KNPC ZOR Project

Blinding Concrete Report


P055BZOR-0051-Q-412
Rev.: O, 09-Aug-16

Tag No: Tag Description:


TOS No: TOS Description:
CWP: PO No.:
ITP Ref. No.: Subcontractor:
Insp. Request No.: Drawing Ref.:

Inspection Result
Description of Activities Remarks
Accept Reject N/A

1 Check that all existing surface are released:  

Guide rails set for 50 mm minimum blinding


2    
thickness:
Setting out verified by surveyor(dimension,
3     
location & elevation):

Blinding Concrete Pouring Record

SI.
Location Quantity(m³) Truck No. Ticket No. Time Start Time Finish Remarks
No

All blinding concrete has been constructed in accordance with the specification and approved drawing.

  Water curing   Curing compound


The above mention has been satisfactorily completed and checked by the survey department for correction level.
The gauge polyethylene sheet has been place and ready for the next stage of construction

Description Subcontractor Contractor Company

Name

Signature

Date

Page 1 of 1