Department of Public Works and Highways (DPWH)

Contract ID: 22F00025

Contract Name: OO1: Ensure Safe and Reliable National Road System – Network Development Program –
Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Jovellar, Albay

Location of the Contract: Jovellar, Albay 3rd Legislative District


BILL OF QUANTITIES
PAY ITEM UNIT PRICE AMOUNT
NO. DESCRIPTION UNIT QUANTITY IN WORDS & IN IN FIGURES
FIGURES (Php) (Php)
Part A Facilities for the Engineer

A.1.1(6) Provision of Combined Field Office, mo. 9.00


Laboratory and Living Quarters Building for
the Engineer (Rental Basis)
Part B General Requirements

B.5 Project Billboard/Signboard ea. 2.00

B.7(2) Occupational Safety and Health Program l.s. 1.00

B.9 Mobilization/Demobilization l.s. 1.00

I Construction of Gravel Road and PCCP: L=2,349.62 Meters/4,699.24 Lane Meters, L=66.82
Meters/133.64 Lane Meters

Part C Earthworks

100(3)a1 Individual Removal of Trees, 150-300mm ea. 160.00


dia., Small

100(3)a2 Individual Removal of Trees, 301-500mm ea. 50.00


dia., Small

100(3)a3 Individual Removal of Trees, 501-750mm ea. 17.00


dia., Small

Sub-Total for this page In figures: Php


______________
__
Submitted By:
Name & Signature of the Bidder's Representative:
Position:
Name of Bidder: Date:

DPWH-INFR-47 Page 1 of 4
Department of Public Works and Highways (DPWH)
Contract ID: 22F00025

Contract Name: OO1: Ensure Safe and Reliable National Road System – Network Development Program –
Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Jovellar, Albay

Location of the Contract: Jovellar, Albay 3rd Legislative District


BILL OF QUANTITIES
PAY ITEM UNIT PRICE AMOUNT
NO. DESCRIPTION UNIT QUANTITY IN WORDS & IN IN FIGURES
FIGURES (Php) (Php)
100(3)a4 Individual Removal of Trees, 751-900mm ea. 4.00
dia., Small

100(4) Individual Removal of Trees, above 900mm ea. 10.00


dia., Large

101(3)b2 Removal of Actual Structures/ Obstruction, sq.m. 195.00


0.20m thk., PCCP (Unreinforced)

102(2) Surplus Common Excavation, Common cu.m. 45,787.00


Material

102(3)a Surplus Rock Excavation, Soft cu.m. 109,816.00

103(1)a Structure Excavation, Common Soil cu.m. 1,994.00

103(1)b Structure Excavation, Soft Rock cu.m. 1,039.00

103(3) Foundation Fill cu.m. 250.00

103(6)a Pipe Culverts and Drain Excavation, cu.m. 125.00


Common Soil

104(1)a Embankment from Roadway Excavation, cu.m. 68,838.00


Common Soil

105(1)a Subgrade Preparation, Common Material sq.m. 595.00

Sub-Total for this page In figures: Php


______________
__
Submitted By:
Name & Signature of the Bidder's Representative:
Position:
Name of Bidder: Date:

DPWH-INFR-47 Page 2 of 4
Department of Public Works and Highways (DPWH)
Contract ID: 22F00025

Contract Name: OO1: Ensure Safe and Reliable National Road System – Network Development Program –
Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Jovellar, Albay

Location of the Contract: Jovellar, Albay 3rd Legislative District


BILL OF QUANTITIES
PAY ITEM UNIT PRICE AMOUNT
NO. DESCRIPTION UNIT QUANTITY IN WORDS & IN IN FIGURES
FIGURES (Php) (Php)
Part D Subbase and Base Course

200(1) Aggregate Subbase Course cu.m. 262.00

201(1) Aggregate Base Course cu.m. 20.00

Part E Surface Courses

311(1)e1 PCCP (Unreinforced), 0.28m thk., 14 days sq.m. 926.00

Part G Drainage and Slope Protection Structures

404(1)a Reinforcing Steel, Grade 40 kg. 68,118.00

405(1)a3 Structural Concrete (Class A), 20.68 Mpa @ cu.m. 4.00


28 days (Catch Basin)

405(1)a3 Structural Concrete (Class A), 20.68 Mpa @ cu.m. 971.00


28 days (Line Canal)

500(1)a5 Pipe Culverts, 1220mmØ (48"Ø) Class II, l.m. 32.00


RCPC

505(2)a Grouted Riprap, Class A cu.m. 2,151.00

Sub-Total for this page In figures: Php


______________
__
Submitted By:
Name & Signature of the Bidder's Representative:
Position:
Name of Bidder: Date:

DPWH-INFR-47 Page 3 of 4
Department of Public Works and Highways (DPWH)
Contract ID: 22F00025

Contract Name: OO1: Ensure Safe and Reliable National Road System – Network Development Program –
Construction of By-Pass and Diversion Roads – Palanas-San Isidro Road, Jovellar, Albay

Location of the Contract: Jovellar, Albay 3rd Legislative District


BILL OF QUANTITIES
PAY ITEM UNIT PRICE AMOUNT
NO. DESCRIPTION UNIT QUANTITY IN WORDS & IN IN FIGURES
FIGURES (Php) (Php)
506(1) Stone Masonry cu.m. 11.00

622(1)a Coco-net, CN 400 sq.m. 24,074.00

622(2)c Coco-logs/Fascine, CN 300 l.m. 4,831.00

622(3)b Vegetation, Vetiver Grass System sq.m. 24,074.00

Part H Miscellaneous Structures

612(1) Reflectorized Thermoplastic Pavement sq.m. 17.00


Markings, White

612(2) Reflectorized Thermoplastic Pavement sq.m. 10.00


Markings, Yellow

x-x-x-x

Sub-Total for this page In figures: Php


______________
__
Submitted By:
Name & Signature of the Bidder's Representative:
Position:
Name of Bidder: Date:

DPWH-INFR-47 Page 4 of 4