Download as pdf or txt
Download as pdf or txt
You are on page 1of 11

Employee of The Year 2022 Program

How To Be Effective &


Efficient Working As In-House
Graphic Designer at Hotel
Geo Nusa Hakam - Sales & Marketing Department
WHAT?
Measured

Online Automatic Database of Artwork Design Request — This is purposed to assist Sales &
Marketing Team to manage all project (Graphic Design) to be more easier to manage.

Effective & Efficient

Request Form & Approval Form — Cut cost of time if every request/revision is detail in brief. It makes
more working life balance.
WHY?
Mismeasured

Every staff outside of sales & marketing department in Bentani hotel who make a request design want
their request done by graphic designer as soon as possible without any understand how many project
that i actually did. They are upset if their project is not finish in a day even though their request urgency
is not classified as an urgent or they think by their self their request is urgent without any discussion
between each of leader.

Effective & Efficient

● Many request of design from another department is not clear information (media, size, price,
description kind of paper etc). It takes a time to find out its information.
● Revision is part by part. It also takes a time to do over create another project of design
HOW?
Database of Artwork Design Project

https://docs.google.com/spreadsheets/d/18cHgHjjsN2XxD3EQ6cZlSvO4FxtvYq-QbEFmp9k-jOo/edit?resourcekey#gid=
1045393198

Request Design Form

https://docs.google.com/forms/d/1VUVxV88I2AWZkBvHnXK0h5pngs9OeryRt3hOOmf4fDc/edit

Approval Design Form

https://docs.google.com/forms/d/160-zqSMLUpAXNsoGxtGwI8zlGwBXUVpG-3YJjzOvhyI/edit

Khusus approval form, ini hanya contoh. tiap approval form akan beda link. dan akan dikeluarkan desain grafis
HOW?
Database of Artwork Design Project
HOW?
Timeline of Artwork Design Project
HOW?
Request Design Form
HOW?
Approval Design Form
THE WAY WE THINK
SWOT Analysis Expected After Solution

Strength
1. GD is work more effective & efficient without confuse which one that should be done first and wasting much of his
time in a not priority things
2. User are know our GD ability
3. We work more professional

Weakness
1. More procedure or step to do for me, my team and management

Opportunity
1. Effective & efficient of GD's work is making a life balance, healthier of cost and expenses. Those things make us
more productive and happier. GD is also an artist, working by heart.
2. We don't waste the time in not important thing or important thing but not priority thing
3. less to overthinking about what GD/S&M team do

Thread
1. As a human, we have an ego and think, all request is important
CAUSE & EFFECT
:)
THANK YOU

You might also like