KARNATAKA TEST HOUSE PVT. LTD.

CHECKLIST FOR INSPECTION OF REINFORCEMENT WORK


PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed residential
housing units by adopting single stage , single pour shear wall technology with aluminium
shuttering including infrastructure works at PACKAGE -8E Thotagere .
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD

SITE NAME: THOTAGERE – PACKAGE -8E DATE :


LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO
1 Construction drawing checked & approved
2 Bar schedules approved
3 Reinforcement materials approved
4 Bar sizes correct
5 Bar spacing correct
6 Bar lap length correct
7 Bar lap at correct locations
8 Bar tied as specified
9 Bar assembly rigid and adequately supported
10 Cover to bottom bars correct
11 Cover to side boards correct
12 Cover to top bars correct
13 Cover blocks approved including fixing
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.

CHECKLIST FOR INSPECTION OF FORMWORK


PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed residential
housing units by adopting single stage , single pour shear wall technology with aluminium
shuttering including infrastructure works at PACKAGE -8E Thotagere .
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD

SITE NAME: THOTAGERE – PACKAGE -8E DATE :


LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO

1 Formwork design/drawing approved including


de-shuttering arrangement
2 Correctness of formwork alignment
3 Correctness of formwork levels
4 Correctness of formwork dimensions
5 Correctness of formwork member spacing
6 Shuttering condition
7 Joints between panels closed (No gaps)
8 Joints between panels closed (No steps/lips)
9 Tie rod provided
10 Spacers between shutter surface tightly fitted
11 Formwork clean
12 Formwork release oil materials approved
13 Formwork release oil applied correctly
14 Safe access constructed

15 Adequate work space provided for


labour/equipment

16 Shutter vibrators (if required) location and


fixing arrangement approved
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR SLAB CONDUITING – ELECTRICAL & PLUMBING WORK
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed residential
housing units by adopting single stage , single pour shear wall technology with aluminium
shuttering including infrastructure works at PACKAGE -8E Thotagere .
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD

SITE NAME: THOTAGERE – PACKAGE -8E DATE:


LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO
1 Is the approved GFC / shop drawing available at
site?

2 Is the marking of all the electrical points (junction


boxes, fan box and drops) done as per drawing?

3 Has proper gauge and specified type of conduit


and accessories (heavy duty/medium/normal)?

4 Is the proper space (Minimum 15mm) maintained


between two conduits for easy flow of concrete?

5 Check for proper space between electrical and


communication conduits?
6 Are all the conduit joints sealed with solvent?

7 Are all the fan box, junction boxes, drops are


covered with thermocol sheet/masking tape?

8 Are all the drops provided in the beams vertical


and consideration with wall positioning?
Has the physical checking been carried out for all
9 the junction boxes, fan boxes, drop points for its
position?
10 Is the supervisor available during concreting?
11 Are all the plumbing lines marked on shuttering?
12 Are all mould for provision for plumbing grooves
provided in shuttering?
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR INSPECTION BEFORE APPROVAL OF CONCRETING
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed residential
housing units by adopting single stage , single pour shear wall technology with aluminium
shuttering including infrastructure works at PACKAGE -8E Thotagere .
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD

SITE NAME: THOTAGERE – PACKAGE -8E DATE:


LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO

1 Batching plant mixer in working order, separate


dispenser or admixture, if required, available
Concrete conveying arrangement (including
2 transit mixes) available in working condition and
of sufficient capacity
3 Formwork approved
4 Reinforcement approved
5 Concreting equipment in working order
6 Tremie in working order (for under water work)

7 Concrete gang present, including carpenter, steel


fixers, electrician and mechanics
8 Access provided
9 Lighting provided
10 Arrangements for arranging suspension/stoppage
of concrete provided
11 Curing arrangements made
12 Cube mould and slump cone sufficient at site
13 Vibrators and needles sufficient at site
14 Safety arrangement sufficient at site
15 Sufficient arrangement for construction joint
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR PCC
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed residential housing
units by adopting single stage , single pour shear wall technology with aluminium shuttering
including infrastructure works at PACKAGE -8E Thotagere .

CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD


SITE NAME: THOTAGERE – PACKAGE -8E
DATE:
LOCATION: Thotagere , Bengaluru.

