54. GA of PCC poles (9 Mtr long, 400 KG) for 11 KV OH Lines at Tangent location.
55. GA for 11 KV line sectionalizer on PCC pole
56. GA for 11 KV line sectionalizer on PCC pole
57. GA with PCC Pole (8 Mtr, 200 KG) with extension for 11 KV OH Line.
58. Details of V Bracket & Top Adopter for 11 KV line on PCC pole ( 8 Mtr ,200 KG) at tangent location
59. 11 KV line Protective Guarding across the minor crossing like village road etc.
60. Armouring tapping and Binding of overhead line conductor for HV line pin type insulator
61. Mid Span Twister Joint for ACSR
62. Holding of conductor formation on 11 KV Pin Insulator straight run( Helically formed fittings)
63. Holding of conductor formation on 11 KV Pin Insulator angle location( Helically formed fittings)
64. Holding of conductor formation on 11 KV Pin Insulator dead end ( Helically formed fittings)
65. 11 KV Danger Board
66. 45 KN Composite Insulator
67. Bimetallic connector(H.T.) for 11KV Distribution Transformer
68. GA of DC Cross Arm & Bracing with Back Cleat for for 150m DP on 600IBS PCC pole
69. GA of 11 KV Line Crossing of Railway using 3cx185 sqmm XLPE cable on PCC pole DP Structure.
A
70. 11 KV AB Cable to Cable End Termination Arrangement
E> General Drawing
71. Foundation Details of PCC/PSC Pole
72. Pole pit for PCC pole in normal soil.
73. RCC base Pad for PCC/PSC Pole
74. Stay set arrangement on PCC /PSC pole
75. Spike type earthing for normal soil
76. Pipe type earthing details
77. Guy end assembly (using Helically formed fittings )
78. Cable trench Layout 500 mm
79. Cable trench Layout 750 mm
80. Pin Insulator
81. Strut Arrangement
82. Stone/RCC base plate for Stay set
83. Arrangement for Binding of Stay Wire
84. Guying Arrangement Single & Double Guy
85. Arrangement for U.G. cable laying direct in ground with brick protection in ordinary location.
86. Arrangement for laying of 4 nos. & 3 nos.UG cable directly in ground with brick protection in ordinary location.
87. Details of Protection Duct for cable joint.
88. Details of Marker for 11KV Cable Joint.
Structural Layout
Drawing of New
33/11KV Power
Sub Station
Foundation &
Structural Details
of 33/11KV Power
Sub Station
A B C D
6750 1750 2900
1 2 3 4 5 6 1 2 3 4 5 6
3375 3500 3125 4250 4400 3375 3500 3125 4250 4400
1000
1000
750 (TYP.)
3750
2900
1000
2550
P.V.C WATER RESERVOIR 1000mm HIGH 250 THICK
3750
800
1750
E.L. + 4.550m
FGL
100mm THICK C.C
800
SIDE ELEVATION
250 THICK BRICK WORK
PL 25 THICK D.P.C
ROOF TREATMENT
PL
100 THICK P.C.C. APRON 1.0m WIDE (1:2:4)
6750
800
FINISHING SCHEDULE
R.C.C DRAIN
50
250 THICK
900
SYMBOL MARKED DESCRIPTION BRICKWORK 1000 75 (SLOPE 1:500,
50
100
DEPTH 200 MIN.)
200 75
A 35 MM THICK ARTIFICIAL STONE FLOOR
FGL FGL FGL
B 20 MM THICK ARTIFICIAL STONE SKIRTING 100 MM HIGH _
GRADE BEAM 8 f @ 200 C/C
(REINFORCEMENT _
C 18 TO 22 MM THICK KOTA STONE SLAB IN FLOOR 75 THICK 5-8 f
450
NOT SHOWN)
A 375 THICK B.F.S.
75
D 100 MM HIGH KOTA STONE TILE IN FLOOR AND DADO BRICKWORK 450 50 THICK P.C.C (1:3:6)
19000 1050 75 THICK P.C.C (1:3:6)
E 15 TO 18 MM THICK MARBLE SLAB/TILES IN FLOOR
ROOF PLAN AT E.L. + 4.550m F 100 MM HIGH MARBLE SLAB DADO
TYPICAL SECTION OF PLINTH PROTECTION
G GLAZED CERAMIC TILES, 2.1 M HIGH IN WALL AND SURFACE DRAIN (EXTERNAL WALL)
125 125 THICK
TWO COATS INTERIOR GRADE ACRYLIC EMULSION PAINT OVER ONE COAT
H ACRYLIC PRIMER OVER PLASTER OF PARIS / WALL PUTTY
P.C.C.(1:3:6) NOTES:
OVER S.L.B.F.S 1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE STATED.
I ACRYLIC EMULSION PAINT IN CEILING DETAIL OF PLINTH WALL 2. ONLY FIGURED DIMENSIONS ARE TO BE FOLLOWED AND SHALL NOT BE SCALED.
3. GRID LINES ARE DRAWN ON BEAM CENTERS.
WITHOUT GRADE BEAM 4. FGL SHALL MEAN FINISHED GROUND LEVEL AFTER NECESSARY LAND DEVELOPMENT BY FILLING AND/OR CUTTING, AS THE
J 10 MM THICK ACID RESISTANT TILES
1 2 3 4 5 6 CASE MAY BE, IF ANY.
5. BRICK WALLS OTHER THAN 'P1 & P2' ARE 250mm THICK.
3375 3500 3125 4250 4400 K TWO COATS OF ACID RESISTANT PAINT OVER ONE COAT OF PRIMER
6. CONCRETE FOR RCC WORK SHALL BE OF GRADE M-20, NOMINAL MIX (1:121: 3).
WC 1250 X 7. REINFORCEMENT SHALL CONFORM TO Fe-500 AS PER IS 1786 : 2008.
X 1850 8. FLOOR FINISH SHALL BE PLACED OVER 100mm THICK M15 GRADE CONCRETE (1:2:4). PLINTH FILLING SHALL BE MADE
W2 W2 W1 W2 W2 1950 WITH COMPACTED EARTH BY RAMMING.
W3 W3
9. SUITABLE ROOF TREATMENT SHALL BE ADOPTED AS PER SITE CONDITION.
D D 10. PLINTH PROTECTION AND SIDE DRAIN SHALL BE PROVIDED AROUND THE BUILDING.
H.T.M.T.C SPIRAL STAIR 11. FOR OTHER DETAILS PLEASE REFER DRAWING NO. PLN(D)/SS/44 (REV. 04) LIKE CABLE TRENCH.
BATTERY ROOM BATTERY FLOOR INTERNAL
P2 TOILET 1200F 12. BOTTOM OF LINTEL SHALL BE AT LEVEL 2550mm FROM PLINTH LEVEL. CONTINUOUS BAND LINTEL SHALL BE PROVIDED.
3125X2775 3375 X 2775 ROOM P1 ROOM WALL 13. THE STRUCTURAL LAYOUT DRAWING VIDE NO. PLN(D)/SSL/604 DATED 04.12.2015 FOR MANDARPUR 33/11 KV SUB-STATION
2900
2900
D5 3000 X 2775 4125X2775 SHALL BE REVISED IN DUE COARSE REPLACING THE CONTROL ROOM BUILDING PLAN DRAWN WITH THE ONE SHOWN IN
EH P1 JK T=250
GI JK EH R=160 THIS DRAWING OMITTING THE STAIR.
P1 JK
W2A
P2 JK FI 1000
W4 DADO /
1000
SKIRTING CEILING
C D4 D3 D3 D3 C
P1 P1 P1 P1 REF. WORK ORDER NO. DDUGJY/P-II/2015-16/02 DATED 31.08.2015 OF THE C.E.-PROJECT-II
D2 + CG
D2 + CG
2000
1750
1750
E.L. + 0.800m CH IN CASE OF ANY CONFUSION PLEASE CONSULT DIST. P. & E. DEPT.
