U POC PDH/UTOS PROJECT

RISK ASSESSMENT
SUBJECT: RISK ASSESSMENT FOR SPLITTER INSULLATION JOB

Company: BFIM Area / location: Dess-up Area APOC PDH/UTOS PROJECT


Date: February 7, 2023 Ref No: SESA-BFIM-RA-INS-002

ACTIVITY Hazard Identified Risk Initial RL Control Measures Final RL Responsibility


C L RL C L RL
 Mechanical  Crane tilting  Insulation and metal sheet should properly
hazard  Equipment prepared and ready to install
collapse  Surface and walkway must be free from any
 Fatality obstruction, unnecessary materials shall be
removed.
 Ground level should be covered by plastic to
ensure proper management of insulation waste.
 Inspection will be executed by QC inspector
during preparation and completion for quality Supervisor
issue. EHSS officer
2 2 4 1 2 2
 Provide hard barricade to avoid entering of any Crane operator
unauthorize person, only the working crews Rigger
allowed inside the barricaded area.
Job preparation underneath the  The Safety officer will ensure the compliance of
saddle # 4, & 8 the requirements including the issuance of work
permits prior to commence the activity.
 Project manager will have a proper coordination
to ARCC and MAMMOET who in charge in lifting
activity.

 Ergonomic  Back injury,  Minimize the weight of load handled


Hazard sprain, and  Avoid moving bulky loads by hand
Supervisor
(Manual muscle strain  Make sure hand interfaces are working well and
2 2 4 1 2 2 EHSS officer
lifting) not slippery
Crew
 Find ways to adjust tool handles that are small
and narrow
APOC PDH/UTOS PROJECT
RISK ASSESSMENT
ACTIVITY Hazard Identified Risk Initial RL Control Measures Final RL Responsibility
C L RL C L RL
 Only competent/ trained scaffolder with certified
supervisor executes the scaffolding job.
 Ensure the stability of scaffolding and ground
condition.
 Collapse of Supervisor
 Materials shall not be stored on the working
 Unstable scaffolding EHSS officer
platform.
Scaffolding erection and dismantling Scaffolding  Falling of Crane operator
2 2 4  Referred to JSA No. SESA-BFIM-JSA-SCAF-002 1 2 2
underneath the saddle # 4, & 8 platform materials Rigger
 Provide appropriate PPEs to the workers.
 Fall of Insulator
 Shall ensure complete scaffolding platform has
personnel Scaffolder
been erected.
 Wear fall body harness at 1.8m heights work
platform.
 Compliance to JSA No. SESA-BFIM-JSA-INS-002
Installation of insulation and cladding  Wear appropriate dust mask (rated N95/ 3M dust Supervisor
underneath the saddle # 4, & 8  Respiratory mask) EHSS officer
 Dust problem  Always wear disposable coverall and safety glass Crane operator
accumulation  Skin/ Eye 2 3 6 during application of insulation 1 2 2 Rigger
irritation  MSDS must be available and discussed to the Insulator
workers for their awareness. Scaffolder
 Compliance to JSA No. SESA-BFIM-JSA-INS-002
 Sharper edge  Laceration/ Cut  Wear proper hand gloves as per EN 388:2016 cut
of Cladding injury standard with performance level rating of 4 or 5
to prevent hand injury.
 Properly handle the materials and stored
accordingly.
2 3 6 1 2 2
 Unnecessary cladding shall be place on proper
storage.
 Cladding waste must be disposed of properly to
avoid scattering on the working area.

 Caught in  Fatality 2 2 4  Rigging equipment’s shall be inspected with 1 2 2


Between,  Equipment concerns company (ARCC/Mammoet)
Rolled Over, collapse  Assigned safety officer and site supervisor must
Pinch Point  Laceration be available at all times.
2
APOC PDH/UTOS PROJECT
RISK ASSESSMENT
ACTIVITY Hazard Identified Risk Initial RL Control Measures Final RL Responsibility
C L RL C L RL
and Bump  Contusion  Equipment must be secured with proper
Hazard positioning under suspended load to ensure
workers are safe from danger.
 Crane lifting plan shall be available for critical
lifting manage by Rigger 1 (supervisor) and it shall
be discussed to both parties working the same
area.
 Shall install the barricades and strictly not allow
unauthorize personnel in the area.
 The loads shall not be exceeded to Crane SWL
rated capacity; the rigging supervisors shall
ensure the safe lifting requirements have been
complied with.
 Insulators must be alert to the possible
movement of the equipment, always place
themselves in a safe position (not under the
suspended load).
 Bfim will assigned Watchman/ Standby man on
every group of activity.
 Supervisor and safety officer shall closely monitor
the activity, any sudden movement of the
equipment must stop the work immediately.
 Lifting  Severe physical 2 2 4  Shall ensure rigging tools and equipment must be 1 2 2 Supervisor
equipment injury in good condition and properly inspected by the EHSS officer
failure during  Fatality assigned competent personnel. Crane operator
activity  Do not lift when the wind speed exceeds 25knot/ Rigger
32 kph.
 Stop the work when the weather conditions are
bad such as sandstorms, rain or high temperature
of heat exceeds as per permit requirements.
 Damaged rigging tools shall be remove from site.
 Full supervision required and be vigilant during
underhung activity for insulation, any observed
with unpleasant things shall be immediately stop

