Sl. No. ITEM REMARKS
YES NO
1 Construction drawing checked & approved
2 Bar schedules approved
3 Reinforcement materials approved
4 Bar sizes correct
5 Bar spacing correct
6 Bar lap length correct
7 Bar lap at correct locations
8 Bar tied as specified
9 Bar assembly rigid and adequately supported
10 Cover to bottom bars correct
11 Cover to side boards correct
12 Cover to top bars correct
13 Cover blocks approved including fixing
Final Comment/Approvals
CHECKED
Sl. No. ITEM REMARKS
YES NO
CHECKED
Sl. No. ITEM REMARKS
YES NO
1 Is the approved GFC / shop drawing available at
site?
CHECKED
Sl. No. ITEM REMARKS
YES NO
Sl. CHECKED
ITEM REMARKS
No. YES NO
PRE-POUR CHECKS
1 Are the latest "Good for Construction" drawings available?
7 Has the pit been cleaned by removing all the loose materials?
Has the excavated pit watered and rammed for better compacted
8 strata?
POST-POUR CHECKS
Has it been ensured that hessian cloth is provided and curing
15 done?
Has it been ensured that no loose earth has fallen on the P.C.C
16 bed?
Final Comment/Approvals
CHECKED
Sl. No. ITEM REMARKS
YES NO
PRE-EXECUTION CHECKS
CHECKED
Sl. No. ITEM REMARKS
YES NO
PRE-POUR CHECKS
POST-POUR CHECKS
CHECKED
Sl. No. ITEM REMARKS
YES NO
PRE-POUR CHECKS
POST-POUR CHECKS
Final Comment/Approvals
CHECKED
Sl. No. ITEM REMARKS
YES NO
PRE-POUR CHECKS
POST-POUR CHECKS