing) kg
Measurement 12.995 kg
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Dis


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 1 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 12.995 kg
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg 1.05 Prices of materials are variable per Regio


a. Cross Bracing District based on the prevailing unit price
b. Consumables (3% of Material Cost) locality which include payment of local fa
Sub - Total for F hauling cost to the project sife.
Refer to the Construction Ma/eria/ Price
established quarterly by Central Offi”ce P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
Contractor's Profit (CP) 10%/8% ofG I
J.
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of(G + H + I) I
Total Unit Cost (G + H + I + J) I
ate Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local faxes and
st to the project sife.
e Construction Ma/eria/ Price Data
d quarterly by Central Offi”ce Price
Committee.
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor"
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/Dist
c. Unskilled Laborer 1 1.00 based on minimum wage as approved by
Sub - Total for A 1 1.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 12.995 kg
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg 1.05 Prices of materials are variable per Regio


a. Steel Plates District based on the prevailing onif price
b. Consumables (3% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Offi”ce P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing onif prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Offi”ce Price
Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1048(1)a Carbon Fiber (1 layer)
Measurement 1.20 md
Output per hour

A Designation No. of Person/s No. of Hour/s


.
Labor 1 1.00
a. Construction Foreman Site Preparation 2 0.71
b. Skilled Laborer 4 0.71
c. Unskilled Laborer 2 1.00
Application 1.00
2
a. Skilled Laborer
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 2 0.40
Surface Preparation 1 0.20
a. Portable Grinder 1 0.40
b. Jack Hammer 1 0.40
c. Air Compressor 1 0.20
c. Speed Ventilator 1 0.10
d. Electric Drill 1 0.20
e. Chipping Gun 1 0.10
f. Paddle Mixer 1 0.10
g. Generator Set (20KVA) 1 0.10
Application
a.Saturator Machine
b. Generator Set (20 KVA)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.20 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity
F.

Materials gal gal sack pc pc 0.27


Surface Preparation 0.13
a. Clear Epoxy A 0.18
b. Clear Epoxy B 0.30
c. Kalcomine 0.10
d. Cup Wheel 1.05
e. Diamond Disk Application
a. Carbon Fiber
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I) I

Total Unit Cost (G + H + I + J) I


LYSIS (DUPA)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)


Prices of materials are variable per Region/
District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I) I

I + J) I
Item No./Description Unit of 1048(2) Glass Fiber rn2
Measurement 1.20 m*
Output per hour
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Construction Foreman 2 0.71
Site Preparation 4 0.71
b. Skilled Laborer 2 1.00
c. Unskilled Laborer 2 1.00
Application
a. Skilled Laborer
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 2 040
Surface Preparation 1 0.20
a. Portable Grinder 1 0.40
b. Jack Hammer 1 0.40
c. Air Compressor 1 0.20
c. Speed Ventilator 1 010
d. Electric Drill 1 0.20
e. Chipping Gun 1
f. Paddle Mixer 1 0.10
g. Generator Set (20KVA) 1 0.10 -* 0.10
Application
a.Saturator Machine
b. Generator Set (20 KVA)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.20 m2
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity
F.

Materials gal gal sack pc pc 0.27


Surface Preparation 0.13
a. Clear Epoxy A 0.18
b. Clear Epoxy B 0.30
c. Kalcomine 0.10
d. Cup Wheel 1.05
e. Diamond Disk Application
a. Glass Fiber
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor's Profit (CP)
J. 10%/ 8% of G I

K. Value Added Tax (VAT) 5% of (G + H + i› j


Total Unit Cost
(G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per RegioNDistrict based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)


Prices of materials are variable per Region/
District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + i› j
Item No./Description Unit of 1049(1) Jet Grouting (0.80 m diameter)
Measurement 1.18 m
Output per hour

A. Designation No. of Personls No. of Hour/s

Labor 1 1.00
a. Coristruction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Jetting Machine 1 1.00
b. Air Compressor 12 Bars/600 CFM 1 1.00
c. Water Tank/Pump 1 1.00
d. Agitator 1 1.00
e. Generator/Power Supply 1 1.00
f. High Pressure Pump
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.20 m*
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity
F.

Materials bags L 14.00


a. Portland Cement 3.50
b. Additives
c. Consumables (5% of Material Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP)
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)


Prices of materials are variable per Region/
District based on the prevailing unit prices in the
locality which include payment of/oca/ taxes and
hauling cost to the project site.
Refer fo the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I) I

I + J) I
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1052(1) Untreated Timber Piles, furnished
Measurement 48.00 m
Output per hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor - 1 1.00 Labor Rates are variable per Region/Distric


a. Construction Foreman 4 1.00 minimum wage as approved by DOLE. Ref
b. Unskilled Laborer Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate t Amount (PhP)

Equipment mt) 1 1.00 See /afesf ACEL rental rates.


a. Truck Mounted Crane (41 - 45 )
(Unloading and Stockpiling) Minor for B
Tools (10% of Labor Cost
Sub - Total

C. Total (A + B)
D. Output per Hour = 48.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials bd-ft 48.30 Prices of materials are variable per Region/


a. Untreated Timber (375 mm jzl average) based on the prevailing unit prices in the lo
b. Miscellaneous (5% of Materials Cost) which include payment of local taxes and
Note: cost to the project sife.
Assumed average minimum diameter is 375 mm for less than 12 m Refer to the Construction Material Price Dat
length. For beyond 12 m length and bigger diameter, adjust the established quarterly by Central Office Price
quantity in bd-ft accordingly. Monitoring Committee.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor's Profit (CP) 10%/ 8% of G I


J.
J. Value Added Tax (VAT)
5% of (G + H + l) l

K. Total Unit Cost


(G + H + I + J) I
Amount (PhP)

es are variable per Region/District based on


wage as approved by DOLE. Refer to the
of Labor Rates.

t Amount (PhP)

ACEL rental rates.

Amount (PhP)

materials are variable per Region/ District


the prevailing unit prices in the locality
lude payment of local taxes and hauling
e project sife.
he Construction Material Price Data
ed quarterly by Central Office Price
g Committee.
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rafes are variable per Region/Distri


a. Construction Foreman 4 1.00 on minimum wage as approved by DOLE.
b. Unskilled Laborer the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment mt) 1 1.00 See latest ACEL rental rates.


a. Truck Mounted Crane (41 - 45 for B
(Unloading and Stockpiling) Minor
Tools (10% of labor cost)
Sub - Total

C. Total (A + B)
D. Output per Hour = 48.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials bd-ft 48.30 Prices of materials are variable per Regio


a. Treated Timber (375 mm {Zi average) based on the prevailing unit prices in the l
b. Miscellaneous (3% of Materials Cost) which include payment of local faxes and h
Note: cost to the project site.
Assumed average minimum diameter is 375 mm for less than 12 Refer to the Construction Material Price D
m length. For beyond 12 m length and bigger diameter, adjust the established quarterly by Central Office Pri
quantity in bd-ft accordingly. Monitoring Commiftee.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

1 Contractor’s Profit (CP) 10%/8% ofG


J. Value Added Tax (VAT) 5% of(G + H + I) j
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District based


um wage as approved by DOLE. Refer fo
ule of Labor Rates.

Amount (PhP)

ACEL rental rates.

Amount (PhP)

materials are variable per Regiori/ District


the prevailing unit prices in the locality
ude payment of local faxes and hauling
e project site.
he Construction Material Price Data
d quarterly by Central Office Price
g Commiftee.
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 1.00 Labor Rates are variable per Region/Dis
a. Construction Foreman 2 1.00 on minimum wage as approved by DOLE
b. Skilled Laborer 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
2
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 1.00 See latest ACEL rental rates.


a. Truck Mounted Crane (41 - 45 mt) (Unloading and Stockpiling)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 48.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Regio


a. Structural Steel Pile, W=159 kg/m (delivered at site) based on the prevailing unit prices in the
b. Miscellaneous (2% of Materials Cost) which include payment of local taxes and
Sub - Total for F cost to the project site.
Refer to the Construction Material Price
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) j
Rate Amount (PhP)

tes are variable per Region/District based


um wage as approved by DOLE. Refer to
dule of Labor Rates.

Rate Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region District


the prevailing unit prices in the locality
lude payment of local taxes and hauling
e project site.
he Construction Material Price Data
ed quarterly by Central Office Price
g Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description : 1052(4)a.1 Precast Concrete Piles, furnished (400mm x 400mm - type A) Unit of Measurement . m
Output per hour : 2.50 m

A Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/District


a. Construction Foreman 4 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer g 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

fo
r A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

B. Equipment
a. Payloader (1.50 m*), LX80-2C 1 0.05 See latest ACEL rental rates.

b. Concrete Vibrator 1 0.10


c. Plate Compactor (for Casting Bed) 1 0.28
d. Bar Bender 1 0.28
e. Bar Cutter 1 0.28
Minor Tools (10% of Labor Cost)

Sub - Total for B


c. Total (A + B)
D. Output per Hour = 2.50 m
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials
a. Ready Mix concrete, Class AA-27.60MPa @ 28Days“
b. Reinforced Steel Bar, Grade 60 0.168
c. Tie Wire #16 (2% of RSB) cu.m Prices of materials are variable per Region/
d. Good Lumber - 4 uses
kg kg 40.45 District based on the prevailing unit prices in
e. Marine Plywood, 1/2" x 4' x 8' - 4 uses
f. Assorted CWN (1kg/100bd-ft of Lumber) bd-ft 0.809 locality which include payment of local taxes
15.333 hauling cost to the project site.
Casting Bed
Refer to the Construction Material Price Data
a. Ready Mix Concrete, Class B
pc 0.268 established quarterly by Central Office Price
b. Good Lumber
c. Base Course kg 0.163 Monitoring Committee.
Note:
*If no available Ready Mix Concrete at project site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for small cu.m 0.03
quantity.
Sub - Total for F
bd-ft 1.00
c. Base Course
Note:
*If no available Ready Mix Concrete at project site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for small
quantity.
Sub - Total for F

cu.m 0.06

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) I
m

Amount (PhP)

es are variable per Region/District based on


wage as approved by DOLE. Refer to the
of Labor Rates.

Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region/

sed on the prevailing unit prices in the


ich include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
g Committee.
Output per hour 2.50 m
Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 8 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.05
a. Payloader (1.50 m*), LX80-2C 1 0.10
b. Concrete Vibrator 1 0.28
c. Plate Compactor (for Casting Bed) 1 0.28
d. Bar Bender 1 0.28
e. Bar Cutter -*
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.50 m
E.
Direct Unit Cost (C + D/
F. Name and Specification Unit Quantity

Materials cu.m 0.168


a. Ready Mix concrete, Class AA-27.60MPa @ 28Days” kg kg bd-ft pc kg 48.69
b. Reinforced Steel Bar, Grade 60 cu.m bd-It cu.m 0.974
c. Tie Wire #16 (2% of RSB) 15.333
d. Good Lumber - 4 uses 0.268
e. Marine Plywood, 1/2" x 4’ x 8’ - 4 uses 0.163
f. Assorted CWN (1kg/100bd-ft of Lumber) 0.03
Casting Bed 1.00
a. Ready Mix Concrete, Class B 0.06
b. Good Lumber
c. Base Course
Note:
“/fno available Ready Mix Concrete at Project Site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for
small quantity
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J.
K.
G.
H.
i.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per RegiomDistrict based


on minimum wage as approved by DOLE. Refer to
the Schedule of Laóor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

I
Prices of materials are variable per Region/ District
based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
+ I)
+ J)
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 8 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.05
a. Payloader (1.50 m3), LX80-2C 1 0.10
b. Concrete Vibrator 1 0.27
c. Plate Compactor (for Casting Bed) 1 0.27
d. Bar Bender 1 0.27
e. Bar Cutter
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.30 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m 0.213


a. Ready Mix concrete, Class AA-27.60MPa @ 28Days“ kg kg bd-ft pc kg 50.040
b. Reinforced Steel Bar, Grade 60 CU.m 1.001
c. Tie Wire #16 (2% of RSB) bd-ft Cu.M 17.25
d. Good Lumber - 4 uses 0.30
e. Marine Plywood, 1/2" x 4’ x 8’ - 4 uses 0.183
f. Assorted CWN (1kg/100bd.ft of Lumber) 0.033
Casting Bed 1.00
a. Ready Mix Concrete, Class B 0.07
b. Good Lumber
c. Base Course
Note:
*If no available Ready Mix Concrete at Project Site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for
small quantity
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K.
G.
H.
i.
J.
K. Value Added Tax (VAT) 5% of(G + H + I) ]
Total Unit Cost (G + H + I + J) ]
Hourly Rate Amount (PhP)

Labor Rafes are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cosf to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
+ I) ]
+ J) ]
Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 8 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.05
a. Payloader (1.50 m*), LX80-2C 1 0.10
b. Concrete Vibrator 1 0.27
c. Plate Compactor (for Casting Bed) 1 0.27
d. Bar Bender 1 0.27
e. Bar Cutter
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.30 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m 0.213


a. Ready Mix concrete, Class AA-27.60MPa @ 28Days“ kg kg bd-ft pc kg 62.46
b. Reinforced Steel Bar, Grade 60 cu.m bd-ft cu.m 1.249
c. Tie Wire #16 (2% of RSB) 17.25
d. Good Lumber - 4 uses 0.30
e. Marine Plywood, 1/2" x 4’ x 8' - 4 uses 0.183
f. Assorted CWN (1kg/100bd-ft of Lumber) 0.033
Casting Bed 1.00
a. Ready Mix Concrete, Class B 0.07
b. Good Lumber
c. Base Course
Note:
”if no available Ready Mix Concrete at Project Site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for
small quantity
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor’s Profit (CP) 10%/8% ofG
K.
G.
H.
1.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit COSt Amount (PhP)

Prices of materials are variable per RegioN District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project s/fe.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
+ I)
+ J)
Item No./Description 1052(5)a Precast, Prestressed Concrete Piles, furnished (400 mm x 400 mm)
Unit of Measurement Output per 48.00 m
hour

A. Designation No. of Person/s No. of Hour/s

Labor- 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41 - 45 mt) Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 48.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a. Precast, Prestressed Concrete Piles (delivered at site)
Miscellaneous (2% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
J. 10%/8% ofG j
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J) I
m x 400 mm)

Hourly Rate Amount (PhP)

Labor Rates are variable per RegiomDistrict based


on minimum wage as approved by DOLE. Refer fo
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Regiori/ District


based on the pre\Lai/ing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
Item No./Description Unit of 1052(5)b Precast, Prestressed Concrete Piles, furnished (450 mm x 450 mm)
Measurement 48.00 m
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dis


a. Construction Foreman 2 1.00 on minimum wage as approved by DOLE
b. Skilled Laborer 2 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00 See latest ACEL rental ra/es.


a. Truck Mounted Crane (41 - 45 mt) Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 48.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variaò/e per Regi


a. Precast, Prestressed Concrete Piles (delivered at site) based on the prevailing unit prices in the
Miscellaneous (2% of Materials Cost) which include payment of local taxes and
Sub - Total for F cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
i. Contractor’s Profit (CP)
J. 10%/ 8% of G I

K. Value Added Tax (VAT) 5% of (G + H + I)


Total Unit Cost (G + H + I + J) I
Amount (PhP)

ates are variable per Region/District based


mum wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

latest ACEL rental ra/es.

Amount (PhP)

materials are variaò/e per Region/ District


n the prevailing unit prices in the locality
clude payment of local taxes and hauling
e project site.
the Construction Material Price Data
ed quarterly by Central Office Price
ng Committee.
Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/District


a. Construction Foreman 2 1.00 minimum wage as approved by DOLE. Refe
b. Skilled Laborer 2 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 1.00 See latest ACEL rental rates.


a. Truck Mounted Crane (41 - 45 mt) Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 72.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg 48.00 Prices of materials are variable per Regiori/


a. Steel Sheet Pile KSP II (delivered at site) Miscellaneous (2% of based on the prevailing unit prices in the loc
Materials Cost) include payment of local taxes and hauling c
Sub - Total for F project site.
Refer to the Construction Material Price Dat
established quarterly by Central Office Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Rate Amount (PhP)

es are variable per Region/District based on


wage as approved by DOLE. Refer to the
of Labor Rates.

Rate Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Regiori/ District


he prevailing unit prices in the locality which
yment of local taxes and hauling cost to the
.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1052(7)a Precast Concrete Sheet Piles, furnished (0.50 m x 0.35 m)
Measurement 1.90 m
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Distr


a. Construction Foreman 4 1.00 on minimum wage as approved by DOLE
b. Skilled Laborer 8 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

for A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

B. Equipment
a. Payloader (1.50 m3), LX80-2C 1 0.03 See latest ACEL rental rates.
b. One Bagger Mixer 1 0.25
c. Concrete Vibrator 1 0.25
d. Water Truck/Pump (16000 L) 1 0.03
e. Bar Cutter 1 0.15
f. Bar Bender 1 0.15
g. Plate Compactor (5 hp), for Casting Bed 1 0.03
Minor Tools (10% of Labor Cost)

Sub - Total for B


C. Total (A + B)
D. Output per Hour = 1.90 m
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials Prices of materials are variable per Regio


a. Reinforcing Steel Bar based on the prevailing unit prices in the l
b. Cement kg 41.64 which include payment of local taxes and
c. Sand bag 1.66 cost to the project site.
d. Gravel Refer to the Construction Material Price D
e. Plywood, 1/2” x 4' x 8' - 4 uses 0.09 established quarterly by Central Office Pr
f. Good Lumber - 4 uses 0.18 Monitoring Committee.
g. #16 GI Tie Wire (2% of RSB) pc 0.24
h. Assorted CWN (1 kg/100 bd-ft of Lumber)
Casting Bed bd-ft 12.40
a. Cement kg 0.83
b. Sand kg 0.12
c. Gravel
d. Good Lumber - 4 uses
e. Base Course bag 0.296
Sub - Total for F
m* 0.019
0.037
bd.ft 1.00
0.08

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

1 Contractor's Profit (CP) 10%/8% ofG


J. Value Added Tax (VAT) 5% of(G + H + I) {
K. Total Unit Cost (G + H + I + J) I
Amount (PhP)

ates are variable per Region/District based


mum wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

latest ACEL rental rates.

