Arche 2019 - Column Ec2 Sp0 © Graitec
Arche 2019 - Column Ec2 Sp0 © Graitec
Arche 2019 - Column Ec2 Sp0 © Graitec
10/01/20
I) Global assumptions
II) Geometry
___________ ___________
| | 0.25 RECTANGULAR | | 0.00
|___________| |___________|
0.25 0.00
III) Loads
Calculation report 1
03/03/2021 09h39
Arche 2019 - Column EC2 SP0
Load type Nz Mx My Vx Vy
Dead load 166.5 -1.1 -0.3 -0.3 0.2
Self weight 4.6 / / / /
Imposed 1 21.8 -0.4 0.1 0.1 -0.1
Imposed 2 90.6 -1.1 0.5 0.2 -0.2
V) Shear force
Along Ox
Design shear force : VSd= -0 kN
Resisting shear force of concrete only : VRd1= 50 kN
Ultimate shear force : VRd2= 236 kN
Resisting shear force : VRd3= 0 kN
Along Oy
Design shear force : VSd= 0 kN
Resisting shear force of concrete only : VRd1= 50 kN
Ultimate shear force : VRd2= 236 kN
Resisting shear force : VRd3= 0 kN
VI) Reinforcement
Calculation report 2
03/03/2021 09h39
Arche 2019 - Column EC2 SP0
Calculation report 3
03/03/2021 09h39
Arche 2019 - Column EC2 SP0
--REQUIRED REINFORCEMENT --
Longit. reinf. required by design: Amin= 1.25 cm² A=5.25 cm² Amax=25.00 cm²
Required longitudinal reinforcement = 5.25 cm²
-- PROVIDED REINFORCEMENT --
CONSIDERED COLUMN
Current column:
Steel binder along a dir: single bar frames
Steel binder along b dir: single bar frames
No starter bar at bottom
Calculation report 4
03/03/2021 09h39