Sheet Ngu 2bc PL 001 Legend, General Notes & List of Abbreviations Layout1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Notes:

Q Q

ABBREVIATIONS LEGEND NOTES:


1. ALL DIMENSIONS GIVEN ON THIS DRAWING ARE IN MILLIMETERS. DO NOT
SCALE THE DRAWINGS, ANY DISCREPANCIES FOUND SHOULD BE REPORTED
P P

A/P ACCESS PANEL TO THE RESPONSIBLE ARCHITECT OR ENGINEER IMMEDIATELY.


GATE VALVE 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR OR BUILDERS TO
AD AREA DRAIN ASCERTAIN AND CONFIRM THAT ALL DIMENSIONS SHOWN IN THESE
HOSE BIBB DRAWINGS SHALL COMPLY WITH THE SITE DIMENSIONS AND LEVELS PRIOR
O
FCO FLOOR CLEAN OUT TO PREPARING DRAWINGS AND EXECUTING THE WORKS. O
GT GULLY TRAP
3. ALL WORKS ARE TO BE CARRIED OUT TO SAUDI ARABIA REGULATION AND
CO CLEAN OUT
IC INSPECTION CHAMBER OTHER RELEVANT CODES OF CONSTRUCTIONS.
COLD WATER 4. ALL COLD & HOT WATER POINTS FOR WASH BASIN,
CW
SINKS,W.C WILL BE PROVIDED WITH ISOLATING
ROOF DRAIN
N
ANGLE VALVES. N

DN DOWN
5. ALL COLD & HOT WATER PIPES ARE RUNNING AT
DET. TOILET DETAIL ABOVE FALSE CEILING UNLESS OTHER WISE MENTIONED.
H/L HIGH LEVEL
6. ALL HOT WATER PIPES SHALL BE INSULATED.
PN DRAINAGE RISER 7. ALL INSTALLATION SHALL BE ACCESSIABLE FOR
M F/A FROM ABOVE M

FUTURE MAINTENANCE.
PS DOMESTIC RISER 8. NO INSULATION BE DONE UNLESS THE PIPES ARE
F/B FROM BELOW
VENTED TESTED AND APPROVED BY THE ENGINEER.
ST STORM RISER 9. ALL INTERFACES (TIE-IN POINTS) WITH THE MAIN INFRASTRUCTURE
GT GULLY TRAP
NETWORKS SHOULD BE VERIFIES ON SITE BEFORE CONSTRUCTING
L L

GV GATE VALVE THE INTERNAL NETWORK. Key Plan:


TRUE NORTH

10. ALL WATER SUPPLY PIPE DIAMETERS ARE INNER DIAMETER.


BV BALANCE VALVE
SUSPENDED
CV CHECK VALVE 2E

K PIPING 2D
2A K

BAV BURIED ANGLE VALVE 2C

GI GREASE INTERCEPTOR 140


14
1
2B
14
0

GENERAL PLUMBING SYSTEM NOTES


140
145 141
14
151150149 8
142
143
144
145
148
139
140
152
140 138
141
142
143
144
145

CW
137

HOSE BIBB COLD WATER PIPING


145
146

HB
136
147
148
149
150
151
135

J J
GENERAL NOTES: CLEAR HEIGHT INSTALLATION NOTES:

HW HOT WATER HW HOT WATER PIPING 01- THE PLUMBING DRAWINGS SHALL BE READ AS ONE UNIT INCLUDING 01- INSTALL ALL PLUMBING SYSTEM PIPING AT MAXIMUM CLEAR HEIGHT,
PLANS, RISER DIAGRAMS AND MISCELLANEOUS DETAILS. COORDINATE WITH ALL TRADES.