DI
1500
B B DISTRIBUTION HQ.
1000
REVISIONS
1500
1500
PLANNING AND ENGINEERING DEPARTMENT
6750
SPACE FOR 11 KV SPACE FOR 33 KV 2550 ALUMINIUM FRAMING GLAZED DOUBLE LEAF, TOP 300 FIXED GLAZED
300 C. & R. PANEL D2 1500 FLOOR PLAN, ROOF PLAN, ELEVATION, SECTION AND SCHEDULES
SWITCH GEAR D3 1000 2550 WOODEN FLUSH DOOR, SINGLE LEAF, TOP 300 FIXED GLAZED
12000 X 6500 6275 X 6500
CH D4 1000 WOODEN FLUSH DOOR, SINGLE LEAF
CH
DI
DI
D5 750
2100
PVC / FRP SHUTTER SINGLE LEAF DOOR DRAWN BY :
W1 W1
S.A.E.(C)
STEEL FRAMED, GLAZED CENTRE 1/3RD FIXED, GLAZED SIDE HUNG, TOP
W1 1800 1800
300mm FIXED GLAZED DESIGNED BY:
A D1 + CG D2 + CG A
W2 1200 1800 STEEL FRAMED, GLAZED SIDE HUNG, TOP 300mm FIXED GLAZED D.E.(C)
W1 W1 W2 W2 W2 W2A 900 1350 STEEL FRAMED, GLAZED SIDE HUNG
W3 900 900 STEEL FRAMED, GLAZED, FAN LIGHT TOP 300mm FIXED GLAZED
DRAWING NO.
T=250 CHECKED BY:
R=160
W4 600 900 STEEL FRAMED, GLAZED, FAN LIGHT TOP 300mm FIXED GLAZED
S.E.(C)
PLN(D)/BLDG/409
ALL STEEL WINDOWS SHALL BE PROVIDED WITH INTEGRATED GRILLS
3375 3500 3125 4250 4400
SCALE: SHEET NO.
1 2 X 3 4 5 6 RECOMMENDED BY:
NTS 1 OF 3
Addl. C.E.-III
P1=125mm THICK BRICKWORK, FULL HEIGHT
P2= 75mm THICK BRICKWORK, 2550mm HIGH GROUND FLOOR PLAN AT E.L. + 0.800m DATE: REV. NO.
ERECTED FROM FLOOR PCC APPROVED BY:
C.E. (P. & E.-Dist.) 26.04.2016 0
1 2 3 4 5 6
ADDITIONAL NOTES FOR BEAM DETAILING:-
3375 3500 3125 4250 4400 1. REINFORCEMENT AT SUPPORT SHALL MEAN REINFORCEMENT AT THE FACE OF
THE RESPECTIVE COLUMN SUPPORT.
2. EXTRA BOTTOM REINFORCEMENT WITH NO CURTAILMENT AT THE FACE OF 0.3L1 0.3L1 0.3L2 0.3L2 0.3L3
COLUMN SUPPORT WHEN NOT CONTINUOUS IN ADJACENT SPANS SHALL BE
GB1 GB1 GB1 GB1 EMBEDDED BY LENGTH 'E' WITHIN THE RESPECTIVE COLUMN.
D D 3. FOR COLUMN CONNECTED BEAMS CLOSED SPACED VERTICAL STIRRUPS
D
SHALL BE PROVIDED UPTO '2D' OR '0.25L', WHICHEVER IS GREATER FROM
FACE OF COLUMN. _
4. AT SPLICED SECTION IN BEAMS PROVIDE VERTICAL STIRRUPS 2L-8f 150 C/C.
0.1L1 0.15L1 0.15L2 0.15L2 0.15L3
2900
2900
GB4
GB5
GB5
GB5
GB6
1750
GB4
GB5
GB5
GB5
GB6
6750
GB4
GB5
GB5
GB5
GB6
GB7
F1 BOTHWAYS _ _
_ GB3 3.125 250 400 2-16 2-16 2-16 + 1-16 2-12 2-12 2-12 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
1350
1450
1350
1450
1150
D 10 f @ 125 C/C _ _
650
650
700
700
F4 1800 X 1800 400 200 4.250 2-16 + 1-16 2-16 2-16 + 1-20 2-12 2-12 + 2-12 2-12 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
BOTHWAYS
575
700 F2 725 F3 675 F2 725 F3 _ _
4.425 2-16 + 1-20 2-16 2-16 + 1-12 2-12 2-12 + 2-12 2-12 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
2900
_ _
1150 6.750 2-20 + 1-20 2-20 2-20 + 2-20 2-16 2-16 + 2-16 2-16 + 2-16 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
550
C 4.700 2-20 + 2-20 2-20 2-20 + 1-12 2-16 2-16 + 1-12 2-16 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
FGL 8 f @ 150 C/C
1800 1800 1800 575 _ _
1800 6.750 2-16 2-16 2-16 + 1-20 2-16 2-16 2-16 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
1750
1700 1450
H = DEPTH OF LAND FILLING
GRADE BEAM
GB5 250 400 _ _
4.700 2-16 + 1-20 2-16 2-16 + 1-16 2-16 2-16 + 1-16 2-16 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
250 X 400
1800
1800
1700
1800
1800
1450
B _ _
H
750
875
925
925
925
6.750 2-12 2-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12
550
_ _ _
8 f @ 100 C/C
925 925 850 F4 925 925
700 F3 GB6 1.800 250 400 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
F5 F5 F5 F5 EGL
E
_ _
2.900 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
E _ _
GB7 6.750 250 400 2-20 + 2-16 2-20 2-20 + 2-16 2-20 2-20 + 1-16 2-20 2-L 8 f @ 100 C/C 2-L 8 f @ 175 C/C
_ _
6750
700
SGB1 6.750 250 400 2-12 2-12 2-12 2-16 2-16 + 1-16 2-16
1500
_
150
8 f @ 150 C/C
50
8 @ 100 C/C
50 Ast
1450 1450 1700 1450
HEIGHT OF COLUMN
1350 1350 D SPLICING SHOULD
d BE DONE WITHIN
75 THICK
1450
1450
1700
1450
1350
1350
MIDDLE-HALF
(50 x D)
A
SPLICE
PCC (1:3:6) OF COLUMN HEGHT.
700
700
750
750
750
875
700
_ BE KEPT EXPOSED FOR LONG TIME AND SHOULD BE COVERED WITH MUD-MAT AS SOON AS POSSIBLE.
8 f @ 150 C/C GRADE BEAM 30
7. LAP LENGTH FOR REINFORCEMENT SHALL BE 50 X DIA. OF THE BAR, PLACED STAGGERED.
X X ROOF BEAM 25
8. GRADE BEAMS SHALL BE LAID OVER 75 THICK P.C.C (1:3:6) PLACED OVER SINGLE B.F.S. ON COMPACTED SOIL.
9. LONGITUDINAL MAIN REINFORCEMENT IN BEAMS (TOP AND BOTTOM) SHALL BE EMBEDDED TO A MINIMUM LENGTH OF 'E'
1 2 3 4 5 6 SPECIFIED IN TABLE IN COLUMNS FROM FACE OF COLUMNS.
A ROOF SLAB 20 10. THE FOUNDATION HAS BEEN DESIGNED AS PER FINDINGS AND RECOMMENDATION OF SOIL INVESTIGATION WORK BY 'M/S
50
3375 3500 3125 4250 4400
CENTRE FOR ADVANCED ENGINEERING' RECEIVED ON 19.04.2016.
