DRILLING LOGS

PROYEK JALAN TOL BLANG BINTANG - BANDA ACEH SEKSI 5 DAN 6


STA 66+830 BORE HOLE NO. BH T-07

Coordinates :X= Driller : Ujang


Y= Start Date : 22/06/2019
Ground Level : m Finish Date : 24/06/2019
Depth of Hole : 20,00 m Logged By : Ratu Salma
GWL : -2,00 m M.Sudirman

SPT

Thickness ( m )
SPT Diagram Sample No.

Elevation ( m )

Depth ( m )
Layer No.

Legend
Description N - Value / 30 cm
Depth Blow Count
N Depth ( m )
(m)
N0 N1 N2 10 20 30 40 50 60
0,00 - 13,00 m :
LANAU Kerikilan, coklat tua - abu muda,
1.0 konsistensi sangat kaku - sangat keras.

2.0 1.55 - 2.00 7 11 16 27

3.0 DS1 (55,0 cm)


3,00 - 3,55

4.0 3.55 - 4.00 7 14 19 33

5.0 DS2 (55,0 cm)


5,00 - 5,55

6.0 5.55 - 6.00 9 18 24 42

13.00
7.0

8.0 7.55 - 8.00 12 24 27 >50

9.0 DS3 (55,0 cm)


9,00 - 9,55

10.0 9.55 - 10.00 27 50/12 >50

11.0 DS4 (55,0 cm)


11,00 - 11,55

12.0 11.55 - 12.00 50/9 >50

-13,00 13.0
13,00 - 14,00 m :
1.00 BATU Bolderan, coklat, konsistensi
-14,00 sangat padat. 13.55 - 14.00 50/9 >50
14.0
14,00 - 15,00 m :
1.00 LANAU Kerikilan, coklat kekuningan,
-15,00 konsistensi sangat keras. DS5 (55,0 cm)
15.0
15,00 - 16,00 m : 15,00 - 15,55
1.00 BATU Bolderan, coklat muda, konsistensi
-16,00 16.0 sangat padat. 15.55 - 16.00 50/9 >50

16,00 - 19,00 m :
LANAU Kerikilan, coklat, konsistensi
17.0 sangat keras.

3.00
18.0 17.55 - 18.00 50/7 >50

-19,00 19.0 DS6 (55,0 cm)


19,00 - 20,00 m : 19,00 - 19,55
1.00 BATU Bolderan, coklat, konsistensi
sangat padat. 19.55 - 19.65 50/5 >50
-20,00 20.0