Amount (PhP)

materials are variable per Region/ District


n the prevailing unit prices in the locality
clude payment of local taxes and hauling
e project site.
the Construction Material Price Data
ed quarterly by Central Office Price
ng Committee.
Item No./Description Unit of 1052(7)b Precast Concrete Sheet Piles, furnished (0.50 m x 0.35 m), (Ready Mix Concrete)
Measurement 2.30 m
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/District


a. Construction Foreman 4 1.00 minimum wage as approved by DOLE. Refe
b. Skilléd Laborer 8 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

for A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
B.
a. Payloader (1.50 m*), LX80-2C
b. Concrete Vibrator 1 0.03 See latest ACEL rental rates.
c. Plate Compactor (5 hp), for Casting Bed
d. Bar Cutter 1 0.10
e. Bar Bender 1 0.03
Minor Tools (10% of Labor Cost) 1 0.22
Sub - Total for B 1 0.22

c. Total (A + B) ,
D. Output per Hour = 2.30 m
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials
a. Reinforcing Steel Bar
b. Ready Mix Concrete, fc’=27.60 Mpa @ 28 days“ kg 41.64 Prices of materials are variable per Regio
c. Plywood, 1/2" x 4' x 8' - 4 uses 0.18 District based on the prevailing unit prices
f. Good Lumber - 4 uses pc 0.24 locality which include payment of local
g. #16 GI Tie Wire (2% of RSB) taxes and hauling cost to the project site.
h. Assorted CWN (1 kg/100 bd-ft of Lumber)
Casting Bed bd-ft 12.40 Refer to the Construction Maferia/ Price Oa
a. Ready Mix Concrete, Class B kg kg 0.83 established quarterly by Central Office Pri
d. Good Lumber - 4 uses 0.12 Monitoring Committee.
e. Base Course
Note:
*If no available Ready Mix Concrete af project site, derive the cosf
0.037
of concrete using the Batching Plant or One Bagger Mixer for
small quantities.
Sub - Total for F bd-ft 1.00
0.08

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
i. Contractor’s Profit (CP) 10%/8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District based on


age as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region


ased on the prevailing unit prices in the
hich include payment of local
hauling cost to the project site.
he Construction Maferia/ Price Oafa
ed quarterly by Central Office Price
g Committee.
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/Dis
a. Construction Foreman 6 1.00 on minimum wage as approved by DOLE
b. Skilled Laborer 6 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 1 0.58 See /a/es/ ACEL rental rates.


a. Truck Mounted Crane (41 - 45 mt) 1 0.13
b. Drop Hammer
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials m bd-ft kg 1.00 Prices of materials are variable per Regio


a. Coco Log - 2 uses 16.00 based on the prevailing unit prices in the
b. Good Lumber (Falsework) - 4 uses 0.16 which include payment of local taxes and
c. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of cost to the project site.
Materials Cost) Refer to the Construction Material Price D
Sub - Total for F established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM} Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I) I
Total Unit Cost (G + H + I + J) I
Amount (PhP)

tes are variable per Region/District based


um wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

a/es/ ACEL rental rates.

Amount (PhP)

materials are variable per Region/ Oisfricf


the prevailing unit prices in the locality
lude payment of local taxes and hauling
e project site.
he Construction Material Price Data
ed quarterly by Central Office Price
g Committee.
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per RegiomDistric
c. Unskilled Laborer 6 1.00 minimum wage as approved by DOLE. Refe
Sub - Total for A 6 1.00 Schedule of Labor Rates.

Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate


B.
Equipment
a. Truck Mounted Crane (41 - 45 mt)
b. Drop Hammer 1 0.58 See latest ACEL rental ra/es.
Minor Tools (10% of Labor Cost) 1 0.13
Sub - Total for B

,
C. Total (A + B)
D. Output per Hour = 3.00 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials bd-ft kg 1.00 Prices of materials are v’ariaò/e per Regio


a. Coco Log - 2 uses 16.00 based on the prevailing unit prices in the l
b. Good Lumber (Falsework) - 4 uses 0.16 which include payment of local taxes and
c. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of cost to the project site.
Materials Cost) Refer to the Construction Material Price D
Sub - Total for F established quarterly by Central Office Pri
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + Jg
Amount (PhP)

s are variable per RegiomDistrict based on


age as approved by DOLE. Refer fo the
Labor Rates.

Amount (PhP)

atest ACEL rental ra/es.

Amount (PhP)

materials are v’ariaò/e per Regiori/ District


the prevailing unit prices in the locality
ude payment of local taxes and hauling
e project site.
he Construction Material Price Data
ed quarterly by Central Office Price
g Committee.
A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 1.00
c. Unskilled Laborer 6
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41 - 45 mt) 1 0.25
b. Diesel Hammer (K25 or equivalent) 1 0.40
c. Drop Hammer 1 0.15
d. Cutting Outfit 1 0.10
e. Welding Machine (500 A), Gas/Diesel Driven Minor Tools (5% of “
Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 4.50 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials bd-ft kg set kg 1.00


a. Coco Log - 2 uses 16.00
b. Good Lumber (Falsework) - 4 uses 0.16
c. Nail/Spike (1 kg/100 bd-ft of Lumber) 0.032
d. Oxygen/Acetylene (1 set/5000 kg of Steel) 0.08
e. Welding Rod (1 kg/2000 kg of Steel) Miscellaneous (2% of Materials
Cost)
Note:
Assumed weight of Steel H-Pile is 159 kg/m
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I) j
Total Unit Cost
(G + H + I + J) I
A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1.00
b. Skilled Laborer 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.58
a. Truck Mounted Crane (41 - 45 mt) 1 0.25
b. Diesel Hammer (K25 or equivalent) 1 0.13
c. Drop Hammer 1 0.08
d. Welding Machine (500 A), Gas/Diesel Driven 1 0.08
e. Cutting Outfit
Minor Tools (5% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg set m bd-ft kg 1.00


a. Tubular Pile (0.40 m $ x 9.50 mm thk) (delivered at site) 0.048
b. Welding Rod (1 kg/2000 kg of Steel) 0.019
c. Oxygen/Acetylene (1 set/5000 kg of Steel) 1.00
d. Coco Log - 2 uses 16.00
e. Good Lumber (Falsework) - 4 uses 0.16
f. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of
Materials Cost)
Note:
Assumed weight of Tubular Pipe Pile is 95.93
k‹fm
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor’s Profit (CP) 10%/8% of G
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
A Designation No. of Person/s No. of Hour/s
A

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41 - 45 mt) 1 1.00
b. Diesel Hammer (K25 or equivalent) 1 1.00
c. Drop Hammer 1 1.00
d. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
e. Cutting Outfit
Minor Tools (5% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 10.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg set m bd-ft kg 0.024


a. Welding Rod (1 kg/2000 kg of Steel) 0.0096
b. Oxygen/Acetylene (1 set/5000 kg of Steel) 0.18
c. Coco Log - 2 uses 1.55
d. Good Lumber - 4 uses 0.02
e. Assorted CWN (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of
Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor’s Profit (CP)
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local faxes and hauling
cost to the project sife.
Refer fo the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I) j
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cosf to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Hourly Rate Amount (PhP)
Labor Rates are variable per Region/District based on
minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit COSt Amount (PhP)

Prices of materials are variaò/e per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Item No./Description 1052(13) Precast Concrete Sheet Piles, driven
Unit of Measurement Output per 2.80 m
hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distr


a. Construction Foreman 6 1.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 6 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

fo
r A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 0.56 See latest ACEL renfa/ rates.
b. Diesel Hammer (K25 or equivalent) 1 0.31
c. Drop Hammer 1 0.31
d. Jack Hammer 2 0.19
e. Air Compressor (356 - 450 cfm) 1 0.19
Minor Tools (10% of Labor Cost)

Sub - Total for B


c. Total (A + B)
D. Output per Hour = 2.80 m
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials Prices of materials are variable per Region


based on the prevailing unit prices in the l
a. Coco Log - 2 uses 0.71 which include payment of local taxes and
b. Good Lumber - 4 uses bd-R 6.19 cost to the project site.
Refer to the Construction Material Price D
c. Nail/Spike (1 kg/100 bd-ft of Lumber) kg 0.06 established quarterly by Central Office Pri
d. Assorted CWN (1 kg/100 bd-ft of Lumber) kg 0.06 Monitoring Committee.
Miscellaneous (2% of Materials Cost)

Sub - Total for F


G. Direct Unit Cost (E + F)
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor’s Profit (CP) 10%/8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Rate Amount (PhP)

es are variable per Region/District based


m wage as approved by DOLE. Refer to
ule of Labor Rates.

Amount (PhP)

test ACEL renfa/ rates.

Amount (PhP)

materials are variable per Region/ District


the prevailing unit prices in the locality
ude payment of local taxes and hauling
project site.
he Construction Material Price Data
d quarterly by Central Office Price
g Committee.
Item No./Description Unit of 1052(14)a Precast Concrete Piles, driven (soft strata)
Measurement 2.40 m
Output per hour

A Designation No. of Person/s No. of Hour/s

Labor- 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.53
a. Truck Mounted Crane (41 - 45 mt) 1 0.27
b. Diesel Hammer (K25 or equivalent) 1 0.13
c. Drop Hammer 1 0.20
d. Cutting Outfit 2 0.20
e. Jack Hammer 1 0.20
f. Air Compressor (356 - 450 cfm) Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.40 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials bd-fi kg kg 1.00


a. Coco Log - 2 uses 16.00
b. Good Lumber - 4 uses 0.16
c. Nail/Spike (1 kg/100 bd-ft of Lumber) 0.01
d. Oxygen/Acetylene
Miscellaneous (2% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G j
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

La6Or Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer fo the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rafes.

Unit Cost Amount (PhP)

Prices of materials are variable per Region District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to file
project sife.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Item No./Description 1052(14)b Precast Concrete Piles, driven (hard strata)
Unit of Measurement Output 1.95 m
per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.62
a. Truck Mounted Crane (41 - 45 mt) 1 0.41
b. Diesel Hammer (K25 or equivalent) 1 0.11
c. Drop Hammer 1 0.16
d. Cutting Outfit 2 0.16
e. Jack Hammer 1 0.16
f. Air Compressor (356 - 450 cfm) Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.95 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials bd-ft kg set 1.00


a. Coco Log - 2 uses 16.00
b. Good Lumber - 4 uses 0.16
c. Nail/Spike (1 kg/100 bd-ft of Lumber) 0.01
d. Oxygen/Acetylene
Miscellaneous (2% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G I
i. Contractor's Profit (CP)
10%/8% ofG I
J.
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer fo
file Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cosf to the project site.
Refer to the Construction /Uateria/ Price Data
established quarterly by Central Office Price
Monitoring Committee.

I + J)
Item No./Description Unit of 1052(15)a Precast, Prestressed Concrete Piles, driven (soft strata)
Measurement 2.40 m
Output per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.53
a. Truck Mounted Crane (41 - 45 mt) 1 0.27
b. Diesel Hammer (K25 or equivalent) 1 0.13
c. Drop Hammer 1 0.20
d. Cutting Outfit 2 0.20
e. Jack Hammer 1 0.20
f. Air Compressor (356 - 450 cfm) Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.40 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials bd-ft kg set 1.00


a. Coco Log - 2 uses 16.00
b. Good Lumber (Falsework) - 4 uses 0.16
c. Nail/Spike (1 kg/100 bd-ft of Lumber) 0.01
d. Oxygen/Acetylene
Miscellaneous (2% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Item No./Description : 1052(15)b Precast, Prestressed Concrete Piles, driven (hard strata) Unit of Measurement : m
Output per hour : 1.95 m

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Distri


a. Construction Foreman 6 1.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 6 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

fo
r A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 0.62 See latest ACEL ren/a/ rates.
b. Diesel Hammer (K25 or equivalent) 1 0.41
c. Drop Hammer 1 0.11
d. Cutting Outfit 1 0.16
e. Jack Hammer 2 0.16
f. Air Compressor (356 - 450 cfm) 1 0.16
Minor Tools (10% of Labor Cost)

Sub - Total for B


C. Total (A + B)
D. Output per Hour = 1.95 m
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials Prices of materials are variable per Region


based on the prevailing unit prices in the lo
a. Coco Log - 2 uses 1.00 which include payment of local taxes and h
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 cost to the project site.
Refer to the Construction Material Price D
c. Nail/Spike (1 kg/100 bd-ft of Lumber) kg 0.16 established quarterly by Central Office Pric
d. Oxygen/Acetylene set 0.01 Monitoring Committee.
Miscellaneous (2% of Materials Cost)

Sub - Total for F


G. Direct Unit Cost (E + F) I
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor’s Profit (CP) 10%/8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I) I

K. Total Unit Cost (G + H + I + ) I


m

Amount (PhP)

Rates are variable per Region/District based


nimum wage as approved by DOLE. Refer to
chedule of Labor Rates.

Amount (PhP)

ee latest ACEL ren/a/ rates.

Amount (PhP)

s of materials are variable per Region/ District


d on the prevailing unit prices in the locality
include payment of local taxes and hauling
o the project site.
to the Construction Material Price Data
ished quarterly by Central Office Price
oring Committee.
Item No./Description Unit of 1052(16)a Test Piles, furnished and driven (type A, B, C or D), soft strata
Measurement 2.40 m
Output per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.53
a. Truck Mounted Crane (41 - 45 mt) 1 0.27
b. Diesel Hammer (M5 or equivalent) 1 0.13
c. Drop Hammer 1 0.20
d. Cutting Outfit 2 0.20
e. Jack Hammer 1 0.20
f. Air Compressor (356 - 450 cfm) Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.40 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials bd-ft kg set m 2.00


a. Coco Log - 2 uses 16.00
b. Good Lumber (Falsework) - 4 uses 0.16
c. Nail/Spike (1 kg/100 bd-ft of Lumber) 0.01
d. Oxygen/Acetylene 1.00
e. Fabricated RC Pile (delivered at site)
Note:
The unit cost of Fabricated RC Pile is dependent on its type.
Please refer to the Oirect Cost of Item 1052(7)a
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
J. 10%/8% ofG I
K.
Value Added Tax (VAT)
5% of(G + H + I) I
Total Unit Cost
(G + H + I + ) I
oft strata

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per RegioN District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction /Uater/a/ Price Data
established quarterly by Central Office Price
Monitoring Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1052(16)b Test Piles, furnished and driven (type A, B, C or D), hard strata
Measurement 1.95 m
Output per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.62
a. Truck Mounted Crane (41 - 45 mt) 1 0.41
b. Diesel Hammer (K25 or equivalent) 1 0.11
c. Drop Hammer 1 0.16
d. Cutting Outfit 2 0.16
e. Jack Hammer 1 0.16
f. Air Compressor (356 - 450 cfm) Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B) -“
D. Output per Hour = 1.95 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials bd-ft kg set m 2.00


a. Coco Log - 2 uses 16.00
b. Good Lumber (Falsework) - 4 uses 0.16
c. Nail/Spike (1 kg/100 bd-ft of Lumber) 0.01
d. Oxygen/Acetylene 1.00
e. Fabricated RC Pile (delivered at site)
Note:
The unit cost of Fabricated RC Pile is dependent on its type.
Please refer to the Direct Cost of Item 1052(7)a
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP)
J. 10%/ 8% of G
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
SIS (DUPA)
ard strata

Hourly Rate Amount (PhP)

Labor Rates are variable per RegionDistrict based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the ocality
which include payment of local faxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052(17)a Concrete Piles cast in Drilled Holes, 0.80 m B, fc’ - 28 MPa (ordinary soil condition)
Unit of Measurement Output 1.58 m
per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Con5truction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. UnSk’lled Laborer Fabrication of Cage Bar 17 0.50
d. Skilled Laborer 0.50
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.26
a. Drilling Rig (300 hp) 1 0.95
b. Crawler Crane (41 - 45 mt) 1 0.95
c. Crawler Crane (21 - 25 mt) 1 0.95
d. Dump Truck (12 yd3) 1 0.95
e. Payloader (1.50 m3), LX80-2C 1 0.95
f. Generator Set (300 kW) 1 0.50
g. Bentonite Bin 1 0.50
h. Bentonite Mixer 1 0.74
i . Water Pump, 100 mm suction $ (7.5 hp) 1 0.74
j. Water Truck (16000 L) 1 0.50
k. Bar Cutter 1 0.50
I. Bar Bender 1 0.71
m. Welding Machine (SOOA), Electric Driven 1 0.71
n. Cutting Outfit 1 0.24
o. Tremie Pipe Set 1 0.24
p. SPT & Desanding Machine 2 0.05
q. Portable Breaker, BHF30S 1 0.05
r. Air Compressor, Portable (126 - 160 cfm) 1 0.95
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour - 1.58 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m kg kg set kg 0.55


a. Ready Mix Concrete, fc’ = 28 MPa @ 28 Days 205.00
b. Reinforcing Steel Bar * 4.10
c. Tire Wire (2% of RSB) 0.041
d. Oxygen/Acetylene (1 set/5000 kg. of RSB) 0.10
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of Materials,
Bentonite and etc.)
” Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G j
1. Contractor’s Profit (CP)
J. 10%/8% ofG I
K.
Value Added Tax (VAT)
5% of(G + H + I) I
Total Unit Cost
(G + H + I + J) I
8 MPa (ordinary soil condition)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Regiori/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

j
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052(17)b Concrete Piles cast in Drilled Holes, 1.00 m Cl, fc' = 28 MPa (ordinary soil condition)
Unit of Measurement Output 1.33 m
per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 16 0.56
d. Skilled Laborer 0.56
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.31
a. Drilling Rig (300 hp) 1 0.96
b. Crawler Crane (41 - 45 mt) 1 0.96
c. Crawler Crane (21 - 25 mt) 1 0.96
d. Dump Truck (12 yd*) 1 0.96
e. Payloader (1.50 m"), LX80-2C 1 0.96
f. Generator Set (300 kW) 1 0.53
g. Bentonite Bin 1 0.53
h. Bentonite Mixer 1 0.78
i . Water Pump, 100 mm suction lzi (7.5 hp) 1 0.78
j. Water Truck (16000 L) 1 0.56
k. Bar Cutter 1 0.56
I. Bar Bender 1 0.73
m. Welding Machine (SOOA), Electric Driven 1 0.73 - 0.22 0.24 0.04
n. Cutting Outfit 1 0.04 0.96
o. Tremie Pipe Set 1
p. SPT & Desanding Machine 2
q. Portable Breaker, BHF30S 1
r. Air Compressor, Portable (126 - 160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.33 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m kg kg set kg 0.86


a. Ready Mix Concrete, fc' = 28 MPa @ 28 Days 253.59
b. Reinforcing Steel Bar * 5.07
c. Tire Wire (2% of RSB) 0.051
d. Oxygen/Acetylene (1 set/5000 kg. of RSB) 0.13
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of
Materials, Bentonite and etc.)
” Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% of G
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
28 MPa (ordinary soil condition)

Hourly Rate Amount (PhP)