_ LINTEL 25 11. THE BUILDING FRAME AND FOUNDATION HAS BEEN DESIGNED CONSIDERING SEISMIC LOADING 'ZONE-III' CONFORMING TO
450
8 f @ 100 C/C
125
125
125
125
125
50 IS 1893 : 2002.
300 300 300 300 300 CHAJJA 20 12. THERE IS NO SCOPE FOR ANY VERTICAL EXTENSION IN UPPER STOREY. THE PROVISION FOR VERTICAL EXTENSION HAS
D D _ NOT BEEN CONSIDERED IN ABSENCE OF SPECIFIC RECOMMENDATION IN THIS RESPECT FROM C.E.-PROJECT-II, AS ADVISED
8 f @ 150 C/C BY THE DIRECTOR (DIST.) ON 08.10.2015 THROUGH U/O NOTE NO. D/D/NR/663 DATED 10.10.2015.
175 C1 150 C1 150 C1 150 C1 150 C1 13. FOR LAYOUT OF THE CONTROL ROOM BUILDING PLEASE REFER DRAWING NO. PLN(D)/SSL/ 604 DATED 04.12.2015. THE
300
300
300
300
300
STRUCTURAL LAYOUT DRAWING FOR MANDARPUR 33/11 KV SUB-STATION SHALL BE REVISED IN DUE COARSE REPLACING
2900
2900
THE CONTROL ROOM BUILDING PLAN DRAWN WITH THE ONE SHOWN IN THIS DRAWING OMITTING THE STAIR AND THE
A PORTICO.
125
TYPICAL DETAIL OF ISOLATED COLUMN FOOTING
300 _
8 f @ 150 C/C
C C
150 C1 300 REF. WORK ORDER NO. DDUGJY/P-II/2015-16/02 DATED 31.08.2015 OF THE C.E.-PROJECT-II
300
1750
1750
175
175
175
175
175
175
_ IN CASE OF ANY CONFUSION PLEASE CONSULT DIST. P. & E. DEPT.
8 f @ 100 C/C
300 300 300 300 300 300 _
B B
4-16 f
DISTRIBUTION HQ.
175 C2 150 C2 150 C2 150 C2 150 C3 125 C4 _ REVISIONS
300
300
300
300
300
300
300
450
4-12 f
_
8 f LATERALS (2 SETS) PLANNING AND ENGINEERING DEPARTMENT
@ 100/150 C/C #
300
(MIN) CONTROL ROOM BUILDING FOR 33/11 KV SUB-STATION AT MANDARPUR,
DETAIL OF 'C1' TYPICAL DETAIL OF COLUMN TIES AT DIST.- BURDWAN
6750
6750
BEAM-COLUMN JUNCTION LAYOUT AND DETAILS OF COLUMN, FOUNDATION AND GRADE BEAM
# FOR LATERAL AND LINK SPACING PLEASE
REFER TYPICAL DETAIL OF COLUMN TIES AT
BEAM-COLUMN JUNCTION
DRAWN BY :
S.A.E.(C)
300 300 300
175
175
175
175
175
175
300 300 300 300 300 300 _ _ _
DESIGNED BY:
A A 8-16 f 4-20 f 8-20 f D.E.(C)
175 C3 150 C2 150 C2 150 C3 150 C3 125 C4 DRAWING NO.
_
300
300
300
300
300
300
300
300
300
4-16 f CHECKED BY:
_ _ _ S.E.(C)
PLN(D)/BLDG/409
3375 3500 3125 4250 4400 8 f LATERALS (2 SETS) 8 f LATERALS (2 SETS) 8 f LATERALS (2 SETS)
@ 100/150 C/C # @ 100/150 C/C # @ 100/150 C/C #
1 2 3 4 5 6 SCALE: SHEET NO.
RECOMMENDED BY:
NTS 2 OF 3
DETAIL OF 'C2' DETAIL OF 'C3' DETAIL OF 'C4' Addl. C.E.-III
COLUMN LAYOUT
DATE: REV. NO.
APPROVED BY:
C.E. (P. & E.-Dist.) 26.04.2016 0
ADDITIONAL NOTES :- 250 125
1. REINFORCEMENT AT SUPPORT SHALL MEAN REINFORCEMENT AT THE FACE OF
_ _
2-8 f 2-8 f
THE RESPECTIVE COLUMN SUPPORT. _ _
150
150
2. EXTRA BOTTOM REINFORCEMENT WITH NO CURTAILMENT AT THE FACE OF 2-L 8 f @ 150 C/C 2-L 8 f @ 150 C/C
TABLE FOR REINFORCEMENT DETAIL OF ROOF SLAB COLUMN SUPPORT WHEN NOT CONTINUOUS IN ADJACENT SPANS SHALL BE _ _
EMBEDDED BY LENGTH 'E' WITHIN THE RESPECTIVE COLUMN. 2-8 f 2-8 f
BAR DIA & SPACING (mm) 3. FOR COLUMN CONNECTED BEAMS CLOSED SPACED VERTICAL STIRRUPS
BAR MARK REMARKS 0.3L1 0.3L1 0.3L2 0.3L2 0.3L3
_ SHALL BE PROVIDED UPTO '2D' OR '0.25L', WHICHEVER IS GREATER FROM TYPICAL DETAILS OF LINTEL OVER 250 TYPICAL DETAILS OF LINTEL OVER 125
