The document contains a schedule for 9 presentations happening from February 1-7. It lists the topic, presenter, and date for each presentation, which include background jobs, LSMW/LTMC, interface, ticketing process, activate methodology, land scape and moving TR, S/4HANA vs ECC, BP in S/4HANA, and credit management. Lavanaya is scheduled to present on February 5th, 7th, and 7th.
The document contains a schedule for 9 presentations happening from February 1-7. It lists the topic, presenter, and date for each presentation, which include background jobs, LSMW/LTMC, interface, ticketing process, activate methodology, land scape and moving TR, S/4HANA vs ECC, BP in S/4HANA, and credit management. Lavanaya is scheduled to present on February 5th, 7th, and 7th.
The document contains a schedule for 9 presentations happening from February 1-7. It lists the topic, presenter, and date for each presentation, which include background jobs, LSMW/LTMC, interface, ticketing process, activate methodology, land scape and moving TR, S/4HANA vs ECC, BP in S/4HANA, and credit management. Lavanaya is scheduled to present on February 5th, 7th, and 7th.
A Variant, Monitoring, Spool 2 LSMW/ LTMC Sirisha 2nd Feb A MASS/XD99 3 Interface Sai 3rd Feb A IDOC 4 Ticketing Process Chandana 4th Feb A SLA, Incident, CR 5 Activate Methodology Lavanaya 5th Feb 6 Land Scape , Moving TR Khaleel 6th Feb BDC Process 7 S/4HANA Vs ECC Lavanaya 7th Feb 8 BP in S/4HANA Lavanaya 7th Feb 9 Credit Mgnt Lavanaya 7th Feb