TESDAmayan

Typhoon Odette
Province/Area
Region Assigned Date Conducted
(Beneficiaries)

Region I Cebu Day 0( 01/06/22)

Day 1( 01/07/22)

Day 2( 01/10/22)

Day 3( 01/11/22)
Day 4( 01/12/22)

Day 5( 01/13/22)

Day 6( 01/14/22)
Day 7( 01/17/22)

Day 8( 01/18/22)

Day 9( 01/19/22)

Day 10( 01/20/22)

Day 11( 01/21/22)


TESDAmayan
Typhoon Odette
Solar Lighting
Buildings/ Houses/ Rooms Repaired/ Built Food Packs Released System/ Solar Panel
Installed

*Selected 2 Households from Sitio Upper


Banica, Brgy. Lahug, Cebu City, Cebu.
*Assessed 100+ households by
checking/inspecting possible electrical-
wiring connection fault in coordination
with Visayan Electric Cooperative at
Barangay Luz, Cebu City, Cebu.

*Helped and assisted in


serving "free-lugaw" for
150+ constituents and
random people
(especially informal
settlers) nearby the
TESDA-7 compound.
*Performed and carry-out repair of damaged
portion of one RTC training facility, while the
materials needed in the repair of damaged
households of the target beneficiaries weren't yet
available.
*Performed checking and inspection of materials
ordered by the target beneficiaries and carry-out
discussion for intervention and rehabilitation.
Other Interventions Remarks
*Arrived at Mactan International Airport
at exactly 7:40 PM.

*Warm welcomed by the personnel of


.
RTC 7, led by the Center Administrator
Engr. Wilkie Reroma and accompanied
*Crafted a presentation with to the TESDA 7 compound for the
*Courtesy visit with outgoing RD Atty.
construction skills accommodation
Andrew Bido, and meeting together with
integration and intervention
FASD Chief Mrs. Joy Cabahug and RTC
overview plan to be
7 Center Administrator Engr. Wilkie
presented on January 10,
Reroma.
plan
2022.integrating the
carpentry&masonry skills in
preparation for the
implementation on TESDA’
operating procedure for
disaster response, pursuant
to the TO#002, s.2022, to
provide workforce
complementation and
technical services and
support to calamity-affected
brought by the onslaught of
typhoon Odette, attended
by the 25 RTC R-VII
*Conducted site
assessment in selecting
target beneficiaries of
Damaged Households.

*Conducted estimate for the


materials needed for
restoration of damaged
properties of the target
beneficiaries.
Cebu City, we, the
Augmentation Team from
Region I, together with
E.Engr. Shan Ryck L. Largo
and Sir Ryan dela Peña, EIM
Trainer with his Trainees, of
RTC 7, were given the task
to austerely inspect for the
potentially wiring fault
nearby, and advised every
households to shut all their
main-breakers/fuse down to
prevent possible fire- *Courtesy visit to the RD Gamaliel B.
outbreak and to avoid Vicente and PD Floro of PO Cebu.
damage of their appliances,
before the energizing
activity, done by the
Visayan Electric Company
Inc. team, and as a safety
precaution, everyone is
strictly reminded to STAY
AWAKEN when using
candle, since every houses
were made in 95% light
materials, and seems no
house was ever build here

*Helped and assisted in *Augmentation team were warmly


preparation for the arrival of acknowledged together with the just arrived
Sec. Isidro S. Lapeña. additional personnel/trainers of Region I.

*Continuation of site assessment on Brgy. Luz,


Cebu City.
*Attended meeting with RTC 7
personnel and discussed the
intervention and planning, led by
the RTC 7, Center Administrator,
Engr. Wilkie Reroma.

*Discussed the fabrication of


Portable Saw Mill.

*Presented accomplishment
reports and status updates done
by the augmentation team of
Region I to RTC 7 Center
Administrator, Engr. Wilkie
Reroma.
*Fabricate of Portable Table *Conducted assessment on the second target
Saw. beneficiaries at Brgy. Lahug, Cebu City.

Start of Removal of damage and


destroyed Roofing System at
Mrs. Yu's House and Fabrication *Continuation and work-in-progress in
of Truss Members fabrication of Portable Table Saw.

*Continuation of recover, refurbish and repair,


as intervention/rehabilitation cycle of
damaged/destroyed portion (roofing system) of
Mrs. Yu's House and performed fabrication of
roofing truss, also advised purchasing of
additional materials for the completion of
installation of roofing system.

*Designed wiring lay-out and analysis to


restore electrical system.

*While the materials needed (purlins, rafter)


for the completion of roofing system in Mrs.
Yu's property weren't available yet, we went to
the second targeted beneficiary at the same
Sitio, and conducted materials estimation,
provided plan/solution/redesign, as the
owner's requested, for better and stronger
architectural roofing system against Typhoons.