FACE OF COLUMN. _ THICK BRICK WALL WITHOUT OPENING THICK BRICK WALL WITHOUT OPENING
T1 10 f @ 100 C/C
4. AT SPLICED SECTION IN BEAMS PROVIDE VERTICAL STIRRUPS 2L-8f 150 C/C.
_ (CONTINUOUS BAND LINTEL) (CONTINUOUS BAND LINTEL)
D
T2 8 f @ 100 C/C
_ TOP E E
T3 8 f @ 125 C/C
REINFORCEMENT E E
_ 0.1L1 0.15L1 0.15L2 0.15L2 0.15L3
T4 8 f @ 150 C/C
_ EMBEDDED LENGTH OF MAIN STIRRUPS # STIRRUPS #
2D OR 0.25L1
STIRRUPS #
2D OR 0.25L2
STIRRUPS # STIRRUPS #
2D OR 0.25L1 2D OR 0.25L2 2D OR 0.25L3
T5 8 f @ 175 C/C REINFORCEMENT 'E' OF BEAMS IN WHICHEVER WHICHEVER 250 125
_ WHICHEVER WHICHEVER WHICHEVER _ _
IS GREATER IS GREATER IS GREATER 2-10 f 2-10 f
B1 8 f @ 100 C/C END COLUMNS (TOP & BOTTOM) IS GREATER IS GREATER
_ _ _
150
150
BOTTOM L1 L2 L3 2-L 8 f @ 125 C/C 2-L 8 f @ 125 C/C
B2 8 f @ 150 C/C
REINFORCEMENT
TYPICAL DETAIL OF BAR
_ DIA OF BAR (mm) EMBEDDED LENGTH 'E' (mm) TYPICAL SECTION OF CONTINUOUS ROOF BEAM _ _
B3 8 f @ 175 C/C EMBEDMENT IN END COLUMN 3-10 f 2-10 f
DISTRIBUTION REINFORCEMENT AT TOP LAYER WHEREVER REQUIRED, 12 800 TYPICAL DETAILS OF LINTEL OVER 250 THICK TYPICAL DETAILS OF LINTEL OVER 125
_ BRICK WALL ON DOOR/ WINDOW OPENING
SHALL BE PROVIDED 8 f @ 200 C/C UNLESS OTHERWISE MENTIONED . 16 1100 THICK BRICK WALL ON DOOR OPENING
(WITHOUT CHAJJA)
20 1350
SCHEDULE OF ROOF BEAMS
_
SIZE (mm) TOP REINFORCEMENT BOTTOM REINFORCEMENT STIRRUPS
150
8 f @ 125 C/C
_ _
1 2 3 4 5 6 SPAN
100
4-8 f 2-10 f
BEAM
75
'L' _
3375 3500 3125 4250 4400 _ _ 2-L 8 f
MARKED WIDTH DEPTH LEFT SUPPORT
_
RIGHT
_
LEFT SUPPORT
_
RIGHT
_ '0.25L' OR '2D' FROM BALANCE MIDDLE a
(m) SPAN (f ) SPAN (f ) a
@ 125 C/C _
'b' 'D' (f ) SUPPORT (f ) (f ) SUPPORT (f ) FACE OF COLUMNS # SPAN _
150
8 f @ 125 C/C
3-10 f _ _
100
600 250 3-8 f 2-10 f
_
65
RB1 RB1 RB1 RB1 _ _ 2-L 8 f @ 125 C/C
D D 3.400 2-12 + 1-12 2-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C n
n _
_ _ 3-10 f
3.500 2-12 + 1-12 2-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C 450 250
600
RB1 250 450 _ _
2900
300
RB5
3.125 2-12 + 1-12 2-12 2-12 + 2-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
_ _
4650
RB3
RB4
RB4
RB4
4.250 2-12 + 2-12 2-12 2-12 + 2-12 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
C _ _ TYPICAL DETAILS OF LINTEL AND CHAJJA OVER 250
3.400 2-16 2-16 2-16 2-12 + 1-12 2-12 + 1-12 2-12 + 1-12 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
THICK BRICK WALL ON WINDOW OPENINGS 'W3'
_ _
1750
150
RB3 250 500 _ FOUNDATION 50
_ _ 6-8 f
2-L 10 f
4.700 2-16 + 2-16 2-16 2-16 2-16 2-16 2-16 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
250
6750
6750
RB3
RB4
RB4
RB4
RB5
RB6
75
RB4 250 500 GRADE BEAM 30
_ _ 1000 250 _
4.700 2-20 + 1-16 2-20 2-20 2-20 2-20 2-20 2-L 8 f @ 100 C/C 2-L 8 f @ 100 C/C 2-16 f
ROOF BEAM 25
_ _ TYPICAL DETAILS OF LINTEL AND CHAJJA OVER 250
6.750 2-16 + 1-12 2-16 2-16 + 2-16 2-20 2-20 + 2-16 2-20 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
THICK BRICK WALL DOOR OPENING 'D1 & D2' ROOF SLAB 20
_ _
RB5 1.800 250 500 2-16 + 2-16 2-16 + 2-16 2-16 + 2-16 2-20 2-20 2-20 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
RB2 RB2 RB2 RB2 RB2 LINTEL 25
_ _
A A 2.900 2-16 + 2-16 2-16 2-16 2-20 2-20 2-20 2-L 8 f @ 100 C/C 2-L 8 f @ 200 C/C
CHAJJA 20
_ _
RB6 6.750 250 500 2-16 + 1-12 2-16 2-16 + 1-12 2-20 2-20 + 2-16 2-20 2-L 8 f @ 100 C/C 2-L 8 f @ 100 C/C
3375 3500 3125 4250 4400
1 2 3 4 5 6
NOTES :
1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRE UNLESS SPECIFIED OTHERWISE.
ROOF BEAM LAYOUT 2. FIGURED DIMENSIONS ARE TO BE FOLLOWED AND DRAWING SHALL NOT BE SCALED.
3. GRID LINES ARE DRAWN ON BEAM CENTRES. OFFSET BETWEEN CORRESPONDING BEAM CENTRES (GRID LINES) AND COLUMN
CENTRES ARE SHOWN SEPARATELY IN COLUMN LAYOUT PLAN.
4. CONCRETE FOR ALL R.C.C. WORK SHALL BE OF GRADE M-20, NOMINAL MIX (1:121:3) AND REINFORCEMENT SHALL CONFORM
1 2 3 4 5 6 1 2 3 4 5 6 TO Fe-500 AS PER IS 1786 : 2008.
3375 3500 3125 4250 4400 3375 3500 3125 4250 4400 5. FINISHED GROUND LEVEL (F.G.L.) SHALL MEAN THE GROUND LEVEL AROUND THE BUILDING AFTER NECESSARY LAND
DEVELOPMENT BY EARTH FILLING AND/OR CUTTING AS THE CASE MAY BE, IF ANY.
6. LAP LENGTH FOR REINFORCEMENT SHALL BE 50 X DIA. OF THE BAR, PLACED STAGGERED.
300
300
7. LONGITUDINAL MAIN REINFORCEMENT IN BEAMS (TOP AND BOTTOM) SHALL BE EMBEDDED TO A MINIMUM LENGTH OF 'E'
SPECIFIED IN TABLE IN COLUMNS FROM FACE OF END COLUMNS.
D D D D 8. THIS BUILDING FRAME AND FOUNDATION HAS BEEN DESIGNED CONSIDERING SEISMIC LOADING 'ZONE-III' CONFORMING TO
IS 1893 : 2002.
300 300
9. THERE IS NO SCOPE FOR ANY VERTICAL EXTENSION IN UPPER STOREY.
950
950
950
950
T5 T5 T5 T5
B3 B3 B3 B3
2900
2900
700 1050 1050 1050 950 950 1300 850
B3 B3 B3 B3
4650
4650
REF. WORK ORDER NO. DDUGJY/P-II/2015-16/02 DATED 31.08.2015 OF THE C.E.-PROJECT-II
T5 T5 T5 T5 T5 T3 T3 T5
IN CASE OF ANY CONFUSION PLEASE CONSULT DIST. P. & E. DEPT.
C C
DISTRIBUTION HQ.
1400
1400
1400
1400
1750
1750
T5 T5 T5 T5
B B B B
REVISIONS
PLANNING AND ENGINEERING DEPARTMENT
1350
T5 T5 T5 T5 T4
2050
2050
2050
2050
CONTROL ROOM BUILDING FOR 33/11 KV SUB-STATION AT MANDARPUR,
B3 B3 B3 B2
DIST.- BURDWAN
B2
LAYOUT AND DETAILS OF ROOF BEAM & SLAB, LINTEL AND CHAJJA
700 1050 1050 1050 950 950 1300 1300 1350 900
6750
6750
6750
6750
T4 T2 T2 T3 T3 T2 T2 T1 T1 T3
B3 B3 B3 B1 DRAWN BY :
B3 S.A.E.(C)
DESIGNED BY:
D.E.(C)
1350
1350
1350
1350
1350
T5 T5 T5 T5 T4
DRAWING NO.
A A A A CHECKED BY:
S.E.(C)
PLN(D)/BLDG/409
SCALE: SHEET NO.
RECOMMENDED BY:
3375 3500 3125 4250 4400 3375 3500 3125 4250 4400 NTS 3 OF 3
Addl. C.E.-III
1 2 3 4 5 6 1 2 3 4 5 6
DATE: REV. NO.
APPROVED BY:
ROOF SLAB LAYOUT WITH BOTTOM REINFORCEMENT (125mm THICK) ROOF SLAB LAYOUT WITH TOP REINFORCEMENT (125mm THICK) C.E. (P. & E.-Dist.) 26.04.2016 0
Powered by TCPDF (www.tcpdf.org)
Powered by TCPDF (www.tcpdf.org)
Construction
Standard of 11KV
Line
12 11 10 9 8 7 6 5 4 3 2 1
H H
G G
NOTE:-
1. REFER REC CONSTRUCTION STANDARD
A-22 FOR TYPE OF POLE TO BE USED.
E E
D D
ELEVATION
C C
R0
PROJECT
REC/DDUGJY/11KV/14 1 OF 1 0
REV. NO. PREPARED CHECKED APPROVED DATE
BY BY BY
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
BILL OF MATERIALS
H
SR. H
NO. DESCRIPTION SECTION QTY.
