The Central Safety Committee meeting was held on 26th September 2022. Key discussions included:
1. An HSE message was shared and the next message will be from Thiagarajan. Performance scoreboard showed 89 days LTI free and 318,604 LTI free hours.
2. Activities completed in September such as energy reviews and training were discussed. The FY22 HSE plan and FY23 endorsement were also reviewed.
3. Matters arising included actions around walkie talkie communication upgrades and audiometric retesting arrangements. The minutes of the last meeting were also reviewed.
The Central Safety Committee meeting was held on 26th September 2022. Key discussions included:
1. An HSE message was shared and the next message will be from Thiagarajan. Performance scoreboard showed 89 days LTI free and 318,604 LTI free hours.
2. Activities completed in September such as energy reviews and training were discussed. The FY22 HSE plan and FY23 endorsement were also reviewed.
3. Matters arising included actions around walkie talkie communication upgrades and audiometric retesting arrangements. The minutes of the last meeting were also reviewed.
The Central Safety Committee meeting was held on 26th September 2022. Key discussions included:
1. An HSE message was shared and the next message will be from Thiagarajan. Performance scoreboard showed 89 days LTI free and 318,604 LTI free hours.
2. Activities completed in September such as energy reviews and training were discussed. The FY22 HSE plan and FY23 endorsement were also reviewed.
3. Matters arising included actions around walkie talkie communication upgrades and audiometric retesting arrangements. The minutes of the last meeting were also reviewed.
The Central Safety Committee meeting was held on 26th September 2022. Key discussions included:
1. An HSE message was shared and the next message will be from Thiagarajan. Performance scoreboard showed 89 days LTI free and 318,604 LTI free hours.
2. Activities completed in September such as energy reviews and training were discussed. The FY22 HSE plan and FY23 endorsement were also reviewed.
3. Matters arising included actions around walkie talkie communication upgrades and audiometric retesting arrangements. The minutes of the last meeting were also reviewed.
MINUTES OF MEETING- CENTRAL SAFETY cOMMITTEE (CSC)
DATE 26th September 2022 (Monday) TIME 1530hrs to 1630 hrs VENUE Team Meeting (Online) Micros oft Present: Yong Soo San (Chairman) Ng Chia Ling (Secretary) Management Representative Employee Representative Contractor Wong Hung Kuan Juizza Uthyakumar Saravanan (TOLL) Balu Yvonne Chan Sharifudin Mohd Salji Zulfahmi LiewKah Wai Alvin Loh Syaiful Amir Sharmila Mazlina Kama Azreik Murali Raman Hanim Abu Bakar_ Thana Kuppusamy Farhan Nasurudeen Absent: Baharuddin Agenda: Safety Message Review of Minutes of Last Meeting Performance Scoreboard Matters arising Feedback from Crew Review of High Risk SORI Audit Findings/ Minute verification & closure .Incident Sharing: ICAM, othersites sharing Activities BlueScope LOG STATUS BY WHOM BY WHEN ACTIONS PLAN DATE NO. ITEM/ ISSUE 22.8.22 30.10.22 Open "Refresher of Safety Hazard". Thiaga HSE message shared by Thana on 1 HSE message Next HSE message will be share by Thiagarajan. LTI Free Days= 89 days 2 Performance LTI Free Hour- 318,604 Hours Info Scoreboard (Leading and shared the HSE scoreboard and incidents listing for ChiaLing Lagging Indicators)) FY22. Activities completed during month of September a) Energy and GHG review review FY22 HSE Plan b) Traffic management risk Info waste management training (Summary of FY22 Climate change awareness, c) Batch 1 3 activities) d) Contractor supervisor Sheet and Chemical Handling, respiratory fit & FY23 HSE plan e) Safety Data endorsement test, PPE training of 477 frequency 30.10.22 channel communication Murali 26.9.22 Open Current walkie talkie 2022. terminated on 31 Dec Walkie talkie band will be information on number of walkie- talkie 4 Procurement is gathering Channel communication impacted on this change. with Standard Mazlina 26.9.22 11.11.22 Open arrangement for employees audiometric HR to liaise on previous months after the Threshold Shift within 3 Audiometric retest 5 was camied out. testing BlueScope REVIEw OF LAST MOM Ingot fall from crane tong while transferring to Corrective & Preventive Actions: premelt pot 1) Communicated to all potman via memo, if pin is covered with metal, cleaned before use: Done 2) Provide pictorial checklist for overhead crane for Done daily check: 3) Schedule crane tong preventive maintenance Proactive Level 4 months): Done (Proposed 3 incident 4) Install additional beam to strengthen the platform.: Done 5) Conduct physical audit and refresher for ingot lifting (Inclusive implementation of pictorial checklist and procedure): Sentot 27.4.22 18.5.22 Done Open 6) Implement ARDI system for overhead crane checklist: Open In progress 7) Tong pin to be coat with boron nitride to prevent metal build up: (using Microsoft Done Norsyam forms as interim action) Minutes prepared By: Approved By X .... AL ***i************ NG CHIA LING YONG S0O SAN Secretaryy CSC Chairman Date: 19th October 2022