EB Liasoning & Self Execution Proposal - GHAN22 IN-3128307

S.NO Description Of Items UOM Qty Remarks

2 Steel Tubular Pole 9 mtr. Long(154 Kgs) SP 32 Each 1


Steel Tubular Pole 10 mtr. Long(200 Kgs) For Transformer(sub-station)
3 only * prior approval to be obtained Each 1

AAAC Conductor 7/3.15 mm 30 MM SQ. (REC SPECS. E-


8 10/73)INCLUDING CUTTING AND SAGGING FOR LT LINE Mtr. 280
10 G.I. Wire 8 SWG Kgs 15
11 Shackle Insulator No 10
12 D-Iron No 8
LT/HT Stay Set MS 11 kv overhead line complete with 19/20 mm
diameter *1.8 mtr long stay rod and anchor plate of size
17 45cm*45cm*6mm thimble and stay clamp turn buckel (20mm* 600 Set 3
mm) 7 SWG/4mm diameter stay wire and 11 kv strain insulator (1 no)
includind excavation filling and ramming
19 M.S. Nuts & Bolts all size Kgs 8
20 Aluminium Paint NO 3
22 Supply & Installation of RCC Muff/Cement Concreting for GI Pipes & ChanneNo 1

RCC Muff for LT/HT line (errection of steel tubular pole length 9 mtrs
23 long excavation for cement concrete (1.3.6) agreegate 40mm normal No 2
size foundation including excavation and filling as required)

44 L.T. MCCB 63-100 A 25 KVA including LT box (havells/L&T) Set 1


50 G.I. Thimble all size No 26
77 Cable 4Cx35 Sqmm - Aluminium - Armoured - HRFR Mtr. 85
123 Black Tape No 4
135 LTCT/Traveko Meter- /5 A-0.5 accuracy WC Meter (Including testing) Each 1
148 Earthingof Pole No 2
151 Bakalite Sheet No 2
153 M-Seal No 4
158 Gland Nos 1
159 Supply & installation of meter box with stand Nos 1
A.2.14 4Cx16 Sqmm - Cu - AR - HRFR Mtr 1
Other Terms: Service Charges
S.NO Description Of Items UOM Qty
1 Service Charges for 3 phase healthy connection (Non EB to PC) per site 1
8 Additional Service Charges for EB Connection From Standard Vendor per site 1
Labour Charges:
S.NO Description Of Items UOM Qty
3 Erection charges of LT line, 3 phase per km 0.360
5 Transportation on the material cost (4%) per site 4%
6 Head load charges on the material cost (3%) per site 3%
Installation of Steel / PCC poles (digging and fitting etc)(in SELF
14 Execution) per pole 2

Additional for extra


19 Team Mobilization Charges-Capex Per Visit 3 work stay installation