100
1070 1070 90 145 5 4 PIPE EARTHING 3 SET
9
5 11KV STRAIN INSULATOR 6 SET
11KV LINE 11KV LINE
4 NOS, M16x150 6 STAY SET ARRANGEMENT 4 SET
450
7 11KV 400A AIR BREAK SWITCH 1 SET
10
6 8 11kV DANGER BOARD 1 NO.
4 NOS, M16x65
1130
G G
9 FISH PLATE 50x8 6 NOS.
500
11 7 10 TOP CHANNEL ( [ 100x50 ) 100x50 2 NOS.
360
13 ANGLE SUPPORT 'A' FOR OPERATING HANDLE 50x50x6 1 NO.
4 NOS, M16x85 1 NO.
14 CHANNEL SUPPORT 'B' FOR OPERATING HANDLE 75x40
580 4 NOS, M16x65
2 NOS.
400
15 CHANNEL SUPPORT FOR OPERATING ROD ( [ 75x40 ) 75x40
18
16 TOP CLAMP FOR ANTI-CLIMBING DEVICE 40x5 2 SET
4 NOS, M16x65
17 BOTTOM CLAMP FOR ANTI-CLIMBING DEVICE 40x5 2 SET
790
1000
17
4 NOS, M10x50 GENERAL NOTES:
1) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED
500
2) MANUFACTURING TOLERANCE
27
4 NOS, M16x85 8372PP
22 72PP
D
8
72PP D
800
$ %29 (PP
12
3) ALL M.S. PARTS SHALL CONFORM TO IS:2062.
3 NOS, M16x85
13 4) ALL M.S. FABRICATED ITEMS SHALL BE HOT DIP GALVANISED
2000
2 NOS, M16x85
AS PER IS:2629 & 4759
14 5) ALL THE ITEMS SHALL BE MARKED WITH ERECTION CODE.
1
2440 6) WEIGHT MENTIONED IS FOR PACKING & FORWARDING PURPOSE.
1200
GL GL GL
FOR TENDER PURPOSE ONLY
300
4
1500
2500
B B
ELEVATION SIDE VIEW PROJECT: Deen Dayal Upadhyaya Gram Jyoti Yojna (DDUGJY)
TITLE
GA OF 11KV LINE SECTIONALIZER ON PSC/ PSC POLE
A A
175
FLAT 40x5mm FLAT 40x5mm
50
330 1070 1070 330 50x8 MS FLAT 30 30 204 30 30 30 30 223 30 30
H H
2 NOS. M10x65 2 NOS. M10x65
30 30 30 30
20 35
35
35
100
20
20
35
35
35
90 180 [6/ 27126 180 90
2800 +2/ (
DUMMY CLAMP FOR
TOP CHANNEL (100x50) AB SWITCH (50x8) PLAN
10 18 16 BOTTOM CLAMP 17
TOP CLAMP
ANTI CLIMBING DEVICE ANTI CLIMBING DEVICE
G 90 G
177
40 [6/ 27
124 40
30 35 35 30
10 NOS. 2700
150
A.B. SWITCH MOUNTING CHANNEL 11 176 30 35 30
CLAMP FOR
19
BILL OF MATERIALS
CHANNEL SUPPORT FOR +2/ (
OPERATING ROD
50
SR. LENGTH TOTAL Wt.
180 2260 180 NO. DESCRIPTION SECTION MATERIAL kG./mtr. QTY.
CLAMP FOR 29
MM KG.
F F
PIN INSULATOR SETTING CHANNEL
1 8m/200Kg. PCC POLE 2 NOS.
40 [6/ 27 40 90
4 NOS. 2700 50X8 MS FLAT 2 11KV PIN INSULATOR WITH G.I. PINS 3 SET
145
4 PIPE EARTHING 1 SET
E 35 30
+2/ ( 5 11KV STRAIN INSULATOR 6 SET
40
3 NOS. +2/ (
50
23
7 11KV 400A AIR BREAK SWITCH 1 SET
CLAMP FOR
20 8 11kV DANGER BOARD 1 NO.
AB SWITCH (50x8)
13 ANGLE SUPPORT 'A' FOR OPERATING HANDLE 50x50x6 M.S. 240 4.5 1 NO. 1.080
35 20 35
[6/ 27 +2/ (6
28
D TOP BELTING ANGLE 21 14 CHANNEL SUPPORT 'B' FOR OPERATING HANDLE 75x40 M.S. 260 5.7 1 NO. 2.206
4 NOS. 2 NOS.
15 CHANNEL SUPPORT FOR OPERATING ROD ( [ 75x40 ) 75x40 M.S. 390 5.7 2 NOS. 2.223
+2/ ( 16 TOP CLAMP FOR ANTI-CLIMBING DEVICE 40x5 M.S. 487+487 1.6 2 SET 3.117
CLAMP FOR
2 SET
STAY SET (50x8) 25 17 BOTTOM CLAMP FOR ANTI-CLIMBING DEVICE 40x5 M.S. 499+499 1.6 3.194
18 DUMMY CLAMP FOR A.B. SWITCH 50x8 M.S. 427+427 3.14 2 SET 5.363
D D
19 TOP CLAMP FOR A.B. SWITCH OPERATING ROD 50x8 M.S. 626 3.14 1 NO. 1.966
2700
40 180 330 690 220 690 330 180 40 20 CLAMP FOR AB SWITCH MOUNTING CHANNEL 50x8 M.S. 640 3.14 4 NOS. 8.038
90
21 TOP BELTING ANGLE 50x50x6 M.S. 2700 4.5 1 NO. 1.080
BOTTOM BELTING ANGLE 22 BOTTOM BELTING ANGLE 50x50x6 M.S. 2700 4.5 1.080
4 NOS.
22 2 NOS.
50x8 MS FLAT 23 BRACING ANGLE 50x50x6 M.S. 2700 4.5 2 NOS. 1.080
178
C 35 35
24 PIN INSULATOR SUPPORTING CHANNEL 75x40 M.S. 2700 5.7 1 NO. 1.482
30 25 DUMMY CLAMP FOR STAY SET 50x8 M.S. 427+427 3.14 2 SET 5.363
(MIN)
+2/ ( 26 CLAMP FOR TOP BELTING ANGLE 50x8 M.S. 592 3.14 2 SET 3.717
50
27 CLAMP FOR BOTTOM BELTING ANGLE 50x8 M.S. 626 3.14 2 SET 3.931
C +2/ (6 C
50
1268 1268 28 CLAMP FOR CHANNEL SUPPORT OF OPERATING HANDLE 50x8 M.S. 726 3.14 2 NOS. 4.559
TOP CLAMP FOR
26
BELTING ANGLE (50x8) 29 CLAMP FOR PIN INSULATOR SUPPORTING CHANNEL 50x8 M.S. 516 3.14 2 NOS. 3.240
25 25
2535
[6/ 27
2 NOS. BRACING ANGLE
23
90
90
50x8 MS FLAT
207
160 65 60 20 200 20
221
35 35
B
75 50 B
(MIN)
30 68
(MIN)
30 35 35 30 Rural Electrification Corporation Ltd.
462 13
+2/ (
12 ANGLE SUPPORT 'A'
50
40 [6/ 27 75
260 TITLE
[6/ 27 [6/ 277('+2/ ( GA OF 11KV LINE SECTIONALIZER ON PCC/ PSC POLE
390
CHANNEL SUPPORT 'B' CHANNEL SUPPORT 15
A A
FOR OPERATING ROD
FOR OPERATING HANDLE DATE SCALE DRG. NO. REV. NO.
R0 NTS R0
14.01.09
REC/DDUGJY/11KV/05B
PROJECT SIZE SHT. NO.
