Hvac

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1- FOR LEGEND ABBREVIATION & GENERAL NOTES REFER TO DWG.NO.

(ME-T3-001).
2- FOR STANDARD DETAILS REFER TO DWG.NO.
(ME-T3-002).
3- FOR SCHEDULE OF EQUIPMENT REFER TO DWG.NO.
(ME-T3-201).

LEGEND:

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 SPLIT UNIT (IN DOOR UNIT)

CONDENSING UNIT (OUT DOOR UNIT)

TWO CONDENSING UNIT ONE ABOVE ONE


(OUT DOOR UNIT)

TYPICAL IN ALL FLOORS


STAIR PRESSURIZATION FAN

DN DN
A A
‫ﺗ ﺮاس‬ ‫ﺗ ﺮاس‬
FRESH AIR FAN
B GR-L-BEDROOM*-01 GR-L-BEDROOM-01
‫ﺗ ﺮاس‬
GR-R-BEDROOM-01 GR-R-BEDROOM-01
‫ﺗ ﺮاس‬
GR-L-BEDROOM-01 GR-L-BEDROOM*-01 B
‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬
GR-L-M.BEDROOM-01 ‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬ ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ ‫ﺗ ﺮاس‬ ‫ﺗ ﺮاس‬ ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ ‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬ GR-L-M.BEDROOM-01
‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬
‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ GR-R-M.BEDROOM-01 GR-R-M.BEDROOM-01 ‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬
‫رﺋﻴﺴ ﻴﺔ‬ ‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ ‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ ‫رﺋﻴﺴ ﻴﺔ‬
‫رﺋﻴﺴ ﻴﺔ‬ ‫رﺋﻴﺴ ﻴﺔ‬
C C EXHAUST FAN
‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ GR-R-RECEPTION-01 GR-R-RECEPTION-01 ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬

D ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ D
‫ﻏﺮﻓ ﺔ‬ ‫ﺣﻤﺎم‬ ‫رﺋﻴﺴ ﻰ‬ ‫رﺋﻴﺴ ﻲ‬ ‫ﻲ‬ ‫رﺋﻴﺴ‬ ‫ﻰ‬ ‫رﺋﻴﺴ‬ ‫ﺣﻤﺎم‬ ‫ﻏﺮﻓ ﺔ‬
‫ﻣﻼﺑ ﺲ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻣﻼﺑ ﺲ‬
GR-L-RECEPTION-02
‫ﻣﻼﺑ ﺲ‬ GR-R-RECEPTION-02 GR-R-RECEPTION-02 ‫ﻣﻼﺑ ﺲ‬
GR-L-RECEPTION-02
TWIN FAN FOR GARBAGE CHUTE
‫ﻣﻄﺒ ﺦ‬ ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ ‫ﻣﻄﺒ ﺦ‬

WM
GR-L-RECEPTION-01 GR-L-RECEPTION-01 WM
WM DW DW WM

‫ﻣﻄﺒ ﺦ‬ ‫ﻣﻄﺒ ﺦ‬ ‫ﻣﻄﺒ ﺦ‬ ‫ﻣﻄﺒ ﺦ‬


EXHAUST PROPELLER FAN
‫ﺗﻮزﻳ ﻊ‬ ‫ﺗﻮزﻳ ﻊ‬
‫ﻣﻄﺒ ﺦ‬ ‫ﻣﻄﺒ ﺦ‬

‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬
‫ﺿ ﻴﻮف‬ ‫ﺿ ﻴﻮف‬ UNDER CUT

‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬


EMERGENCY MOTOR CONTROL CENTER
‫ﺿ ﻴﻮف‬ ‫ﺗﻮزﻳ ﻊ‬ ‫ﺿ ﻴﻮف‬ ‫ﺿ ﻴﻮف‬ ‫ﺗﻮزﻳ ﻊ‬ ‫ﺿ ﻴﻮف‬
‫ﺗﻮزﻳ ﻊ‬ ‫ﺗﻮزﻳ ﻊ‬
DIGITAL DIRECT CONTROL
E ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ E
‫رﺋﻴﺴ ﻰ‬ ‫ﻰ‬ ‫رﺋﻴﺴ‬ ‫رﺋﻴﺴ ﻰ‬ ‫رﺋﻴﺴ ﻰ‬
CAT WALK