02- PLUMBING DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE 02- IN AREA WITH SUSPENDED CEILINGS, ALL PLUMBING PIPING SHALL BE

HWR HOT WATER RETURN HWR HOT WATER RETURN PIPING ARCHITECTURAL, STRUCTURAL, ELECTRICAL, A/C, FF AND OTHER DRAWINGS INSTALLED A MINIMUM OF 150 mm ABOVE THE SUSPENDED CEILING TO
FOR COORDINATION, VERIFICATION OF ADEQUATE SPACES AND EARLY TO ALLOW FOR LIGHT FIXTURES CLEARANCE.
DETERMINATION OF ANY CONTRADICTIONS OR INTERFERENCE PER 00 Issued For Reference Oct. 2021
THE PROVISIONS OF THE SPECIFICATION AND MOM DOCUMENTS. REV.NO. REVISION DESCRIPTION DATE
I I
IC INSPECTION CAHMBER 03- THE DRAWINGS ARE ISSUED FOR PLUMBING WORKS ONLY AND SHALL PLUMBING WORKS NOTES:
Owner /Developer:
NOT BE USED FOR ARCHITECTURAL, STRUCTURAL OR OTHER WORKS.
01- HOSE BIBS TO BE PROVIDED THROUGHOUT PARKING GARAGE AREA
04- DRAWINGS SHALL NOT BE SCALED FOR EXECUTING THE WORKS. AND IN MECHANICAL ROOMS FOR MAINTENANCE PURPOSES.
K.S. KITCHEN SINK GATE VALVE ALL MEASUREMENTS SHALL BE MADE FROM ESTABLISHED LINES,
LEVELS & BENCH MARKS. 02- ALL DRAINAGE PIPING BEING ROUTED BY GRAVITY SHALL MAINTAIN A
MINIMUM SLOPE AS PER LOCAL CODE AND INTERNATIONAL STANDARDS.
05- THE DRAWINGS ARE ONLY DIAGRAMMATIC. THE CONTRACTOR SHALL
LAV LAVATORY EXECUTE ALL WORK IN ACCORDANCE WITH APPROVED (SHOP AND 03- ALL VENT PIPING SHALL BE SLOPED TOWARD THE DRAIN.
INSTALLATION) DRAWINGS PER THE PROVISIONS OF THE SPECIFICATION.
H CHECK VALVE 04- ALL MECHANICAL SHAFTS AND SERVICES TO BE PROVIDED WITH H
06- FOR SERVICES CONNECTED WITH HAVC/FF WORKS REFER TO HVAC/FF MAINTENANCE ACCESS.
Conceptual and Master Plan Architect:
NTS NOT TO SCALE DRAWINGS FOR THE EXACT LOCATION, SIZE AND OTHER REQUIREMENTS,
05- ALL END OF SUPPLY LINES TO BE PROVIDED WITH WATER HUMMER
ALL SUCH SERVICES SHALL BE COORDINATED WITH THE HVAC/FF TRADE.
ARRESTOR.

V VENT
07- PLUMBING WORKS REQUIRING ELECTRICAL SERVICES SHALL BE
COORDINATED WITH THE ELECTRICAL TRADE.
06- PROVIDE AN AIR VENT AT THE TOP OF ALL RISERS IN WATER SYSTEM. Gensler
07- PROVIDE HOSE END DRAIN VALVES AT THE BOTTOM OF ALL RISERS
PIPE DIAMETER REFERENCE 08- EQUIPMENT AND PIPE MATERIALS SHALL BE AS PER SPECIFICATION
UNLESS OTHERWISE INDICATED.
AND LOW POINTS.
Thomas More
Square
London, E1 W 1 YW
Tel +44 (0)20 7073 9600
Fax + 44 (0)20 7539
1917
United Kingdom
G
FFD FUNNEL FLOOR DRAIN 09- FOR EQUIPMENT CAPACITIES, RATINGS, TYPES AND CHARACTERISTICS
08- PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED G

15 mm 1/2" REFER TO THE "SCHEDULE OF EQUIPMENT" DRAWINGS.


