Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

EB JMR 3 PHASE PC - HP KSBA20 IN-2019314

S.NO Description Of Items UOM Qty Remarks

2 Steel Tubular Pole 9 mtr. Long(154 Kgs) SP 32 Each 6


9 AAAC Conductor 7/4.26 FOR HT LINE Mtr. 450
10 G.I. Wire 8 SWG Kgs 50
11 Shackle Insulator No 4
12 D-Iron No 4
16 Eye Hook Bolt ( J BOLT ) No 4
LT/HT Stay Set MS 11 kv overhead line complete with 19/20 mm
diameter *1.8 mtr long stay rod and anchor plate of size
17 45cm*45cm*6mm thimble and stay clamp turn buckel (20mm* 600 Set 9
mm) 7 SWG/4mm diameter stay wire and 11 kv strain insulator (1 no)
includind excavation filling and ramming
19 M.S. Nuts & Bolts all size Kgs 55
20 Aluminium Paint NO 8 1 Dead & 1 Tapping
22 Supply & Installation of RCC Muff/Cement Concreting for GI Pipes & ChanneNo 1 Meter box Reinstalled

RCC Muff for LT/HT line (errection of steel tubular pole length 9 mtrs
23 long excavation for cement concrete (1.3.6) agreegate 40mm normal No 6
size foundation including excavation and filling as required)

24 CI X-Arm(600x100x50 mm) No 10
26 CI(2800x100x50)mm for X-Arm Transformer base main channel No 14
27 C.I. /F.G. X -ARM ( 2400X100X50) MM FOR DOUBLE POLE Each 4
28 CI X-Arm(1500x100x 5 mm) Each 4
29 AI (460x100x50)mm for X-Arm Transformer base main channel No 32
30 AI X-Arm(2800x45x45) mm for lightening Arrestor No 6
33 11 kva pin insulator with pin No 18
34 G.O.Switch 11 kv line (isolator) Set 2
35 D.O.Fuse 11 kv Set 2
38 Supply & Installation of GO Switch Guiding clamp No 2
39 Lightening Arrestor (11KV) complete set (3 no's) Set 1
Disc Insulator 11 KV with fitting including ( Ball eye cleaves/Wind
42 Stapple, dead end clamp ,nut and volt,) Set 18

Earthing work for Transformer (Earthing pit required : (1*1*3) mtr


excavation, GI pipe 50mm dia holes of 16mm at 150mm from center to
43 center for 2 mtrs, MS plate 150*150*6mm (1.13kg aproxx), 50*6mm No 3
MS flat connection with mat to mat, nut bolts GI 16mm* 50

44 L.T. MCCB 63-100 A 25 KVA including LT box (havells/L&T) Set 1


49 Half Clamps/pole clamp No 70
50 G.I. Thimble all size No 50
51 Danger Plate No 5
52 Barbed Wire Kgs 5
53 Energy Meter 3 phase 4 wire -10-60 A (Including testing) Secure/L&T No 1
77 Cable 4Cx35 Sqmm - Aluminium - Armoured - HRFR Mtr. 60
Meter box , M.S Frame Structure for holding Main switch & Meterbox.(
121 Meter Canopy stand) with cover etc (approx size 24"x24"x6" with 16 No 1
gauge sheet ( Iincluding installation )
123 Black Tape No 4
KIT-KAT FUSE CERAMIC 63 (upto 15 kw)/100 A (above 15 kw) including
128 installation SET 6
133 POLE TOP CLAMP M S FLAT 50X6mm Each 18
135 LTCT/Traveko Meter- /5 A-0.5 accuracy WC Meter (Including testing) Each 1

25 KVA,11/0.4 KVA Transformer including transportation, loading &


136 unloading, testing & commissioning. Each 1
147 Paint - Complete Sub-Station2.5+2.5 Each 2
148 Earthingof Pole No 2
152 Supply and Installation of Aluminimum Bus Bars (2 ft) SET 5
153 M-Seal No 4
154 Disc Wind Staple / Flat MS Strip As per SEB Specifications No 30
155 Supply and Installation of Post Insulator for Bus Bars & GI Strip All Sizes No 8
A.2.14 4Cx16 Sqmm - Cu - AR - HRFR Mtr 1
Other Terms: Service Charges
S.NO Description Of Items UOM Qty
7 Service Charges for 1 Ph to 3 Ph Conversion & TC-PC per site 1
Labour Charges:
S.NO Description Of Items UOM Qty
1 Erection charges of 25/63/100/250 kva substation per site 1
2 Erection charges of HT line work 11/22 kva per km 0.130
3 Erection charges of LT line, 3 phase per km 0.060
4 Tapping Structure per site 1
5 Transportation on the material cost (4%) per site 4%
6 Head load charges on the material cost (3%) per site 3%
Installation of Steel / PCC poles (digging and fitting etc)(in SELF
14 Execution) per pole 7
1 for meter box
15 Manual Carriage for Transformer of 25/kva from road head to site 1KM 1
19 Team Mobilization Charges-Capex Per Visit 2