Labor Rates are variable per RegioNDistrict based


on minimum wage as approved by DOLE. Refer fo
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I)
I + J)
Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 8 0.60
d. Skilled Laborer 15 0.60
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.35
a. Drilling Rig (300 hp) 1 0.96
b. Crawler Crane (41 - 45 mt) 1 0.96
c. Crawler Crane (21 - 25 mt) 1 0.96
d. Dump Truck (12 yd*) 1 0.96
e. Payloader (1.50 m^), LX80-2C 1 0.96
f. Generator Set (300 kW) 1 0.56
g. Bentonite Bin 1 0.56
h. Bentonite Mixer 1 0.82
i . Water Pump, 100 mm suction {Zl (7.5 hp) 1 0.82
j. Water Truck/Pump (16000 L) 1 0.60
k. Bar Cutter 1 0.60
I. Bar Bender 1 0.75
m. Welding Machine (500 A), Electric Driven 1 0.75
n. Cutting Outfit 1 0.22 -* 0.25
o. Tremie Pipe Set 1 0.04
p. SPT & Desanding Machine 2 0.04
q. Portable Breaker, BHF30S 1 0.96
r. Air Compressor, Portable (126-160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.09 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials CU.ITI 1.24


a. Ready Mix Concrete, fc' = 28 MPa @ 28 Days kg kg set kg 304.30
b. Reinforcing Steel Bar “ 6.09
c. Tire Wire (2% of RSB) 0.06
d. Oxygen/Acetylene (1 set/5000 kg. of RSB) 0.15
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of
Materials, Bentonite and etc.)
“ Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
10%/8% ofG
J.
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost
(G + H + I + J) j
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 7 0.65
d. Skilled Laborer 13 0.65
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.39
a. Drilling Rig (300 hp) 1 0.97
b. Crawler Crane (41 - 45 mt) 1 0.97
c. Crawler Crane (21 - 25 mt) 1 0.97
d. Dump Truck (12 yd*) 1 0.97
e. Payloader (1.50 m3), LX80-2C 1 0.97
f. Generator Set (300 kW) 1 0.61
g. Bentonite Bin 1 0.61
h. Bentonite Mixer 1 0.86
i . Water Pump, 100 mm suction $ (7.5 hp) 1 0.86
j. Water Truck/Pump (16000 L) 1 0.65
k. Bar Cutter 1 0.65
l. Bar Bender 1 0.76
m. Welding Machine (500 A), Electric Driven 1 0.76
n. Cutting Outfit 1 0.22
o. Tremie Pipe Set 1 0.26
p. SPT & Desanding Machine 2 0.03
q. Portable Breaker, BHF30S 1 0.03
r. Air Compressor, Portable (126-160 cfm) 1 0.97
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.81 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m kg kg set kg 1.94


a. Ready Mix Concrete, fc’ = 28 MPa @ 28 Days 387.77
b. Reinforcing Steel Bar “ 7.76
c. Tire Wire (2% of RSB) 0.08
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.19
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of Materials,
Bentonite and etc.)
* Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor's Profit (CP)
J. 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Designation No. of Person/s No. of Hour/s
Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 11 0.68
d. Skilled Laborer 0.68
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.42
a. Drilling Rig (300 hp) 1 0.98
b. Crawler Crane (41 - 45 mt) 1 0.98
c. Crawler Crane (21 - 25 mt) 1 0.98
d. Dump Truck (12 yd3) 1 0.98
e. Payloader (1.50 m*), LX80-2C 1 0.98
f. Generator Set (300 kW) 1 0.64
g. Bentonite Bin 1 0.64
h. Bentonite Mixer 1 0.90
i . Water Pump, 100 mm suction {Zl (7.5 hp) 1 0.90
j. Water Truck/Pump (16000 L) 1 0.68
k. Bar Cuker 1 0.68
I. Bar Bender 1 0.76
m. Welding Machine (500 A), Electric Driven 1 0.76
n. Cutting Outfit 1 0.22
o. Tremie Pipe Set 1 0.26
p. SPT & Desanding Machine 2 0.02
q. Portable Breaker, BHF30S 1 0.02
r. Air Compressor, Portable (126- 160 cfm) 1 0.98
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 0.62 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m kg kg set kg 2.80


a. Ready Mix Concrete, fc’ = 28 Mpa @ 28 D 451.98
b. Reinforcing Steel Bar * 9.04
c. Tire Wire (2% of RSB) 0.09
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.23
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of Materials,
Bentonite and etc.)
* /fs quantity is variable depending on the actual design

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District


based on minimum wage as approved by DOLE.
Refer to the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Hourly Rate Amount (PhP)

Labor Rales are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Laóor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region District


based on the prevailing unit prices in the locality
which include payment of local faxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Hourly Rate Amount (PhP)
Labor Rates are variable per Region/District based
on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /afes/ ACEL rental rates.

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to he project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 5 0.70
d. Skilled Laborer 10 0.70
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.44
a. Drilling Rig (300 hp) 1 0.98
b. Crawler Crane (41 - 45 mt) 1 0.98
c. Crawler Crane (21 - 25 mt) 1 0.98
d. Dump Truck (12 yd*) 1 0.98
e. Payloader (1.50 m*), LX80-2C 1 0.98
f. Generator Set (300 kW) 1 0.65
g. Bentonite Bin 1 0.65
h. Bentonite Mixer 1 0.91
i . Water Pump, 100 mm suction {Zl (7.5 hp) 1 0.91
j. Water Truck/Pump (16000 L) 1 0.70
k. Bar Cutter 1 0.70
1. Bar Bender 1 0.77
m. Welding Machine (500 A), Electric Driven 1 0.77 - 0.21 0.26 0.02
n. Cutting Outfit 1 0.02 0.98
o. Tremie Pipe Set 1
p. SPT & Desanding Machine 2
q. Portable Breaker, BHF30S 1
r. Air Compressor, Portable (126-160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.53 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m kg kg set kg 3.46


a. Ready Mix Concrete, fc’ = 28 MPa @ 28 Days 490.33
b. Reinforcing Steel Bar * 9.81
c. Tire Wire (2% of RSB) 0.098
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.25
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of Materials,
Bentonite and etc.)
“ Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local faxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J) I
Item No./Description 1052(18)a Concrete Piles cast in Steel Shells, furnished and driven
Unit of Measurement Output 1.80 m
per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.39
a. Truck Mounted Crane (41 - 45 mt) 1 0.15
b. Diesel Hammer (K25 or equivalent) 1 0.07
c. Drop Hammer 1 0.12
d. Bar Cutter 1 0.12
e. Bar Bender 1 0.05
f. Welding Machine (SOOA), Gas/Diesel Driven 1 0.05
g. Cutting Outfit 1 0.17
h. One Bagger Mixer 1 0.04
i. Water Truck/Pump (16000L) 1 0.04
j. Concrete Vibrator 1 0.17
k. Tremie Pipe Set
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.80 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity
F.

Materials kg bag 1.00


a. Tubular Pile (0.40 m IZI x 9.50 mm thk)* m’ kg kg set m bd-ft kg 29.547
b. Reinforcing Steel Bar 1.194
c. Cement 0.063
d. Sand 0.126
e. Gravel 0.591
f. #16 Tie Wire (2% of RSB) 0.063
g. Welding Rod (1 kg/2000 kg of Steel) 0.025
h. Oxy/Acetylene (1 kg/5000 kg of Steel) 1.00
i. Coco Log- 2 uses 16.00
j. Good Lumber (Falsework)- 4 uses 0.16
k. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of
Materials Cost)
Note:
*Assumed weight of Tubular Pipe Pile is
95.93 kg/m
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor's Profit (CP)
J. 10%/8% ofG I
K.
Value Added Tax (VAT)
5% of(G + H + I) I
Total Unit Cost
(G + H + I + J) I
n

Hourly Rate Amount (PhP)

Labor Rates are variable per RegionDistrict based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)


Prices of materials are variable per Region/ District
based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Item No./Description 1052(18)b Concrete Piles cast in Steel Shells, furnished and driven (Ready Mix Concrete)
Unit of Measurement Output 2.00 m
per hour

A Designation No. of Person/s No. of Hour/s


.
Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unslcilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.45
a. Truck Mounted Crane (41 - 45 mt) 1 0.17
b. Diesel Hammer (K25 or equivalent) 1 0.08
c. Drop Hammer 1 0.14
d. Bar Cutter 1 0.14
e. Bar Bender 1 0.06
f. Welding Machine (SOOA), Gas/Diesel Driven 1 0.06
g. Cutting Outfit 1 0.01
h. Concrete Vibrator 1 0.05
i. Tremie Pipe Set
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg m’ kg kg set 1.00


a. Tubular Pile (0.40 m jzl x 9.50 mm thk)” bd-ft kg 29.547
b. Reinforcing Steel Bar 0.132
c. Ready Mix Concrete fc'=20.7 MPa 0.591
d. #16 Tie Wire (2% of RSB) 0.063
e. Welding Rod (1 kg/2000 kg of Steel) 0.025
f. Oxy/Acetylene (1 kg/5000 kg of Steel) 1.00
g. Coco Log- 2 uses 16.00
h. Good Lumber (Falsework)- 4 uses 0.16
i. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of
Materials Cost)
Note:
*Assumed weight of Tubular Pipe Pile is
95.93 kg/m.
If no available Ready Mix Concrete at project site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for
small quantity.
Sub - Total for F
G. Direct Unit Cost (E + F)
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax{VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
n (Ready Mix Concrete)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central O/lice Price
Monitoring Committee.
+ I)
I + J)
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per RegionDistric


a. Construction Foreman 6 1.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 6 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

for A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 0.39 See latest ACEL rental rates.
b. Diesel Hammer (M5 or equivalent) 1 0.15
c. Drop Hammer 1 0.07
d. Bar Cutter 1 0.12
e. Bar Bender 1 0.12
f. Welding Machine (SOOA), Gas/Diesel Driven 1 0.05
g. Cutting Outfit 1 0.05
h. One Bagger Mixer 1 0.17
i. Water Truck/Pump (16000L) 1 0.04
j. Concrete Vibrator 1 0.04
k. Tremie Pipe Set 1 0.17
Minor Tools (10% of Labor Cost)

Sub - Total for B

c. Total (A + B) ”-“
D. Output per Hour = 2.40 m
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials Prices of materials are variable per Region


a. Tubular Pile (0.40 m 0 x 9.50 mm thk)* based on the prevailing unit prices in the lo
b. Reinforcing Steel Bar m. 1.00 which include payment of local taxes and
c. Cement cost to the project site.
kg. 29.547
d. Sand Refer to the Construction Material Price D
e. Gravel bag 1.194 established quarterly by Central Of/ice Pric
f. #16 Tie Wire (2% of RSB) m‘ 0.063 Monitoring Committee.
g. Welding Rod (1 kg/2000 kg of Steel) m• 0.126
h. Oxy/Acetylene (1 kg/5000 kg of Steel)
i. Coco Log- 2 uses kg. 0.591
j. Good Lumber (Falsework)- 4 uses kg. 0.063
k. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of
Materials Cost) set 0.025
Note: m 1.00
”Assumed weight of Tubular Pipe Pile is bd-ft 16.00
95.93 kg/m.
kg. 0.16
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP) 10%/8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I +J) I
Amount (PhP)

tes are variable per RegionDistrict based


um wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region/ District


the prevailing unit prices in the locality
ude payment of local taxes and hauling
e project site.
he Construction Material Price Data
ed quarterly by Central Of/ice Price
g Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052(19)b Concrete Piles cast in Steel Pipes, furnished and driven (Ready Mix Concrete)
Unit of Measurement Output 2.00 m
per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 6 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.45
a. Truck Mounted Crane (41 - 45 mt) 1 0.17
b. Diesel Hammer (K25 or equivalent) 1 0.08
c. Drop Hammer 1 0.14
d. Bar Cutter 1 0.14
e. Bar Bender 1 0.06
f. Welding Machine (SOOA), Gas/Diesel Driven 1 0.06
g. Cutting Outfit 1 0.01
h. Concrete Vibrator 1 0.05
i. Tremie Pipe Set
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.00 m
E.
Direct Unit Cost (C + D) -“
F. Name and Specification Unit Quantity

Materials kg 1.00
a. Tubular Pile (0.40 m IZI x 9.50 mm thk)“ kg kg set m bd-ft kg 29.547
b. Reinforcing Steel Bar 0.132
c. Ready Mix Concrete fc’=20.7 MPa 0.591
d. #16 Tie Wire (2% of RSB) 0.063
e. Welding Rod (1 kg/2000 kg of Steel) 0.025
f. Oxy/Acetylene (1 kg/5000 kg of Steel) 1.00
g. Coco Log- 2 uses 16.00
h. Good Lumber (Falsework)- 4 uses 0.16
i. Nail/Spike (1 kg/100 bd-ft of Lumber) Miscellaneous (2% of
Materials Cost)
Note:
”Assumed weight of Tubular Pipe Pile is
95.93 kg/m.
If no available Ready Mix Concrete at Project Site, derive the cost
of concrete using the Batching Plant or One Bagger Mixer for
small quantity
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J.
K.
G.
H.
I.
J. Contractor’s Profit (CP) 10%/8% ofG I

K.
Value Added Tax (VAT)
5% of(G + H + I) I
Total Unit Cost
(G + H + I + J)
SIS (DUPA)
n (Ready Mix Concrete)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /a/esf ACEL rental rates.

Unit Cost Amount (PhP)

Prices ofmaferia/s are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052(20) Pile Shoes
Unit of Measurement Output per ea
hour 4.00 ea

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Welding Machine (SOOA), Electric Driven 1 0.25
b. Bar Cutter 1 0.25
c. Bar Bender
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 4.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg kg 23.86
a. Reinforcing Steel Bar, Grade 40 6.00
b. Steel Plate (100+100) x 300 mm, 12 mm thk 0.015
c. Welding Rod (1 kg/2000 kg of Steel)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor’s Profit (CP) 10%/ 8% of G
K.
G.
H.
i.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
+ I)
+ J)
Item No./Description Unit of 1052(23)a Bored Piles, 0.80 m B (ordinary soil condition)
Measurement 1.58 m
Output per hour

A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Con5truction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 9 0.50
d. Skilled Laborer 17 0.50
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.26
a. Drilling Rig (300 hp) 1 0.95
b. Crawler Crane (41 - 45 mt) 1 0.95
c. Crawler Crane (21 - 25 mt) 1 0.95
d. Dump Truck (12 yd*) 1 0.95
e. Payloader (1.50 m*), LX80-2C 1 0.95
f. Generator Set (300 kW) 1 0.50
g. Bentonite Bin 1 0.50
h. Bentonite Mixer 1 0.74
i . Water Pump, 100 mm suction B (7.5 hp) 1 0.74
j. Water Truck (16000 L) 1 0.50
k. Bar Cutter 1 0.50
I. Bar Bender 1 0.71
m. Welding Machine (SOOA), Electric Driven 1 0.71 z 0.24
n. Cutting Outfit 1 0.24
o. Tremie Pipe Set 1 0.05
p. SPT & Desanding Machine 2 0.05
q. Portable Breaker, BHF30S 1 0.95
r. Air Compressor, Portable (126 - 160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.58 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials cu.m kg kg set kg 0.55


a. Ready Mix Concrete, fc' = 28 MPa @ 28 Days 205.00
b. Reinforcing Steel Bar “ 4.10
c. Tire Wire (2% of RSB) 0.041
d. Oxygen/Acetylene (1 set/5000 kg. of RSB) 0.10
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of
Materials, Bentonite and etc.)
“ Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
J. 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variab/e per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /afesf ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established quarterly by Central Offi”ce Price
Monitoring Committee.

+ I)
I + J)
Item No./Description 1052(23)b Bored Piles, 1.00 m Cl (ordinary soil condition)
Unit of Measurement Output 1.33 m
per hour

Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 5 1.00 on minimum wage as approved by DOLE
b. Skilled Laborer 6 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer Fabrication of Cage Bar 9 0.56
d. Skilled Laborer 16 0.56
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment 1 0.31
a. Drilling Rig (300 hp) 1 0.96
b. Crawler Crane (41- 45 mt) 1 0.96
c. Crawler Crane (21- 25 mt) 1 0.96 See latest ACEL rental rates.
d. Dump Truck (12 yd3) 1 0.96
e. Payloader (1.50 m’), LX80-2C 1 0.96
f. Generator Set (300 kW) 1 0.53
g. Bentonite Bin 1 0.53
h. Bentonite Mixer 1 0.78
i . Water Pump, 100 mm suction Cl (7.5 hp) 1 0.78
j. Water Truck/Pump (16000L) 1 0.56
k. Bar Cutter 1 0.56
I. Bar Bender 1 0.73
m. Welding Machine (500 A), Electric Driven 1 0.73
n. Cutting Outfit 1 0.22 - 0.24 0.04 0.04
o. Tremie Pipe Set 1 0.96
p. SPT & Desanding Machine 2
q. Portable Breaker, BHF30S 1
r. Air Compressor, Portable (126- 160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.33 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt Amount (PhP)

Materials kg kg set kg 0.86 Prices of materials are variable per Regio


a. Ready Mix Concrete, fc' = 28 MPa 253.59 based on the prevailing unit prices in the
b. Reinforcing Steel Bar “ 5.07 which include payment of local taxes and
c. Tire Wire (2% of RSB) 0.051 cost to the project site.
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.13 Refer to the Construction /Uaferia/ Price D
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of established quarterly by Central Office Pr
Materials, Bentonite and etc.) Monitoring Committee.
“ Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
urly Rate Amount (PhP)

Rates are variable per Region/District based


nimum wage as approved by DOLE. Refer to
chedule of Labor Rates.

urly Rate Amount (PhP)

ee latest ACEL rental rates.

COSt Amount (PhP)

s of materials are variable per Region/ District


on the prevailing unit prices in the locality
include payment of local taxes and hauling
o the project site.
to the Construction /Uaferia/ Price Data
ished quarterly by Central Office Price
oring Committee.
Item No./Description Unit of 1052(23)c Bored Piles, 1.20 m 0 (ordinary soil condition)
Measurement 1.09 m
Output per hour

A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 8 0.60
d. Skilled Laborer 15 0.60
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.35
a. Drilling Rig (300 hp) 1 0.96
b. Crawler Crane (41- 45 mt) 1 0.96
c. Crawler Crane (21- 25 mt) 1 0.96
d. Dump Truck (12 yd*) 1 0.96
e. Payloader (1.50 m’), LX80-2C 1 0.96
f. Generator Set (300 kW) 1 0.56
g. Bentonite Bin 1 0.56
h. Bentonite Mixer 1 0.82
i . Water Pump, 100 mm suction 0 (7.5 hp) 1 0.82
j. Water Truck/Pump (16000L) 1 0.60
k. Bar Cutter 1 0.60
I. Bar Bender 1 0.75
m. Welding Machine (500 A), Electric Driven 1 0.75
n. Cutting Outfit 1 0.22 -^ 0.25
o. Tremie Pipe Set 1 0.04
p. SPT & Desanding Machine 2 0.04
q. Portable Breaker, BHF30S 1 0.96
r. Air Compressor, Portable (126-160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.09 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg set kg 1.24


a. Ready Mix Concrete, fc’ = 28 MPa 304.30
b. Reinforcing Steel Bar “ 6.09
c. Tire Wire (2% of RSB) 0.061
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.15
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of
Materials, Bentonite and etc.)
“ Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
i.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) ]
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project sife.
Refer to the Construction Material Price Data
established quarterly by Central Of/ice Price
Monitoring Committee.

H + I)
I + J) ]
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1052(23)d Bored Piles, 1.50 m Cl (ordinary soil condition)
Measurement 0.81 m
Output per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 7 0.65
d. Skilled Laborer 13 0.65
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.39
a. Drilling Rig (300 hp) 1 0.97
b. Crawler Crane (41- 45 mt) 1 0.97
c. Crawler Crane (21- 25 mt) 1 0.97
d. Dump Truck (12 yd3) 1 0.97
e. Payloader (1.50 m’), LX80-2C 1 0.97
f. Generator Set (300 kW) 1 0.61
g. Bentonite Bin 1 0.61
h. Bentonite Mixer 1 0.86
i . Water Pump, 100 mm suction 0 (7.5 hp) 1 0.86
j. Water Truck/Pump (16000L) 1 0.65
k. Bar Cutter 1 0.65
l. Bar Bender 1 0.76
m. Welding Machine (500 A), Electric Driven 1 0.76 - 0.22 0.26 0.03
n. Cutting Outfit 1 0.03 0.97
o. Tremie Pipe Set 1
p. SPT & Desanding Machine 2
q. Portable Breaker, BHF30S 1
r. Air Compressor, Portable (126-160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 0.81 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg set kg 1.94


a. Ready Mix Concrete, fc' = 28 MPa 387.77
b. Reinforcing Steel Bar “ 7.76
c. Tire Wire (2% of RSB) 0.078
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.19
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of Materials,
Bentonite and etc.)
“ Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F/


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
)

Hourly Rate Amount (PhP)

Labor Rates are variable per RegionDistrict based on


minimum wage as approved by DOLE. Refer fo the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established gua/Yer/y by Central Office Price Monitoring
Committee.