TO PUMPS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION
ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO
Architecture and Structure Consultant :

10- FOR EQUIPMENT HOOK-UPS AND CONTROL DIAGRAMS REFER TO THE THE EQUIPMENT AS POSSIBLE.
20 mm 3/4"
S&W SOIL & WASTE PIPE "MISCELLANEOUS DETAILS" DRAWINGS.
09- PROVIDE ACCESSIBLE DRAIN POINTS IN ALL SHAFTS AND ENCLOSURES
11- ALL PIPE RUNS SHOWN ARE AT CEILING LEVEL EXCEPT WHERE NOTED CONTAINING PLUMBING WORKS. (WHETHER SHOWN ON DRAWINGS OR NOT).
25 mm 1" OTHERWISE.
10- PROVIDE TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES
WHERE REQUIRED. LOCATING IN ACCESSIBLE LOCATIONS WITH STRAIGHT
T/B TO BELOW 32 mm 1 1/4" 12- PIPE SIZES SHOWN ON DRAWING ARE PIPE NOMINAL DIAMETERS
SECTION PIPE UPSTREAM AND DOWNSTREAM FOR GOOD ACCURACY.
F F
13- ALL SIZES SHOWN ON DRAWINGS ARE IN mm, UNLESS OTHERWISE

40 mm 1 1/2" MENTIONED. 11- PROVIDE SUMP PIT AT THE BOTTOM OF ALL ELEVATOR SHAFTS AND PITS
CONTAINING FIRE FIGHTING SPRINKLERS, ALL SUCH SUMP PITS SHALL BE
Detailed Planner and Landscape Architect :

T/A TO ABOVE 14- ALL FLOOR AND BASE MOUNTED EQUIPMENT AND APPARATUS SHALL BE COORDINATED WITH OTHER TRADES AND ELEVATOR VENDOR.
50 mm 2" PROVIDED WITH NECESSARY CONCRETE PEDESTALS, BASES, PADS AND
ANCHOR BLOCKS. PROVIDE ANCHOR BOLTS, SLAB INSERTS, SUPPORTS 12- ALL PIPING PENETRATING RATED FIRE WALL ASSEMBLIES SHALL BE SEALED
CRADLES, SADDLES, HANGERS AND SLEEVES AS REQUIRED FOR PROPER
65 mm 2 1/2" USING APPROVED FIRE STOPPING MATERIALS AND ASSEMBLY.
S SOIL PIPE SUPPORT OR ATTACHMENT TO THE BUILDING STRUCTURE FOR ALL PIPING
CONDUIT, EQUIPMENT AND APPARATUS. PROVIDE GUIDED HANGERS AND

E 75 mm 3" SUPPORT STEEL FOR ALL PIPING AND EQUIPMENT AS REQUIRED.


CONSTRUCTION NOTES E
W WASTE PIPE 15- PLUMBING FIXTURES DESIGNATIONS SHOWN ON THE DRAWINGS SHALL MEP Consultant :
100 mm 4" CORRESPOND TO THE FIXTURE DESIGNATION TYPE NUMBER GIVEN IN
GENERAL NOTES:

THE SPECIFICATION.
01- ONCE ASSIGNED THE MAIN CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR
IW IN-DIRECT WASTE PIPE 150 mm 6" OVERALL COORDINATION DURING ENGINEERING AND CONSTRUCTIONS STAGES
CONSTRUCTION AND SYSTEM START-UP NOTES: BY ASSIGNING QUALIFIED COORDINATION TEAM TO COVER BOTH TASKS DURING
THE DIFFERENT PHASES OF THE PROJECT.
200 mm 8" 01- PIPE PRESSURE TESTING / HANDOVER SHALL BE DONE PRIOR TO
W.C. WATER CLOSET ANY PIPE INSULATION WORKS EXECUTION. 02- MAIN CONTRACTOR MUST BE FULLY RESPONSIBLE FOR OVERALL INTERFACE
MANAGEMENT BETWEEN ALL PARTIES AND TO ASSIGN A DEDICATED INTERFACE
D 02- INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, D
TEAMS RESPONSIBLE TO HAVE PERIODICAL INTERFACE MEETINGS BETWEEN ALL
WHA WATER HAMMER ARRESTOR FLANGES, TEMPERATURE/PRESSURE/FLOW MEASURING DEVICES
AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
PARTIES IN THE PRESENCE OF THE SUPERVISION ENGINEER ON SITE TO EARLY
IDENTIFY CLEAR SCOPE GAPS IN RELATION TO INTERFACES
Project:

