PETROL STORAGE TANK - MAS FABRIC PARK

BOQ

ITEM DESCRIPTION QTY


A Excavation and Earthwork
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
Wastage and additional working spaces arrangements will not be paid
separately.
A1 Excavation in pit in earth and debris inclusive of backfilling behind walls,
disposal of surplus earth and levelling, ramming bottom of excavation and
disposing surplus within site as directed. m3
A2 Shoring for excavations. m2

B Filling compacted volume


B1 Back filling with excavated soils around walls m3
B2 Sand filling inside tank m3
B3 Quarry dust supplying, spreading, levelling bottom of the tank m3

C Mixing and Placing of Concrete


Concrete must be well vibrated to avoid honeycomb forming.
Grade 15 Concrete
C1 2'' thick mass concrete screed under floor slab m2
C2 2'' thick mass concrete screed in top of the tank m2
Grade 25 Concrete
C3 Slab on Floor including kickers and chambers m3
C4 Walls m3

D Form Work
D1 Slab on Floor m2
D2 Walls m2

F Reinforcement
Reinforcement bars (all sizes) as shown on drawings.
F1 Slab on Floor kg
F2 Walls kg

G Perimeter
Random rubble masonry work in 1:5 cement, sand mortar in perimeter wall
foundations, Block wall for 1.2m height and Chain link mesh fence 2m high
(Gauge 12) with 2" dia. GI pipe at 2.4m c/c up rights and one after the other
3/4" dia. GI pipe up right at 2.4m c/c and 1" dia. GI pipe at top and bottom
runners, including excavation, concrete work in foundation, columns and tie
beams 1:2:4(20mm), welding work, painting of two coats of anticorrosive and
finished coat of green enamel etc. (Chain link mesh open area 2" x 2") and 4ft x
G1 8ft chainlink gate with padlock. m

H Fire wall
150-225mm random rubble masonry work in 1:5 cement, sand mortar in wall
H1 foundations including excavation and backfilling. m

Concrete columns with footings in the wall @ 2.4m and edges including
formwork, reinforcement and 4" thick Cellular block masonry in cement and
sand mortar 1:5 in fire wall plastering in cement lime and sand 1:1:5 finished
H2 semi rough with wooden float. m

Total Amount LKR


ABRIC PARK

UNIT RATE AMOUNT

64.0

53.2

19.8
25.0
5.0

29.0
20.0

12.0
9.0

13.2
64.8

750.0
1150.0
17.0

9.6

9.6

LKR
LENGTH LAP ANCHORAGE NOS TOTAL
BASE H 4.2 0.6 0.4 66 343.2
V 6.4 1.2 0.4 44 352

WALL H 3.2 9 2 2 115.2


V 3 17 2 2 204
WALL H 5.4 0.6 9 2 2 216
V 3 28 2 2 336

CHAMBER 1.7 90 153


18 2.4 3 61.2

1780.6 m
WEIGHT 1,581.17 KG

WITH BINDING AND ALL 1,897.41


offcut
1.8 304.7616
-0.4 312.576 617.3376 740.8051

2.8 102.2976
3 181.152
0.6 191.808
3 298.368

4.3 135.864
-12 54.3456 963.8352 1156.602