+ I)
+ J)
Item No./Description Unit of 1052(23)e Bored Piles, 1.80 m 0 (ordinary soil condition)
Measurement 0.62 m
Output per hour

A Designation No. of Person/s No. of Hour/s


.
Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 7 0.68
d. Skilled Laborer 12 0.68
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls

Equipment 1 0.42
a. Drilling Rig (300 hp) 1 0.98
b. Crawler Crane (41- 45 mt) 1 0.98
c. Crawler Crane (21- 25 mt) 1 0.98
d. Dump Truck (12 yd^) 1 0.98
e. Payloader (1.50 m*), LX80-2C 1 0.98
f. Generator Set (300 kW) 1 0.64
g. Bentonite Bin 1 0.64
h. Bentonite Mixer 1 0.90
i . Water Pump. 100 mm suction 0 (7.5 hp) 1 0.90
j. Water Truck/Pump (16000L) 1 0.68
k. Bar Cutter 1 0.68
l. Bar Bender 1 0.76
m. Welding Machine (500 A), Electric Driven 1 0.76
n. Cutting Outfit 1 0.22 -* 0.26
o. Tremie Pipe Set 1 0.02
p. SPT & Desanding Machine 2 0.02
q. Portable Breaker 1 0.98
r. Air Compressor, Portable (126-160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.62 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg set kg 2.80


a. Ready Mix Concrete, fc' - 28 MPa 451.98
b. Reinforcing Steel Bar “ 9.04
c. Tire Wire (2% of RSB) 0.090
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.23
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of
Materials, Bentonite and etc.)
” its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
J. 10%/ 8% of G
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /atesf ACEL rental ra/es.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the preva/ling unit prices in the locality
which include payment of local faxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

I
Item No./Description 1052(23)f Bored Piles, 2.00 m B (ordinary soil condition)
Unit of Measurement Output per 0.53 m
hour

A Designation No. of Person/s No. of Hour/s


.
Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 5 0.70
d. Skilled Laborer 10 0.70
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.44
a. Drilling Rig (300 hp) 1 0.98
b. Crawler Crane (41- 45 mt) 1 0.98
c. Crawler Crane (21- 25 mt) 1 0.98
d. Dump Truck (12 yd*) 1 0.98
e. Payloader (1.50 m*), LX80-2C 1 0.98
f. Generator Set (300 kW) 1 0.65
g. Bentonite Bin 1 0.65
h. Bentonite Mixer 1 0.91
i . Water Pump, 100 mm suction Cl (7.5 hp) 1 0.91
j. Water Truck/Pump (16000L) 1 0.70
k. Bar Cutter 1 0.70
1. Bar Bender 1 0.77
m. Welding Machine (500 A), Electric Driven 1 0.77
n. Cutting Outfit 1 0.21 . 0.26 0.02 0.02
o. Tremie Pipe Set 1 0.98
p. SPT & Desanding Machine 2
q. Portable Breaker 1
r. Air Compressor, Portable (126- 160 cfm) 1
s. Lighting System/Tower Lights Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.53 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg kg set kg 3.46


a. Ready Mix Concrete, fc’ = 28 MPa 490.33
b. Reinforcing Steel Bar “ 9.81
c. Tire Wire (2% of RSB) 0.098
d. Oxygen/Acetylene (1 set/5000 kg of RSB) 0.25
e. Welding Rod (1 kg/2000 kg of RSB) Miscellaneous (3% of Materials,
Bentonite and etc.)
” Its quantity is variable depending on the actual design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I) I
Total Unit Cost
(G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /afesf ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer fo the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052(24)a Permanent Casing (0.80 m II)
Unit of Measurement Output per 3.00 m
hour

A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 1.00 Labor Rates are variable per Region/Distr


a. Construction Foreman 4 1.00 on minimum wage as approved by DOLE.
b. Skilled Laborer 6 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total

fo
r A
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

B. Equipment
a. Truck Mounted Crane (41- 45 mt) 1 1.00 See /afesf ACEL rental rates.
b. Vibro Hammer w/ Hydraulic Power Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting Outfit 1 0.50
Minor Tools (10% of Labor Cost)

Sub - Total for B


c. Total (A + B)
D. Output per Hour = 3.00 m
E. Direct Unit Cost (C + D}
F. Name and Specification Unit Quantity Unit Cost

Materials set kg 1.025 Prices of materials are variable per Region


a. Steel Casing, 10 mm thk 0.082 based on the prevailing unit prices in the lo
b. Oxy/Acetylene (1 set/2500 kg of Steel) 0.409 which include payment of local faxes and h
c. Welding Rod (1 kg/500 kg of Steel) cost to the project site.
Note: Refer to the Construction /Ua/eria/ Price D
Assumed length of Steel Casing without splicing but with full established quarterly by Central Office Pri
weld -- 12.00 meter, 2.50% additional quantity of Steel Casing Monitoring Committee.
represents the collar of 0.30 m for 12 m.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor’s Profit (CP) 10%/8% ofG I


J. Value Added Tax (VAT) 5% of(G + H + I) I
K. Total Unit Cost (G + H + I + J) I
Rate Amount (PhP)

es are variable per Region/District based


um wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

afesf ACEL rental rates.

Amount (PhP)

materials are variable per Region District


the prevailing unit prices in the locality
ude payment of local faxes and hauling
e project site.
he Construction /Ua/eria/ Price Data
ed quarterly by Central Office Price
g Committee.
Item No./Description 1052(24)b Permanent Casing (1.00 m $)
Unit of Measurement Output 2.40 m
per hour

A. Designation No. of Personls No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41- 45 mt) 1 0.50
b. Vibro Hammer w/ Hydraulic Power Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting Outfit
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.40 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set kg 1.025


a. Steel Casing, 10 mm thk 0.102
b. Oxy/Acetylene (1 set/2500 kg of Steel) 0.511
c. Welding Rod (1 kg/500 kg of Steel)
Note:
Assumed length of Steel Casing without splicing but with full
weld -- 12.00 meter, 2.50% additional quantity of Steel Casing
represents the collar of 0.30 m for 12 m.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /afes/ ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I)
+ J)
Item No./Description : 1052(24)c Permanent Casing (1.20 m 0)
Unit of Measurement Output per 2.00 m
hour

A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41- 45 mt) 1 0.50
b. Vibro Hammer w/ Hydraulic Power Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting Outfit ,
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 2.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set kg 1.025


a. Steel Casing, 10 mm thk 0.122
b. Oxy/Acetylene (1 set/2500 kg of Steel) 0.612
c. Welding Rod (1 kg/500 kg of Steel)
Note:
Assumed length of Steel Casing without splicing but with fu// weld
-- 12.00 meter, 2.50% additional quantity of Steel Casing
represents the collar of 0.30 m for 12 m.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor's Profit (CP)
J. 10%/ 8% of G I

K. Value Added Tax (VAT) 5% of (G + H + I)


Total Unit Cost
(G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per RegionDistrict based


on minimum wage as approved by DOLE. Re/'er to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /ates/ ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local faxes and hauling
cost to the project sife.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I)
Item No./Description 1052(24)d Permanent Casing (1.50 m lzl)
Unit of Measurement Output 1.60 m
per hour

A Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41- 45 mt) 1 0.50
b. Vibro Hammer w/ Hydraulic Power Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting Outfit
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.60 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set kg 1.025


a. Steel Casing, 10 mm thk 0.153
b. Oxy/Acetylene (1 set/2500 kg of Steel) 0.763
c. Welding Rod (1 kg/500 kg of Steel)
Note:
Assumed length of Steel Casing without splicing but with full
weld -- 12.00 meter, 2.50% additional quantity of Steel Casing
represents the collar of 0.30 m for 12 m.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Regiori/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer fo the Construction Material Price Oafa
established quarterly by Central Office Price
Monitoring Committee.

+ I)
I + J) I
Item No./Description 1052(24)e Permanent Casing (1.80 m {Zl)
Unit of Measurement Output 1.33 m
per hour

Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41- 45 mt) 1 0.50
b. Vibro Hammer w/ Hydraulic Power Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting Outfit
Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.33 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set 1.025


a. Steel Casing, 10 mm thk kg 0.163
b. Oxy/Acetylene (1 set/2500 kg of Steel) 0.814
c. Welding Rod (1 kg/500 kg of Steel)
Note:
Assumed length of Steel Casing without splicing but with full weld --
12.00 meter, 2.50% additional quantity of Steel Casing represents
the collar of 0.30 m for 12 m.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /a/es/ ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site.
Refer to the Construction Material Price Data
established quarter/y by Central Office Price Monitoring
Committee.

H + I)
I + J)
Designation No. of Person/s No. of Hour/s

Labor - 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41- 45 mt) 1 0.50
b. Vibro Hammer w/ Hydraulic Power Pack 1 0.50
c. Welding Machine (500 A), Gas/Diesel Driven 1 0.50
d. Cutting Outfit
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.20 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials m set kg 1.03


a. Steel Casing, 10 mm thk 0.203
b. Oxy/Acetylene (1 set/2500 kg of Steel) 1.016
c. Welding Rod (1 kg/500 kg of Steel)
Note:
Assumed length of Steel Casing without splicing but with full
weld -- 12.00 meter, 2.50% additional quantity of Steel Casing
represents the collar of 0.30 m for 12 m.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor's Profit (CP)
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J) j


Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

+ I) I

+ J) j
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 1.00
a. Truck Mounted Crane (41-45 mt) Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.50 ea “
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials kg. set gal m 51.83


a. Reinforcing Steel Bar (36 mm jzl x 1.50 m)* 0.70
b. Concrete Epoxy for RC Piles (Part A & B) 1.40
c. Silica Sand 3.00
d. Pipe Sleeve, 50 mm Cl GI Miscellaneous (2% of Materials Cost)
” Depth of dowel will be as recommended by the manufacturer of
epoxy resin in order to develop required pile joint strength.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
J. 10%/8% ofG I
K.
Value Added Tax (VAT)
5% of(G + H + I) I
Total Unit Cost
(G + H + I + J) I
Hourly Rate Amount (PhP)

Labor Rates are variable per RegionDistrict based


on minimum wage as approved by DOLE. Refer /o
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local faxes and hauling
cost to the project sife.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per RegionDistr
c. Unskilled Laborer 1 1.00 on minimum wage as approved by DOLE
Sub - Total for A 1 1.00 the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00 See latest ACEL rental rates.


a. Truck Mounted Crane (41-45 mt) Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 0.50 ea
E. Direct Unit Cost (C + D)
Name and Specification Unit Quantity Unit Cost

F. Materials
a. Reinforcing Steel Bar (36 mm IZI x 1.50 m)*
b. Concrete Epoxy for RC Piles (Part A & B) kg set gal m 51.83 Prices of materials are variable per Regio
c. Silica Sand 0.80 based on the prevailing unit prices in the
d. Pipe Sleeve, 50 mm 0 GI Miscellaneous (2% of Materials Cost) 1.60 which include payment of local taxes and
” Depth of dowel will be as recommended by the manufacturer of 3.00 cost to the project site.
epoxy resin in order to develop required pile joint strength. Refer fo the Consfrucfion /Uaferia/ Price Da
Sub - Total for F established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I) I
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

tes are variable per RegionDistrict based


um wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region/ District


the prevailing unit prices in the locality
lude payment of local taxes and hauling
e project site.
he Consfrucfion /Uaferia/ Price Data
ed quarterly by Central Office Price
g Committee.
Item No./Description Unit of 1052(27)a Pile Integrity Testing (Sonic), ordinary soil condition ea
Measurement 1.00 ea (assumed pile length = 30 m)
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 4.00 Labor Rates are variable per RegionDistrict


a. Construction Foreman 1 4.00 minimum wage as approved by DOLE. Refe
b. Skilled Laborer 1 4.00 Schedule of Labor Rates.
c. Unskilled Laborer Pipe Installation 2 4.00
a. Skilled Laborer 4.00
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 1 lot See latest ACEL rental rates.


a. Pile Integrity Testing (Sonic) and accessories (includes professional 1
fee of Structural Engineer and reports)
b. Welding Machine (SOOA), Electric Driven Minor Tools (10% of
Labor Cost)
Sub - Total for B
4.00

C. Total (A + B)
D. Output per Hour = 1.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials kg 120.00 Prices of materials are variable per Region/


a. Black/GI Pipe & accessories 2" jzl x 6 m, Schedule 20 0.10 based on the prevailing unit prices in the loc
b. Welding Rod include payment of local taxes and hauling
Miscellaneous (2% of Materials Cost) project site.
Note: Refer to the Construction Material Price Dat
Materials quantity component, equipment and labor output may vary established quarterly by Central Office Price
proportionately depending on the pile length. Monitoring Committee.
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i. Contractor's Profit (CP)
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Amount (PhP)

es are variable per RegionDistrict based on


wage as approved by DOLE. Refer to the
of Labor Rates.

Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region/ District


he prevailing unit prices in the locality which
yment of local taxes and hauling cost to the
e.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1052(27)b Pile Integrity Testing (PIT), ordinary soil condition ea
Unit of Measurement Output per 1.00 ea
hour
A. Designation No. of Personls No. of Hour/s Hourly Rate

Labor 1 2.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 on minimum wage as approved by DOLE
b. Skilled Laborer 1
2.00
the Schedule of Labor Rates.
c. Unskilled Laborer 2.00
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 1 lot See latest ACEL rental rates.


a.Pile Integrity Testing and accessories (includes professional fee of 1
Structural Engineer and reports)
b. Grinding Machine and accessories
Sub - Total for B

2.00

c. Total (A + B)
D. Output per Hour = 1.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regi


a. Grinding Disc based on the prevailing unit prices in the
Note: which include payment of local faxes and
Materials quantity component, equipment and labor output may cost fo the project site.
vary proportionately depending on the pile length. Refer to the Construction Material Price
Sub - Total for F established quarterly by Central Office P
Monitoring Committee

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

tes are variable per Region/District based


um wage as approved by DOLE. Refer to
dule of Labor Rates.

Amount (PhP)

atest ACEL rental rates.

Amount (PhP)

materials are variable per Region/ District


the prevailing unit prices in the locality
lude payment of local faxes and hauling
e project site.
he Construction Material Price Data
ed quarterly by Central Office Price
g Committee
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description Unit of 1052(22)b High Strain Dynamic Testing (PDA), ordinary soil condition ea
Measurement 1.00 ea (assumed pile 0 = 1.50 m)
Output per hour
A. Designation No. of Person/s No. of Hour/s

Labor 1 400
a. Construction Foreman 2 4.00
b. Skilled Laborer 4
c. Unskilled Laborer 800
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 lot 4.00


a.Dynamic Pile Testing 1 4.00
(includes professional fee of Structural Engineer) 1
b. Truck Mounted Crane (45 mt) 1 8.00
c. Drop Hammer w/ accessories 1 0.60
d. 1 Air Compressor w/ 2 Jack Hammer 1 2.00
e. Concrete Vibrator 1 2.00
f. Cutting Outfit
g. Welding Machine (SOOA), Electric Driven Minor Tools (10% of
Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.00 ea
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 3.00
a. Steel Casing, L = 2 x Pile 0, thickness = 100 mm 5.57
b. Ready Mix Concrete, 3000 psi 2.234
c. Welding Rod (1 kg/500 kg of Steel) 0.447
d. Oxy/Acetylene (1 kg/2500 kg of Steel) Miscellaneous (5% of
Materials Cost)
Note:
Materials quantity component, equipment and labor output may
vary proportionately depending on the pile length. kg set
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1. Contractor’s Profit (CP)
J. 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J) I
SIS (DUPA)
ndition ea

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See latest ACEL renta/ rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer fo the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

H + I)
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052 (29) Micro Piles In Drilled Holes, 0.20m 0 (ordinary soil condition)
Unit of Measurement Output per 3.00 m
hour

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 5 1.00
b. Skilled Laborer 6 1.00
c. Unskilled Laborer Fabrication of Cage Bar 4 0.25
d. Skilled Laborer 8 0.25
e. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment 1 0.74
a. Drill Rig, Mechanical Rotary 1 0.95
b. Truck Mounted Crane (25T) 1 0.04
c. Bar Bender 1 0.04
d. Bar Cutter 1 0.50
e. Bentonite Mixer 1 0.50
f. Bentonite Bin 1 0.50
g. Water Pump h.Water Truck 1 0.50
i. Welding Machine 1 0.50
j. Tremie Pipe Set 1 0.24
k. SPT & Desanding Machine 1 0.24
1. Tower Light 1 0.50
m. Minor Tools (10% of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 3.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 0.033 cu.m kg kg


a. Ready Mix 12.626
b. Reinforced Steel Bar* 0.006
c. Welding Rod (1kg/2000kg of RSB)
d. Miscellaneous (3% of Materials, Bentonite & etc.)
“ Its quantity is variable depending on the acfua/ design

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/8% ofG
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
ondition)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

See /ates/ ACEL rental rates.

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on he prevai/ing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
+ I)
+ J)
Item No./Description : 1100(1) 15 mm 0 - 25 mm Cl Rigid Steel Conduit (RSC)/Intermediate metal Conduit (IMC)/ Electrical Metal Tubing (EMT
Unit of Measurement Output length
per hour 1.333 length

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/District
c. Unskilled Laborer 1 1.00 minimum wage as approved by DOLE. Refer
Sub - Total for A 1 1.00 Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.333 length
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials length 1.00 Prices of materials are variable per Region/ D


a. 15 mm Cl - 25 mm 0 x 3.00 m Rigid Steel Conduit (RSC)/ based on the prevailing unit prices in the loca
Intermediate metal Conduit (IMC)/ Electrical Metal Tubing (EMT) which include payment of local taxes and ha
b. Consumables (5% of Materials Cost) cost to the project site. Refer to the Construc
Sub - Total for F Material Price Data established quarterly by C
Office Price Monitoring Commiffee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor’s Profit (CP) 10%/8% of G I

J. Value Added Tax (VAT) 5% of (G + H + I)


K. Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1100(1)a1, 1100(1)a2, 1100(1)a3, 1100(2)a1, 1100(2)a2, 1100(2)a3, 1100(4)a1,
1100(4)a2, and 1100(4)a3.
MC)/ Electrical Metal Tubing (EMT)

Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality
payment of local taxes and hauling
oject site. Refer to the Construction
e Data established quarterly by Central
Monitoring Commiffee.
Item No./Description 1100(1) 32 mm 8 - 40 mm 0 Rigid Steel Conduit (RSC)/ Intermediate metal Conduit (IMC)/ Electrical Metal Tubing (EM
Unit of Measurement Output per length
hour 1.250 length

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 1.00 Labor Rates are variable per RegionDistrict bas
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of UniVs No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.250 length
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials length 1.00 Prices of materials a”re variable per Region/ Di


a. 32 mm IB - 40 mm Cl x 3.00 m Rigid Steel Conduit (RSC)/ based on the prevailing un'it prices in the locali
Intermediate metal Conduit (IMC)/ Electrical Metal Tubing (EMT) include payment of local taxes and hauling cos
b. Consumables (5% of Materials Cost) project s/Ie. Refer to the Construction Material P
Sub - Total for F established quarterly by Central Office Price Mo
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor’s Profit (CP) 10%/8% of G I
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of (G + H + I) I
Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1100(1)a4, 1100(1)a5, 1100(2)a4, 1100(2)a5, 1100(4)a4, 1100(4)a5.
(IMC)/ Electrical Metal Tubing (EMT)

Amount (PhP)

are variable per RegionDistrict based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials a”re variable per Region/ District


prevailing un'it prices in the locality which
ent of local taxes and hauling cost to the
efer to the Construction Material Price Data
uarterly by Central Office Price Monitoring
Unit of Measurement length
Output per hour 0.516 length
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Coristruction Foreman 1 1.00
b. Skilled Laborer 1 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.516 length
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials length 1.00


a. 50 mm Cl - 65 mm 0 x 3.00 m Rigid Steel Conduit/ Intermediate
metal Conduit (IMC)/ Electrical Metal Tubing (EMT)
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor's Profit (CP) 10%/8% of G I

K. Value Added Tax (VAT) 5% of (G + H + I)


Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1100(1)a6, 1100(1)a7, 1100(2)a6, 1100(2)a7, 1100(4)a6 and 1100(4)a7.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost fo the
project site. Refer to the Construction Material Price
Data established quarterly by Central Office Price
Monitoring Committee.

