BOQ
D Form Work
D1 Slab on Floor m2
D2 Walls m2
F Reinforcement
Reinforcement bars (all sizes) as shown on drawings.
F1 Slab on Floor kg
F2 Walls kg
G Perimeter
Random rubble masonry work in 1:5 cement, sand mortar in perimeter wall
foundations, Block wall for 1.2m height and Chain link mesh fence 2m high
(Gauge 12) with 2" dia. GI pipe at 2.4m c/c up rights and one after the other
3/4" dia. GI pipe up right at 2.4m c/c and 1" dia. GI pipe at top and bottom
runners, including excavation, concrete work in foundation, columns and tie
beams 1:2:4(20mm), welding work, painting of two coats of anticorrosive and
finished coat of green enamel etc. (Chain link mesh open area 2" x 2") and 4ft x
G1 8ft chainlink gate with padlock. m
H Fire wall
150-225mm random rubble masonry work in 1:5 cement, sand mortar in wall
H1 foundations including excavation and backfilling. m
Concrete columns with footings in the wall @ 2.4m and edges including
formwork, reinforcement and 4" thick Cellular block masonry in cement and
sand mortar 1:5 in fire wall plastering in cement lime and sand 1:1:5 finished
H2 semi rough with wooden float. m
64.0
53.2
19.8
25.0
5.0
29.0
20.0
12.0
9.0
13.2
64.8
750.0
1150.0
17.0
9.6
9.6
LKR
LENGTH LAP ANCHORAGE NOS TOTAL
BASE H 4.2 0.6 0.4 66 343.2
V 6.4 1.2 0.4 44 352
1780.6 m
WEIGHT 1,581.17 KG
2.8 102.2976
3 181.152
0.6 191.808
3 298.368
4.3 135.864
-12 54.3456 963.8352 1156.602