03- WHERE BEAMS ARE INDICATED TO BE PENETRATED WITH PIPING,


∅ DIAMETER COORDINATE PIPING LAYOUT WITH BEAM OPENING SIZE AND LOCATIONS.
03- MAIN CONTRACTOR MUST HAVE AN EARLY STUDY FOR THE SHARE OF WORKS
BETWEEN THE VARIOUS MEP/SAS/ELV/IT SUB-CONTRACTORS BY PROVIDING
NEW GIZA UNIVERSITY
P 04- LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS
SHARE OF WORKS SKETCHES FOR EACH SYSTEM/SUB-SYSTEM TO CLOSE ALL PHASE II
PLUMBING RISER SCOPE GAPS.
U/G UNDER GROUND No
SHALL BE COORDINATED WITH OTHER TRADES.

05- ALL PIPING SUPPORT SHALL BE FROM PERMANENT BUILDING STRUCTURE. 04- MAIN CONTRACTOR MUST SUBMIT PROPER AND WELL-COORDINATED COMBINED
C C
DO NOT SUPPORT FROM DUCTWORK OR OTHER PIPING. SERVICES DRAWINGS, REFLECTED CEILING PLANS, FLOORS/SCREED COMBINED
U/T UNDER TILE CARPET PLANS, COMBINED SERVICES DRAWINGS FOR WALLS FOR THE DRAWING TITLE :
06- ALL EQUIPMENT, PIPING, etc., SHALL BE SUPPORTED AS DETAILED, ENGINEER'S APPROVAL, THESE DRAWINGS MUST INCLUDE ALL SERVICES AND TO
SPECIFIED, AND REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION. BE COORDINATED WITH THE LATEST ARCHITECTURAL AND ID LAYOUTS

RD-1 SIDE ROOF DRAIN Building C


AIR RELIEF VALVE 07- CONTRACTOR IS RESPONSIBLE TO PROVIDE A TEMPORARY STORM WATER 05- DIFFERENT CEILINGS CANNOT BE CLOSED WITHOUT THE APPROVAL OF ALL
DRAINAGE SYSTEM AT ALL TIMES DURING CONSTRUCTI0N PERIOD. ARCHITECTURAL AND ENGINEERING TRADES INVOLVED WITH PROPER CEILING
CLOSURES INSPECTION REQUESTS.
LEGEND,GENERAL NOTES & LIST OF
RD-2 ROOF DRAIN AT H.W RISER TOP ABBREVIATIONS
06- SUB-CONTRACTORS MUST PROVIDE PROPER BUILDER'S WORKS SHOP DRAWINGS
DURING THE CIVIL CONSTRUCTION PHASE AND CONSIDER ALL REQUIRED
B B
OPENINGS/SLEEVES TO AVOID ABORTIVE CORING WORKS & EXPOSED CONTAINMENTS
Drawn: Checked: Approved:
WATER HAMMER ARREST 07- CONTRACTOR MUST STUDY THE STORAGE CONDITIONS OF THE MATERIALS & PLAN
RELATED DELIVERIES ACCORDING TO SITE NEED TO AVOID LONG TIME SITE STORAGE.
S.T M.R T.R
Phase Discipline: Date: Scale: Rev:
2 PLUMBING Oct.2021 1:1 00

Project No: Building Code: Sheet Number


17063 B2C NGU.2BC.PL-001
A A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

You might also like