H + I)
I + J) I
6 and 1100(4)a7.
Unit of Measurement : length
Output per hour 0.500 length
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/District


a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.500 length
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials length 1.00 Prices of materials are variable per Region/ D


a. 80 mm 0 x 3 m Rigid Steel Conduit (RSC) based on the prevailing unit prices in the loca
b. Consumables (5% of Materials Cost) include payment of local taxes and hauling co
Sub - Total for F project site. Refer to the Construction Materia
Data established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) j


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/8% of G I

K. Value Added Tax (VAT) 5% of (G + H + I) I


Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1100(1)a8, 1100(1)a9, 1100(1)a10, 1100(2)a8, 1100(2)a9, 1100(2)a10, 1100(4)a8,
1100(4)a9 and 1100(4)a10.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

terials are variable per Region/ District


e prevailing unit prices in the locality which
ment of local taxes and hauling cost to the
Refer to the Construction Material Price
shed quarterly by Central Office Price
ommittee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1100(3) 15 mm 8 - 25 mm 0 Flexible Metal Conduit
Unit of Measurement Output per 2.00 m
hour

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 1.00 Labor Rates are variable per Region/District b
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Region/ D


a. 15 mm 0 - 25 mm 0 Flexible Metal Conduit based on the prevailing unit prices in the loca
b. Consumables (5% of Materials Cost) which include payment of local faxes and hau
Sub - Total for F to the project site. Refer fo the Construction M
Price Data established quarterly by Central O
Price Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% ofG
K.
G.
H.
1.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J) }
Note : 1. Use this cost sheet for Item Nos. 1100(3)a1, 1100(3)a2 and 1100(3)a3.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality
payment of local faxes and hauling cost
site. Refer fo the Construction Material
tablished quarterly by Central Office
ing Committee.
Item No./Description 1100(6) 15 mm 0 - 32 mm $ Polyvinyl Chloride (PVC) Pipes length
Unit of Measurement Output per 3.534 length
hour
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/District
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 3.534 length
E.
Direct Unit Cost (C + D}
F. Name and Specification Unit Quantity Unit COSt

Materials length 1.05 Prices of materials are variable per Region/ D


a. 15 mm Cl - 32 mm 0 x 3.00 mm Polyvinyl Chloride (PVC) Pipes based on the prevailing unit prices in the loca
b. Consumables (5% of Materials Cost) which include payment of local taxes and ha
Sub - Total for F fo the project sife. Refer to the Construction M
Price Data established quarterly by Central O
Price Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1100(6)a1, 1100(6)a2, 1100(6)a3, and 1100(6)a4.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

terials are variable per Region/ District


prevailing unit prices in the locality
e payment of local taxes and hauling cosf
sife. Refer to the Construction Material
stablished quarterly by Central Office
ring Committee.
Item No./Description Unit of 1100 PVC/RSC/ IMC/ EMT Conduit Filings pc
Measurement 1.00 pc
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor in the installation of conduits.)
(Labor cost for these items shall be considered/included
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output = 1.00 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials pc 1.00 Prices of materials are variable per Region D


a. Coupling/Elbow/End Bell/Clamp or others based on the prevailing unit prices in the locali
Sub - Total for F include payment of/oca/ taxes and hauling co
project sife. Refer to the Construction Materia
Data established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit(CP) 10%/8% of G
J. Value Added Tax(VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1100(7), 1100(8), 1100(9), 1100(10), 1100(11), 1100(12), 1100(13), 1100(14) and
1100(15).
Amount (PhP)

Amount (PhP)

Amount (PhP)

erials are variable per Region District


prevailing unit prices in the locality which
ent of/oca/ taxes and hauling cost to the
Refer to the Construction Material Price
hed quarterly by Central Office Price
ommittee.
Item No./Description Unit of 1100 Junction/ Utility/ Pull/ Square Box pc
Measurement 1.00 pc
Output
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Skilled Laborer
b. Unskilled Laborer 1 0.40 Labor Rates are variable per RegionDistrict b
Sub - Total for A 1 040 minimum wage as approved by DOLE. Refer
Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output = 1.00 pc
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Region/ D


a. Junction/ Utility/ Pull/ Square Box based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling c
Sub - Total for F project site. Refer to the Construction Materia
Data established quarterly by Central Office
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% ofG I
J. Value Added Tax (VAT) 5% of(G + H + I) I

K. Total Unit Cost {G + H + I + J)


Note : 1. Use this cost sheet for Item Nos. 1100(19), 1100(20). 1100(21), and 1100(22).
Amount (PhP)

are variable per RegionDistrict based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ment of local taxes and hauling cosf to the
Refer to the Construction Material Price
hed quarterly by Central Office Price
ommittee.
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1100(30) Conduit Works, Boxes and Fittings I.s.
Unit of Measurement Output 1.00 I.s.

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor (11)
See Oeriv'afion for Item No.1100(1) to item No. 1100
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment 11)
See Derivation for Item No.0000(1) to Item No. 1100
Sub - Total for B

c. Total (A + B)
D. Output = 1.00 I.s.
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 11)
See derivation /br Item No.1100(1) to /fem No. 1100(
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor’s Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
(
Note : 1. The "lumpsum" unit of measurement as per Blue Book, shall be based on the derived outputs of Item No. 1100(1) to Item No. 1100(11).
Amount (PhP)

Amount (PhP)

Amount (PhP)
to Item No. 1100(11).
Item No./Description 1101(2) 1.6 mm2 - 5.5 mm2 Electric Wire (TW/THHN/TWHN 2)
Unit of Measurement Output per 25 m
hour

Designation No. of Person/s No. of Hour/s Hourly Rate


A
. Labor
a. Construction Foreman
1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer
c. Unskilled Laborer
1 1.00 minimum wage as approved by DOLE. Refer
1 1.00 Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 25 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region/ D


a. 1.6 mm2 - 5.5 mm2 Electric Wire (TW/THHN/TWHN2) based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling c
Sub - Total for F project site. Refer to the Construction Materia
Data established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

1 Contractor's Profit (CP) 10%/8% of G I


J. Value Added Tax (VAT) 5% of (G + H + I) I
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(2)a1, 1101(2)a2, 1101(2)a3, 1101(2)a4, 1101(2)a5, 1101(2)a6, and 1101(2)a7.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ment of local taxes and hauling cost to the
Refer to the Construction Material Price
hed quarterly by Central Office Price
ommittee.
Item No./Description 1101(2) 8.00 mm2 - 22 mm2 Electric Wire (TW/THHN/TWHN 2)
Unit of Measurement Output per 14.286 m
hour

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 1.00 Labor Rates are variable per Region/District
a. Construction Foreman 1 1.00 on minimum wage as approved by DOLE. Re
b. Skilled Laborer 1 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 14.286 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Region/ D


a. 8.00 mm2 Electric Wire (TW/THHN/TWHN 2) based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) which include payment of local taxes and ha
Sub - Total for F cost to the project site. Refer to the Consfrucf
Material Price Data established quarterly by
Office Price Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor’s Profit (CP) 10%/8% of G I
K.
G.
H.
I.
J.
K.
Value Added Tax (VAT)
5% of (G + H + I)
Total Unit Cost
(G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(2)a8, 1101(2)a9, and 1101(2)a10.
Amount (PhP)

are variable per Region/District based


wage as approved by DOLE. Refer to
e of Labor Rates.

Amount (PhP)

Amount (PhP)

terials are variable per Region/ District


e prevailing unit prices in the locality
e payment of local taxes and hauling
roject site. Refer to the Consfrucfion
e Data established quarterly by Central
Monitoring Committee.
” Item No./Description 1101(2) 30.00 mm2 - 38 mm2 Electric Wire (TW/THHN/TWHN 2)
Unit of Measurement Output per hour 5.714 m

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per RegionDistrict b


a. Construction Foreman 2 1.00 minimum w’age as approved by DOLE. Refe
b. Skilled Laborer 2 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of UniVs No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 5.714 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Region/ D


a. 30.00 mm2 - 38 mm2 Electric Wire (TW/THHN/TWHN 2) based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling co
Sub - Total for F project site. Refer to the Construction Afaferi
Data established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/8% of G
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(2)a11 and 1101(2)a12.
Amount (PhP)

are variable per RegionDistrict based on


age as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ment of local taxes and hauling cost to the
Refer to the Construction Afaferia/ Price
hed quarterly by Central Office Price
ommittee.
Item No./Description Unit of 1101(2) 50.00 mm2 - 60 mmz Electric Wire (TW/THHN/TWHN2)
Measurement 4.615 m
Output per hour

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 1.00 Labor Rates are variable per Region/District b
a. Construction Foreman 2 1.00 on minimum wage as approved by DOLE. Re
b. Skilled Laborer 1.00 the Schedule of Labor Rates.
c. Unskilled Laborer
2
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 4.615 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region/ D


a. 50.00 mm2 - 60mm2 Electric Wire (TW/THHN/TWHN2) based on the prevailing unit prices in the local
b. Consumables (3% of Materials Cost) which include payment of local taxes and hau
Sub - Total for F cost to the project site. Refer to the Construct
Material Price Data established quarterly by C
Off/ce Price iVionitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor’s Profit (CP) 10%/8% ofG
K.
G.
H.
l.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(2)a13 and 1101(2)a14.
Amount (PhP)

are variable per Region/District based


wage as approved by DOLE. Refer to
of Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality
e payment of local taxes and hauling
oject site. Refer to the Construction
e Data established quarterly by Central
Vionitoring Committee.
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/District
a. Construction Foreman 2 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 2 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 2.857 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Region/ D


a. 80.00 mm2 - 125 mm2 Electric Wire (TW/THHN/TWHN 2) based on the prevailing unit prices in the loca
b. Consumables (3% of Materials Cost) which include payment of local faxes and ha
Sub - Total for F to the project sife. Refer to the Construction
Price Data established quarterly by Central 0
Price Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(2)a15, 1101(2)a16and 1101(2)a17.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

terials are variable per Region/ District


e prevailing unit prices in the locality
e payment of local faxes and hauling cost
t sife. Refer to the Construction Material
stablished quarterly by Central 0 ffice
ring Committee.
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 1.00
b. Skilled Laborer
4 1.00
c. Unskilled Laborer 4
Sub - Total for A

B. Name and Capacity No. of UniVs No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.875 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a.150.00 mm2 -250 mm2 Electric Wire (TW/THHN/TWHN 2)
b. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I

H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I


I. Contractor’s Profit (CP)
10%/8% ofG I
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
I.
J.
K.
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(2)a18, 1101(2)a19 and 1101(2)a20.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Amount (PhP)

Prices of materials are variable per Region/ District based


on the prevailing unit prices in the locality which include
payment of local taxes and hauling cost to the project
site. Refer to the Construction Material Price Data
established quarterly by Central Office Price Monitoring
Committee.

I
H + I + J)
Item No./Description Unit of 1101(2) 325.00 mm2 - 400 mm2 Electric Wire (TW/THHN/TWHN 2)
Measurement 1.60 m
Output per hour
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 4 1.00
b. Skilled Laborer 4 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1.60 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a. 325.00 mm2 - 400 mm2 Electric Wire (TW/THHN/TWHN2)
b. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1. Contractor's Profit (CP)
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I) I
G.
H.
1.
J.
K.
Total Unit Cost (G + H + I + J) I

Note : 1. Use this cost sheet for Item Nos. 1101(2)a21, and 1101(2)a23.
HHN/TWHN 2)

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District based on


the prevailing unit prices in the locality which include payment
of local taxes and hauling cost to the project site. Refer to the
Construction Material Price Data established quarterly by
central 0 ffice Price Monitoring Committee.

H + I) I
I + J) I
Item No./Description Unit of : 1101(2)a23 500.00 mm2 Electric Wire (TW/THHN/TWHN 2)
Measurement 1.333 m
Output per hour

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/District b
c. Unskilled Laborer 4 1.00 on minimum wage as approved by DOLE. Re
Sub - Total for A 4 1.00 the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1.333 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region/ D


a. 500.00 mm2 Electric Wire (TW/THHN/TWHN 2) based on the prevailing unit prices in the local
b. Consumables (3% of Materials Cost) which include payment of local taxes and hau
Sub - Total for F cost to the project site. Refer to the Construct
Uaterial Price Data established quarterly by C
Office Price Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

I. Contractor's Profit (CP) 10%/8% ofG I


J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

are variable per Region/District based


wage as approved by DOLE. Refer to
of Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality
e payment of local taxes and hauling
oject site. Refer to the Construction
e Data established quarterly by Central
Monitoring Committee.
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor MERALCO or Loca l Power Cooperative .)


(Labor cost shall be included in the Power Contract with
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 0
E.
Direct Unit Cost (C +DQ
F. Name and Specification Unit Quantity Unit COSt

Materials (Materi als cost included in the Power Contract


a. XLPE, Creosoted pole, anchor Rod, anchor log, power load studs, or Local Power Cooperative.)
pad mounted transformer, pole-type transformer, transformer
bracket, Aluminum Conductor Steel-Reinforced (ACSR)
powerfuse, concrete pole, power transmission pole, pin insulator,
pole top pin, machine bolts and washers
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

Amount (PhP)

Amount (PhP)

with MERALCO
Company Name

For Office Use Only

Expense Report
STATEMENT
PURPOSE: NUMBER: PAY PERIOD: From

To
EMPLOYEE INFORMATION:

Name Position SSN

Department Manager Employee ID

Date Account Description Hotel Transport Fuel Meals Phone Entertainment Misc Total
$ -
Total $ - $ - $ - $ - $ - $ - $ - $ -
Subtotal $ -
Cash Advances
APPROVED: NOTES: Total $ -

Page 696 of 858


A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/District ba
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 20.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Region/ Dis


a. 2.00 mm2 - 5.00 mm2 Bare Copper Wire based on the prevailing unit prices in the localit
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling cos
Sub - Total for F project site. Refer to the Construction Material P
Data established quarterly by Central Office Pri
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J) t
Note : 1. Use this cost sheet for Item Nos. 1101(7)a1, 1101(7)a2, and 1101(7)a3.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cosf to the
Refer to the Construction Material Price
hed quarterly by Central Office Price
ommittee.
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per Region/District ba
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 10.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials 1.00 Prices of materials are variable per Region/ Distric


a. 8.00 mm2 - 22.00 mm2 Bare CoPDer Wire fñe prevai/ing unit prices in the
b. Consumables (3% of Materials Cost) /oca/ify which include payment of local faxes and ha
fo the project site. Refer to the Construction Materi
Sub - Total for F
Data established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP} 10%/8% ofG
K. Value Added Tax (VAT} 5% of(G + H + I) I
Total Unit Cost (G + H + I +J) I
Note : 1. Use this cost sheet for ltem Nos. 1101(7)a4, 1101(7)a5, and 1101(7)a6.
Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

rials are variable per Region/ District 6ased on


nit prices in the
nclude payment of local faxes and hauling cosf
ite. Refer to the Construction Material Price
ed quarterly by Central Office Price Monitoring
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 1.00
c. Unskilled Laborer 2
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 12.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a. 30.00 mm2 - 38.00 mm2 Bare Copper Wire
b. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(7)a7 and 1101(7)a8.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local faxes and hauling cost
to the project site. Refer to the Construction iviaterial
Price Data established quarterly by Cenfra/ Office
Price Monitoring Committee.

H + I)
I + J)
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 10.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a. 50.00 mm2 - 60.00 mm2 Bare Copper Wire
b. Consumables (3% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1. Contractor’s Profit (CP)
J. 10%/8% of G I
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(7)a9 and 1101(7)a10.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost t Amount (PhP)

Prices of materials are variable per Region District based


on the prevailing unit prices in the locality which include
payment of local taxes and hauling cost to the project
site. Refer to the Construction Material Price Data
established quarterly by Central Office Price Monitoring
Committee.

H + I)
I + J)
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.00
a. Construction Foreman 2 1.00
b. Skilled Laborer 2 1.00
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 6.00 m
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials 1.00
a. 80.00 mm2 - 125.00 mm2 Bare Copper Wire
b. Consumables (5% of Materials Cost)
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(7)a11, 1101(7)a12 and 1101(7)a13.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site. Refer to the Construction
Material Price Data established quarterly by Central
Office Price Monitoring Committee.

H + I)
I + J)
Item No./Description Unit of 1101(7) 200.00 mm2 - 250.00 mm2 Bare Copper Wire
Measurement Output per hour 6.667 m

Designation No. of Person/s No. of Hour/s Hourly Rate


A
. Labor
a. Construction Foreman
b. Skil{ed Laborer 1 1.00 Labor Rates are variable per RegionDistrict bas
c. Unskilled Laborer 4 1.00 minimum wage as approved by DOLE. Refer to
Sub - Total for A 4 1.00 Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 6.667 m
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials 1.00 Prices of materials are variable per Region/ Dis


a. 200.00 mm2 - 250.00 mm2 Bare Copper Wire based on the prevailing unit prices in the localit
b. Consumables (5% of Materials Cost) include payment of local taxes and hauling cos
Sub - Total for F project site. Refer to the Construction Material
Data established guarterly by Central Office Pri
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G I

1 Contractor's Profit (CP) 10%/8% ofG


J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(7)a14 and 1101(7)a15.
Amount (PhP)

are variable per RegionDistrict based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ment of local taxes and hauling cost to the
Refer to the Construction Material Price
hed guarterly by Central Office Price
ommittee.
Item No./Description 1101 Switches set
Unit of Measurement Output 1 set

A Designation No. of Person/s No. of Hour/s


.
Labor 1 1.00
a. Skilled Laborer 1 1.00
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set 1.00


a. Switches
Sub - Total for F

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
10%/8% ofG
J.
K.
G.
H.
I.
J.
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(8) to 1101(19).
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based


on minimum wage as approved by DOLE. Refer to
the Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
locality which include payment of local taxes and
hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Uonitoring
Committee.

