NO SCOPE OF WORK
A PEKERJAAN PERSIAPAN
1 Mobisasi demobilisasi
2 Accomodation
3 Safety tool & administration
4 Pengukuran, install bouwplank & survey
5 Engineering design
6 Reporting & quality Controll
B FOUNDATION
1 CV-121
Supply Pilling
Transfer tower
Takeup tower
Endtower
Pilling work
Transfer tower
Takeup tower
Endtower
PDA test
Lean Concrete
Concrete work K-300
Transfer tower
Takeup tower
Endtower
Cut off pile
Transfer tower
Takeup tower
Endtower
Anchore
2 CV-122
Supply Pilling
Transfer tower
Pilling work
Transfer tower
Lean Concrete
Concrete work K-300
Transfer tower (footplate, transfer tower, trestle)
Cut off pile
Anchore
3 CV-02
Lean Concrete
Concrete work K-300
Chipping concrete existing
Anchore
PILING & FOUNDATION WORKS
SPESIFICATION VOL UNIT UNIT PRICE (Rp) PRICE (Rp)
Ex-WIKA, Concrete spunpile, Dia 500, Type C, Length 12m 168 m'
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 12m 60 m'
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 12m 60 m'
PDA test 5 point
K-175, thickness 50mm 20 m3
Ready mix
Ready mix
Ready mix
Ready mix
4 point, bottom segment
J-anchore, HDG, hight tension
Site mix
Ready mix
K-300
J-anchore, HDG, hight tension
PILING & FOUNDAT
NO SCOPE OF WORK
A PEKERJAAN PERSIAPAN
1 Mobisasi demobilisasi
2 Accomodation
3 Safety tool & administration
4 Pengukuran, install bouwplank & survey
5 Engineering design
6 Reporting & quality Controll
B FOUNDATION
1 CV-121
Supply Pilling
Transfer tower
Takeup tower
Endtower
Pilling work
Transfer tower
Takeup tower
Endtower
PDA test
Lean Concrete
Concrete work K-300
Transfer tower
Takeup tower
Endtower
Cut off pile
Transfer tower
Takeup tower
Endtower
Anchore
2 CV-122
Supply Pilling
Transfer tower
Pilling work
Transfer tower
Lean Concrete
Concrete work K-300
Transfer tower (footplate, transfer tower, trestle)
Cut off pile
Anchore
3 CV-02
Lean Concrete
Concrete work K-300
Chipping concrete existing
Anchore
PILING & FOUNDATION WORKS
SPESIFICATION VOL UNIT UNIT PRICE (Rp)
Ex-WIKA, Concrete spunpile, Dia 500, Type C, Length 12m 168 m' 521,350.00
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 12m 60 m' 428,254.00
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 12m 60 m' 428,254.00
PDA test 5 point 14,500,000.00
K-175, thickness 50mm 20 m3 1,525,388.98
K-300, ratio rebar 150kg /m3, formwork, pouring & curing 50 m3 5,958,209.00
K-300, ratio rebar 150kg /m3, formwork, pouring & curing 30 m3 5,958,209.00
K-300, ratio rebar 150kg /m3, formwork, pouring & curing 100 m3 5,958,209.00
Ex-WIKA, Concrete spunpile, Dia 500, Type C, Length 12m 14 point 2,737,665.76
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 12m 5 point 1,338,558.98
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 12m 5 point 1,338,558.98
J-anchore 1 Ls 6,080,000.00
K-300, ratio rebar 150kg /m3, formwork, pouring & curing 70 m3 5,958,209.00
Ex-WIKA, Concrete spunpile, Dia 350, Type C, Length 6m 4 point 1,338,558.98
J-anchore 1 Ls 6,080,000.00
No. DESKRIPSI
A. Pilling Work
I MANPOWER
1 Pilling per Meter (Dim 500) include man power by vendor
2 Welding per joint (Dim 500) include welder
3 Pilling per Meter (Dim 350) include man power by vendor
4 Welding per joint (Dim 350) include welder
II Equipment
1 Mobilisasi & Demob Crane Pancang/ Labrang/ Tripod Pemancangan
2 BBM Solar
II Equipment
1 Mesin Cutting Beton
2 BBM Solar
3 Mata Cutting
II Equipment
1 Molen
2 BBM Solar
3 Mata Cutting
4 Peralatan Pengecoran (Plastik, Kasutan,Cetok,dll)
5 Vibrator
III Material
1 Pasir Palu
2 Semen
3 Agregat
4 Kayu Kaso
5 Wiremesh
II Material
1 Readymix K-300
2 Rebar
III Equipment
1 Vibrator
2 BBM Bensin Vibrator
3 Peralatan Pengecoran (Plastik, Kasutan,Cetok,dll)
E. Equipment Tambahan
1 Scaffolding
2 Cutting Torch (oxy-Acetylene) / Panjang Hose Min.25 Mtr, Brand Victor/cigweld
3 Genset 3 Phase
4 Mesin Gerinda 7"
5 Mesin Bending Besi
6 Mesin Potong Besi
7 Alat Cutting Besi Manual
8 Alat Bending Besi Manual
9 Crowbar
10 Hammer Size : 5 kg
11 Welding Portable Machine
F. Safety
1 Safety Equipment (Helmet, Vest, Boot,etc)
2 Body Harness
3 APAR
4 Radio HT
H. Additional
1 Mess Crew and Staff
2 Perlengkapan Mess
3 PDAM & Listrik
H. Consumable
1 Oxygen Tabung
2 Acetylene
3 Tunjangan Makan
4 Tunjangan Makan untuk Over Time (1,400 Kalori)
5 Air Minum Galon
6 Perijinan Pembuatan ID Bagde Kontraktor
7 Perijinan Pembuatan ID SIMPER Kontraktor
TOTAL
PROFIT CONTRACTOR
TOTAL AFTER PROFIT CONTRACTOR
ENERGI UNGGUL PERSADA
TEMEN PROJECT ENGINEERING
BILL OF QUANTITY
Harga Satuan
Harga Satuan
Man (Rp ) Jumlah Harga/Bulan
Jumlah Satuan Barang
Month *Bulanan (Rp)
(Rp )
(Manpower)
1,975,585,537.45
50% 987,792,768.73
2,963,378,306.18
66