Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

Disaster

Recovery and
Risk Reduction
Written Work 1
Individual Output
Second Semester
2022-2023
Written Work 1
Hazard Profiling
Instructions:
• The learners are going to describe their community
• The learners are going to choose and describe one disaster [Geologic, Hydrometeorological, Man-
Made] that happened in the community
• List the three protocols that the Barangay has (before, during, and after).
• List the people involve and what are their roles during the disaster

Disaster Readiness
and Risk Reduction
Written Works 1

[Assigned Community]

[Name of Proponent #1]

12 – [Section] Part 1

Presented to Overview of [Assigned


[Name of Subject Teacher] Community]

Disaster Readiness
and Risk Reduction
Introduction of [Assigned Community]

[Images]

Add the following:


•Population
•Land Area
•Coordinates

Hazard Profile

Disaster Readiness
and Risk Reduction
[Geological/ Hydrometeorological/
Man-made Hazard]

• Frequency of the disaster


• Likelihood of the hazard
• Warning of Hazards

3 Protocols done by the local


government

* 3 protocols (before, during, after) the


disaster

Disaster Readiness
and Risk Reduction
Personnel Involved

References (APA Format)

Disaster Readiness
and Risk Reduction
Format
• Word Document
- Letter Sized
• Font Style: Arial
• Font Size:
• Title: 14
• Content: 12
• Number of Pages Required: Maximum 10
• Logo: SHS Logo and AdDU Logo must be shown and
used appropriately.

Disaster Readiness
and Risk Reduction
RUBRICS

Disaster Readiness
and Risk Reduction
Criteria 1 2 3 4
Descript The output DOES NOT The output contains one The output contains only The output contains ALL of
ion of contain any of the of the following details: two of the following the following details:
the following details: • Most recent number of details: • Most recent number of
commu • Most recent number of population • Most recent number of population
nity population • Topography population • Topography
(x2) • Topography • Actual picture of the • Topography • Actual picture of the
• Actual picture of the Community • Actual picture of the Community
Community Community
Hazard The output DOES NOT The output discusses only The output discusses only The output discusses ALL
Profile discuss any of the one of the following: two of the following: of the following:
following: • Likelihood of the hazard • Likelihood of the hazard • Likelihood of the hazard
(x2) • Likelihood of the hazard • Frequency of the hazard • Frequency of the hazard • Frequency of the hazard
• Frequency of the hazard • Warning System of the • Warning System of the • Warning System of the
• Warning System of the disaster disaster disaster
disaster
Protocol The output DOES NOT The output contains ALL of The output contains ALL of The output contains ALL of
s contain any of the the following information: the following information: the following information:
following information: • (1) Activities done • (2) Activities done • (3 or more) Activities
(x2) • Activities done BEFORE BEFORE a disaster BEFORE a disaster done BEFORE a disaster
a disaster • (1) Activities done during • (2) Activities done during • (3 or more) Activities
• Activities done during a a disaster a disaster done during a disaster
disaster • (1) Activities done after • (2) Activities done after • (3 or more) Activities
• Activities done after the the disaster the disaster done after the disaster
disaster
Disaster Readiness
and Risk Reduction
Criteria 1 2 3 4
Persons Involved The output The output identifies four The output identifies The output identifies four
identifies one two three or more
people/stakehol people/stakeholders/orga people/stakeholders/orga people/stakeholders/orga
der/organization nization who actively nization who actively nization who actively
who actively participated before, participated before, participated before,
participated during, and after a during, and after a during, and after a
before, during, disaster. disaster. disaster.
and after a
disaster.
Language Use, So many A number of spelling, Few spelling and Virtually no spelling,
Style & spelling, punctuation or punctuation errors, minor punctuation or
Conventions punctuation, grammatical errors. grammatical errors. grammatical error.
and grammatical (four to six errors were (one to three errors were
(Sentence errors that it sighted) sighted)
structure, word interferes with
choice, grammar, the meaning.
spelling, (seven or more
punctuation) errors were
sighted)

Disaster Readiness
and Risk Reduction
Criteria 1 2 3 4
Format The output was The output was written using The output was written using The output was written using
written using all all the following format: any four of the following all the following format:
the following Word Document​ format: Word Document​
format: Word Document​
Word Document​ • Letter Size (8” x 11”)​ • Letter Size (8” x 11”)​
• Letter Size (8” x • Font Style: Arial​ • Letter Size (8” x 11”)​ • Font Style: Arial​
11”)​ • Font Size​: at least 12 • Font Style: Arial​ • Font Size​: at least 12
• Font Style: Arial​ • Page number (Number of • Font Size​: at least 12 • Page (Number of pages
• Font Size​: at least pages Required: Maximum • Page number (Number of Required: Maximum of 10​)
12 of 10​) pages Required: Maximum • Logo: SHS Logo and AdDU
• Page number • Logo: SHS Logo and AdDU of 10​) Logo must be shown and
(Number of pages Logo must be shown and • Logo: SHS Logo and AdDU used appropriately. ​
Required: used appropriately. ​ Logo must be shown and
Maximum of 10​) used appropriately. ​
• Logo: SHS Logo
and AdDU Logo
must be shown
and used
appropriately. ​
Promptness The output was The output was submitted on
submitted late. time. (refer to the instructed
due date and time c/o
teacher)
References The output missed The output missed to enlist The output missed to enlist The output enlists all the
to enlist seven or four to six references/source one to three references/source used (both
more used (both texts and photos). references/source used (both texts and photos).
references/source texts and photos).
used (both texts
and photos). Disaster Readiness
TOTAL and Risk Reduction
/40

You might also like