I
Item No./Description 1101 Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Heavy Duty Convenience Outlet/Receptacle, Grou
Unit of Measurement Output Weather Proof Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Pop-up Type/Floor Triplex Convenience Ou
Grounding Type (GT)
set
1 set

A Designation No. of Person/s No. of Hour/s


.
Labor 1 0.25
a.Skilled Laborer 1 0.25
b. UnkiledLaborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F.
Name and Specification Unit Quantity ‘

Materials
a. Single Convenience Outlet/Receptacle, Grounding Type (GT)/
Heavy Duty Convenience Outlet/Receptacle, Grounding Type (GT)/
Weather Proof Single Convenience Outlet/Receptacle, Grounding
Type (GT)/ Pop-up Type/Floor Triplex Convenience
Outlet/Receptacle, Grounding Type (GT)
Sub - Total for F

set 1.00

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost
(G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(20), 1101(22), 1101(23) and 1101(31).
ding Type (GT)/ Heavy Duty Convenience Outlet/Receptacle, Grounding Type (GT)/
Grounding Type (GT)/ Pop-up Type/Floor Triplex Convenience Outlet/Receptacle,

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum i+’age as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site. Refer to the Construction
Material Price Data established quarterly by Central 0
ffice Price Monitoring Committee.

H + I)
Item No./Description 1101 Duplex Convenience Outlet/Receptacle, Grounding Type (GT) / Weather Proof Duplex Convenience Outlet/Recep
Unit of Measurement Output (GT)/ Special Purpose Convenience Outlet/Receptacle, Grounding Type for ACU, WH, etc/ Explosion Proof Type Duplex
Outlet/Receptacle, Grounding Type (GT)/ Duplex Convenience Outlet/Receptacle with Ground Fault Circuit lnterupter
set
1 set

A. Designation No. of Person/s No. of Hour/s

Labor 1 030
a. Skilled Laborer 1 0.30
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of UniVs No. of Hour/s

Equipment
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F.
Name and Specification Unit Quantity

Materials
a. Duplex Convenience Outlet/Receptacle, Grounding Type (GT) /
Weather Proof Duplex Convenience Outlet/Receptacle, Grounding
Type (GT)/ Special Purpose Convenience Outlet/Receptacle,
Grounding Type for ACU, WH, etc/ Explosion Proof Type Duplex
Convenience Outlet/Receptacle, Grounding Type (GT)/ Duplex
Convenience Outlet/Receptacle with Ground Fault Circuit lnterupter
Sub - Total for F

set 1.00

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor's Profit (CP) 10%/8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
G.
H.
1.
J.
K.
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1101(21), 1101(24), 1101(25), 1101(30) and 1101(32).
nding Type (GT) / Weather Proof Duplex Convenience Outlet/Receptacle, Grounding Type
Grounding Type for ACU, WH, etc/ Explosion Proof Type Duplex Convenience
enience Outlet/Receptacle with Ground Fault Circuit lnterupter

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site. Refer to the Construction Material Price Data
established quarterly by Central Office Price Monitoring
Committee.

H + I)
I + J)
.
Item No./Description 1101 Pop-up Type/Floor Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Pop-up Type/Floor Duplex Co
Unit of Measurement Output Outlet/Receptacle, Grounding Type (GT)/ Explosion Proof Type Single Convenience Outlet/Receptacle, Grounding Type (G
Convenience Outlet/Receptacle with Ground Fault Circuit Interrupter
set
1 set

A. Designation No. of Personls No. of Hour/s

Labor 1 0.15
a. Skilled Laborer 1 0.15
b. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s

Equipment
Sub - Total for B

c. Total QA + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F.
Name and Specification Unit Quantity

Materials
a. Pop-up Type/Floor Single Convenience Outlet/Receptacle,
Grounding Type (GT)/ Pop-up Type/Floor Duplex Convenience
Outlet/Receptacle, Grounding Type (GT)/ Explosion Proof Type
Single Convenience Outlet/Receptacle, Grounding Type (GT)/
Single Convenience Outlet/Receptacle with Ground Fault Circuit
lnterupter
Sub - Total for F
set 1.00

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
1. Contractor's Profit (CP}
J. 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J)


Note : 1. Use this cost sheet for Item Nos. 1101(26), 1101(27), 1101(29), and 1101(32).
/Receptacle, Grounding Type (GT)/ Pop-up Type/Floor Duplex Convenience
oof Type Single Convenience Outlet/Receptacle, Grounding Type (GT)/ Single
uit Interrupter

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site. Refer to the Construction
Material Price Data established quarterly by central
Offiice Price Monitoring Committee

H + I) I

I + J)
Item No./Description Unit of 1101(42) Wires and Wiring Devices
Measurement I.s.
Output 1.00 I.s

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor
See derivation for Items 1101(1) to /fem 1101(8).
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
See r/erivafion /br Items 1101(1) to Item 1101(8).
Sub - Total for B

C. Total (A + B)
D. Output = 1.00 I.s
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
See derivation for/fems 1001(1)- /fem 1101(8).
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1 Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. The "lumpsum" unit of measurement as per Blue Book, shall be based on the derived outputs of Item No. 1101(1) to
Item No. 1101(8)
Amount (PhP)

Amount (PhP)

Amount (PhP)
to
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 9.00 Labor Rates are variable per Region/District ba
c. Unskilled Laborer 1 oo 9:00 minimum wage as approved by DOLE. Refer to
Note: 2 Schedule of Labor Rates.
Labor includes disassembling of Panel Board component,
fabrication of hole (conduit for main breaker and branches),
installation of fitting, alignment of panel board enclosure, re-
installation of circuit breaker component and accessories,
termination of wire, testing and commissioning.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Amount (PhP)

Materials set 1.00 Prices of materials are variable per Region/ Dis
a. Panel Board with Main Breaker and 8 Branches 250 amp - 400 amp based on the prevailing unit prices in the localit
b. Consumables (3% of Materials Cost) include payment of local faxes and hauling cos
Sub - Total for F project site. Refer to the Construction Material
established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM} Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J) I
Note: 1. Additional 1 hr may be added every another 2 circuit branches, 1 hr per every additional main breaker (500-600Amp), 2 hrs per additional main breaker (800-1000A
additional 1200 Amp main breaker.
2. Use this cost sheet for Item Nos. 1102(1)a1 to 1102(1)a12, 1102(2)a1 to 1102(2)a6, and 1102(2)b1 to 1102(2)b6.
Amount (PhP)

are variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local faxes and hauling cost to the
efer to the Construction Material Price Data
uarterly by Central Office Price Monitoring

additional main breaker (800-1000Amp) and 4 hrs per


Item No./Description 1102 Panel Board with Main Breaker/Branches, 3 wires, 1 neutral, 50 Amp - 200 Amp set
Unit of Measurement Output 1 set

Designation No. of Person/s No. of Hour/s Hourly Rate

A Labor
. a. Construction Foreman
b. Skilled Laborer 1 5.50 Labor Rates are variable per Region/District ba
c. Unskilled Laborer 1 5.50 minimum wage as approved by DOLE. Refer to
Note: 2 5.50 Schedule of Labor Rates.
Labor includes disassembling of Panel Board component,
fabrication of hole (conduit for main breaker and branches),
installation of fitting, alignment of panel board enclosure, re-
installation of circuit breaker component and accessories,
termination of wire, testing and commissioning.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Dis
a. Panel Board with Main Breaker and 8 Branches 50 amp - 200 amp based on the prevailing unit prices in the localit
b. Consumables (3% of Materials Cost) include payment of local taxes and hauling cos
Sub - Total for F project site. Refer to the Construction Material P
established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

1 Contractor's Profit (CP) 10%/8% of G I

J. Value Added Tax (VAT) 5% of (G + H + I) I

K. Total Unit Cost (G + H + I + J)


Note: 1. Additional 0.75 hr may be added every another 2 circuit branches, and deduction of 0.50 for 2 wires, 1 neutral.
2. Use this cost sheet for Item Nos. 1102(1)a1 to 1102(1)a12, 1102(2)a1 to 1102(2)a6, and 1102(2)b1 to 1102(2)b6.
- 200 Amp set

Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cosf fa the
efer to the Construction Material Price Data
uarterly by Central Office Price Monitoring
Item No./Description Unit of 1102 NEMA I (Enclosed Circuit Breaker) Single Phase or Three Phase Commercial/Industrial Type set
Measurement Output per hour 1 set

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 1.00 Labor Rates are variable per Region/District ba
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Note:
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hole, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Regiori/ Dis
a. NEMA I Enclosed Circuit Breaker, plug-in or bolt type 15AT-70AT based on the prevailing unit prices in the localit
Flushed Mounted include payment of local taxes and hauling cos
Sub - Total for F project site. Refer to the Construction Material
established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1. Contractor's Profit (CP) 10%/ 8% ofG
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
1.
J.
K.
Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1102(4)a1 to 1102(4)a6 and 1102(4)b1 to 1102(4)b4.
rial Type set

Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Regiori/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cosf to the
efer to the Construction Material Price Data
uarterly by Central Office Price Monitoring
Item No./Description 1102 NEMA 3R (Enclosed Circuit Breaker) Single Phase or Three Phase Commercial/Industrial Type set
Unit of Measurement Output per 1 set
hour
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 0.75 Labor Rates are variable per Region/District ba
a. Construction Foreman 1 0.75 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 0.75 Schedule of Labor Rates.
c. Unskilled Laborer
Note:
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hole, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Dis
a. NEMA 3R Enclosed Circuit Breaker, plug-in or bolt type 15AT-70AT based on the prevailing unit prices in the locali
Flushed Mounted include payment of local taxes and hauling co
Sub - Total for F project site. Refer to the Construction Material
established quarterly by Central Of/ice Price M
Commi/tee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G j
l. Contractor's Profit (CP)
10%/ 8% ofG
J.
K.
Value Added Tax (VAT)
5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1102(4)a1 to 1102(4)a6 and 1102(4)b1 to 1102(4)b6
ustrial Type set

Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cost to the
efer to the Construction Material Price Data
uarterly by Central Of/ice Price Monitoring
Item No./Description 1102 Motor Control Center with main, branch breaker and motor starter (NEMA 1, NEMA 3R and 4X) Fl
Unit of Measurement Output per Mounted
hour set 1 set

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 8.00 Labor Rates are variable per Region/District ba
a. Construction Foreman 2 8.00 minimum w’age as approved by DOLE. Refer t
b. Ski3ed Laborer Schedule of Labor Rates.
c. Unskilled Laborer 8.00
Note:
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hole, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Distric
a. Motor Control Center with main, branch breaker and the prevailing unit prices in the locality which inclu
of local faxes and hauling cost to the project site. R
motor starter (NEMA 1, NEMA 3R and 4X) Flush or Surface Construction Material Price Data established q
Mounted Central Office Price Monitoring Committee.
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
Contractor’s Profit (CP) 10%/ 8% ofG
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Note : 1. Use this cost sheet for Item Nos. 1102(5)a1 to 1102(5)a6.
EMA 1, NEMA 3R and 4X) Flush or Surface

Amount (PhP)

are variable per Region/District based on


ge as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

Amount (PhP)

rials are variable per Region/ District based on


unit prices in the locality which include payment
nd hauling cost to the project site. Refer to the
Material Price Data established quarterly by
Price Monitoring Committee.
Item No./Description 1102(8) Generator (Stand by and Continuous), Synchonizing Panel for Generator, High Voltage Switch Gear
Unit of Measurement Output per set 1 set
hour

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor r’s Oc/ofafion (atta ch at least 3 qt/ofaf ionsy


Labor by Specia/fy Worhs or Afant/Facft/rer’s/Supp/ie
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment rer’s/Supp/iers Ou ofafion (aftach at least 3 quotations)


Equipment Rental by Specialty Works or AfanuFacfo
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials Afateria/s Cost by Specia/fy Works or Manufactu h


a. Generator (Stand by and Continuous), Synchonizing Panel for Qoofafion (attac at /easf 3 quotatio
Generator, High Voltage Switch Gear
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1102(4)a1 to 1102(4)a6.
High Voltage Switch Gear

Amount (PhP)

Amount (PhP)

Amount (PhP)

rer’sfSuppIier’s ns)
Item No./Description 1102 Main Enclosed Automatic Circuit Breaker 50 AT, 60 AT, 70 AT , 3P, 240V: NEMA I, NEMA 3R, NEMA 4x Flushed/ S
Unit of Measurement Output per set 1 set
hour

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.75 Labor Rates are variable per Region/District ba
c. Unskilled Laborer 1 1.75 minimum wage as approved by DOLE. Refer fo
Note: 1 1.75 Schedule of Labor Rates.
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hoIé, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Dis
Main Enclosed Automatic Circuit Breaker 50 AT, 60 AT, 70 AT , 3P, based on the prevailing unit prices in the locali
240x: NEMA I, NEMA 3R, NEMA 4x include payment of local taxes and hauling co
Flushed/ Surface Mounted project site. Refer to the Construction Material
Sub - Total for F established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
10%8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost )
(G + H + I + J
I
Note : 1. Use this cost sheet for Item Nos. 1102(4)a1 to 1102(4)a6.
A I, NEMA 3R, NEMA 4x Flushed/ Surface Mounted

Amount

are variable per Region/District based on


e as approved by DOLE. Refer fo the
abor Rates.

Amount

Amount

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cost to the
efer to the Construction Material Price Data
uarterly by Central Office Price Monitoring
Item No./Description Unit of 1102 Main Enclosed Automatic Circuit Breaker 50 AT, 60 AT, 70 AT , 2P, 240V NEMA I, NEMA 3R, NEMA 4x set
Measurement 1 set
Output
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1x50 Labor Rates are variable per Region/District bas
c. Unskilled Laborer 1 1.50 minimum wage as approved by DOLE. Refer to t
Note: 1 1.50 Schedule of Labor Rates.
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hole, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)
D. Output = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Dist
a. Main Enclosed Automatic Circuit Breaker 50 AT, 60 AT, 70 AT , 2P, based on the prevailing unit prices in the locality
240V NEMA I, NEMA 3R, NEMA 4x Flushed/ Surface Mounted include payment of local taxes and hauling cost
Sub - Total for F project site. Refer to the Construction Material P
Data established guarterly by Central 0 ffice Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8% of G
1 Contractor's Profit (CP) 10%8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1102(4)a1 to 1102(4)a6.
I, NEMA 3R, NEMA 4x set

Amount

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount

Amount

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cost to the
efer to the Construction Material Price
ed guarterly by Central 0 ffice Price
mmittee.
Item No./Description 1102 Main Enclosed Automatic Circuit Breaker 100 AT, 125 AT, 205 AT , 225 AT, 3P, 240V NEMA I, NEMA 3R, NEMA 4x
Unit of Measurement Output per Mounted
hour set
1 set
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 5.50 Labor Rates are variable per Region/District ba


a. Construction Foreman 1 5.50 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 5.50 Schedule of Labor Rates.
c. Unskilled Laborer
Note:
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hole, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of UniVs No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region/ Dis
a. Main Enclosed Automatic Circuit Breaker 100 AT, 125 AT, 205 AT , based on the prevailing unit prices in the
225 AT, 3P, 240V NEMA I, NEMA 3R, NEMA 4x Flushed/ Surface /oca/ify which include payment of local taxes an
Mounted cost to the project site. Refer to the Constructio
Sub - Total for F Price Data established quarterly by Central Off
Monitoring Committee

G. Direct Unit Cost/E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8% of G I
I. Contractor's Profit (CP) 10%8% ofG I
J.
K. Value Added Tax (VAT) 5% of(G + H + I) I
Total Unit Cost (G + H + I + J) I
Note : 1. Use this cost sheet for Item Nos. 1102(4)a1 to 1102(4)a6.
40V NEMA I, NEMA 3R, NEMA 4x Flushed/ Surface

Amount

are variable per Region/District based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount

Amount

erials are variable per Region/ District


prevailing unit prices in the
include payment of local taxes and hauling
oject site. Refer to the Construction Material
tablished quarterly by Central Office Price
ommittee
Item No./Description 1102 Main Enclosed Automatic Circuit Breaker 100 AT, 125 AT, 200 AT , 2P, 225 AT, 2P, 240V NEMA I,
Unit of Measurement Output per NEMA 3R, NEMA 4x Flushed/ Surface Mounted set
hour 1 set

Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 5.00 Labor Rates are variable per Region/District ba
c. Unskilled Laborer 1 500 minimum wage as approved by DOLE. Refer to
Note: 1 Schedule of Labor Rates.
500
Labor Includes removal of circuit breaker, Alignment mounting
and removal of hub/hole, installation of pipe/fittings, re-installation
of circuit breaker, termination of wires, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Dis
a. Main Enclosed Automatic Circuit Breaker 100 AT, 125 AT, 200 AT , based on the prevailing unit prices in the localit
2P, 225 AT, 2P, 240V NEMA I, NEMA 3R, NEMA 4x Flushed/ Surface include payment of local taxes and hauling cos
Mounted project site. Refer to the Construction Material P
Sub - Total for F Data established quarterly by Central Office Pric
Monitoring Commi/tee

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
P, 240V NEMA I,

Amount

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount

Amount

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cost to the
efer to the Construction Material Price
ed quarterly by Central Office Price
mmi/tee
Item No./Description Unit of 1102 Low Voltage Switch Board Main 2500-4000 AT, 3P, 240V NEMA I with Breaker set
Measurement 1 set
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor r’s Quofaf/on (atta ch at least 3 quota tions)


Lador 6y Specialty Works or Manufacturer’s/Supplie
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment rer’s/Supplier’s Qu otation (attach at /easf 3 quotations)


Equipment Renfa/ by Spec/a/fy Works or Manufactu ”
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials âfaferia/ Cosf dy Specialty Works or Manufactu


a. Low Voltage Switch Board Main 2500-4000 AT, 3P, 240V Quotation (attac h at /easf 3 quotatio
NEMA I with Breaker
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8% of G
I.
Contractor’s Profit (CP) 10%8% of G
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
I with Breaker set

Amount

Amount

rer's/Supplier’s ns)
Item No./Description Unit of 1102 Main Enclosed Automatic Breaker 250-500 Amp set
Measurement 1 set
Output
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 12.50 Labor Rates are variable per Region/District bas


a. Construction Foreman 2 12.50 minimum wage as approved by DOLE. Refer to t
b. Skilled Laborer 2 12.50 Schedule of Labor Rates.
c. Unskilled Laborer
Note:
Labor Includes removal of circuit breaker, Alignment, mounting
and removal of hub/hole, installation of pipe/fittings, re-
installation of circuit breaker, termination of wires, testing and
commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Region/ Distr
a. Main Enclosed Automatic Breaker 250-500 Amp based on the prevailing unit prices in the locality
Sub - Total for F include payment of local taxes and hauling cost
project site. Refer to the Construction /Uaferia/ P
Data established quarterly by Central Offi”ce Pric
Monitoring Committee.

