RIG AUDIT

GENERAL

a) Rig

Contractor

b) Audit Date Location

c) Audit Team

Name Position

d) General

Check Reference Comment

1 Housekeeping

2 Paintwork

3 Safety (No of LTAs in Past 3 Years)

4 Surveys Cert. of Fitness ABS/Lloyds etc. Validity

5 Compliance with current legislation in ALL aspects Y/N

Date:

Company Name:

UK Address:

Rig Manager:

Fax/ Telex: Telephone

MARINE OPERATIONS DATA


Rig Name / Number

1 Country Of Registry

2 Classification (ABS, DNV, etc.)

i) SEMI-SUBMERSIBLE VESSEL SPECIFICATION

Year Built By (Shipyard)

1 Length ft Width ft Height (to main deck) ft

2 Number of Stabilising columns:

3 Displacement tons

4 Operating Draft ft Transit Draft ft

5 Air gap at operating draft ft

Air gap at survival draft ft


6 BOP deck clear height ft

7 Helicopter Deck ft X ft Suitable for

Refueling eqpt capacity gallons

8 Accommodation, No. of persons

Room arrangement

Office Accommodation

9 Natural Periods; Heave sec Pitch sec

10 Survival Conditions: Roll Degrees

Combined Max. wind speed kts

Max. wave height ft

Corresponding wave period sec

ii) JACK-UP VESSEL SPECIFICATION

Year Built

By (shipyard)

1 Length ft Width ft Hull Depth ft

2 Number of legs Leg Length

Spud Can Size

3 Displacement tons

4 Transit Draft ft

5 Maximum operating air gap ft

6 Storm air gap ft

7 Helicopter Deck ft X ft

8 Accommodation, No. of persons

Room Arrangement

Office Accommodation

PROPULSION EQUIPMENT AND MAIN POWER PLANT

1 Main Power Plant: Number HP Each

KVA each SCR Type

2 Main Screws Number Total HP

3 Thrusters Number HP each

Number Fixed Number Rotating

4 Self-propelled speed Knots in a calm sea

5 Towing speed Knots in a calm sea

with HP sea tug


MOORING EQUIPMENT ( Semi-submersibles)

1 Anchors (1) No. Size Type Condition

(2) No. Size Type Condition

(3) No. Size Type Condition

2 Chain Min. Length Size Type Age

Condition Last Inspection

Remarks

3 Wildcats No. Type Rating Power

4 Wireline Min. Length Size Type

Age Condition

Dates last socketed

Remarks

5 Winches No. Type Rating

Power Wire Size Capacity

6 Tensiometers Manufacturer Type Max. Load

Controls Location

Readout at

Printout at

Last Calibration

Frequency of Calibration

7 Mooring pattern Attach Drawing

8 Mooring Design

Percent breaking Strength

Initial line tension, tons

Working lent line tension

9 Max. allowable displacement, %

10 Other Equipment

Buoys

Piggy Back anchors Number Size Type Condition

Pendants Number Size Length

11 Dynamic Positioning Equipment

12 Position Sensor System

Type

Make
Age

13 Operating Water Depths:

Maximum rated water depth ft Maximum water depth Rig has operated

Minimum rated water depth ft Minimum water depth Rig has operated

ROV/DIVING SYSTEM

Manufacturer

Saturation or non-saturation/Type

Depth capability

Deepest dive with unit ft Date

Number of service personnel on board

TV SYSTEM

Manufacturer

Operating depth

BALLAST CONTROL EQUIPMENT (Semi-submersible)

PERSONNEL SURVIVAL EQUIPMENT

Lifeboats Type No. Cap

Life Rafts Type No. Cap

No. of Immersion Survival Suits

MAXIMUM PRACTICAL OPERATING LIMITS (Wind speed)

i) Semi-submersibles Wind Speed Heave Pitch Roll

Drilling

Running BOP & Riser

Logging

Running Casing

Disconnect

Reconnect

Crane Operations

VESSEL RESPONSE MONITORING & RECORDING DEVICES ( Semi-submersibles)

1 Heave

2 Pitch

3 Roll

COMMUNICATION EQUIPMENT
DRILLING EQUIPMENT

Depth rating of rig

Hoisting equipment

1 Mast (or derrick) Manufacturer Height

Cantilever load Racking Cap

Last Inspection By

2 Draw works, Manufacturer Model

Power

3 *Motion compensator Manufacturer Rating Stroke

4 Crown Block Manufacturer Model Capacity

5 Traveling Block Manufacturer Model Capacity

6 Block Guidance Model

Type

7 Drilling Hook Manufacturer Model Capacity

8 Drill Pipe Elevators

(1) Size Manufacturer Model Capacity

Last Inspection By

(2) Size Manufacturer Model Capacity

Last Inspection By

(3) Size Manufacturer Model Capacity

Last Inspection By

9 Elevator Links

(1) Size Manufacturer Capacity

Last Inspection By

(2) Size Manufacturer Capacity

Last Inspection By

10 Cross-Overs

Adequate cross-overs for contractor supplied equipment Y/N

11 Fishing

Adequate fishing equipment and spares to retrieve all contractor


Y/N
supplied tubular for each size of hole for companies well

12 Drilling Line Size Type Amount remaining on spool

*Applies to semi-submersibles only


ROTATING EQUIPMENT

1 Top drive, Manufacturer Model Size

Power

2 Rotary table, manufacturer Model Size

Power

3 Swivel, manufacturer Model Rated load

4 Kelly 1 manufacturer Size Rating

5 Upper IBOP

Manufacturer Size Rating

6 Lower IBOP

Manufacturer Size Rating

7 Spare Safety Valve (On Rig Floor)

(1) Manufacturer Size Rating

(2) Manufacturer Size Rating

8 Float Valves, manufacturer Size Type

9 Instrumentation (List Drilling Recorders, etc. Installed)

CIRCULATING SYSTEM

Mud Pumps

Manufacturer Model HP Rating Avail Liner

TUBULAR GOODS

1 Drill Pipe

a) No. of joints Size & Wt Grade

Range Tool Joints OD Last Insp.