Sl. CHECKED
ITEM REMARKS
No. YES NO
PRE-POUR CHECKS
1 Are the latest "Good for Construction" drawings available?

2 Have the required barricading and safety measures been


taken?
3 Are adequate quantity of RMC been ordered
4 Are the required tools available at site to ensure correct
work?
5 Is the necessary shuttering and reinforcement complete and
in place?
Are spare hessain cloth or tarpaulin sheet available as
6 protection from the elements?

7 Has the pit been cleaned by removing all the loose materials?
Has the excavated pit watered and rammed for better compacted
8 strata?

9 Has the anti-termite treatment been done?

Has the strata been checked and approved by the concerned


10 authority?

CHECKS DURING EXECUTION

11 Are all the labourers wearing gum boots while concreting?

12 Is the right grade of concrete being used?

13 Has the level of P.C.C been maintained?

14 Has the levelling and finishing of P.C.C done?

POST-POUR CHECKS
Has it been ensured that hessian cloth is provided and curing
15 done?
Has it been ensured that no loose earth has fallen on the P.C.C
16 bed?

17 Has curing been done properly?

Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR EXCAVATION
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed
residential housing units by adopting single stage , single pour shear wall technology
with aluminium shuttering including infrastructure works at PACKAGE -8E
Thotagere
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD
SITE NAME: THOTAGERE – PACKAGE -8E DATE:
LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO
PRE-EXECUTION CHECKS

1 Are the latest "Good for Construction" drawings


available?
2 Is the soil investigation report kept on-site?

3 Have TBMs been established?


4 Is it possible to deploy larger excavation
machinery?
5 Is a ramp for vehicular movement required?
6 Are safety measures required for the
neighboring construction activities?
7 Is a First Aid kit available on site?

8 Are all the requirements met for maintaining


dewatering?
9 Is it possible to employ water pumps?
10 Has the consultant inspected the site before
commencement of work?
11 Are the required tools available?

CHECKS DURING EXECUTION

12 Has the Block Level Register been maintained?

13 Are the layout & alignment as per drawings?

14 Has the required depth of cut been achieved?


15 Has proper shoring and strutting been done in
loose soils?
16 Is the excavation barricaded at a distance of 1
meter?
Are the marking pillars safely barricaded or
17 protected to avoid any disturbance of marking
points?
18 Certified, licensed contractor?

19 If blasting is necessary, is it being carried out by a


certified, licensed contractor?
20 If excavation is beyond 1.25m are there steps
provided?
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR CONCRETING OF COLUMNS/WALLS
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed
residential housing units by adopting single stage , single pour shear wall technology
with aluminium shuttering including infrastructure works at PACKAGE -8E
Thotagere
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD
SITE NAME: THOTAGERE – PACKAGE -8E DATE:
LOCATION: : Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO

PRE-POUR CHECKS

1 Are the latest "Good for Construction" drawings


available?
2 Have the required barricading and safety
measures been taken?

3 Are adequate quantity of RMC been ordered

4 Are the required tools available at site to ensure


correct work?
5 Have the vibrators been checked before start of
the concrete?

6 Is the platform and scaffolding material secure?

7 Is the necessary shuttering and reinforcement


complete and in place?

Has the shuttering material been properly aligned


8 using appropriate equipment?

9 Is the dimensional accuracy of shuttering material


correct?
10 Have markings been made on the column dowels
for concrete level?
11 Has the diameter and spacing of reinforcement
been checked?
12 Has the verticality of properly supported column
box been checked?
13 Are spare hessain cloth or tarpaulin sheet
available as protection from the elements?
14 Has the sequence of concreting been planned and
sufficient labour deployed?
CHECKS DURING EXECUTION

15 Are all the labourers wearing gum boots while


concreting?
16 Is the concrete been properly compacted with a
vibrator or manually?
17 If the depth to be concreted is more than 500 mm,
then is concreting being done in layers?
18 Is the right grade of cement and water-cement
ratio been followed?
Are the markings on the column dowels done and
19 a line doribeing used to maintain correct concrete
level?
20 Has the slump cone test been conducted on fresh
concrete?
21 Have test cubes been cast (site lab)?