3
APOC PDH/UTOS PROJECT
RISK ASSESSMENT
ACTIVITY Hazard Identified Risk Initial RL Control Measures Final RL Responsibility
C L RL C L RL
the work and reported.
 Illumination  Eye strain  Adequate planning for lighting in the area
(Insufficient  Headaches (quantity, quality)
Supervisor
and excessive  Impairment of  Provide sufficient lighting
2 2 4 1 2 2 Electrician
lighting) vision  Maintenance of lighting fixtures
EHSS officer
 Proper positioning of workers

 Biological  COVID 19  Shall ensure all employee’s got vaccinated with
hazards  Venom COVID 19.
(Virus,  Extreme pain  Proper PPE must always be worn. Supervisor
bacteria,  Fatality 2 2 4  Shake out clothing or shoes before putting them 1 2 2 EHSS officer
Venomous on Working crew
animals)  Clean the area to avoid venomous animals stay on
the area.
 Hot weather  Heat stress/  Workers shall always work in pairs when required.
condition Heat stroke/  Work on scaffolds and elevated areas shall be
Heat cramps stopped when temperature is 50deg Celsius or
and health more.
problems  Workers shall be instructed to drink water on
regular interval according to the heat level.
 Ventilation shall be provided inside the vessel
Supervisor
 Drinking water shall be renewed first thing every
2 2 4 1 2 2 EHSS officer
morning before commencing the activities and
Working crew
shall be kept cold by using ice.
 Workers shall be informed and trained in the
effects of heat on the body and the preventive
and control measures to avoid it.
 Heat stress program shall be implemented
 Protective clothing providing cooling shall be
considered for extreme cases.
 Electrical  Electric shock/  Only competent electrician authorized to do any
contact Fire Supervisor
electrical related activity.
2 2 4 1 2 2 EHSS officer
 Shall ensure proper cable management applied
Electrician
 Remove all damaged electrical cables and
4
APOC PDH/UTOS PROJECT
RISK ASSESSMENT
ACTIVITY Hazard Identified Risk Initial RL Control Measures Final RL Responsibility
C L RL C L RL
appliance
 Provide fire extinguishers and fire watcher
assigned.
 The scaffold shall not be near to any high-tension
electrical lines.
 Falling object  Struck by/ head  Loose clamps shall all put in specific clamp
injury buckets
 Keep all tools closer to users’ body by using tool
lanyard
 Barricade work area and provide warning signs.
 Never accumulate scaffolding material at height
Supervisor
while erection.
2 2 4 1 2 2 EHSS officer
 Ensure falling protection (crash deck) is provided
Working crew
to prevent falling materials during lowering and
raising scaffold materials.
 No loose materials shall be kept on scaffold.
 Ensure nobody is exposed under line of fire.
 Keep horizontal distance with lifting object in case
of accidental dropping
 Poor  Falling  Housekeeping shall be held on a daily basis at the
housekeeping materials/ end of the shift. Proper time shall be allocated for
 Fall of this purpose. Supervisor
personnel 2 2 4  Unsafe conditions due to poor housekeeping shall 1 2 2 EHSS officer
 Injury due to be immediately eliminated from the workplace. Working crew
tripping hazard  All construction waste and unwanted materials
shall be removed from site on a daily basis.

NOTE:
1. Assigned Job supervision and EHSS Personnel shall be always at the work location.
2. Entry to multiple confined space at different elevation on one equipment Risk assessment is subject to revision and review depending on site requirement and changes in the site condition and
situation.
3. Refer to approved JSA for further information related to hazards, risks and control measures.
5
APOC PDH/UTOS PROJECT
RISK ASSESSMENT
ACTIVITY Hazard Identified Risk Initial RL Control Measures Final RL Responsibility
C L RL C L RL

Risk Assessment Team:

SN
Name Designation Signature Date
.