Connections

b) No. of joints Size & Wt Grade

Range Tool Joints OD Last Insp.

Connections
2 Drill Collar

a) Number OD ID

Range Connections Last Insp.

b) Number OD ID

Range Connections Last Insp.

c) Number OD ID

Range Connections Last Insp.

3 Hewi-Wate Drill Pipe

Number of joints Size & Wt Range

Connections Last Insp.

MARINE RISER, TENSIONING, GUIDANCE SYSTEMS (Semi-submersible)

1 Marine Riser Size OD ID

Manufacturer & Type Connector

Length / Joint Number of Joints

List Pup Joints

Last Inspection By

Frequency of Inspection

Kill & Choke Lines, Size

Booster Line, Size

Hydraulic Fluid Line, Size

Buoyant Riser Joints, Number Type

2 Telescoping Joint, Manufacturer Size (ID)

Length of Stroke

3 Flexible Joint, Manufacturer Type

Max. Deflection Angle Indicator

4 Riser Tensioning System

5 Max. Tension Angle Line with Riser

6 Riser Tensioning Lines, Size Number

7 Guideline Size

8 Guideline Size

9 Rotary Hose, Size Length Rating


MUD SYSTEM

1 Mud Storage Tanks

Mud Pits Capacity, bbls

Slug Pits 1

Trip Tank

2 Mud Mixing Equipment

3 Pit Level Indicator, Type

4 Flow Indicators Type Location

5 Shale Shakers

6 Desanders

7 Desilters

8 Centrifuges

9 Degassers

10 Remarks
BLOWOUT PREVENTER STACK

1 Diverter System

Manufacturer & Type Size Rating

Side Outlets Number Size

2 Blowout Preventers (Main Stack) (incl. stack arrgt drg)

a) Manufacturer & Type Size Rating

b) Manufacturer & Type Size Rating

c) Manufacturer & Type Size Rating

d) Manufacturer & Type Size Rating

e) Manufacturer & Type Size Rating

f) Manufacturer & Type Size Rating

Available Pipe Rams

Connector/Flange/Clamp Size Rating

3 Kill & Choke Valves (Main Stack)

a) Manufacturer & Type Size Rating

Operation

b) Manufacturer & Type Size Rating

Operation

4 Side Outlet Location

Position 1 2

3 4

5 Auxiliary

??????????????????????????????????????????????????????????????????????????????????????????????

8 BOB Handling Systems

CONTROL SYSTEM

a) Semi-submersibles

1 Manufacturer Type

2 Control Pods Manufacturer & Type

3 Surface Accumulators

No. Manufacturer Type

Charge Press Volume Usable Volume

Oper Press Pumps No. Type


4 Calc Volume to close, Open, Close All Preventers + 25% of close

Oper Press Surplus Vol. %

(include subsea accumulators in calculations)

5 Control Hose (Hydraulic System)

Hose Bundle No 1 Length Reel Capacity

Hose Manufacturer & Type

Number of functions per Hose

Size of Function Hoses

Hose Bundle No 2 Length Reel Capacity

Hose Manufacturer & Type

Number of functions per Hose

Size of Function Hoses

6 Closing Times: Annular Preventer

Ram-type Preventers

ii) Jack-Ups

1 Manufacturer Type

2 Accumulators

Number Manufacturer Type

Charge Press Vol. Usable Vol.

3 Calc Volume to close, Open, Close All Preventers + 25% of close

4 Closing Times: Annular Preventer

Ram-type Preventers

WELL CONTROL MANIFOLD & SYSTEM


(include a diagram of choke and standpipe manifolds)

1 Choke Manifold Size

Chokes: 1) Type Rating

2) Type Rating

3) Type Rating

4) Type Rating

Separator, Size Rating

2 Choke Manifold Control

Type

Location

3 Standpipe Manifold Size Rating


STORAGE CAPACITIES

Consumables Storage

1 Bulk barytes cu ft in tanks

gel cu ft in tanks

2 Socket Storage sacks

3 Bulk cement cu ft in tanks

4 Base oil bbls

5 Brine bbls

6 Fuel oil tons

Fuel oil consumption a) Transit tons / day

b) Drilling tons / day

7 Drilling water tons

8 Portable water tons

9 Water making unit Manufacturer Volume / Day

Variable Operating Load

1 Drilling

2 Transit tons at ft draft

a) Field move tons at ft draft

b) Ocean move tons at ft draft

3 Survival

a) Anchored tons at ft draft

b) Transit tons at ft draft

Deck Cranes

1 Capacity tons @ ft radium. Boom Length

2 Capacity tons @ ft radium. Boom Length

3 Capacity tons @ ft radium. Boom Length

4 Capacity tons @ ft radium. Boom Length

5 Make and model