REV. NO. PREPARED CHECKED APPROVED DATE
BY BY BY A3 2 OF 2
12 11 10 9 8 7 6 5 4 3 2 1
BILL OF MATERIAL
ERE
DESCRIPTION QTY. REF. DRG. NO.
CODE
BILL OF MATERIAL
ERE DESCRIPTION SECTION MATERIAL LENGTH kG./mtr. QTY. TOTAL Wt.
CODE MM KG.
TOTAL 30.97
TOTAL 0.752
GENERAL NOTES:
ELEVATION
PLAN
BACK CLAMP FOR Deen Dayal Upadhyaya Gram Jyoti Yojana
GUARDING CROSS ARM
PLAN
GUARDING CROSS ARM
1 OF 1 0
Side Tie In Position On 11 KV Pin Insulator
11kV CONDUCTOR DEAD-END FITTING IN POSITION
+2/ (6 00
Equivalent of Danger in
Local Language
12 11 10 9 8 7 6 5 4 3 2 1
H H
G G
F F
O 16
O91+1
E E
D D
A
11 KV 45KN COMPOSITE INSULATOR
A
R0
REC/DDUGJY/11kV/08
REV. NO. PREPARED CHECKED APPROVED DATE
PROJECT 1 OF 1 0
BY BY BY
12 11 10 9 8 7 6
5 4 3 2 1
A
H
E
F
12
12
17
32 4
11 20
2 13 3 4 5
1
11
11
27
20 15O
35
10 45
10
10
THREADS TO SUIT M-12
MIG BOLT
20 85 TYPE"A"
30
9
9
30
8
8
M S RIVET ELECTRO GALVANISED M-6 BOLT,NUT( IS:1367)
WITH PLAIN AND SPRING WASHER
17
32 4
7
7
11
2 3 4 5
3 1
2
6
6
20 15O
35
10
5
20
115
30
43 12
12 18
4
30 24
PROJECT:
Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
TITLE
Bimettalic Connector (H. T.) for
11kV Distribution Transformer
1
H
E
F
12 11 10 9 8 7 6 5 4 3 2 1
H H
G
BILL OF MATERIAL G
Details of 5 Details of 4
E E
Holes O 25
Back Cleat
Strain Plate
D D
M.S Flat
B
Rural Electrification Corporation Ltd. B
R0
PROJECT
REC/DDUGJY/11KV/21 1 OF 1 0
REV. NO. PREPARED CHECKED APPROVED DATE
BY BY BY
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
H H
90 145
002 006
8201
4-M16x200 IN COMING
760 760 4-M16x70
8221
700
G G
8202
4-M16x100
360
3Cx185sq mm XLPE
007
End Termination kit
8209 8228 8231
4-M16x65
F
3-M16x65 F
300
8229 8260
4-M16x65 8232
GU
2-M16x35
Y
8260a 2-M16x100
3-M16x65 8219a
E
004
2000
8214 DANGER
11000 VOLTS
2-M8x50
003 11000
2-M16x100
4-M16x65 8219b
8209 8229 2-M16x35
3-M16x65 8233
8260a
1870
D D
3000
2-M12x35 8220
4-M16x100
2500
8208
8208b 3Cx185 Sqmm
8208a XLPE Cable
1000
C shall bo routed C
6) ALL MS PARTS SALL BE HOT DIP GALVANISED AS PER IS: 2629 & IS: 4759
1500
B B
6/ 27 [QRV
150
285
825 3210 3210 825 285
H H
573
300
149
150 450 6870 450 150
9090 9090 9090 9090
8070
8201. TOP CHANNEL (100x50)
90 180 90 90 180 90
120
G
OP. ROD SUPPORT (50x8) OP. ROD SUPPORT (50x8) G
2707
6/ 27 [ 6/ 27 [ 6/ 27 [
225
36
90 225
124 124 124
45 270
36
150 513 372.5 760 760 372.5 513 150
225
225
150
F F
GENERAL NOTES:
1) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED
8676
2) MANUFACTURING TOLERANCE
150
E 8372PP E
75 8526 75 72PP
72PP
8230. BRACING ANGLE (50x50x6) $ %29 (PP
285 3) ALL M.S. PARTS SHALL CONF0RM TO IS:2062
120
423
5) ALL THE ITEMS SHALL BE MARKED WITH ERECTION CODE.
[6/ 27 459
90
127 6) WEIGHT MENTIONED IS FOR PACKING & FORWARDING PURPOSE.
675
7) ALL CHANNELS AND ANGLES SHALL CONFORM TO IS SP6
570
90
D D
90
80
[6/ 27
591
120
483
C 90 40 40 90 C
465
390 40 180
90
90 90 90 90 90 90 90 90
[6/ 277('+2/ ( 90 90 90 90
90 190 90
CLAMP FOR
[6/ 27 100 DIA GI PIPE 8260a
90 513 90 90 513 90
75 260 90 513 90
40 180 120 8232. CLAMP-A 8233. CLAMP-B
50 8231. TOP CLAMP FOR TENDER PURPOSE ONLY
BELTING (50x8) BELTING (50x8) 8208a. AB SWITCH OP HANDLE FOR BELTING (50x8)
SUPP. CHANNEL (75x40)
20 200 20
B
75 390 B
L50x50x6
C:\Users\hp laptop\Desktop\s.jpg Rural Electrification Corporation Ltd.
50
8209. AB SWITCH OP PIPE 240
SUPP. CHANNEL (75x40) 8208b ANGLE SUPPORT FOR
OPERATING HANDLE PROJECT: Deen Dayal Upadhyaya Gram Jyoti Yojna (DDUGJY)
TITLE GA OF 11 KV LINE CROSSING OF RAILWAY
USING 3c X 185 SQMM XLPE CABLE ON
A
DP STRUCTURE PCC/PSC POLES A
H H
1070 1070
90 002
808
145
006
2-M16x200
75
650
008 2-M16x70
3Cx185sq mm XLPE
End Termination kit
G 812 007 G
4-M16x65 813a
2000
3-M16x65
1500
001
005 3Cx185 sq mm XLPE
Cable
813
812 2-M16x35
4-M16x65
3-M16x65
F F
815
2000
1000
1-M16x35 004
814
815 DANGER
11000
11000
VOLTS
003
E
2-M16x35 E
2-M16x65
8000
3-M16x65
812
2-M8x50 814B
3000
2500
D D
300
300
GL GL GL GL
C C
GENERAL NOTES:
1) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED
CONCRETE GRADE
1500
6) ALL MS PARTS SALL BE HOT DIP GALVANISED AS PER IS: 2629 & IS: 4759
C:\Users\hp laptop\Desktop\s.jpg
Rural Electrification Corporation Ltd.
1 2
H
IN COMMING 145 145 OUT GOING H
A
3Cx185sq mm XLPE
G G
4
5 B B
Ref Sheet 2 of 5
Ref Sheet 4 of 5
BACK FILLED SOIL 3Cx185 sq mm XLPE Cable
F TRACKS(N) F
6500
EXCAVATED
2050
10 60
SAND FILLED TRENCH
30 51 190 51 30 VIEW A-A
CONDUCTOR
D
CABLE ROUTE MARKER
M12x35
RAILWAY CROSSING DETAILS
DETAIL-A
HT HT A B H W N
CABLE CABLE
NAME OF THE BRANCH LINE LENGTH IN METERS IN Nos.
300
300
D
ATTABIRA TO SAMBALPUR 8.5 45 6 2.5 2 D
C 6 *,3,3(
C
C
C
A C
B
2) LENGTH OF GI PIPE DEPENDING ON WIDTH OF TRACK. B
3) LENGTH OF XLP CABLE DEPENDING ON SPAN BETWEEN TWO ARRANGEMENTS. Rural Electrification Corporation Ltd.