F F
32 33 34 35 36 37 38 39 40 41 41 40 39 38 37 36 35 34 33 32 32 33 34 35 36 37 38 39 40 41 41 40 39 38 37 36 35 34 33 32
REV. Date Description
31 30 29 28 27 26 25 24 23 22 21
‫ﺣﻤﺎم‬
‫ﺣﻤﺎم‬ 21 22 23 24 25 26 27 28 29 30 31 31 30 29 28 27 26 25 24 23 22 21
‫ﺣﻤﺎم‬ 21 22 23 24 25 26 27 28 29 30 31
00 15-08-2021 SCHEMATIC PACKAGE
‫ﺣﻤﺎم‬ ‫رﺋﻴﺴ ﻰ‬ ‫ﺣﻤﺎم‬ ‫ﻰ‬ ‫رﺋﻴﺴ‬ ‫ﺣﻤﺎم‬
UP UP ‫ﻏﺮﻓ ﺔ‬ ‫ﺿ ﻴﻮف‬ UP UP UP UP ‫ﻏﺮﻓ ﺔ‬ UPUP
‫ﺣﻤﺎم‬
‫ﺣﻤﺎم‬ ‫ﻣﺮﺑﻴ ﺔ‬
‫ﺗﻮزﻳ ﻊ‬ ‫ﻣﻄﺒ ﺦ‬ ‫ﺣﻤﺎم‬ ‫ﺣﻤﺎم‬ ‫ﻣﻄﺒ ﺦ‬ ‫ﺿ ﻴﻮف‬ ‫ﺗﻮزﻳ ﻊ‬
‫ﻣﺮﺑﻴ ﺔ‬ ‫ﺣﻤﺎم‬
‫ﺣﻤﺎم‬ 00 06-10-2021 DETAILED DESIGN PACKAGE
G G 00 02-11-2021 TENDER PACKAGE
‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬
‫ﻣﻼﺑ ﺲ‬ ‫ﻣﻼﺑ ﺲ‬ ‫ﻣﻼﺑ ﺲ‬ ‫ﻣﻼﺑ ﺲ‬
01 28-11-2021 TENDER PACKAGE
‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ ‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬
‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫رﺋﻴﺴ ﻴﺔ‬ ‫رﺋﻴﺴ ﻴﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬
‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ ‫ﻧ ﻮم‬ ‫ﻣﻼﺑ ﺲ‬ ‫ﻏﺮﻓ ﺔ‬
‫ﻧ ﻮم‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬
‫ﻏﺮﻓ ﺔ‬
‫ﻧ ﻮم‬
‫ﻣﻼﺑ ﺲ‬ ‫ﻧ ﻮم‬ ‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ DESIGN BY: Eng: Islam Ali
‫رﺋﻴﺴ ﻴﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫ﻏﺮﻓ ﺔ‬ ‫رﺋﻴﺴ ﻴﺔ‬
‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬ GR-R-BEDROOM*-02 ‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬ GR-R-BEDROOM*-02 ‫ﻧ ﻮم‬ ‫ﻧ ﻮم‬
GR-L-BEDROOM*-02 GR-L-BEDROOM*-02
GR-L-BEDROOM-03 GR-L-BEDROOM*-03 GR-R-BEDROOM-02 GR-R-M.BEDROOM-02 GR-R-M.BEDROOM-02 GR-R-BEDROOM-02 GR-L-BEDROOM*-03 GR-L-BEDROOM-03
H GR-L-BEDROOM-02 GR-L-BEDROOM-02
H DRAWN BY: Mr: Mohamed Ali
GR-L-M.BEDROOM-02 GR-L-M.BEDROOM-02

I I CHECKED BY: Eng: Walaa Fatuoh


‫ﺘﻘﺒﺎل‬ ‫إﺳ‬ ‫ﺘﻘﺒﺎل‬ ‫إﺳ‬
‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬ ‫ﻏﺮﻓ ﺔ ﻧ ﻮم‬
‫رﺋﻴﺴ ﻴﺔ‬ ‫رﺋﻴﺴ ﻴﺔ‬
GR-L-RECEPTION-03 GR-L-RECEPTION-03
J GR-L-M.BEDROOM-03
‫ﺗ ﺮاس‬ ‫ﺗ ﺮاس‬
GR-L-M.BEDROOM-03
J
K K

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

STRUCTURAL CONSULTANT

Prof.Dr. M. EL−ZANATY − Prof. Dr. A. EL−ZANATY


176 SAMEH GADO STR. 6TH OF OCTOBER

105 El-Thawra St., Floor #3, Heliopolis, Cairo, Egypt.


T:(+2)0222902045- F:(+2)0222902045
info.mep.eepm@dorra.com

1:100

You might also like