The document outlines the scope for a basic engineering package for a 1G grain-based 500 KLPD ethanol plant and associated facilities in Rajasthan, India. It includes studying the design basis and technology options, providing overall diagrams and descriptions, estimating project costs, creating an implementation schedule, specifying materials and utilities, and determining manpower needs. It also details requirements for drawings, infrastructure, capacities, and machinery suppliers.
The document outlines the scope for a basic engineering package for a 1G grain-based 500 KLPD ethanol plant and associated facilities in Rajasthan, India. It includes studying the design basis and technology options, providing overall diagrams and descriptions, estimating project costs, creating an implementation schedule, specifying materials and utilities, and determining manpower needs. It also details requirements for drawings, infrastructure, capacities, and machinery suppliers.
The document outlines the scope for a basic engineering package for a 1G grain-based 500 KLPD ethanol plant and associated facilities in Rajasthan, India. It includes studying the design basis and technology options, providing overall diagrams and descriptions, estimating project costs, creating an implementation schedule, specifying materials and utilities, and determining manpower needs. It also details requirements for drawings, infrastructure, capacities, and machinery suppliers.
The document outlines the scope for a basic engineering package for a 1G grain-based 500 KLPD ethanol plant and associated facilities in Rajasthan, India. It includes studying the design basis and technology options, providing overall diagrams and descriptions, estimating project costs, creating an implementation schedule, specifying materials and utilities, and determining manpower needs. It also details requirements for drawings, infrastructure, capacities, and machinery suppliers.
DPR Project - 1G grain based 500 KLPD ethanol plant (for blending) along with
associated facilities at the identified location in Rajasthan
SCOPE for basic engineering package
Study design basis Technology options, together with a list of potential technology licensors and their broad credentials Overall block diagram and process description Plant and machinery requirement Copies of the drawing for the facility in Auto-CAD format and PDF format Details of utilities like sizing and capacity of the plant and machinery, along with utilities Infrastructure requirement Project Cost estimates, the hardware cost including the following – o Land and land development cost o Civil works, Piping & structural works o Plant & machinery o Utilities & off-sites o Electrical system; Instrumentation & control system o Basic design and engineering fees, License / know-how fees, project management consultancy fee o Misc. Fixed assets Project implementation mechanism including the implementation schedule along with bar chart Capacity, material balance and product mix Overall plot plan for the project in liner with existing norms (OISD, CCOE etc.) Operational specifics like specification of raw material, utilities, chemical, auxiliary facilities and effluent data Manpower requirement Plant and machinery supplier details Basis of cost estimates for each component and break-up for Indian & foreign exchange component.