POST-POUR CHECKS

22 Is curing been ensured?

23 Has deshuttering been done carefully without


damaging the concrete surface?
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR CONCRETING OF BEAMS
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed
residential housing units by adopting single stage , single pour shear wall technology
with aluminium shuttering including infrastructure works at PACKAGE -8E
Thotagere
CONTRACTOR: M/s. SKS KARKALA INFRA PROJECTS PVT LTD
SITE NAME: THOTAGERE – PACKAGE -8E DATE:
LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO
PRE-POUR CHECKS

1 Are the latest "Good for Construction" drawings


available?
2 Have the required barricading and safety
measures been taken?

3 Are adequate quantity of RMC been ordered

4 Are the required tools available at site to ensure


correct work?
5 Have the vibrators been checked before start of
the concrete?

6 Is the platform and scaffolding material secure?

7 Is the necessary shuttering and reinforcement


complete and in place?
Has the shuttering material been properly aligned
8 using appropriate equipment?

9 Is the dimensional accuracy of shuttering material


correct?
10 Have markings been made on the column dowels
for concrete level?
11 Has the diameter and spacing of reinforcement
been checked?
12 Has the verticality of properly supported column
box been checked?
13 Are spare hessain cloth or tarpaulin sheet
available as protection from the elements?
14 Has the sequence of concreting been planned and
sufficient labour deployed?
CHECKS DURING EXECUTION

15 Are all the labourers wearing gum boots while


concreting?
16 Is the concrete been properly compacted with a
vibrator or manually?
17 If the depth to be concreted is more than 500 mm,
then is concreting being done in layers?
18 Is the right grade of cement and water-cement
ratio been followed?
Are the markings on the column dowels done and
19 a line doribeing used to maintain correct concrete
level?
20 Has the slump cone test been conducted on fresh
concrete?
21 Have test cubes been cast (site lab)?

POST-POUR CHECKS

22 Is curing been ensured?

23 Has deshuttering been done carefully without


damaging the concrete surface?
Have high pressure water cleaners been used to
24 clean the beam bottoms of inverted beams?

Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)


KARNATAKA TEST HOUSE PVT. LTD.
CHECKLIST FOR CONCRETING OF FOOTINGS
PROJECT: Construction of 260-1BHK & 144 -2BHK (G+3) Multi storeyed
residential housing units by adopting single stage , single pour shear wall technology
with aluminium shuttering including infrastructure works at PACKAGE -8E
Thotagere
CONTRACTOR: M/s.SKS KARKALA INFRA PROJECTS PVT LTD
SITE NAME: THOTAGERE – PACKAGE -8E DATE:
LOCATION: Thotagere , Bengaluru.

CHECKED
Sl. No. ITEM REMARKS
YES NO

PRE-POUR CHECKS

1 Are the latest "Good for Construction" drawings


available?

2 Have the required barricading and safety


measures been taken?

3 Are adequate quantity of RMC been ordered

4 Are the required tools available at site to ensure


correct work?
5 Have the vibrators been checked before start of
the concrete?

6 Is the platform and scaffolding material secure?

7 Is the necessary shuttering and reinforcement


complete and in place?

Has the shuttering material been properly aligned


8 using appropriate equipment?

9 Is the dimensional accuracy of shuttering material


correct?
10 Have markings been made on the column dowels
for concrete level?
11 Has the diameter and spacing of reinforcement
been checked?
12 Has the verticality of properly supported column
box been checked?
13 Are spare hessain cloth or tarpaulin sheet
available as protection from the elements?
14 Has the sequence of concreting been
planned andsufficient labour deployed?
CHECKS DURING EXECUTION

15 Are all the labourers wearing gum boots while


concreting?
16 Is the concrete been properly compacted with a
vibrator or manually?
17 If the depth to be concreted is more than 500 mm,
then is concreting being done in layers?
18 Is the right grade of cement and water-cement
ratio been followed?
Are the markings on the column dowels done and
19 a line doribeing used to maintain correct concrete
level?
20 Has the slump cone test been conducted on fresh
concrete?
21 Have test cubes been cast (site lab)?

POST-POUR CHECKS

22 Is curing been ensured?

23 Has deshuttering been done carefully without


damaging the concrete surface?
Final Comment/Approvals

CONTRACTOR PMC (KTH) CLIENT(RGHCL)

You might also like