G. Direct Unit Cost (E + F)


H.
1.
J.
K.
G.
H. Overhead, Contingencies & Miscellaneous (OCM) 15%/ 12%/ 10%/ 8% of G
1.
Contractor's Profit (CP) 10%8% ofG
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount

Amount

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of local taxes and hauling cost to the
efer to the Construction /Uaferia/ Price
ed quarterly by Central Offi”ce Price
mmittee.
Item No./Description Unit of 1103(1) Lighting Fixtures l.s.
Measurement 1.00 I.s
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor Labor Rates are variable per Region/District bas
See derivation fior item 1103 - Item 1103(13) minimum wage as approved by DOLE. Refer to
Sub - Total for A Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
See cfer/vaf/on far/fem 1103(2)- /fem 1103(13)
Sub - Total for B

c. Total (A + B)
D. Output = 1.00 I.s
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Amount (PhP)

Materials Prices of materials are variable per Region/ District


See cfer/vafion for Item 1103(2)- /fem 1103(13) the prevailing unit prices in the locality which includ
Sub - Total for F of local taxes and hauling cost to the project site. R
Construction Material Price Data established quarte
Central 0 ffice Price Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I) j
K. Total Unit Cost (G + H + I + J)
Note : 1. The "lumpsum" unit of measurement as per Blue Book, shall be based on the derived outputs of Item 1103(2) to
Item 1103(13).
Rate Amount (PhP)

s are variable per Region/District based on


age as approved by DOLE. Refer to the
f Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/ District based on


g unit prices in the locality which include payment
s and hauling cost to the project site. Refer to the
n Material Price Data established quarterly by
ce Price Monitoring Committee.
j
Item No./Description Unit of 1103(2) Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 1 Bulb set
Measurement 1 set
Output
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 1.00 Labor Rates are variable per RegionDistrict b
a. Construction Foreman 1 1.00 minimum wage as approved by DOLE. Refer
b. Skilled Laborer 1 1.00 Schedule of Labor Rates.
c. Unskilled Laborer
Note :
Labor Includes installation of scaffolding, alignment of fixtures,
disassemble of lighting fixture, permanent lnstallation of
insullation material, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region/ D


a. 1 -20Watts-40Watts flourescent lighting fixture, Box type, based on the prevailing unit prices in the locali
Diffuser type, Mirrorized Aluminum Louver, Industrial type include payment of local taxes and hauling co
(Recessed and Surface Mounted) project site. Refer to the Construction Materia
Sub - Total for F Data established quarterly by Central 0 ffice
Monitoring Committee.
j

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
J. Contractor’s Profit (CP) 10%/ 8% of G I
K. Value Added Tax (VAT) 5% of (G + H + I) I
Total Unit Cost (G + H + I + J)
Note: 1. Use this cost sheet for Item Nos. 1103(2)a1, 1103(2)a5, 1103(2)a9, 1103(2)a13, 1103(2)a17, 1103(2)a21, 1103(2)a25, 1103(2)a29, 1103(2)a33, 1103(2)a3
1103(2)a41, 1103(2)a45, 1103(2)b1, 1103(2)b5, 1103(2)b9, 1103(2)b13,
1103(2)b17, 1103(2)b21, 1103(2)b25, 1103(2)b29, 1103(2)b33, 1103(2)b33, 1103(2)b37, 1103(2)b41, 1103(2)b45,
1103(2)c1, 1103(2)c6, 1103(2)c11, 1103(2)c16, 1103(2)c21, 1103(2)c26, 1103(2)c31, 1103(2)c36, 1103(2)c41, 1103(2)c46,
1103(2)c51, 1103(2)d1, 1103(2)d5, 1103(2)d9, 1103(2)d13, 1103(2)d17 and 1103(2)d21.
Bulb set

Amount (PhP)

are variable per RegionDistrict based on


ge as approved by DOLE. Refer to the
Labor Rates.

Amount (PhP)

Amount (PhP)

terials are variable per Region/ District


revailing unit prices in the locality which
nt of local taxes and hauling cost to the
Refer to the Construction Material Price
shed quarterly by Central 0 ffice Price
Monitoring Committee.
j
103(2)a29, 1103(2)a33, 1103(2)a33, 1103(2)a37,
Item No./Description : 1103(2) Fluorescent Lighting Fixture with Ballast /Light Emitting Diode (LED) Bulb, 2 Bulbs set
Unit of Measurement Output 1 set

A. Designation No. of Person/s No. of Hour/s

Labor 1 1.15
a. Construction Foreman 1 1.15
b. Skilled Laborer 1 1.15
c. UnsjsiIIed Laborer
Note :
Labor includes installation of scaffolding, alignment of fixtures,
disassemble of lighting fixture, permanent Installation of
insullation material, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set 1.00


a. 2 -20Watts-40Watts flourescent lighting fixture, Box type,
Diffuser type, Mirrorized Aluminum Louver, Industrial type
(Recessed and Surface Mounted)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + JR I
Note : 1. Use this cost sheet for Item Nos. 1103(2)a2, 1103(2)a6,1103(2)a10, 1103(2)a14, 1103(2)a18, 1103(2)a22, 1103(2)a26, 1103(2)a30, 1103(2)a34, 1103(2)a
1103(2)b6,1103(2)b10, 1103(2)b14, 1103(2)b18, 1103(2)b22,
1103(2)b26, 1103(2)b30, 1103(2)b34, 1103(2)b46, 1103(2)c2, 1103(2)c3, 1103(2)c7, 1103(2)c8, 1103(2)c12, 1103(2)c13,
1103(2)c17, 1103(2)c18, 1103(2)c22, 1103(2)c23, 1103(2)c27, 1103(2)c28, 1103(2)c32, 1103(2)c33, 1103(2)c37,
1103(2)c38, 1103(2)c42, 1103(2)c43, 1103(2)c47, 1103(2)c48, 1103(2)c52, 1103(2)c53, 1103(2)c57, 1103(2)c58,
1103(2)d2, 1103(2)d6, 1103(2)d10, 1103(2)d14, 1103(2)d18, and 1103(2)d22.
ht Emitting Diode (LED) Bulb, 2 Bulbs set

Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Regiori/ District


based on the prevailing unit prices in the locality which
include payment of local taxes and hauling cost to the
project site. Refer to the Construction Material Price
Data established quarterly by Central Office Price
Monitoring Committee.
t

H + I)
I + JR I
2)a18, 1103(2)a22, 1103(2)a26, 1103(2)a30, 1103(2)a34, 1103(2)a46, 1103(2)b2,

1103(2)c12, 1103(2)c13,
33, 1103(2)c37,
57, 1103(2)c58,
A. Designation No. of Person/s No. of Hour/s

Labor 1 1.25
a. Construction Foreman 1 1.25
b. Skilled Laborer 1 1.25
c. Unskilled Laborer
Note :
Labor Includes installation of scaffolding, alignment of fixtures,
disassemble of lighting fixture, permanent Installation of
insullation material, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set 1.00


a. 3-20watts-40watts flourescent lighting fixture
Box type, Diffuser type, Mirrorized Aluminum Louver, Industrial
type (Recessed and Surface Mounted)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor's Profit (CP) 10%/ 8% of G
K. Value Added Tax (VAT) 5% of (G + H + I) I

Total Unit Cost (G + H + I + J) I

Note : 1. Use this cost sheet for Item Nos. 1103(2)a3, 1103(2)a7, 1103(2)a11, 1103(2)a15, 1103(2)a19, 1103(2)a23, 1103(2)a27, 1103(2)a30, 1103(2)a35, 1103(2)a39
1103(2)a47, 1103(2)b3, 1103(2)b7, 1103(2)b11, 1103(2)b15,
1103(2)b19, 1103(2)b23, 1103(2)b27, 1103(2)b30, 1103(2)b35, 1103(2)b39, 1103(2)b43, 1103(2)b47, 1103(2)c4,
1103(2)c9, 1103(2)c14, 1103(2)c19, 1103(2)c24, 1103(2)c29, 1103(2)c34, 1103(2)c39, 1103(2)c44, 1103(2)c49,
1103(2)c54, 1103(2)c59, 1103(2)d3, 1103(2)d7, 1103(2)d11, 1103(2)d15, 1103(2)d19, and 1103(2)d23.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District


based on the prevailing unit prices in the locality
which include payment of local taxes and hauling
cost to the project site. Refer to the Construction
Material Price Data established quarterly by Central
Of/7ce Price Monitoring Committee.

H + I) I

I + J) I

2)a19, 1103(2)a23, 1103(2)a27, 1103(2)a30, 1103(2)a35, 1103(2)a39, 1103(2)a43,

47, 1103(2)c4,
, 1103(2)c49,
d23.
A Designation No. of Person/s No. of Hour/s
.
Labor 1 1.50
a. Construction Foreman 1 1.50
b. Skilled Laborer 1 1.50
c. Unskilled Laborer
Note
Labor Includes installation of scaffolding, alignment of//xfures,
disassemble of lighting Fixture, permanent Installation of
insullation material, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity

Materials set 1.00


a. 4-20watts-40watts flourescent lighting fixture
Box type, Diffuser type, Mirrorized Aluminum Louver, Industrial
type (Recessed and Surface Mounted)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l.
J. Contractor’s Profit (CP) 10%/ 8% of G I

K. Value Added Tax (VAT) 5% of (G + H + I) I

Total Unit Cost (G + H + I + J) I

Note : 1. Use this cost sheet for Item Nos. 1103(2)a4, 1103(2)a8, 1103(2)a12, 1103(2)a16, 1103(2)a20, 1103(2)a24, 1103(2)a28, 1103(2)a32, 1103(2)a36, 1103(2)a
1103(2)a48, 1103(2)b4, 1103(2)b8, 1103(2)b12, 1103(2)b16,
1103(2)b20, 1103(2)b24, 1103(2)b28, 1103(2)b32, 1103(2)b36, 1103(2)b40, 1103(2)b44, 1103(2)b48, 1103(2)c5,
1103(2)c10, 1103(2)c15, 1103(2)c13, 1103(2)c20, 1103(2)c25, 1103(2)c30, 1103(2)c35, 1103(2)c40, 1103(2)c45,
1103(2)c50, 1103(2)c55, 1103(2)c60, 1103(2)d4, 1103(2)d8, 1103(2)d12, 1103(2)d16, 1103(2)d20, and 1103(2)d24.
Hourly Rate Amount (PhP)

Labor Rates are variable per Region/District based on


minimum wage as approved by DOLE. Refer to the
Schedule of Labor Rates.

Hourly Rate Amount (PhP)

Unit COSt Amount (PhP)

Prices of materials are variable per Region/ District based on


the prevailing unit prices in the locality which include payment
of local faxes and hauling cost to the project site. Refer to the
Construction Material Price Data established quarterly by
Central Office Price Monitoring Committee.

H + I) I

I + J) I

(2)a20, 1103(2)a24, 1103(2)a28, 1103(2)a32, 1103(2)a36, 1103(2)a40, 1103(2)a44,

b48, 1103(2)c5,
40, 1103(2)c45,
0, and 1103(2)d24.
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.00 Labor Rates are variable per Region/District based
c. Unsi‹illed Laborer 1 1.00 minimum wage as approved by DOLE. Refer fo the
Note : 1 1.00 Schedule of Labor Rates.
Labor Includes installation of scaffolding, alignment of fixtures,
disassemble of lighting fixture, permanent Installation of
insullation material, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 1 set
E. Direct Unit Cost (C + DQ
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region/ District
a. 1-8watts-21watts Downlight/Pinlight, Recessed/Surface Mounted on the prevailing unit prices in the locality which inc
with or without glass payment of local faxes and hauling cost to the proje
Sub - Total for F Refer to the Construction iviaterial Price Data estab
quarterly by Central Office Price Monitoring Commi

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

1 Contractor’s Profit (CP) 10%/8% ofG I


J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1103(5)a, 1103(5)b, 1103(5)c, and 1103(5)d.
Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer fo the
abor Rates.

Amount (PhP)

Amount (PhP)

rials are variable per Region/ District based


ng unit prices in the locality which include
al faxes and hauling cost to the project s/te.
onstruction iviaterial Price Data established
entral Office Price Monitoring Committee.
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor 1 0.75 Labor Rates are variable per Region/District ba
a. Construction Foreman 1 0.75 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 1 0.75 Schedule of Labor Rates.
c. Unskilled Laborer
Note '
Labor Includes installation of scaffolding, alignment of fixtures,
disassemble of lighting fixture, permanent Installation of
insullation material, testing and commisioning.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment
Minor Tools (10 % of Labor Cost)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region Dis
a. 2- 8Watts-21Wahs Downlight/Pinlight, Recessed/Surface Mounted on the prevailing unit prices in the locality which
with or without glass payment of local taxes and hauling cost to the
Sub - Total for F site. Refer to the Construction Material Price D
established quarterly by Central Office Price M
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCMS Expenses 15%/ 12%/ 10%/ 8% of G
I.
Contractor's Profit (CP) 10%/ 8% of G I
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1103(5)a, 1103(5)b, 1103(5)c, and 1103(5)d.
Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

Amount (PhP)

erials are variable per Region District based


ing unit prices in the locality which include
cal taxes and hauling cost to the project
the Construction Material Price Data
uarterly by Central Office Price Monitoring
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.50 Labor Rates are variable per Region/District bas


a. Construction Foreman 1 1.50 minimum wage as approved by DOLE. Refer to
b. Skilled Laborer 2 1.50 Schedule of Labor Rates.
c. Unskilled Laborer
Note :
Labor includes, installation of scaffolding, alignment of lighting
fixture, termination of wire, testing, commissioning and painting.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00 See latest ACEL rental rates.


a. Truck Mounted, Scissor Lift, Rough Terrain (Gas/Diesel)
Minor Tools (10% of Labor Cost)
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region/ Dis
a. High Bay Aluminum Reflector, Dome Luminaire 70Watts - 250 based on the prevailing unit prices in the locality
Watts include payment of local taxes and ñau/ing cosf
Sub - Total for F project sife. Refer to the Construction Material Pr
established quarterly by Central Office Price Mo
Commi/tee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
15%/ 12%/ 10%/ 8% of G I
1.
Contractor's Profit (CP) 10%/ 8% of G
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1103(11)a1 and 1103(11)a2.
Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

ACEL rental rates.

Amount (PhP)

rials are variable per Region/ District


prevailing unit prices in the locality which
nt of local taxes and ñau/ing cosf to the
fer to the Construction Material Price Data
arterly by Central Office Price Monitoring
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 1.50 Labor Rates are variable per Region/District bas
c. Unskilled Laborer 1 1.50 minimum wage as approved by DOLE. Refer to
Note : 2 1.50 Schedule of Labor Rates.
Labor lncludes, installation of scaffolding, alignment of lighting
fixture, termination of wire, testing, commissioning and painting.
Sub - Total for A

B. Name and Capacity No of Unit/s No. of Hour/s Hourly Rate

Equipment 1 1.00 See latest ACEL rental raets.


a. Truck Mounted, Scissor Lift, Rough Terrain (Gas/Diesel)
Sub - Total for B

c. Total (A + B)
D. Output = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit COSt

Materials set 1.00 Prices of materials are variable per Region/ Dist
a.Die-Cast Aluminum Floodlight with electrocoat paint finish based on the prevailing unit prices in the locality
70Watts - 250 Watts include payment of/oca/ taxes and hauling cost
Sub - Total for F project site. Reter to the Construction Material P
Data established quarterly by Central Offi”ce Pri
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1103(12)a1, 1103(12)a2 and 1103(12)a3.
Amount (PhP)

re variable per Region/District based on


e as approved by DOLE. Refer to the
abor Rates.

Amount (PhP)

ACEL rental raets.

Amount (PhP)

erials are variable per Region/ District


prevailing unit prices in the locality which
ent of/oca/ taxes and hauling cost to the
eter to the Construction Material Price
hed quarterly by Central Offi”ce Price
mmittee.
Item No./Description 1200 Air Conditioning and Refrigiration System I.s.
Unit of Measurement Output 1 I.s.

A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor p/ier’s Or/ofation ( attach at /easf 3 qu otationsy


Labor gy Specia/fy Works or Afanu/'acforers/Sop
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment cturer’s/Sopp/ier’s Ouofation (attach at least 3 qoofafion


Eqr/ipmenf Renfa/ 6y Specia/fy Works or Afanufa
Sub - Total for B

C. Total (A + B)
D. Output = 1 l.s.
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

Amount (PhP)

sy

Amount (PhP)
Item No./Description Unit of 1201(1) Water Pumping System
Measurement l.s.
Output 1 l.s.

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor p/iers Or/otafion ( attach af /easf 3 qo ofafions}
Labor by Speciaify Works or Afannfacforer’s/Sup
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment cturer’s/Supplier’s Quofafion (attach at least 3 quotation


Equipment Renfa/ 6y Specia/fy Works or Manufa
Sub - Total for B

c. Total (A + B)
D. Output = 1 l.s.
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials
See /fems 1201(2) - 1012(12)
Sub - Total for F

G. Direct Unit Cost (E + F)


H.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

Amount (PhP)

s)

Amount (PhP)
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor
See Oerivafions For /fems 1202(2) fo 1012(12)
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
See Derivations /'or/fems 1202(2) fo 1012(12)
Sub - Total for B

C. Total (A + B)
D. Output = 1 I.s.
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost
F.

Materials
See derivations for Items Y202{2} fo 1012(12)
Sub - Total for F

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor's Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

Amount (PhP)

Amount (PhP)
A Designation No. of Person/s No. of Hour/s Hourly Rate
.
Labor lier’s Quotation ( attach at /easf 3 qu ofafionsy
Labor 6y Specia/fy fVorks or Manufacturer’s/Supp
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment

Sub - Total for B


C. Total (A + B)
D. Output = 1 set
E. Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity . Unit Cost

Materials Prices of materials are variable per Regio


a. Fire Pump, complete with reinforced concrete pad and District based on the prevailing unit prices
following accessories: coupling and guard, mounted steel base locality which include payment of local fax
plate, pump controller, flow meter autorelease valve, suction hauling cost to the project site.
and discharge gauge, flow meter and other accessories Refer to the Construction Material Price D
specified in mechanical plan and specification established quarterly by Central Office Pr
b. Consumables (5% of Materials Cost) Monitoring Committee.
Sub - Total for F
set 1.00

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP)
10%/ 8% ofG j
J. Value Added Tax (VAT)
5% of(G + H + I) I

K. Total Unit Cost (G + H + I + J) I


Amount (PhP)

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local faxes and
st to the project site.
Construction Material Price Data
d quarterly by Central Office Price
Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor lier’s Ot‹ofafion ( attach at least 3 qU ofafions}


/.a6or 6y Specialty Works or Manufacturer's/Supp
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output =
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Begio


a. Jockey Pump complete with controller and NEMA 3R and District based on the prevailing unit price
other accessories: valve, suction and discharge gauge, flow locality which include payment of local fax
meter and other accessories specified in mechanical plan and hauling cost to the project site.
specifications Refer to the Construction Material Price D
b. Consumables (5% of Materials Cost) established quarterly by Central Office Pr
Sub - Total for F Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I

l. Contractor's Profit (CP) 10%/ 8% ofG


J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J) ]
Amount (PhP)

Amount (PhP)

Amount (PhP)

aterials are variable per Begion/


ed on the prevailing unit prices in the
ch include payment of local faxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A. Designation No. of Personls No. of Hour/s Hourly Rate

Labor 1 0.25 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 0.25 based on minimum wage as approved by
b. Skiled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. Sprinkler Head, upright/pendent/wall District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I)
G.
H.
i.
J.
K.
Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 400 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 4.00 based on minimum wage as approved by
b. Skilled Laborer 1 400 Refer to the Schedule of Labor Rates.
c Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output =
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. Alarm Check Valve District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cost to the project s/fe.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J. Contractor's Profit (CP) 10%/8% ofG
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J) j


Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project s/fe.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Output 1 pc

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 3.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 1 3.00 based on minimum wage as approved by
b. Skilled Laborer c Unskilled Laborer 1 3.00 Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output =
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials pg 1.00 Prices of materials are variable per Regio


a. Flow meter District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cosf /o the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor’s Profit (CP)
J. 10%/ 8% ofG I