4) GI PIPE SHALL BE LAYED UPTO BOTTOM WIDTH OF RAILWAY TRACK AND
FROM ABOVE GROUND LEVEL TO TOP BELTING ANGELS ON EITHER SODE OF CROSSING.
PROJECT: Deen Dayal Upadhyaya Gram Jyoti Yojna (DDUGJY)
TITLE GA OF 11 KV LINE CROSSING OF RAILWAY
USING 3c X 185 SQMM XLPE CABLE ON
A
DP STRUCTURE PCC/PSC POLES A
1635
H H
50 650 235 650 50
DOG CONDUCTOR
CONDUCTOR
150
WITH CRIMPED LUG
11 126 +2/ (
11 4NOS. M16x65
HT CABLE TWO LUGS
TERMINATION KIT CONNECTED
3 2
TOGETHER
CABLE
40
1000
70
35 35
F
(MIN) 30 30 (MIN) AB CABLE SUPPORTING ANGLE(50x50x6) F
50
BILL OF MATERIAL
ERE SECTION MATERIAL LENGTH kG./mtr. TOTAL Wt.
235 CODE
DESCRIPTION
MM
QTY.
KG.
295
1 8M/200kG PSC POLE M.S. 8000 2 NOS.
1000
7
CLAMP FOR 2 TOP CHANNEL C 75X40 M.S. 1635 7.90 2 NOS. 25.28
TOP CHANNEL (ISMC75) BACK CLAMP FOR TOP CHANNEL
3 50X8 M.S. 441 3.14 2 NOS. 2.769
95
E 4 AB CABLE SUPPORTING ANGLE 50x50x6 M.S. 2200 4.50 1 NOS. 9.900 E
DANGER
11000
2NOS, M10x60 11000 N VOLTS2NOS, M10x60
2NN< 9 / N
5 BC FOR AB CABLE SUPPORTING ANGLE 50X8 M.S. 551 3.14 2 NOS. 13.360
[kRkjk
9 50x8 MS FLAT
5500
190
8 6 M.S. 3 NOS.
35 35 7 BARBED WIRE M.S. AS REQ.
50
12 EYE HOOK 2 NOS.
D
1 180 13 HT TENSION CLAMP 2 NOS.
D
240
3000
TOTAL 53.384
SR.
NO. DESCRIPTION SECTION MATERIAL LENGTH kG./mtr. QTY. TOTAL Wt.
95 MM KG.
1500 14 NUTS & BOLTS M16 65 0.164KG/NO. 8 NOS. 1.132
143
16 SPRING WASHERS M16 3.5 THK. 0.009KG/NO. 8 NOS. 0.072
35 35
PIPE EARTHING 17 SPRING WASHERS M10 3.5 THK. 0.003KG/NO. 4 NOS. 0.012
C 005
18 PLAIN WASHER M16 3 THK. 0.015KG/NO. 16 NOS. 0.240
(MIN) 30 30 (MIN)
300
300
GL GL GL GL PLAN TOTAL
+2/ ( 1.706
300
50
CONCRETE GRADE
1:2:4
AB CABLE SUPPORTING ANGLE
B Rural Electrification Corporation Ltd.
50
THREADS FOR
CLAMPING
Deen Dayal Upadhyaya Gram Jyoti Yojna (DDUGJY)
100
90 90 290 PROJECT:
TITLE
FRONT VIEW SIDE VIEW U CLAMP FOR HT CABLE 11KV AB CABLE TO CABLE END TERMINATION ARRANGMENT
A
450
Above 300mm : 2%
600
E E
Line
Direction
A A 500
Aggregates or
Stone bolder 10mm
& above (60%) WITH
NOTES:-
C
Compacted Soil (40%) 1. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS ARE IN MM.
2. AGGREGATES OF SIZE <80 MM ( LARGE SIZE AS PER TABLE-3 OF IS 383).
R0
H H
G G
F
Back filling with F
E E
Earthing coil
D D
BASE PAD
For 11 Kv & LT Pole
Coaching of 0.02 cm or stone
block of size 450x450x75 mm.
C C
B
Rural Electrification Corporation Ltd. B
All dimensions are in mm. DRAWING FOR POLE PIT FOR PCC POLE FOR NORMAL SOIL
A A
R0
PROJECT
REC/DDUGJY/GEN/15 1 OF 1 0
REV. NO. PREPARED CHECKED APPROVED DATE
BY BY BY
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
H H
NOTES:-
G G
F F
E E
D D
B
Rural Electrification Corporation Ltd.
PROJECT:
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
600
45
2 ANCHOR ROD & ANCHOR PLATE G.I. 1 NO.
a ANCHOR ROD PP G.I 1900 1 NO.
6
PLAN M10 Grade PCC
STAY PIT - ANCHOR ASSEMBLY
b ANCHOR PLATE(REC STANDARD K-1) 75 MM 450X450 1 NO.
RCC
c
SQUARE WASHER 8 MM G.I. 40X40 1 NO.
Anchor Plate d
GUY INSULATOR NUT M16 G.I. 1 NO.
F 200x200x+6mm F
R10
Concreting 0.2cm
WELEDED
*,52' *,52'
E
NOTES:- E
1800
648
1) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED.
8,64
57,6
WELDED WELDED SQUARE WASHER
HEXAGONAL NUT 2) ALL M.S. ITEM SHALL BE HOT DIP GALVANISED AS PER IS 2629&4759
25
ANCHOR ROD
432
116 2a
C 75x40 OR
+2/ (
259,2
L 50x50x6
648
3) MANUFACTURING TOLERANCE
0652'
8372PP
450
72PP
3050
WELDED
D 450
72PP D
$ %29 (PP
TURN BUCKLE 2b RCC ANCHOR PLATE(REC STANDARD K1)
1
+2/ ( +2/ (
4) M.S MATERIAL SHALL CONFIRM TO IS: 2062.
40
40
4 40 40
SQUARE WASHER(40x40x4) SQUARE WASHER(40x40x8) 5) GUY INSULATORS TO BE UTILISED AS PER SPECIFICATION FOR
HT & LT LINES RESPECTIVELY.
6) FOR FIRM SOILS, ONLY SOIL FILLING WITH COMPACTION TO BE DONE
Stay Set Arrangement
C
GL GL
2
END MAKING OF GUY WIRE
Soil Filling
1500
1:2:4
0
600
15
RCC Base
450x450x75
1600 ANCHOR ROD
Guy Assembly
B
H
145 H
x
1
R10
WELEDED
*,52'
G G
*,52'
1800
450
6
3
D
SQUARE WASHER
40
F WELDED WELDED F
HEXAGONAL NUT
25
300
116 2a ANCHOR ROD
180 C 75x40 OR
L 50x50x6 +2/ (
450
0652'
3050
450
E WELDED E
450
2b RCC ANCHOR PLATE(REC STANDARD K1)
GL GL
1 TURN BUCKLE
d=DxTAN0 +2/ ( +2/ (
800
40
40
SOIL FILLING
1500
D D
1:2:4
CONCRETE
40 40
800
RCC BASE
450x450x75 SQUARE WASHER(40x40x4) SQUARE WASHER(40x40x8)
GUY ASSEMBLY
(CONVENTIONAL ARRANGEMENT) 500X500
REC CONSTRUCTION STANDARD CONCRETING TO BE DONE
G-1 WHERE SOIL IS NOT FIRM
(SEE NOTE-6)
0 VARIES FROM 30 TO 45 DEG
NOTES:-
GUY INSULATOR
1) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED.
2) ALL M.S. ITEM SHALL BE HOT DIP GALVANISED AS PER IS 2629&4759 FOR TENDER PURPOSE ONLY
3) MANUFACTURING TOLERANCE
8372PP
72PP
72PP
B
STAY INSULATOR MAKE-OFF $ %29 (PP
Rural Electrification Corporation Ltd.
4) M.S MATERIAL SHALL CONFIRM TO IS: 2062.
5) GUY INSULATORS TO BE UTILISED AS PER SPECIFICATION FOR
(5)THIMBLE HT & LT LINES RESPECTIVELY.
6) FOR FIRM SOILS, ONLY SOIL FILLING WITH COMPACTION TO BE DONE
Deen Dayal Upadhyaya Gram Jyoti Yojana( DDUGJY)
H H
GL. GL.
G G
200
300
500
F F
E
*,5RG NOTES:- E
2. EARTH TERMINAL SHOULD BE MADE OF G.I
675,3[:,7+12 678'
3. MANUFACTURING TOLERANCE.
8372PP
2500 72PP
72PP
Welding
D D
$ %29 (PP
4. CLAMP IS TO BE WELDED TO SPIKE.
5. THE WHOLE ASSEMBLY IS TO BE HOT DIP GALVANISED(IS:2629&4759)
6. ALL MS PARTS SHALL CONFIRM TO IS :2062
7. WEIGHT MENTIONED IS FOR PACKING AND FORWARDING PURPOSE ONLY.
B
Rural Electrification Corporation Ltd.
R0
BILL OF MATERIAL
H H
1 Clamp for Earth Pipe GI Flat 40x3 146 0.942 2 Nos 0.275
2 Bolts & Nuts M12 30 0.057 2 Nos 0.114
G
CL of Pole 3 Spring Washer M12 3.5mm Thk. 0.006 2 Nos 0.012 G
GL. GL.
Funnel
200
300
Clamp
GL. GL. 1200 21R
200
F F
300
500
8 S.W.G. G.I. Wire from Pole 8 S.W.G. G.I. Wire Spring Washer
20 20
500 40X3 G.I Flat
20 20
150
00 *,3LSH&ODVVC%
E
Clamp for Earth Pipe E
Charcoal or Coke
75 and Salt alternate
Layer of 300 mm NOTES:-
1. ALL DIMENSIONS ARE IN MM.
3000
2. EARTH TERMINAL OF G.I
PP *,3LSH&ODVVC%
2500
675,3[:,7+126 678'6
D +ROHV 3. MANUFACTURING TOLERANCE. D
8372PP
72PP
72PP
$ %29 (PP
4. MS PARTS SHALL CONFIRM TO IS:2062
5. ALL MS PARTS TO BE HOT DIP
C
GALVANISED AS PER IS 2629 & 4759.
Earthing For Ordinary 6.WEIGHT MENTIONED IS FOR PACKING & FORWARDING PURPOSE ONLY
Soil where Pipe could
be Hammered
FOR TENDER PURPOSE ONLY
B
300 300
Rural Electrification Corporation Ltd.
Earthing for
Hard Stiff or Medium Clay Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
R0
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
H H
G. I. Stay Wire
G
Hellically Formed End Fitting G
F F
Thimble
E E
Stay Rod
D D
NOTE: FOR DETAILS OF HELLICALLY FORMED GUY GRIPS REFER REC SPECIFICATION NO. 25/1983
12 11 10 9 8 7 6 5 4 3 2 1
11 10 9 8 7 6 5 4 3 2 1
H H
G G
F F
E E
D D
11 10 9 8 7 6
11 10 9 8 7 6 5 4 3 2 1
H H
G G
F F
E E
D D
A
SIZE SCALE DRG. NO. SHT. NO. REV. NO.
R0
1:100 1 OF 1 0
A4
REV. NO. PREPARED CHECKED APPROVED DATE PROJECT
11 10 9 8 7 6
12 11 10 9 8 7 6 5 4 3 2 1
H H
18.2
44
G G
165
F
NOTES:- F
E
3) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED. E
ABOVE 300mm
150
Spring Washer
Hexagonal Nut
100
PIN INSULATOR
A
12 11 10 9 8 7 6 5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
X 900 CLAMP FOR PCC POLE (11KV SUPPORT) 50x8 MS 378 3.14 2 NOS. 2.373
901 CLAMP FOR PCC POLE (LT LINE) 50x8 MS 385 3.14 2 NOS. 2.418
902 CLAMP FOR STRUT POLE 50x8 MS 366 3.14 2 NOS. 2.298
TOTAL 7.653
900 OR 901
F F
155
168
160
43
35
35
001
160
160
E E
43
+2/ (
32
+2/ ( +2/ (
400
400
200
200
200
800
0
254
261 244
314
321 304
D D
CLAMP FOR PCC POLE 900
CLAMP FOR PCC POLE CLAMP FOR STRUT POLE 902
LT LINE 901
11 KV SUPPORT
GENERAL NOTES:
1) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE MENTIONED
2) MANUFACTURING TOLERANCE.
8372PP
72PP
72PP
C
$ %29 (PP
3) ALL M.S. PARTS SHALL CONF0RM TO IS:2062
4) ALL M.S. FABRICATED ITEMS SHALL BE HOT DIP GALVANISED
GL GL GL GL
AS PER IS:2629 & 4759
5) ALL THE ITEMS SHALL BE MARKED WITH ERECTION CODE.
6) WEIGHT MENTIONED IS FOR PACKING & FORWARDING PURPOSE ONLY. FOR TENDER PURPOSE ONLY
7) ALL CLAMPS AND ANGLES SHALL CONFORM TO IS:SP6 PART-1.
ALL CHANNELS SHALL BE ISLC CHANNELS.
1500
RCC BASE
PROJECT:
450x450x75
Deen Dayal Upadhyaya Gram Jyoti Yojana (DDUGJY)
STRUT
TITLE
(CONVENTIONAL ARRANGEMENT)
STRUT ARRANGEMENT
A
H H
G G
25 mm
HT Wire 4 mm
F F
E E
D D
R0
REC/DDUGJY/GEN/5D
REV. NO. PREPARED CHECKED APPROVED DATE
PROJECT 1 OF 1 0
BY BY BY
12 11 10 9 8 7 6
5 4 3 2 1
12 11 10 9 8 7 6 5 4 3 2 1
H H
G G
25 mm
HT Wire 4 mm
F F
E E
D D
25 mm 25 mm
B
FOR TENDER PURPOSE ONLY
R0
REC/DDUGJY/GEN/5C
REV. NO. PREPARED CHECKED APPROVED DATE
PROJECT 1 OF 1 0
BY BY BY
12 11 10 9 8 7 6
5 4 3 2 1
{
\a
! ROAD FLANK
!
rf l_
l-_475.--.-}-10 10-{_4 75-----i
125
{
{ t-I
a
I
I
_L
a 125
....?-
I
a PLAN OF SLAB
.o -2900
a 50 CEMENT CONCRETE (i i3:6)
a SECTION AT'AB'
a
a ROAO FLANK
oo0
a
I
I
a
I
a PIAN 9F BOTTOM SLAB
-2e00+
a
I
I DETAILS OF LIFTING HANDLE
o
o NOTE: l
o ELEVATION
o
o X 250 ERICK PILLAR (1:4) lr-talt)I., '/-.d[4rr|.x cdod or
t DISTRIBUTION HQ
6 N*ttr*
REVtgtofts
o PLANNING AND ENGINEERING DEPARTMENT
t o*fi r, 8. 04.0s.20t5
'/i
I l------....-
s.A E rc)
o€s ( NEO 8Y:
Ll*,urt. .\iJt I
I lrt
250 F--1075-------------]
--.........-
250 l--1075_____-______i 25o f_
. o Ercl
t)RAWTNC NO.
t
CHEC :EO 8Y
,.i.Ylpjg'# I't,N(DySS/t06