K. Value Added Tax (VAT) 5% of(G + H + I) I

Total Unit Cost (G + H + I + J)


Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
f /o the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Output per hour 1 pc
Designation No. of Person/s No. of Hour/s Hourly Rate

A. Labor
a. Construction Foreman
b. Skilled Laborer 1 3.00 Labor Rates are variable per Region/Distr
c Unskilled Laborer 1 300 based on minimum wage as approved by
Sub - Total for A 1 3.00 Refer to the Schedule of Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

c. Total (A + B)
D. Output =
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. OS & Y Gate Valve 175 psi District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor’s Profit (CP) 10%/ 8% ofG
J. Value Added Tax (VAT) 5% of(G + H + I)
K.
K. Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Output 1 pc
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 0.50 Labor Rates are variable per Region/Distr


a. Construction Foreman 1 0.50 based on minimum wage as approved by
b. Skilled Laborer Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C :— D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. Pressure Gauge District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description 1202(3)f Pressure Relief Valve
Unit of Measurement Output pc 1 pc

A Designation No. of Person/s No. of Hour/s Hourly Rate


.
Labor 1 3.00 Labor Rates are variable per Region/Dist
a. Construction Foreman 1 3.00 based on minimum wage as approved by
b. Skilled Laborer 1 3.00 Refer to the Schedule of Labor Rates.
c Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)
D. Output per Hour =
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. Pressure Relief Valve District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local ta
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
i.
J. Contractor’s Profit (CP) 10%/ 8% ofG
K.
G.
H.
i.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description Unit of 1202(3)g Floor Control Valve
Measurement ps 1 pc
Output
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 3.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 3.00 based on minimum wage as approved by
b. Skilled Laborer c Unskilled Laborer 1 3.00 Refer to the Schedule of Labor Rates.
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hourls Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C :- D)
F. Name and Specification Unit Quantity Unit Cost

Materials pg 1.00 Prices of materials are variable per Regio


a. Pressure Relief Valve District based on the prevailing unit price
b. Consumables (5% of Materials Cost) locality which include payment of local fa
Sub - Total for F hauling cost fo the project site.
Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I.
J. Contractor’s Profit (CP) 10%/8% ofG
K.
G.
H.
I.
J.
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local faxes and
st fo the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Item No./Description Unit of 1202(3)h1 Inspector Test Valve
Measurement pc 1 pc
Output
A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 0.75 Labor Rates are variable per Region/Distr


a. Construction Foreman 1 0.75 based on minimum wage as approved by
b. Skilled Laborer c Unskilled Laborer 1 0.75 Refer to the Schedule of Labor Rates.
Sub - Total for A

B.
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output = 1 pc
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. Inspector Test Valve District based on the prevailing unit prices
b. Consumables (5% of Materials Cost) locality which include payment of local tax
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
J.
K.
G.
H.
I.
J. Contractor’s Profit (CP) 10%/8% ofG I
K. Value Added Tax (VAT) 5% of(G + H + I)
Total Unit Cost (G + H + I + J)
Amount (PhP)

s are variable per Region/District


inimum wage as approved by DOLE.
Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

aterials are variable per Region/


ed on the prevailing unit prices in the
ch include payment of local taxes and
t to the project site.
Construction Material Price Data
quarterly by Central Office Price
Committee
Unit of Measurement pc
Output : 1 pc
A. Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)

Labor 1 6.00 Labor Rates are variable per Region/District


a. Construction Foreman 1 6.00 based on minimum wage as approved by DOLE.
b. Skiled Laborer 1 6.00 Refer to the Schedule of Laóor Rates.
c Unskilled Laborer
Sub - Total for A

B.
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment

Sub - Total for B


c. Total (A + B)
D. Outpu 1 pc
E. t =
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials pc 1.00 Prices or materials are variable per Region/


a. Inspector Test Connector District based on the prevailing unit prices in the
b. Consumables (5% of Materials Cost) locality which include payment of local taxes and
Sub - Total for F hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% ofG
I. Contractor’s Profit (CP)
10%/8% ofG I
J.
K. Value Added Tax (VAT) 5% of(G + H + I) I

Total (G + H + I +
*) I
Unit
Cost
Item No./Description 1202(4) 25 mm $ - 50 mm $ Black Iron (B.I.) Pipe length
Unit of Measurement Output 0.80 length
per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilted Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Note
Straight line installation for ceiling height of up to 3.5m.
Labor output includes setting, scafolding, cutting, fixing of
pipe from elbow, tee, flange, valve and painting.
Sub - Total for A

B.
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


c. Total (A + B)
D. Output per Hour = 0.80 length
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost
F.

Materials length 1.00 Prices of materials are variable per Regio


a. 25 mm Cl - 50 mm B x 6.00 m Black Iron (B.I.) District based on the prevailing unit prices
Pipe locality which include payment of local tax
b. Consumables (5% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
1.
Contractor’s Profit (CP) 10%/ 8% of G
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note 1. Use this cost sheet for Item Nos. 1202(4)a1, 1202(4)a2, 1202(4)a3 and 1202(4)a4.
Amount (PhP)

s are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)
aterials are variable per Region/
ed on the prevailing unit prices in the
ch include payment of local taxes and
to the project site.
e Construction Material Price Data
quarterly by Central Office Price
Committee.
Item No./Description 1202(4) 65 mm $ -150 mm Cl Black Iron (B.I.) Pipe length
Unit of Measurement Output 0.75 length
per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 1.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 1.00 based on minimum wage as approved by
b. Skilled Laborer 2 1.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Note :
Straight line installation for ceiling height of up to 3.5m.
Labor output includes setting, scafo/ding, cutting, fixing of
pipe from elbow, tee, flange, valve and painting.
Sub - Total for A

B.
Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output per Hour = 0.75 length
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost
F.

Materials length 1.00 Prices of materials are variable per Regio


a. 65 mm 0 -150 mm 0 x 6.00 m Black Iron (B.I.) based on the prevailing onif prices in the
Pipe which include payment of local taxes and
b. Consumables (5% of Materials Cost) cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Offi”ce P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I.
Contractor’s Profit (CP) 10%/ 8% of G
J.
K. Value Added Tax (VAT) 5% of (G + H + I)
Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1202(4)a5, 1202(4)a6, 1202(4)a7 and 1202(4)a8.
Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)
materials are variable per Region/ District
he prevailing onif prices in the locality
ude payment of local taxes and hauling
project site.
e Construction Material Price Data
d quarterly by Central Offi”ce Price
Committee.
Item No./Description Unit of 1202 Fittings pc
Measurement
Output per hour
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor uded in the installati on of pipes.)


(Labor_cost for these items are to be considered/inc
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment

Sub - Total for B


C. Total (A + B)
D. Output per Hour = Output for these items are co nsidered in the insta llation of pipes
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials pc 1.00 Prices of materials are variable per Regio


a. B.I. 90 elbow/B.I. Tee/ Bell Reducer/ Blind Flange/ Slip based on the prevailing unit prices in the
Flange/ Riser Nipple/ Threadolet/ Pipe Sleeve which include payment of local taxes and
b. Consumables (5% of material cost) cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office Pr
Monitoring Committee.

G. Direct Unit Cost (E + F)


H.
H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
l. Contractor’s Profit (CP) 10%/ 8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note : 1. Use this cost sheet for Item Nos. 1202(4)b, 1202(4)c, 1202(5)a, 1202(5)b, 1202(6)a, 1202(6)b, 1202(7)a, 1202(8)a and
1202(9)a.
Amount (PhP)

Amount (PhP)

Amount (PhP)

aterials are variable per Region District


he prevailing unit prices in the locality
de payment of local taxes and hauling
project site.
Construction Material Price Data
quarterly by Central Office Price
Committee.
)a and
A. Designation No. of Person/s No. of Hour/s Hourly Rate

Labor 1 3.00 Labor Rates are variable per Region/Dist


a. Construction Foreman 1 3.00 based on minimum wage as approved by
b. Skilled Laborer 2 3.00 Refer to the Schedule of Labor Rates.
c. Unskilled Laborer
Sub - Total for A

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate

Equipment
Sub - Total for B

C. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost

Materials set 1.00 Prices of materials are variable per Regio


a. Fire Hose Valve siames 150 mm Cl x 2 w x 65 mm fzl with District based on the prevailing unit price
cap locality which include payment of local ta
b. Consumables (5% of Materials Cost) hauling cost to the project site.
Sub - Total for F Refer to the Construction Material Price D
established quarterly by Central Office P
Monitoring Committee.

G. Direct Unit Cost (E + F) I


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G I
I. Contractor's Profit (CP)
10%/8% ofG I
J.
K.
G.
H.
I.
J.
K.
Value Added Tax (VAT)
5% of(G + H + I) I

Total Unit Cost (G + H + I + J) I


Amount (PhP)

es are variable per Region/District


minimum wage as approved by DOLE.
e Schedule of Labor Rates.

Amount (PhP)

Amount (PhP)

materials are variable per Region/


sed on the prevailing unit prices in the
ch include payment of local taxes and
st to the project site.
e Construction Material Price Data
d quarterly by Central Office Price
Committee.
Designation No. of Person/s No. of Hour/s
A. Labor

Name and Capacity No. of Unit/s No. of Hour/s


B. Equipment

Sub - Total for B


c. Total (A + B)
D. Output = 1 set
E.
Direct Unit Cost (C :— D)
Name and Specification Unit Quantity
F. Materials
set 1.00

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses
i. Contracto 15%/ 12%/ 10%/ 8% of G
J. rs Profit
K. Value
Added
Total Unit
Tax (VAT)
Cost

a. Fire Hose Cabinet


b.
5%Consumables
of(G + (5% of Materials Cost)
H + I)
10%/ 8% ofG
Sub - Total for F
Hourly Rate Amount (PhP)

Hourly Rate Amount (PhP)

Unit Cost Amount (PhP)

Prices of materials are variable per Region/


District based on the prevailing unit prices in the
IocaIit”y which include payment of local taxes and
hauling cost to the project site.
Refer fo the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.

(G + H + I + J)
A Designation No. of Person/s No. of Hour/s Hourly Rate Amount (PhP)
.
Labor 1 0.50 Labor Rates are
a. Unskilled Laborer variable per
Sub - Total for A Region/District
based on minimum
wage as approved
by DOLE. Refer to
the Schedule of
Labor Rates.

B. Name and Capacity No. of Unit/s No. of Hour/s Hourly Rate Amount (PhP)

Equipment

Sub - Total for B


c. Total (A + B)
D. Output = 1 set
E. Direct Unit Cost (C + D)
F. Name and Specification Unit Quantity Unit Cost Amount (PhP)

Materials set 1.00 Prices of materials are variable per


a. Fire Extinguisher Region/ District based on the
Sub - Total for F prevailing unit prices in the locality
which include payment of local taxes
and hauling cost to the project site.
Refer to the Construction Material
Price Data established quarterly by
Central Office Price Monitoring
Committee.

G. Direct Unit Cost (E + F)


H. Overhead, Contingencies & Miscellaneous (OCM) Expenses 15%/ 12%/ 10%/ 8% of G
I. Contractor's Profit (CP) 10%/ 8% ofG ]
J. Value Added Tax (VAT) 5% of(G + H + I)
K. Total Unit Cost (G + H + I + J)
S
E
C
A
C
L
T
C
I
U
L
O
A
N
T
I
O
N

O
F

C
Y
C
L
E

T
C. CALCULATION OF CYCLE TIME FOR HAULING EQUIPMENT
C.1 ESTIMATED TRAVEL SPEED, LOADING/UNLOADING & ALLOWANCE FOR DEL

TERRAIN CONDITION ROAD SURFACE DUMP TRUCK TRAVEL SPEED (km/h)


CONDITION LOADED EMPTY
FLAT PAVED 35 55
UNPAVED 30 45
ROLLING PAVED 30 40
UNPAVED 25 35
MOUNTAINOUS PAVED 20 30
UNPAVED 15 25
LOADING TIME (min) 3
UNLOADING TIME (min) 2
ALLOWANCE FOR DELAY (min) 10a/» of Cycle Time
C.2 FORMULA FOR THE CALCULATION OF DUMP TRUCK TRAVEL TIME FORMULA
+R
Where T = Time, Time of Travel (h)
D = Distance, Hauling Distance (km) R = Rate, Travel Speed (km/h)

C.3 COMPUTATION OF CYCLE TIME, T

Example: Average Hauling Distance = 2.00 km

Average Hauling Distance =


Loading Time =
Loaded Travel Time
First 200 m @      20    kph =
Succeeding 1600 m @     30    kph =
Next 200 m @      20    kph =
Unload and Manuever =
Return Empty
First 200 m @     30    kph =
Succeeding 1600 m @      45    kph =
Next 200 m @     30    kph =
Cycle Time, T =
Allowance for Delay =
Total Cycle Time, T =
NOTE:
The assumed travel time for loaded and unloaded dump trucks for each type of road surface and
condition are for normal conditions. It may vary depending on traffic and road surface co
SECTION
COMPUTATION OF LABOR RATES
D. COMPUTATION OF LABOR RATES
D.1 BASIS OF COMPUTATION
The estimated labor rates for each region/district office were computed in accordance with D.O. 4
2009, Re: Guidelines for the establishment of Construction Materials Price Data, Standard Lab
Equipment Rental Rates (or latest issuance), and based on the minimum wage rate as publis
National Wages and Productivity Commission, Department of Labor and EmDlovment fDOL
The computed labor rates including all component costs such as basic wage plus emergency cost of li
allowance (ECOLA) and worker’s statutory monetary benefits and others are in accordance w
existing laws and government regulations. It shall be updated as the need arises based on the latest
new minimum wages by the NWPC/DOLE and/or any amendments to the benefits of the workers.

D.2 CONDITIONS IN THE USAGE OF THE LABOR RATES


CASE I - In cases where project/s traverse/s certain barangays, municipalities, towns or cities (with
labor rates) of a concerned DEO, the average labor cost of the said places shall be utilized by the DEO
CASE II - In cases wherein project/s traverse/s certain provinces within the jurisdiction of only o
Regional Office, the average labor cost of the said Regional Office shall be utilized.
CASE III - In cases wherein project/s passes numerous ptovinces within the jurisdiction of two (
Regional Offices, the average labor cost of the said Regional Office with the longest work cov
with largest major scope of works shall be utilized.
ENT
WANCE FOR DELAY

SPEED (km/h)
EMPTY
55
45
40
35
30
25

Time
TIME FORMULA : T = D

Flat
2.00 km
       3.00   rrtin

       0.60   min
       3.20   min
       0.60   min
       2.00   min

       0.40   min
       2.13   min
       0.40   min
    12.33   min
       1.23   min
   13.56   minutes  

of road surface and terrain


and road surface conditions and

RATES
rdance with D.O. 40, Series of
Data, Standard Labor and
wage rate as published by the
EmDlovment fDOLEJ.
emergency cost of living
are in accordance with the
based on the latest issuances for
efits of the workers.

towns or cities (with varying


utilized by the DEO.
urisdiction of only one (1)
lized.
jurisdiction of two (2) or more
e longest work coverage or
D.3 SAMPLE TABULATION OF LABOR RATES
DPWH - NCR
LOCATION : Cities of Caloocan, Las Piñas, Makati, Malabon, Mandaluyong, Manila, Marikina, Muntinlupa, Navotas, Parañaque, Pasay, Pasig, Quezon, San Juan, T
DATE OF ESTIMATE : February 2015

BASIC WAGE

DAILY
838.80
768.90
699.00
699.00
652.40
605.80
605.80
559.20
466.00
NOTE:

Minimum Wage Rate Basic Daily(Pesos 466) Compensation


Leaves (Service Incentive Leave/ Maternity/Paternal)
Bonus, 13" Month Pay SSS Contribution Philhealth
Pag-lbig
Employer's Compensation Contribution Monthly Rate
Daily Rate
Hourly Rate

SECTION E
EQUIPMENT RENTAL RATES
aque, Pasay, Pasig, Quezon, San Juan, Taguig and Valenzuela and the Municipality of Pateros

13TH MONTH SOCIAL BENEFITS RATE PER RAtE PER


BASIC WAGE LEAVES PAY MONTH DAY
MONTHLY SSS/EC PHILHEALTH PAG-IBIG
20,970.00 838.80 1,747.50 1,090.00 250 100.00 24,996.30 999.85
19,222.50 768.90 1,601.88 1,090.00 237.50 100.00 23,020.78 920.83
17,475.00 699.00 1,456.25 1,090.00 212.50 100.00 21,032.75 841.31
17,475.00 699.00 1,456.25 1,090.00 21250 100.00 2,103,175 841.31
16,310.00 652.40 1,359.17 1,090.00 200.00 100.00 19,711.57 788.46
15,145.00 605.80 1,262.08 1,090.00 187.50 100.00 18,390.38 735.62
15,145.00 60S.80 1,262.08 1,090.00 187.50 100.00 18,390.38 735.62
13,980.00 SS9.20 1,165.00 999.30 162.50 100.00 16,966.00 678.64
11,650.00 466.00 970.83 822.70 137.50 100.00 14,147.03 565.88

E
AL RATES
5.2%
5.7%
6.2%
6.2%
6.7%
7.2%
7.2%
7.1%
7.1%
DESCRIPTION RENTAL RATE
9 Water Pump
9.1 Water Pump, 100 mm suction B ₱266.25
9.2 Water Pump, 100 mm suction B ₱123.38
9.3 Pumpcrete 2,076.00
Power Generating Equipment
Generator Set 300 - 500 kVA ₱872.87
10 Generator Set 600 - 800 kVA ₱2,147.27
10.2 Shop Equipment
Welding Machine ₱391.00

11 Welding Machine ₱371.00


11.2 Special Support Equipment
Chainsaw ₱75.36

12 miscellaneous Equipment

12.1 Concrete Vibrator ₱91.25

13 Bar Cutter ₱219.75

13.1 Bar Bender ₱351.50

13.2 Others

13.3 Drop Hammer w/ accessories ₱5,000.00

14 1 Air Compressor w/ 2 Jack Hammer ₱1,265.00


14.1 Cutting Outfit ₱45.45
14.2 ₱65,000.00
14.3 ₱37,000.00
₱103,000.00
Lighting System/Tower Lights ₱543.50
Bentonite Bin ₱280.00

14.7 Bentonite Mixer ₱173.00

14.8 SPT & Desanding Machine ₱559.00


14.9 Tremie Pipe Set ₱320.00
15
15.1
SOLID SIZE FLYWHEEL
OUTPUT/DISCHARGE (Ipm)
CAPACITY (mm) HORSEPOWER

2,667 50 16
1,800 7.50

F4ODEL CAPAC ITY


kW kVA

All Blakes 700 kW 875


FLYWHEEL
IflODEL AMPERES HORSEPOWER

Gas/Diesel Driven 300 48


FLYWHEEL
FGODEL CAPACITY HORSEPOWER

HUSQVARNA 2100 CD with


CR22, 7 ft Reach, 9 in
Standard Blade

Flexible Shaft Type 2" Head


D with 5 Amperes Gasoline
Drive Unit
25 mm Maximum Rebar IZI
(Grade 40), Single Phase
25 mm Maximum Rebar 0,
Three Phase

20 mt

Tower Height = 28 ft, No. of


Lights = 4 x 1000 watts, hp
= 10.50
Generator = 5 kW